Skip to main content
Top

2009 | OriginalPaper | Chapter

The Resource Usage Aware Backfilling

Authors : Francesc Guim, Ivan Rodero, Julita Corbalan

Published in: Job Scheduling Strategies for Parallel Processing

Publisher: Springer Berlin Heidelberg

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Job scheduling policies for HPC centers have been extensively studied in the last few years, especially backfilling based policies. Almost all of these studies have been done using simulation tools. All the existent simulators use the runtime (either estimated or real) provided in the workload as a basis of their simulations. In our previous work we analyzed the impact on system performance of considering the resource sharing (memory bandwidth) of running jobs including a new resource model in the Alvio simulator. Based on this studies we proposed the

LessConsume

and

LessConsume Threshold

resource selection policies. Both are oriented to reduce the saturation of the shared resources thus increasing the performance of the system. The results showed how both resource allocation policies shown how the performance of the system can be improved by considering where the jobs are finally allocated.

Using the

LessConsume Threshold

Resource Selection Policy, we propose a new backfilling strategy : the

Resource Usage Aware Backfilling

job scheduling policy. This is a backfilling based scheduling policy where the algorithms which decide which job has to be executed and how jobs have to be backfilled are based on a different

Threshold

configurations. This backfilling variant that considers how the shared resources are used by the scheduled jobs. Rather than backfilling the first job that can moved to the run queue based on the job arrival time or job size, it looks ahead to the next queued jobs, and tries to allocate jobs that would experience lower penalized runtime caused by the resource sharing saturation.

In the paper we demostrate how the exchange of scheduling information between the local resource manager and the scheduler can improve substantially the performance of the system when the resource sharing is considered. We show how it can achieve a close response time performance that the shorest job first Backfilling with First Fit (oriented to improve the start time for the allocated jobs) providing a qualitative improvement in the number of killed jobs and in the percentage of penalized runtime.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Metadata
Title
The Resource Usage Aware Backfilling
Authors
Francesc Guim
Ivan Rodero
Julita Corbalan
Copyright Year
2009
Publisher
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-04633-9_4

Premium Partner