Skip to main content
Top

2013 | OriginalPaper | Chapter

75. The Study on Risk Assess Model of Rail Transit Projects

Authors : Xiangdong Zhu, Xiang Xiao, Chaoran Wu

Published in: LTLGB 2012

Publisher: Springer Berlin Heidelberg

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The urban rail transit system is widely adopted in big cities for its large transit capacity, fast speed, low power consumption, and comfortable riding experience. But recently frequent metro accidents appear and the subsequent social impact is very bad, which remind us of the risk in the rail transit system. Therefore, this paper analyzes the risk factors in rail transit project, divides them into different phases, and then specifies the risk in different phases. Then, an AHP-based fuzzy comprehensive evaluation model is developed for the urban rail transit system based on the identified risk factors.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Bai Y, Tang J, Mao J (2007) Application of risk management on metro line no.10 in Shanghai. Tunn Constr 17(S2): 566–570 Bai Y, Tang J, Mao J (2007) Application of risk management on metro line no.10 in Shanghai. Tunn Constr 17(S2): 566–570
go back to reference Cui C (2011) Discussion on project financing risk management methods of urban rail traffic. Shanxi Archit 37(24):232–234 Cui C (2011) Discussion on project financing risk management methods of urban rail traffic. Shanxi Archit 37(24):232–234
go back to reference Gao Y (2005) Risk management in Tianjin Binhai rapid rail construction. Urban Mass Transit 8(4):53–57 Gao Y (2005) Risk management in Tianjin Binhai rapid rail construction. Urban Mass Transit 8(4):53–57
go back to reference Guo L, Tang J (2008) Dynamic risk management in repair of Shanghai rail transit line 4. Undergr Eng and Tunn 18(2):52–54 Guo L, Tang J (2008) Dynamic risk management in repair of Shanghai rail transit line 4. Undergr Eng and Tunn 18(2):52–54
go back to reference Mao R (2007) Safety risk management in rail projects. Saf Risk Manag Rail Proj 20(4):7–9 Mao R (2007) Safety risk management in rail projects. Saf Risk Manag Rail Proj 20(4):7–9
go back to reference Ye G (2008) Research on risk management of urban rail transit project in preliminary stage. Central South University, Changsha Ye G (2008) Research on risk management of urban rail transit project in preliminary stage. Central South University, Changsha
Metadata
Title
The Study on Risk Assess Model of Rail Transit Projects
Authors
Xiangdong Zhu
Xiang Xiao
Chaoran Wu
Copyright Year
2013
Publisher
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-34651-4_75

Premium Partner