Skip to main content
Top

Thermal Engineering

Issue 6/2009

Content (14 Articles)

A coal-fired boiler for a new-generation power unit for ultrasupercritical steam conditions

A. G. Tumanovskii, A. L. Shvarts, E. A. Tugolukov, A. A. Smyshlyaev, E. Kh. Verbovetskii, O. V. Nesiolovskii, N. V. Petrova

Using plasma-fuel systems at Eurasian coal-fired thermal power stations

E. I. Karpenko, Yu. E. Karpenko, V. E. Messerle, A. B. Ustimenko

Selecting a retrofitting profile for the TGME-444 boiler at the Rostov TETs-2 cogeneration station

A. N. Bezgreshnov, A. A. Belov, A. N. Ozerov, N. V. Usikov, E. M. D’yakonov, A. B. Barannikov, D. L. Mikhalev, V. N. Alekseenko, B. G. Gorbat’ko

Experience with using the technology of starting modes of power units equipped with a built-in assembly

V. N. Baranov, L. N. Ginzburg, S. F. Nikolaev, V. F. Rul’kovskii

Optimizing the operating modes of cogeneration stations taking actual state of main equipment into account

A. M. Kler, A. S. Maksimov, E. L. Stepanova, P. V. Zharkov, R. A. Tarariev, E. G. Perevalov

Assessing stressed-and-strain state the annular plates of fire-tube boilers

A. Z. Skorokhod, V. P. Sel’kin, A. P. Pugovko, A. B. Shavshukov

Premium Partner