Skip to main content
Top

2018 | OriginalPaper | Chapter

7. The Scientific Problems with the Mega Infrastructure Construction Management Theory

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The general connotation and significance of the scientific problems associated with the theory system have been elaborated in Sect. 4.​4. Now, based on the core concepts and rationales discussed in Chaps. 5 and 6, we employ the core concepts and make deductions based on the explicit rationales to identify the academic scientific problems and their theoretical values with respect to the mega infrastructure construction management theory. Although this is only a tentative exploration of the building of scientific problems in the mega infrastructure construction management theory system, its significance is far more important because only after the establishment of the complete logic chain, i.e., core concepts—rationales—scientific problems, can the mega infrastructure construction management theory system be perceived as generally normative and complete.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Abdul-Rahman, H., Asef, A., Alashwal, A. M., & Loo, S. C. (2013). A conceptual model of the relationship between risk management maturity and organizational learning. International Journal of e-Education, e-Business, e-Management and e-Learning, 3(1), 43–46. Abdul-Rahman, H., Asef, A., Alashwal, A. M., & Loo, S. C. (2013). A conceptual model of the relationship between risk management maturity and organizational learning. International Journal of e-Education, e-Business, e-Management and e-Learning, 3(1), 43–46.
go back to reference Aghion, P., & Jaravel, X. (2015). Knowledge spillovers, innovation and growth. Economic Journal, 125(583), 533–573.CrossRef Aghion, P., & Jaravel, X. (2015). Knowledge spillovers, innovation and growth. Economic Journal, 125(583), 533–573.CrossRef
go back to reference Alippi, C. (2014). Intelligence for embedded systems. Cham: Springer International Publishing.CrossRef Alippi, C. (2014). Intelligence for embedded systems. Cham: Springer International Publishing.CrossRef
go back to reference Altshuler, A. A., & Luberoff, D. E. (2003). Mega-projects: The changing politics of urban public investment. Washington, DC: Brookings Institution Press. Altshuler, A. A., & Luberoff, D. E. (2003). Mega-projects: The changing politics of urban public investment. Washington, DC: Brookings Institution Press.
go back to reference Aneja, A. (2014). China Invites India to join Asian Infrastructure Investment Bank. The Hindu, p. 30. Aneja, A. (2014). China Invites India to join Asian Infrastructure Investment Bank. The Hindu, p. 30.
go back to reference Ansar, A., Flyvbjerg, B., Budzier, A., & Lunn, D. (2014). Should we build more large dams? The actual costs of hydropower megaproject development. Energy Policy, 69(6), 43–56.CrossRef Ansar, A., Flyvbjerg, B., Budzier, A., & Lunn, D. (2014). Should we build more large dams? The actual costs of hydropower megaproject development. Energy Policy, 69(6), 43–56.CrossRef
go back to reference Banker, R. D., & Kauffman, R. J. (2004). 50th anniversary article: The evolution of research on information systems: A fiftieth-year survey of the literature in management science. Management Science, 50(3), 281–298.CrossRef Banker, R. D., & Kauffman, R. J. (2004). 50th anniversary article: The evolution of research on information systems: A fiftieth-year survey of the literature in management science. Management Science, 50(3), 281–298.CrossRef
go back to reference Battikha, M. G., & Russell, A. D. (1998). Construction quality management-present and future. Canadian Journal of Civil Engineering, 25(3), 401–411.CrossRef Battikha, M. G., & Russell, A. D. (1998). Construction quality management-present and future. Canadian Journal of Civil Engineering, 25(3), 401–411.CrossRef
go back to reference Baumgartner, R. J. (2009). Organizational culture and leadership: Preconditions for the development of a sustainable corporation. Sustainable Development, 17(2), 102–113.CrossRef Baumgartner, R. J. (2009). Organizational culture and leadership: Preconditions for the development of a sustainable corporation. Sustainable Development, 17(2), 102–113.CrossRef
go back to reference Bedford, T. (2013). Decision making for group risk reduction: Dealing with epistemic uncertainty. Risk Analysis, 33(10), 1884–1898. Bedford, T. (2013). Decision making for group risk reduction: Dealing with epistemic uncertainty. Risk Analysis, 33(10), 1884–1898.
go back to reference Blaikie, P., Cannon, T., Davis, I., & Wisner, B. (2014). At risk: Natural hazards, people’s vulnerability and disasters. Routledge. Blaikie, P., Cannon, T., Davis, I., & Wisner, B. (2014). At risk: Natural hazards, people’s vulnerability and disasters. Routledge.
go back to reference Bonabeau, E., & Meyer, C. (2001). Swarm intelligence: A whole new way to think about business. Harvard Business Review, 79(5), 106–115. Bonabeau, E., & Meyer, C. (2001). Swarm intelligence: A whole new way to think about business. Harvard Business Review, 79(5), 106–115.
go back to reference Bonetti, V., Caselli, S., & Gatti, S. (2010). Offtaking agreements and how they impact the cost of funding for project finance deals: A clinical case study of the Quezon Power Ltd Co. Review of Financial Economics, 19(2), 60–71.CrossRef Bonetti, V., Caselli, S., & Gatti, S. (2010). Offtaking agreements and how they impact the cost of funding for project finance deals: A clinical case study of the Quezon Power Ltd Co. Review of Financial Economics, 19(2), 60–71.CrossRef
go back to reference Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6), 728–739. Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6), 728–739.
go back to reference Bosch-Sijtsema, P. M., & Henriksson, L. H. (2014). Managing projects with distributed and embedded knowledge through interactions. International Journal of Project Management, 32(8), 1432–1444.CrossRef Bosch-Sijtsema, P. M., & Henriksson, L. H. (2014). Managing projects with distributed and embedded knowledge through interactions. International Journal of Project Management, 32(8), 1432–1444.CrossRef
go back to reference Brady, T., & Davies, A. (2014). Managing structural and dynamic complexity: A tale of two projects. Project Management Journal, 45(4), 21–38.CrossRef Brady, T., & Davies, A. (2014). Managing structural and dynamic complexity: A tale of two projects. Project Management Journal, 45(4), 21–38.CrossRef
go back to reference Byoun, S., & Xu, Z. (2014). Contracts, governance, and country risk in project finance: Theory and evidence. Journal of Corporate Finance, 26(1), 124–144.CrossRef Byoun, S., & Xu, Z. (2014). Contracts, governance, and country risk in project finance: Theory and evidence. Journal of Corporate Finance, 26(1), 124–144.CrossRef
go back to reference Cantarelli, C. C., Chorus, C. G., & Cunningham, S. W. (2013). Explaining cost overruns of large-scale transportation infrastructure projects using a Signalling game. Transportmetrica A: Transport Science, 9(3), 239–258.CrossRef Cantarelli, C. C., Chorus, C. G., & Cunningham, S. W. (2013). Explaining cost overruns of large-scale transportation infrastructure projects using a Signalling game. Transportmetrica A: Transport Science, 9(3), 239–258.CrossRef
go back to reference Cao, C. H., Xi, Y. M., Zhang, X. J. & Ge, J.. (2011). The mechanism to cope with the uncertainty in project management, 32(11), 157–164. (In Chinese). Cao, C. H., Xi, Y. M., Zhang, X. J. & Ge, J.. (2011). The mechanism to cope with the uncertainty in project management, 32(11), 157–164. (In Chinese).
go back to reference Car-Pušić, D. (2014). PPP model opportunities, limitations and risks in Croatian public project financing. Procedia - Social and Behavioral Sciences, 119, 663–671.CrossRef Car-Pušić, D. (2014). PPP model opportunities, limitations and risks in Croatian public project financing. Procedia - Social and Behavioral Sciences, 119, 663–671.CrossRef
go back to reference Chang, S., & Shen, F. (2013). Effectiveness of coordination methods in construction projects. Journal of Management in Engineering, 6, 1–36. Chang, S., & Shen, F. (2013). Effectiveness of coordination methods in construction projects. Journal of Management in Engineering, 6, 1–36.
go back to reference Chen, W. (2005). Research on decision-making mechanism of the large scale engineering project (Ph.D. Dissertation). Wuhan University of Technology. (In Chinese). Chen, W. (2005). Research on decision-making mechanism of the large scale engineering project (Ph.D. Dissertation). Wuhan University of Technology. (In Chinese).
go back to reference Chen, H. T. (2009). The construction of emergency linkage system for environmental emergencies. China Safety Science Journal, 19(2), 112–115 (in Chinese). Chen, H. T. (2009). The construction of emergency linkage system for environmental emergencies. China Safety Science Journal, 19(2), 112–115 (in Chinese).
go back to reference Chen, Y., Qu, L., & Spaans, M. (2013). Framing the long-term impact of mega-event strategies on the development of Olympic host cities. Planning Practice & Research, 28(3), 340–359.CrossRef Chen, Y., Qu, L., & Spaans, M. (2013). Framing the long-term impact of mega-event strategies on the development of Olympic host cities. Planning Practice & Research, 28(3), 340–359.CrossRef
go back to reference Cheng, M. Y., Hsiang, C. C., Tsai, H. C., & Do, H. L. (2011). Bidding decision making for construction company using a multi-criteria prospect model. Journal of Civil Engineering and Management, 17(3), 424–436.CrossRef Cheng, M. Y., Hsiang, C. C., Tsai, H. C., & Do, H. L. (2011). Bidding decision making for construction company using a multi-criteria prospect model. Journal of Civil Engineering and Management, 17(3), 424–436.CrossRef
go back to reference Chin, K. S., & Choi, T. W. (2003). Construction in Hong Kong: Success factors for ISO9000 implementation. Journal of Construction Engineering and Management, 129(6), 599–609.CrossRef Chin, K. S., & Choi, T. W. (2003). Construction in Hong Kong: Success factors for ISO9000 implementation. Journal of Construction Engineering and Management, 129(6), 599–609.CrossRef
go back to reference Choe, S. H. (2015). South Korea plans to join regional development bank Led by China. New York Times, 27, A12. Choe, S. H. (2015). South Korea plans to join regional development bank Led by China. New York Times, 27, A12.
go back to reference Choi, H.-H., & Mahadevan, S. (2008). Construction project risk assessment using existing database and project-specific information. Journal of Construction Engineering and Management, 134(11), 894–903.CrossRef Choi, H.-H., & Mahadevan, S. (2008). Construction project risk assessment using existing database and project-specific information. Journal of Construction Engineering and Management, 134(11), 894–903.CrossRef
go back to reference Chotibhongs, R., & Arditi, D. (2012). Detection of collusive behavior. Journal of Construction Engineering and Management, 138(11), 1251–1258.CrossRef Chotibhongs, R., & Arditi, D. (2012). Detection of collusive behavior. Journal of Construction Engineering and Management, 138(11), 1251–1258.CrossRef
go back to reference Christensen, T. J., & Snyder, J. (1997). Progressive research on degenerate alliances. American Political Science Review, 91(4), 919–922.CrossRef Christensen, T. J., & Snyder, J. (1997). Progressive research on degenerate alliances. American Political Science Review, 91(4), 919–922.CrossRef
go back to reference Clemen, R. T., & Reilly, T. (1999). Correlations and copulas for decision and risk analysis. Management Science, 45(2), 208–224.CrossRef Clemen, R. T., & Reilly, T. (1999). Correlations and copulas for decision and risk analysis. Management Science, 45(2), 208–224.CrossRef
go back to reference Collingridge, D. (1992). The Management of Scale: Big Organizations, big Decisions, big mistakes. London: Routledge. Collingridge, D. (1992). The Management of Scale: Big Organizations, big Decisions, big mistakes. London: Routledge.
go back to reference Cui, J. H. (2006). Severity of Disasters and the importance of civil engineering in disaster prevention and mitigation. Engineering Mechanics., 23(z2), 49–77 (in Chinese). Cui, J. H. (2006). Severity of Disasters and the importance of civil engineering in disaster prevention and mitigation. Engineering Mechanics., 23(z2), 49–77 (in Chinese).
go back to reference Davis, J. H., Brandstätter, H., & Stocker-Kreichgauer, G. (1982). Group decision making. New York: Academic Press. Davis, J. H., Brandstätter, H., & Stocker-Kreichgauer, G. (1982). Group decision making. New York: Academic Press.
go back to reference Doloi, H. (2011). Balancing Stakeholder’s Requirements in Project Procurement – Have we learnt anything yet?. In W092-Special Track 18th CIB World Building Congress May 2010. Salford, p. 195. Doloi, H. (2011). Balancing Stakeholder’s Requirements in Project Procurement – Have we learnt anything yet?. In W092-Special Track 18th CIB World Building Congress May 2010. Salford, p. 195.
go back to reference Dorée, A. G. (2004). Collusion in the Dutch construction industry: An industrial organization perspective. Building Research & Information, 2004, 32(2), 146–156.CrossRef Dorée, A. G. (2004). Collusion in the Dutch construction industry: An industrial organization perspective. Building Research & Information, 2004, 32(2), 146–156.CrossRef
go back to reference Dosi, G., & Marengo, L. (2015). The dynamics of organizational structures and performances under diverging distributions of knowledge and different power structures. Journal of Institutional Economics, 11(3), 535–559.CrossRef Dosi, G., & Marengo, L. (2015). The dynamics of organizational structures and performances under diverging distributions of knowledge and different power structures. Journal of Institutional Economics, 11(3), 535–559.CrossRef
go back to reference Ebrahimnejad, S., Mousavi, S. M., Tavakkoli-Moghaddam, R., & Heydar, M. (2014). Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis. Journal of Intelligent and Fuzzy Systems, 26(2), 949–959. Ebrahimnejad, S., Mousavi, S. M., Tavakkoli-Moghaddam, R., & Heydar, M. (2014). Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis. Journal of Intelligent and Fuzzy Systems, 26(2), 949–959.
go back to reference Eweje, J., Turner, R., & Müller, R. (2012). Maximizing strategic value from megaprojects: The influence of information-feed on decision-making by the project manager. International Journal of Project Management, 30(6), 639–651.CrossRef Eweje, J., Turner, R., & Müller, R. (2012). Maximizing strategic value from megaprojects: The influence of information-feed on decision-making by the project manager. International Journal of Project Management, 30(6), 639–651.CrossRef
go back to reference Falconer, L. (2002). Management decision-making relating to occupational risks: The role of ‘gray data’. Journal of Risk Research, 5(1), 23–33.CrossRef Falconer, L. (2002). Management decision-making relating to occupational risks: The role of ‘gray data’. Journal of Risk Research, 5(1), 23–33.CrossRef
go back to reference Fan, J. Y. (2005). Analysis in Law on international finance and way of finance of San Xia project. Theory Monthly, 6, 126–130 (in Chinese). Fan, J. Y. (2005). Analysis in Law on international finance and way of finance of San Xia project. Theory Monthly, 6, 126–130 (in Chinese).
go back to reference Fan, Z., Huang, W. Y., & Lu, W. N. (2007). Discussion on engineering financing mode: Taking Tehran metro line three as an example. Journal of International Economic Cooperation, 8, 78–82 (in Chinese). Fan, Z., Huang, W. Y., & Lu, W. N. (2007). Discussion on engineering financing mode: Taking Tehran metro line three as an example. Journal of International Economic Cooperation, 8, 78–82 (in Chinese).
go back to reference Fei, H. (2004). Investment and financing of major road transport infrastructure projects in Shanghai after 1990. Urban Development Research, 11(6), 64–72 (In Chinese). Fei, H. (2004). Investment and financing of major road transport infrastructure projects in Shanghai after 1990. Urban Development Research, 11(6), 64–72 (In Chinese).
go back to reference Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5. Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5.
go back to reference Flyvbjerg, B. (2007). Cost overruns and demand shortfalls in urban rail and other infrastructure. Transportation Planning and Technology, 30(1), 9–30.CrossRef Flyvbjerg, B. (2007). Cost overruns and demand shortfalls in urban rail and other infrastructure. Transportation Planning and Technology, 30(1), 9–30.CrossRef
go back to reference Flyvbjerg, B. (2011). Over budget, over time, over and over again: Managing major projects. In P. W. G. Morris, J. K. Pinto, & J. Söderlund (Eds.), The Oxford Handbook of Project Management (pp. 321–344). Oxford: Oxford University Press. 2013. Flyvbjerg, B. (2011). Over budget, over time, over and over again: Managing major projects. In P. W. G. Morris, J. K. Pinto, & J. Söderlund (Eds.), The Oxford Handbook of Project Management (pp. 321–344). Oxford: Oxford University Press. 2013.
go back to reference Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003a). Megaprojects and risk: An anatomy of ambition (First). Cambridge, UK: Cambridge University Press. Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003a). Megaprojects and risk: An anatomy of ambition (First). Cambridge, UK: Cambridge University Press.
go back to reference Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003b). The megaprojects paradox (pp. 1–10). Megaprojects and Risk: An Anatomy of Ambition. Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003b). The megaprojects paradox (pp. 1–10). Megaprojects and Risk: An Anatomy of Ambition.
go back to reference Flyvbjerg, B., Skamris holm, M. K., & Buhl, S. L. (2003c). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71–88.CrossRef Flyvbjerg, B., Skamris holm, M. K., & Buhl, S. L. (2003c). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71–88.CrossRef
go back to reference Gavetti, G. (2005). Cognition and hierarchy: Rethinking the microfoundations of capabilities’ development. Organization Science, 16(6), 599–617.CrossRef Gavetti, G. (2005). Cognition and hierarchy: Rethinking the microfoundations of capabilities’ development. Organization Science, 16(6), 599–617.CrossRef
go back to reference Giezen, M. (2012). Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning. International Journal of Project Management, 30(7), 781–790.CrossRef Giezen, M. (2012). Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning. International Journal of Project Management, 30(7), 781–790.CrossRef
go back to reference Gopalakrishnan, C., & Okada, N. (2007). Designing new institutions for implementing integrated disaster risk management: Key elements and future directions. Disasters, 31(4), 353–372.CrossRef Gopalakrishnan, C., & Okada, N. (2007). Designing new institutions for implementing integrated disaster risk management: Key elements and future directions. Disasters, 31(4), 353–372.CrossRef
go back to reference Gu, Y. (2011). The Sanmenxia project decision-making errors and the impact of the Soviet Union experts. Studies in Dialectics of Nature, 27(5), 122–126 (In Chinese). Gu, Y. (2011). The Sanmenxia project decision-making errors and the impact of the Soviet Union experts. Studies in Dialectics of Nature, 27(5), 122–126 (In Chinese).
go back to reference Gransberg, D. D., Shane, J. S., Strong, K., & Puerto, C. L. (2013). Project complexity mapping in five dimensions for complex transportation projects. Journal of Management in Engineering, 29(4), 316–326.CrossRef Gransberg, D. D., Shane, J. S., Strong, K., & Puerto, C. L. (2013). Project complexity mapping in five dimensions for complex transportation projects. Journal of Management in Engineering, 29(4), 316–326.CrossRef
go back to reference Grimes, A. J. (1985). Normal accidents: Living with high risk technologies. Academy of Management Review, 10(2), 366–368. Grimes, A. J. (1985). Normal accidents: Living with high risk technologies. Academy of Management Review, 10(2), 366–368.
go back to reference Hai, H. U., Xiao, W., Yuan, J., Shi, J., Chen, M., Shang, G. W., et al. (2000). Auditorily elicited event-related desynchronization (erd) and synchronization (ers) as a method for studying cortical correlates of cognitive processes. Journal of Environmental Sciences, 19(1), 80–85. Hai, H. U., Xiao, W., Yuan, J., Shi, J., Chen, M., Shang, G. W., et al. (2000). Auditorily elicited event-related desynchronization (erd) and synchronization (ers) as a method for studying cortical correlates of cognitive processes. Journal of Environmental Sciences, 19(1), 80–85.
go back to reference Han, S. H., Diekmann, J. E., & Ock, J. H. (2005). Contractor’s risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), 283–292.CrossRef Han, S. H., Diekmann, J. E., & Ock, J. H. (2005). Contractor’s risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), 283–292.CrossRef
go back to reference Hoda, R., & Murugesan, L. K. (2016). Multi-level agile project management challenges: A selforganizing team perspective. Journal of Systems and Software, 117, 245–257.CrossRef Hoda, R., & Murugesan, L. K. (2016). Multi-level agile project management challenges: A selforganizing team perspective. Journal of Systems and Software, 117, 245–257.CrossRef
go back to reference Hongyun, J. (2005). Research on technology innovation system based on complexity theory. University of Science and Technology of China. (in Chinese). Hongyun, J. (2005). Research on technology innovation system based on complexity theory. University of Science and Technology of China. (in Chinese).
go back to reference Hou, X. X. (2008). The contract nature analysis of government-invested projects based on public commissioned responsibility. Chinese Public Administration, 12, 105–108 (in Chinese). Hou, X. X. (2008). The contract nature analysis of government-invested projects based on public commissioned responsibility. Chinese Public Administration, 12, 105–108 (in Chinese).
go back to reference Hu, Y., Chan, A. P. C., Le, Y., & Jin, R. (2015). From construction megaproject management to complex project management: Bibliographic analysis. Journal of Management in Engineering, 31(4), 04014052.CrossRef Hu, Y., Chan, A. P. C., Le, Y., & Jin, R. (2015). From construction megaproject management to complex project management: Bibliographic analysis. Journal of Management in Engineering, 31(4), 04014052.CrossRef
go back to reference Hurwicz, L. (1951). Optimality criteria for decision making under ignorance (Cowles Commission Discussion Paper, 370). Hurwicz, L. (1951). Optimality criteria for decision making under ignorance (Cowles Commission Discussion Paper, 370).
go back to reference Hwang, B. G., Zhao, X., & Toh, L. P. (2014). Risk management in small construction projects in Singapore: Status, barriers and impact. International Journal of Project Management, 32(1), 116–124.CrossRef Hwang, B. G., Zhao, X., & Toh, L. P. (2014). Risk management in small construction projects in Singapore: Status, barriers and impact. International Journal of Project Management, 32(1), 116–124.CrossRef
go back to reference Ismail, A. I., Rose, R. C., Uli, J., & Abdullah, H. (2012). The relationship between organisational resources, capabilities, systems and Competitive Advantage. Asian Academy of Management Journal, 17(1), 151–173. Ismail, A. I., Rose, R. C., Uli, J., & Abdullah, H. (2012). The relationship between organisational resources, capabilities, systems and Competitive Advantage. Asian Academy of Management Journal, 17(1), 151–173.
go back to reference Jennings, W. (2012). Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(6), 455–462.CrossRef Jennings, W. (2012). Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(6), 455–462.CrossRef
go back to reference Jergeas, G. (2008). Analysis of the front-end loading of Alberta mega oil sands projects. Project Management Journal, 39(4), 95–104.CrossRef Jergeas, G. (2008). Analysis of the front-end loading of Alberta mega oil sands projects. Project Management Journal, 39(4), 95–104.CrossRef
go back to reference Jin, S., Sheng, Z. H., & Ding, X. (2013). The evolution and enlightenment of the coordinated decision system of the HK-Zhuhai-Macao Bridge Project. Construction Economy, 12, 27–31 (In Chinese). Jin, S., Sheng, Z. H., & Ding, X. (2013). The evolution and enlightenment of the coordinated decision system of the HK-Zhuhai-Macao Bridge Project. Construction Economy, 12, 27–31 (In Chinese).
go back to reference Jog, G. M., Brilakis, I. K., & Angelides, D. C. (2011). Testing in harsh conditions: Tracking resources on construction sites with machine vision. Automation in Construction, 20(4), 328–337.CrossRef Jog, G. M., Brilakis, I. K., & Angelides, D. C. (2011). Testing in harsh conditions: Tracking resources on construction sites with machine vision. Automation in Construction, 20(4), 328–337.CrossRef
go back to reference Jolivet, F., & Navarre, C. (1996). Large-scale projects, self-organizing and meta-rules: Towards new forms of management. International Journal of Project Management, 14(5), 265–271.CrossRef Jolivet, F., & Navarre, C. (1996). Large-scale projects, self-organizing and meta-rules: Towards new forms of management. International Journal of Project Management, 14(5), 265–271.CrossRef
go back to reference Jolly, J. A. (1980). The stevenson-wydler technology innovation act of 1980 public law 96-480. Journal of Technology Transfer, 5(1), 69–80.CrossRef Jolly, J. A. (1980). The stevenson-wydler technology innovation act of 1980 public law 96-480. Journal of Technology Transfer, 5(1), 69–80.CrossRef
go back to reference Kamat, V. R., Martinez, J. C., Fischer, M., Golparvarfard, M., Peñamora, F., & Savarese, S. (2011). Research in visualization techniques for field construction. Journal of Construction Engineering & Management, 137(10), 853–862.CrossRef Kamat, V. R., Martinez, J. C., Fischer, M., Golparvarfard, M., Peñamora, F., & Savarese, S. (2011). Research in visualization techniques for field construction. Journal of Construction Engineering & Management, 137(10), 853–862.CrossRef
go back to reference Kapsali, M. (2011). Systems thinking in innovation project management: A match that works. International Journal of Project Management, 29(4), 396–407.CrossRef Kapsali, M. (2011). Systems thinking in innovation project management: A match that works. International Journal of Project Management, 29(4), 396–407.CrossRef
go back to reference Kayser, D. (2013). Recent research in project finance – A commented bibliography. Procedia Computer Science, 17, 729–736.CrossRef Kayser, D. (2013). Recent research in project finance – A commented bibliography. Procedia Computer Science, 17, 729–736.CrossRef
go back to reference Kelley, D. J., Ali, A., & Zahra, S. A. (2013). Where do breakthroughs come from? Characteristics of high-potential inventions. Journal of Product Innovation Management, 30(6), 1212–1226.CrossRef Kelley, D. J., Ali, A., & Zahra, S. A. (2013). Where do breakthroughs come from? Characteristics of high-potential inventions. Journal of Product Innovation Management, 30(6), 1212–1226.CrossRef
go back to reference Kengpol, A., & Neungrit, P. (2014). A decision support methodology with risk assessment on prediction of terrorism insurgency distribution range radius and elapsing time: An empirical case study in Thailand. Computers and Industrial Engineering, 75(1), 55–67.CrossRef Kengpol, A., & Neungrit, P. (2014). A decision support methodology with risk assessment on prediction of terrorism insurgency distribution range radius and elapsing time: An empirical case study in Thailand. Computers and Industrial Engineering, 75(1), 55–67.CrossRef
go back to reference Kwak, Y. H., Sadatsafavi, H., Walewski, J., & Williams, N. L. (2015). Evolution of project based organization: A case study. International Journal of Project Management, 33(8), 1652–1664.CrossRef Kwak, Y. H., Sadatsafavi, H., Walewski, J., & Williams, N. L. (2015). Evolution of project based organization: A case study. International Journal of Project Management, 33(8), 1652–1664.CrossRef
go back to reference Lavikka, R. (2015). Coordination for shared knowledge creation in the development and management of inter-organizational business processes. Aalto University. Lavikka, R. (2015). Coordination for shared knowledge creation in the development and management of inter-organizational business processes. Aalto University.
go back to reference Le, Y., & Shan, M. (2013). A literature review on collusion in construction industry. Journal of Industrial Technological Economics, 1, 145–151 (in Chinese). Le, Y., & Shan, M. (2013). A literature review on collusion in construction industry. Journal of Industrial Technological Economics, 1, 145–151 (in Chinese).
go back to reference Le, Y., Zhang, B., Guan, X. J., & Li, Y. K. (2013). Collusion study of public investment projects based on SNA. Journal of Public Management, 3, 29–40 (in Chinese). Le, Y., Zhang, B., Guan, X. J., & Li, Y. K. (2013). Collusion study of public investment projects based on SNA. Journal of Public Management, 3, 29–40 (in Chinese).
go back to reference Lempert, R. J., Groves, D. G., Popper, S. W., & Bankes, S. C. (2006). A general, analytic method for generating robust strategies and narrative scenarios. Management Science, 52(4), 514–528.CrossRef Lempert, R. J., Groves, D. G., Popper, S. W., & Bankes, S. C. (2006). A general, analytic method for generating robust strategies and narrative scenarios. Management Science, 52(4), 514–528.CrossRef
go back to reference Levitt, R. E. (2011). Towards project management 2.0. Engineering Project Organization Journal, 1(3), 197–210.CrossRef Levitt, R. E. (2011). Towards project management 2.0. Engineering Project Organization Journal, 1(3), 197–210.CrossRef
go back to reference Li, B., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005). Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), 459–471.CrossRef Li, B., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005). Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), 459–471.CrossRef
go back to reference Li, Y. K., Lu, Y. J., Kwak, Y. H., Le, Y., & He, Q. H. (2011). Social network analysis and organizational control in complex projects: Construction of EXPO 2010 in China. Engineering Project Organization Journal, 1(4), 223–237.CrossRef Li, Y. K., Lu, Y. J., Kwak, Y. H., Le, Y., & He, Q. H. (2011). Social network analysis and organizational control in complex projects: Construction of EXPO 2010 in China. Engineering Project Organization Journal, 1(4), 223–237.CrossRef
go back to reference Li, T. H. Y., Ng, S. T., & Skitmore, M. (2012). Public participation in infrastructure and construction projects in china: From an eia-based to a whole-cycle process. Habitat International, 36(1), 47–56.CrossRef Li, T. H. Y., Ng, S. T., & Skitmore, M. (2012). Public participation in infrastructure and construction projects in china: From an eia-based to a whole-cycle process. Habitat International, 36(1), 47–56.CrossRef
go back to reference Liu, S. X., & Liu, X. (2005). Hazards of Changbaishan volcano and its impact on large engineering projects. Global Geology, 24(3), 289–292 (in Chinese). Liu, S. X., & Liu, X. (2005). Hazards of Changbaishan volcano and its impact on large engineering projects. Global Geology, 24(3), 289–292 (in Chinese).
go back to reference Liu, H. M., Sheng, Z. H., & Cao, Q. L. (2014). Analysis and reference of the reform of highway investment and financing system in developed countries. Modern Economic Discussion, 12, 91–95 (in Chinese). Liu, H. M., Sheng, Z. H., & Cao, Q. L. (2014). Analysis and reference of the reform of highway investment and financing system in developed countries. Modern Economic Discussion, 12, 91–95 (in Chinese).
go back to reference Lo, W., Lin, C. L., & Yan, M. R. (2007). Contractor’s opportunistic bidding behavior and equilibrium price level in the construction market. Journal of Construction Engineering and Management, 133(6), 409–416.CrossRef Lo, W., Lin, C. L., & Yan, M. R. (2007). Contractor’s opportunistic bidding behavior and equilibrium price level in the construction market. Journal of Construction Engineering and Management, 133(6), 409–416.CrossRef
go back to reference Locatis, C. (1994). Technopoly: The surrender of culture to technology. Journal of Computing in Higher Education, 5(2), 145–148.CrossRef Locatis, C. (1994). Technopoly: The surrender of culture to technology. Journal of Computing in Higher Education, 5(2), 145–148.CrossRef
go back to reference Long, J., Zhang, Y. B., & Chen, J. F. (2014). Research on virtual emergency management of manufacturing supply chain risk. Modern Management Science, 8, 36–38 (in chinese). Long, J., Zhang, Y. B., & Chen, J. F. (2014). Research on virtual emergency management of manufacturing supply chain risk. Modern Management Science, 8, 36–38 (in chinese).
go back to reference Lu, G. Y. (2010). Research on several problems in decision making pattern of momentous project (Ph.D. Dissertation). Hefei University of Technology. (In Chinese). Lu, G. Y. (2010). Research on several problems in decision making pattern of momentous project (Ph.D. Dissertation). Hefei University of Technology. (In Chinese).
go back to reference Lu, Y., Luo, L., Wang, H., Le, Y., & Shi, Q. (2015a). Measurement model of project complexity for large-scale projects from task and organization perspective. International Journal of Project Management, 33(3), 610–622.CrossRef Lu, Y., Luo, L., Wang, H., Le, Y., & Shi, Q. (2015a). Measurement model of project complexity for large-scale projects from task and organization perspective. International Journal of Project Management, 33(3), 610–622.CrossRef
go back to reference Lu, Z., Peña-Mora, F., Wang, X. R., Shen, C. Q., & Riaz, Z. (2015b). Social impact project finance: An innovative and sustainable infrastructure financing framework. Procedia Engineering, 123, 300–307.CrossRef Lu, Z., Peña-Mora, F., Wang, X. R., Shen, C. Q., & Riaz, Z. (2015b). Social impact project finance: An innovative and sustainable infrastructure financing framework. Procedia Engineering, 123, 300–307.CrossRef
go back to reference Lubchenco, J. (1998). Entering the century of the environment: A new social contract for science. Science, 279(5350), 491–497.CrossRef Lubchenco, J. (1998). Entering the century of the environment: A new social contract for science. Science, 279(5350), 491–497.CrossRef
go back to reference Luo, K. (2006a). Analysis on investment and financing patterns of foreign space facilities (Part 1). Aerospace China, 5, 21–25 (in Chinese). Luo, K. (2006a). Analysis on investment and financing patterns of foreign space facilities (Part 1). Aerospace China, 5, 21–25 (in Chinese).
go back to reference Luo, K. (2006b). Analysis on investment and financing patterns of foreign space facilities (Part 2). Aerospace China, 6, 18–25 (in Chinese). Luo, K. (2006b). Analysis on investment and financing patterns of foreign space facilities (Part 2). Aerospace China, 6, 18–25 (in Chinese).
go back to reference Ma, S. H., & Gong, F. M. (2009). Collaborative decision of distribution lot-sizing among suppliers based on supply-hub. Industrial Engineering and Management, 14(2), 1–9. Ma, S. H., & Gong, F. M. (2009). Collaborative decision of distribution lot-sizing among suppliers based on supply-hub. Industrial Engineering and Management, 14(2), 1–9.
go back to reference Martin, J. (2001). Organizational culture: Mapping the terrain. Thousand Oaks: Sage Publications. Martin, J. (2001). Organizational culture: Mapping the terrain. Thousand Oaks: Sage Publications.
go back to reference Merrow, E. W. (1988). Understanding the outcomes of megaprojects: A quantitative analysis of very large civilian projects. Santa Monica: RAND Corporation. Merrow, E. W. (1988). Understanding the outcomes of megaprojects: A quantitative analysis of very large civilian projects. Santa Monica: RAND Corporation.
go back to reference Mlecnik, E. (2013). Opportunities for supplier-led systemic innovation in highly energy-efficient housing. Journal of Cleaner Production, 56(10), 103–111.CrossRef Mlecnik, E. (2013). Opportunities for supplier-led systemic innovation in highly energy-efficient housing. Journal of Cleaner Production, 56(10), 103–111.CrossRef
go back to reference Mok, K. Y., Shen, G. Q., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446–457. Mok, K. Y., Shen, G. Q., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446–457.
go back to reference Morris, P. W. G., & Hough, G. H. (1987). The anatomy of major projects: A study of the reality of Project Management. New York: Wiley. Morris, P. W. G., & Hough, G. H. (1987). The anatomy of major projects: A study of the reality of Project Management. New York: Wiley.
go back to reference Nordin, R. M., Takim, R., & Nawawi, A. H. (2011). Critical factors contributing to corruption in construction industry. 2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA), pp. 330–333. Nordin, R. M., Takim, R., & Nawawi, A. H. (2011). Critical factors contributing to corruption in construction industry. 2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA), pp. 330–333.
go back to reference Nutt, D. J., King, L. A., & Phillips, L. D. (2010). Drug harms in the UK: A multicriteria decision analysis. The Lancet, 376(9752), 1558–1565.CrossRef Nutt, D. J., King, L. A., & Phillips, L. D. (2010). Drug harms in the UK: A multicriteria decision analysis. The Lancet, 376(9752), 1558–1565.CrossRef
go back to reference Park, S., Kim, J. K., & Park, S. (2016). An imputation approach for handling mixed-mode surveys. Annals of Applied Statistics, 10(2), 1063–1085.CrossRef Park, S., Kim, J. K., & Park, S. (2016). An imputation approach for handling mixed-mode surveys. Annals of Applied Statistics, 10(2), 1063–1085.CrossRef
go back to reference Patanakul, P., Kwak, Y. H., Zwikael, O., & Liu, M. (2016). What impacts the performance of largescale government projects? International Journal of Project Management, 34(3), 452–466.CrossRef Patanakul, P., Kwak, Y. H., Zwikael, O., & Liu, M. (2016). What impacts the performance of largescale government projects? International Journal of Project Management, 34(3), 452–466.CrossRef
go back to reference Pederson, P., Dudenhoeffer, D., Hartley, S., & Permann, M. (2006). Critical infrastructure interdependency modeling: A survey of US and international research. Idaho National Laboratory, 25, 27. Pederson, P., Dudenhoeffer, D., Hartley, S., & Permann, M. (2006). Critical infrastructure interdependency modeling: A survey of US and international research. Idaho National Laboratory, 25, 27.
go back to reference Perrow, C. (1981). Normal accident at three Mile Island. Society, 18(5), 17–26.CrossRef Perrow, C. (1981). Normal accident at three Mile Island. Society, 18(5), 17–26.CrossRef
go back to reference Perrow, C. (1994). The limits of safety: The enhancement of a theory of accidents. Journal of Contingencies and Crisis Management, 2(4), 212–220.CrossRef Perrow, C. (1994). The limits of safety: The enhancement of a theory of accidents. Journal of Contingencies and Crisis Management, 2(4), 212–220.CrossRef
go back to reference Perrow, C. (1999). Organizing to reduce the vulnerabilities of complexity. Journal of Contingencies and Crisis Management, 7(3), 150–155.CrossRef Perrow, C. (1999). Organizing to reduce the vulnerabilities of complexity. Journal of Contingencies and Crisis Management, 7(3), 150–155.CrossRef
go back to reference Perminova, O., Gustafsson, M., & Wikström, K. (2008). Defining uncertainty in projects–A new perspective. International Journal of Project Management, 26(1), 73–79.CrossRef Perminova, O., Gustafsson, M., & Wikström, K. (2008). Defining uncertainty in projects–A new perspective. International Journal of Project Management, 26(1), 73–79.CrossRef
go back to reference Pol, E., & Carroll, P. (2006). An introduction to economics with emphasis on innovation. Melbourne: Thomson. Pol, E., & Carroll, P. (2006). An introduction to economics with emphasis on innovation. Melbourne: Thomson.
go back to reference Pries, K. H., & Quigley, J. M. (2012). Reducing Process Costs with Lean, Six Sigma, and Value Engineering Techniques. CRC Press. Pries, K. H., & Quigley, J. M. (2012). Reducing Process Costs with Lean, Six Sigma, and Value Engineering Techniques. CRC Press.
go back to reference Priemus, H. (2010). Mega-projects: Dealing with pitfalls. European Planning Studies, 18(7), 1023–1039.CrossRef Priemus, H. (2010). Mega-projects: Dealing with pitfalls. European Planning Studies, 18(7), 1023–1039.CrossRef
go back to reference Priemus, H., Flyvbjerg, B., & van Wee, B. (Eds.). (2008). Decision-making on mega-projects: Costbenefit analysis, planning and innovation. Edward Elgar Publishing. Priemus, H., Flyvbjerg, B., & van Wee, B. (Eds.). (2008). Decision-making on mega-projects: Costbenefit analysis, planning and innovation. Edward Elgar Publishing.
go back to reference Qian, Z. (2013). Master plan, plan adjustment and urban development reality under China’s market transition: A case study of Nanjing. Cities, 30, 77–88.CrossRef Qian, Z. (2013). Master plan, plan adjustment and urban development reality under China’s market transition: A case study of Nanjing. Cities, 30, 77–88.CrossRef
go back to reference Rausch, A. (2011). Reconstruction of decision-making behavior in shareholder and stakeholder theory: Implications for management accounting systems. Review of Managerial Science, 5(2–3), 137–169.CrossRef Rausch, A. (2011). Reconstruction of decision-making behavior in shareholder and stakeholder theory: Implications for management accounting systems. Review of Managerial Science, 5(2–3), 137–169.CrossRef
go back to reference Ravanshadnia, M., Rajaie, H., & Abbasian, H. R. (2012). A comprehensive bid/no-bid decision making framework for construction companies. Iranian Journal of Science & Technology. Ravanshadnia, M., Rajaie, H., & Abbasian, H. R. (2012). A comprehensive bid/no-bid decision making framework for construction companies. Iranian Journal of Science & Technology.
go back to reference Robertson, D. A. (2003). Agent-based models of a banking network as an example of a turbulent environment: The deliberate vs. emergent strategy debate revisited. Emergence, 5(2), 65–71.CrossRef Robertson, D. A. (2003). Agent-based models of a banking network as an example of a turbulent environment: The deliberate vs. emergent strategy debate revisited. Emergence, 5(2), 65–71.CrossRef
go back to reference Ruuska, I., Ahola, T., Artto, K., Locatelli, G., & Mancini, M. (2011). A new governance approach for multi-firm projects: Lessons from Olkiluoto 3 and Flamanville 3 nuclear power plant projects. International Journal of Project Management, 29(6), 647–660.CrossRef Ruuska, I., Ahola, T., Artto, K., Locatelli, G., & Mancini, M. (2011). A new governance approach for multi-firm projects: Lessons from Olkiluoto 3 and Flamanville 3 nuclear power plant projects. International Journal of Project Management, 29(6), 647–660.CrossRef
go back to reference Salet, W., Bertolini, L., & Giezen, M. (2013). Complexity and uncertainty: Problem or asset in decision making of mega infrastructure projects? International Journal of Urban and Regional Research, 37(6), 1984–2000.CrossRef Salet, W., Bertolini, L., & Giezen, M. (2013). Complexity and uncertainty: Problem or asset in decision making of mega infrastructure projects? International Journal of Urban and Regional Research, 37(6), 1984–2000.CrossRef
go back to reference Sanderson, J. (2012). Risk, uncertainty and governance in megaprojects: A critical discussion of alternative explanations. International Journal of Project Management, 30(4), 432–443.CrossRef Sanderson, J. (2012). Risk, uncertainty and governance in megaprojects: A critical discussion of alternative explanations. International Journal of Project Management, 30(4), 432–443.CrossRef
go back to reference Sandin, G., Peters, G. M., & Svanström, M. (2014). Life cycle assessment of construction materials: The influence of assumptions in end-of-life modelling. International Journal of Life Cycle Assessment, 19(4), 723–731.CrossRef Sandin, G., Peters, G. M., & Svanström, M. (2014). Life cycle assessment of construction materials: The influence of assumptions in end-of-life modelling. International Journal of Life Cycle Assessment, 19(4), 723–731.CrossRef
go back to reference Savage, L. J. (1951). The theory of statistical decision. Journal of the American Statistical Association, 46(253), 55–67.CrossRef Savage, L. J. (1951). The theory of statistical decision. Journal of the American Statistical Association, 46(253), 55–67.CrossRef
go back to reference Saynisch, M. (2010). Beyond frontiers of traditional project management: An approach to evolutionary, self-organizational principles and the complexity theory-results of the research program. Project Management Journal, 41(2), 21–37.CrossRef Saynisch, M. (2010). Beyond frontiers of traditional project management: An approach to evolutionary, self-organizational principles and the complexity theory-results of the research program. Project Management Journal, 41(2), 21–37.CrossRef
go back to reference Serpella, A. F., Ferrada, X., Howard, R., & Rubio, L. (2014). Risk management in construction projects: A knowledge-based approach. Procedia - Social and Behavioral Sciences, 119, 653–662.CrossRef Serpella, A. F., Ferrada, X., Howard, R., & Rubio, L. (2014). Risk management in construction projects: A knowledge-based approach. Procedia - Social and Behavioral Sciences, 119, 653–662.CrossRef
go back to reference Sheng, Z. H. (2009). Researches on the model of large-complex projects meta-synthesis management—Based on the project management practices of Sutong Bridge. Construction Economy, 5, 20–22 (in Chinese). Sheng, Z. H. (2009). Researches on the model of large-complex projects meta-synthesis management—Based on the project management practices of Sutong Bridge. Construction Economy, 5, 20–22 (in Chinese).
go back to reference Sheng, Z. H., & Zhang, W. (2011). Computational experiments in management science and research. Journal of Management Science in China, 14(5), 1–10. Sheng, Z. H., & Zhang, W. (2011). Computational experiments in management science and research. Journal of Management Science in China, 14(5), 1–10.
go back to reference Shi, P., Xu, W., Ye, T., Yang, S., Liu, L., Fang, W., et al. (2015). World atlas of natural disaster risk. In World Atlas of natural disaster risk (pp. 309–323). Berlin Heidelberg: Springer. Shi, P., Xu, W., Ye, T., Yang, S., Liu, L., Fang, W., et al. (2015). World atlas of natural disaster risk. In World Atlas of natural disaster risk (pp. 309–323). Berlin Heidelberg: Springer.
go back to reference Shin, M., Lee, H.-S., Park, M., Moon, M., & Han, S. (2014). A system dynamics approach for modeling construction workers’ safety attitudes and behaviors. Accident Analysis & Prevention, 68(2), 95–105.CrossRef Shin, M., Lee, H.-S., Park, M., Moon, M., & Han, S. (2014). A system dynamics approach for modeling construction workers’ safety attitudes and behaviors. Accident Analysis & Prevention, 68(2), 95–105.CrossRef
go back to reference Sprague, R. H. (1980). A framework for the development of decision support systems. MIS Quarterly, 4(4), 1–26.CrossRef Sprague, R. H. (1980). A framework for the development of decision support systems. MIS Quarterly, 4(4), 1–26.CrossRef
go back to reference Stefanie, K., & Roald, V. (2010). Project finance as a driver of economic growth in low-income countries. Review of Financial Economics, 19(2), 49–59.CrossRef Stefanie, K., & Roald, V. (2010). Project finance as a driver of economic growth in low-income countries. Review of Financial Economics, 19(2), 49–59.CrossRef
go back to reference Sun, J., & Zhang, P. (2011). Owner organization design for mega industrial construction projects. International Journal of Project Management, 29(7), 828–833.CrossRef Sun, J., & Zhang, P. (2011). Owner organization design for mega industrial construction projects. International Journal of Project Management, 29(7), 828–833.CrossRef
go back to reference Szyliowicz, J. S., & Goetz, A. R. (1995). Getting realistic about megaproject planning: The case of the new Denver International Airport. Policy Sciences, 28(4), 347–367.CrossRef Szyliowicz, J. S., & Goetz, A. R. (1995). Getting realistic about megaproject planning: The case of the new Denver International Airport. Policy Sciences, 28(4), 347–367.CrossRef
go back to reference Takeuchi, H., & Nonaka, I. (1986). The new product development game. Harvard Business Review, 64(1), 137–146. Takeuchi, H., & Nonaka, I. (1986). The new product development game. Harvard Business Review, 64(1), 137–146.
go back to reference Taucean, I. M., Tamasila, M., & Negru-Strauti, G. (2016). Study on management styles and managerial power types for a large organization. Procedia-Social and Behavioral Sciences, 221, 66–75.CrossRef Taucean, I. M., Tamasila, M., & Negru-Strauti, G. (2016). Study on management styles and managerial power types for a large organization. Procedia-Social and Behavioral Sciences, 221, 66–75.CrossRef
go back to reference Taylor, C., & VanMarcke, E. (2005). Infrastructure risk management processes: Natural, accidental, and deliberate hazards. ASCE Council on Disaster Risk Management American Society of Civil Engineers (ASCE). Taylor, C., & VanMarcke, E. (2005). Infrastructure risk management processes: Natural, accidental, and deliberate hazards. ASCE Council on Disaster Risk Management American Society of Civil Engineers (ASCE).
go back to reference Tchidi, M. F., He, Z., & Li, Y. B. (2012). Process and quality improvement using Six Sigma in construction industry. Journal of Civil Engineering and Management, 18(2), 158–172.CrossRef Tchidi, M. F., He, Z., & Li, Y. B. (2012). Process and quality improvement using Six Sigma in construction industry. Journal of Civil Engineering and Management, 18(2), 158–172.CrossRef
go back to reference Tsai, M. H., Mom, M., & Hsieh, S. H. (2014). Developing critical success factors for the assessment of BIM technology adoption: Part I. Methodology and survey. Journal of the Chinese Institute of Engineers, 37(7), 845–858.CrossRef Tsai, M. H., Mom, M., & Hsieh, S. H. (2014). Developing critical success factors for the assessment of BIM technology adoption: Part I. Methodology and survey. Journal of the Chinese Institute of Engineers, 37(7), 845–858.CrossRef
go back to reference Tsai, S.-B., Li, G., Wu, C.-H., Zheng, Y., & Wang, J. (2016). An empirical research on evaluating banks’ credit assessment of corporate customers. SpringerPlus, 5(1), 2088.CrossRef Tsai, S.-B., Li, G., Wu, C.-H., Zheng, Y., & Wang, J. (2016). An empirical research on evaluating banks’ credit assessment of corporate customers. SpringerPlus, 5(1), 2088.CrossRef
go back to reference van Wee, B., & Priemus, H. (2006). Megaproject decision making and management: Ethical and political issues. In The Oxford handbook of megaproject management (p. 20). Oxford,UK: Oxford University Press. van Wee, B., & Priemus, H. (2006). Megaproject decision making and management: Ethical and political issues. In The Oxford handbook of megaproject management (p. 20). Oxford,UK: Oxford University Press.
go back to reference Wald, A. (1950). Statistical decision functions. New York: Wiley. Wald, A. (1950). Statistical decision functions. New York: Wiley.
go back to reference Wang, Q. (2009). Comparison of financing modes between three gorges project and British channel tunnel project. Manager’ Journal, 8, 132–133 (in Chinese). Wang, Q. (2009). Comparison of financing modes between three gorges project and British channel tunnel project. Manager’ Journal, 8, 132–133 (in Chinese).
go back to reference Wang, L., & Yang, Q. (2000). Research on the Problems and Countermeasures in Project Financing in China. On Economic Problems, 5, 45–47 (in Chinese). Wang, L., & Yang, Q. (2000). Research on the Problems and Countermeasures in Project Financing in China. On Economic Problems, 5, 45–47 (in Chinese).
go back to reference Wang, M. T., & Chou, H. Y. (2003). Risk allocation and risk handling of highway projects in Taiwan. Journal of Management in Engineering, 19(2), 60–68.CrossRef Wang, M. T., & Chou, H. Y. (2003). Risk allocation and risk handling of highway projects in Taiwan. Journal of Management in Engineering, 19(2), 60–68.CrossRef
go back to reference Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(3), 237–252.CrossRef Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(3), 237–252.CrossRef
go back to reference Wang, Y., Chen, H., Shen, L., & Zhang, Y. (2008). A study on the key factors of over-time and over-pay in governmental engineering projects. Construction Economy, 309(7), 76–79. (In Chinesee). Wang, Y., Chen, H., Shen, L., & Zhang, Y. (2008). A study on the key factors of over-time and over-pay in governmental engineering projects. Construction Economy, 309(7), 76–79. (In Chinesee).
go back to reference Williams, T., & Samset, K. (2010). Issues in front-end decision making on projects. Project Management Journal, 41(2), 38–49.CrossRef Williams, T., & Samset, K. (2010). Issues in front-end decision making on projects. Project Management Journal, 41(2), 38–49.CrossRef
go back to reference Winsen, J. K. (2010). An overview of project finance binomial loan valuation. Review of Financial Economics, 19(2), 84–89.CrossRef Winsen, J. K. (2010). An overview of project finance binomial loan valuation. Review of Financial Economics, 19(2), 84–89.CrossRef
go back to reference Wu, S. F., & Wei, X. P. (2009). The rule and method of risk allocation in project finance. Procedia Earth & Planetary Science, 1(1), 1757–1763.CrossRef Wu, S. F., & Wei, X. P. (2009). The rule and method of risk allocation in project finance. Procedia Earth & Planetary Science, 1(1), 1757–1763.CrossRef
go back to reference Xie, H., & Wang, M. (2010). Analysis to situation and problems of decision-making stage of large engineering in China based on questionnaire investigation. Engineering Sciences, 12(1), 18–23 (In Chinese). Xie, H., & Wang, M. (2010). Analysis to situation and problems of decision-making stage of large engineering in China based on questionnaire investigation. Engineering Sciences, 12(1), 18–23 (In Chinese).
go back to reference Yan. (2014).The choice and implementation of major public project investment and financing mode of local government. Local Financial Research, 7:11–15. (In Chinese). Yan. (2014).The choice and implementation of major public project investment and financing mode of local government. Local Financial Research, 7:11–15. (In Chinese).
go back to reference Yang, T., Long, R. Y., Li, W. b., & Rehman, S. U. (2016). Innovative application of the public–Private partnership model to the electric vehicle charging infrastructure in China. Sustainability, 8(8), 738. Yang, T., Long, R. Y., Li, W. b., & Rehman, S. U. (2016). Innovative application of the public–Private partnership model to the electric vehicle charging infrastructure in China. Sustainability, 8(8), 738.
go back to reference Yao, L., Xia, E. J., & Ren, Y. H. (2006). The development and current situation of project financing at home and abroad. Engineering Technology Economy, 12, 138–140 (In Chinese). Yao, L., Xia, E. J., & Ren, Y. H. (2006). The development and current situation of project financing at home and abroad. Engineering Technology Economy, 12, 138–140 (In Chinese).
go back to reference Ye, Q. J. (1994). Mechanism of self-organization in systems—To annotate the key diagram of Prigogine’s dissipative structure. Journal of Systemic Dialectics, 2, 57–63 (in Chinese). Ye, Q. J. (1994). Mechanism of self-organization in systems—To annotate the key diagram of Prigogine’s dissipative structure. Journal of Systemic Dialectics, 2, 57–63 (in Chinese).
go back to reference Yildiz, A. E., Dikmen, I., Birgonul, M. T., Ercoskun, K., & Alten, S. (2014). A knowledge-based risk mapping tool for cost estimation of international construction projects. Automation in Construction, 43, 144–155.CrossRef Yildiz, A. E., Dikmen, I., Birgonul, M. T., Ercoskun, K., & Alten, S. (2014). A knowledge-based risk mapping tool for cost estimation of international construction projects. Automation in Construction, 43, 144–155.CrossRef
go back to reference You, Q. Z. (2009). Engineering management practice and basic experience of Sutong Bridge. Science Press. (in Chinese). You, Q. Z. (2009). Engineering management practice and basic experience of Sutong Bridge. Science Press. (in Chinese).
go back to reference You & Guo, (2014). Thinking on the financing mode of construction of large-scale quasi-public welfare water conservancy projects. Research on Water Conservancy Development, 14(1), 59–64 (In Chinese). You & Guo, (2014). Thinking on the financing mode of construction of large-scale quasi-public welfare water conservancy projects. Research on Water Conservancy Development, 14(1), 59–64 (In Chinese).
go back to reference Young, S. (2011). Chapter 34 Drainage design. In ICE manual of highway design and management (pp. 285–303). Thomas Telford Ltd. Young, S. (2011). Chapter 34 Drainage design. In ICE manual of highway design and management (pp. 285–303). Thomas Telford Ltd.
go back to reference Yuge, M. (2014). The environment implications of China’s New Bank. The Diploma. Yuge, M. (2014). The environment implications of China’s New Bank. The Diploma.
go back to reference Yunbi, A., & Keith, C. (2010). Project financing: Deal or no deal. Review of Financial Economics, 19(2), 72–77.CrossRef Yunbi, A., & Keith, C. (2010). Project financing: Deal or no deal. Review of Financial Economics, 19(2), 72–77.CrossRef
go back to reference Zarkada-Fraser, A. (2000). A classification of factors influencing participating in collusive tendering agreements. Journal of Business Ethics, 23(3), 269–282. Zarkada-Fraser, A. (2000). A classification of factors influencing participating in collusive tendering agreements. Journal of Business Ethics, 23(3), 269–282.
go back to reference Zhang, J. W., & Sheng, Z. H. (2014). Study on the relationship of the “government” principal-agent in the decision-making of the major projects: Based on the practice of the Hong Kong-Zhuhai-Macao bridge project. Scientific Decision-Making, 12, 23–34 (in Chinese). Zhang, J. W., & Sheng, Z. H. (2014). Study on the relationship of the “government” principal-agent in the decision-making of the major projects: Based on the practice of the Hong Kong-Zhuhai-Macao bridge project. Scientific Decision-Making, 12, 23–34 (in Chinese).
Metadata
Title
The Scientific Problems with the Mega Infrastructure Construction Management Theory
Author
Zhaohan Sheng
Copyright Year
2018
DOI
https://doi.org/10.1007/978-3-319-61974-3_7