Skip to main content
Top

2020 | OriginalPaper | Chapter

A Building Information Modelling-Integrated Model of Construction Project Performance Indicators

Authors : Oluseye Olugboyega, Abimbola Windapo

Published in: The Construction Industry in the Fourth Industrial Revolution

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The traditional construction project performance indicators are no longer the sole determinant of the performance of construction projects, firms, and actors because other construction performance indicators and factors such as Building Information Modelling are increasingly becoming important and relevant. This paper identifies a comprehensive set of construction project performance indicators, and it establishes a new, integrated, model for evaluating construction performance. The model uses ten types of performance indicators and four types of performance factors for Building Information Modelling-based construction projects. The result of the study is a set of comprehensive construction project performance indicators that are useful in enhancing the performance of construction firms, projects, and actors. The paper concludes with recommendations for the development of relative weightings and measurement models for the indicators and the development of measurement models for the various components of construction project performance indicators and Building Information Modelling performance indicators in future studies.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Alarcon, L.F., Ashley, D.B.: Modeling project performance for decision making. J. Constr. Eng. Manag. 122(3), 265–273 (1996)CrossRef Alarcon, L.F., Ashley, D.B.: Modeling project performance for decision making. J. Constr. Eng. Manag. 122(3), 265–273 (1996)CrossRef
2.
go back to reference Ali, H.A.E.M., Al-Sulaihi, I.A., Al-Gahtani, K.S.: Indicators for measuring the performance of building construction companies in the Kingdom of Saudi Arabia. J. King Saud University Eng. Sci. 25(2), 125–134 (2013)CrossRef Ali, H.A.E.M., Al-Sulaihi, I.A., Al-Gahtani, K.S.: Indicators for measuring the performance of building construction companies in the Kingdom of Saudi Arabia. J. King Saud University Eng. Sci. 25(2), 125–134 (2013)CrossRef
3.
go back to reference Bassioni, H.A., Price, A.D.F., Hassan, T.M.: Performance measurement in construction. J. Manag. Eng. 20(2), 42–50 (2004)CrossRef Bassioni, H.A., Price, A.D.F., Hassan, T.M.: Performance measurement in construction. J. Manag. Eng. 20(2), 42–50 (2004)CrossRef
4.
go back to reference Beatham, S., Anumba, C., Thorpe, T., Hedges, I.: KPIs: a critical appraisal of their use in construction. Benchmarking Int. J. 11(1), 93–117 (2004)CrossRef Beatham, S., Anumba, C., Thorpe, T., Hedges, I.: KPIs: a critical appraisal of their use in construction. Benchmarking Int. J. 11(1), 93–117 (2004)CrossRef
5.
go back to reference BEC: Benchmarking Danish Construction. The Benchmark Centre for the Danish Construction Sector Copenhagen (2014) BEC: Benchmarking Danish Construction. The Benchmark Centre for the Danish Construction Sector Copenhagen (2014)
6.
go back to reference CCIC: Measuring the performance of the Canadian construction industry: pilot project final report. Canadian Construction Innovation Council, Toronto, Ontario (2007). www.ccic-ccic.ca/reports.html. Accessed Feb 2018 CCIC: Measuring the performance of the Canadian construction industry: pilot project final report. Canadian Construction Innovation Council, Toronto, Ontario (2007). www.​ccic-ccic.​ca/​reports.​html. Accessed Feb 2018
7.
go back to reference Cheung, S.O., Suen, H.C.H., Cheung, K.K.W.: PPMS: a web-based construction project performance monitoring system. Autom. Constr. 13(3), 361–376 (2004)CrossRef Cheung, S.O., Suen, H.C.H., Cheung, K.K.W.: PPMS: a web-based construction project performance monitoring system. Autom. Constr. 13(3), 361–376 (2004)CrossRef
8.
go back to reference Constructing Excellence: UK Construction Industry: Key Performance Indicators. Constructing Excellence, UK (2004) Constructing Excellence: UK Construction Industry: Key Performance Indicators. Constructing Excellence, UK (2004)
10.
go back to reference Corporación de Desarrollo Tecnológico (CDT): National benchmarking system for the construction industry (2002) Corporación de Desarrollo Tecnológico (CDT): National benchmarking system for the construction industry (2002)
11.
go back to reference Costa, D.B., Formoso, C.T., Kagioglou, M., Alarcón, L.F., Caldas, C.H.: Benchmarking initiatives in the construction industry: lessons learned and improvement opportunities. J. Manag. Eng. 22(4), 158–167 (2006)CrossRef Costa, D.B., Formoso, C.T., Kagioglou, M., Alarcón, L.F., Caldas, C.H.: Benchmarking initiatives in the construction industry: lessons learned and improvement opportunities. J. Manag. Eng. 22(4), 158–167 (2006)CrossRef
12.
go back to reference Costa, D.B., Lima, H., Formoso, C.T.: Performance measurement systems for benchmarking in the Brazilian construction industry. In: Performance Measuring System for Benchmarking Conference, Rotterdam, Netherlands, pp. 1029–1040 (2004) Costa, D.B., Lima, H., Formoso, C.T.: Performance measurement systems for benchmarking in the Brazilian construction industry. In: Performance Measuring System for Benchmarking Conference, Rotterdam, Netherlands, pp. 1029–1040 (2004)
13.
go back to reference Dawood, N., Sikka, S.: Development of 4D based performance indicators in the construction industry. Eng. Constr. Architectural Manag. 16(5), 438–458 (2009)CrossRef Dawood, N., Sikka, S.: Development of 4D based performance indicators in the construction industry. Eng. Constr. Architectural Manag. 16(5), 438–458 (2009)CrossRef
14.
go back to reference Fazli, A., Fathi, S., Enferadi, M.H., Fazli, M., Fathi, B.: Appraising effectiveness of Building Information Management (BIM) in project management. Procedia Technol. 16, 1116–1125 (2014)CrossRef Fazli, A., Fathi, S., Enferadi, M.H., Fazli, M., Fathi, B.: Appraising effectiveness of Building Information Management (BIM) in project management. Procedia Technol. 16, 1116–1125 (2014)CrossRef
15.
go back to reference Furneaux, C.W., Hampson, K.D., Scuderi, P., Kajewski, S.L.: Australian construction industry KPIs. In: CIB World Congress Proceedings–Building a Better World, pp. 1–12. CIB (2010) Furneaux, C.W., Hampson, K.D., Scuderi, P., Kajewski, S.L.: Australian construction industry KPIs. In: CIB World Congress Proceedings–Building a Better World, pp. 1–12. CIB (2010)
16.
go back to reference Garbharran, H., Govender, J., Msani, T.: Critical success factors influencing project success in the construction industry. Acta Strutilia 19(2), 90–108 (2012) Garbharran, H., Govender, J., Msani, T.: Critical success factors influencing project success in the construction industry. Acta Strutilia 19(2), 90–108 (2012)
17.
go back to reference Hartmann, T., Van Meerveld, H., Vossebeld, N., Adriaanse, A.: Aligning building information model tools and construction management methods. Autom. Constr. 22, 605–613 (2012)CrossRef Hartmann, T., Van Meerveld, H., Vossebeld, N., Adriaanse, A.: Aligning building information model tools and construction management methods. Autom. Constr. 22, 605–613 (2012)CrossRef
18.
go back to reference Hunter, J.E., Schmidt, F.L.: Dichotomization of continuous variables: the implications for meta-analysis. J. Appl. Psychol. 75(3), 334 (1990)CrossRef Hunter, J.E., Schmidt, F.L.: Dichotomization of continuous variables: the implications for meta-analysis. J. Appl. Psychol. 75(3), 334 (1990)CrossRef
19.
go back to reference Jastaniah, Y.R.: Performance evaluation and benchmarking of construction industry projects using data envelopment analysis. Ph.D. dissertation, Southern Methodist University (1997) Jastaniah, Y.R.: Performance evaluation and benchmarking of construction industry projects using data envelopment analysis. Ph.D. dissertation, Southern Methodist University (1997)
20.
go back to reference Love, P.E.D., Matthews, J., Simpson, I., Hill, A., Olatunji, O.A.: A benefits realization management building information modeling framework for asset owners. Autom. Constr. 37, 1–10 (2014)CrossRef Love, P.E.D., Matthews, J., Simpson, I., Hill, A., Olatunji, O.A.: A benefits realization management building information modeling framework for asset owners. Autom. Constr. 37, 1–10 (2014)CrossRef
21.
go back to reference Luu, T.-V., Kim, S.-Y., Cao, H.-L., Park, Y.-M.: Performance measurement of construction firms in developing countries. Constr. Manag. Econ. 26(4), 373–386 (2008)CrossRef Luu, T.-V., Kim, S.-Y., Cao, H.-L., Park, Y.-M.: Performance measurement of construction firms in developing countries. Constr. Manag. Econ. 26(4), 373–386 (2008)CrossRef
22.
go back to reference Marx, H.: Construction industry indicators affecting contractors. J. Adv. Perform. Inf. Value 4(1) (2012) Marx, H.: Construction industry indicators affecting contractors. J. Adv. Perform. Inf. Value 4(1) (2012)
23.
go back to reference Ofori-Kuragu, J.K., Baiden, B.K., Badu, E.: Key performance indicators for project success in Ghanaian contractors. Int. J. Constr. Eng. Manag. 5(1), 1–10 (2016) Ofori-Kuragu, J.K., Baiden, B.K., Badu, E.: Key performance indicators for project success in Ghanaian contractors. Int. J. Constr. Eng. Manag. 5(1), 1–10 (2016)
24.
go back to reference Pillai, A.S., Joshi, A., Srinivasa Rao, K.: Performance measurement of R&D projects in a multi-project, concurrent engineering environment. Int. J. Proj. Manag. 20(2), 165–177 (2002)CrossRef Pillai, A.S., Joshi, A., Srinivasa Rao, K.: Performance measurement of R&D projects in a multi-project, concurrent engineering environment. Int. J. Proj. Manag. 20(2), 165–177 (2002)CrossRef
25.
go back to reference Pinheiro, J.P.C.: Key performance indicators applied to construction: sector performance and benchmarking. Extended Abstract: Instituto superior tecnico (2011) Pinheiro, J.P.C.: Key performance indicators applied to construction: sector performance and benchmarking. Extended Abstract: Instituto superior tecnico (2011)
26.
go back to reference Radujković, M., Vukomanović, M., Dunović, I.B.: Application of key performance indicators in South-Eastern European construction. J. Civil Eng. Manag. 16(4), 521–530 (2010)CrossRef Radujković, M., Vukomanović, M., Dunović, I.B.: Application of key performance indicators in South-Eastern European construction. J. Civil Eng. Manag. 16(4), 521–530 (2010)CrossRef
27.
go back to reference Ramırez, R.R., Alarcón, L.F.C., Knights, P.: Benchmarking system for evaluating management practices in the construction industry. J. Manag. Eng. 20(3), 110–117 (2004)CrossRef Ramırez, R.R., Alarcón, L.F.C., Knights, P.: Benchmarking system for evaluating management practices in the construction industry. J. Manag. Eng. 20(3), 110–117 (2004)CrossRef
28.
go back to reference Rankin, J., Fayek, A.R., Meade, G., Haas, C., Manseau, A.: Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Can. J. Civ. Eng. 35(9), 894–907 (2008)CrossRef Rankin, J., Fayek, A.R., Meade, G., Haas, C., Manseau, A.: Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Can. J. Civ. Eng. 35(9), 894–907 (2008)CrossRef
29.
go back to reference Roberts, M., Latorre, V.: KPIs in the UK’s construction industry: using system dynamics to understand underachievement. Revista de la Construcción 8(1), 69–82 (2009) Roberts, M., Latorre, V.: KPIs in the UK’s construction industry: using system dynamics to understand underachievement. Revista de la Construcción 8(1), 69–82 (2009)
30.
go back to reference Rokooei, S.: Building information modeling in project management: necessities, challenges, and outcomes. Procedia Soc. Behav. Sci. 210, 87–95 (2015)CrossRef Rokooei, S.: Building information modeling in project management: necessities, challenges, and outcomes. Procedia Soc. Behav. Sci. 210, 87–95 (2015)CrossRef
31.
go back to reference Sarhan, S., Fox, A.: Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Constr. Econ. Build. 13(1), 23–35 (2013)CrossRef Sarhan, S., Fox, A.: Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Constr. Econ. Build. 13(1), 23–35 (2013)CrossRef
32.
go back to reference Scottish Construction Centre: Scottish KPIs (2009), From the Scottish Construction Centre website www.scocon.org. Accessed 17 April 2008 Scottish Construction Centre: Scottish KPIs (2009), From the Scottish Construction Centre website www.​scocon.​org. Accessed 17 April 2008
33.
go back to reference Sibiya, M., Aigbavboa, C., Thwala, W.: Construction projects’ key performance indicators: a case of the South African construction industry. ICCREM 2015, 954–960 (2015) Sibiya, M., Aigbavboa, C., Thwala, W.: Construction projects’ key performance indicators: a case of the South African construction industry. ICCREM 2015, 954–960 (2015)
34.
go back to reference Takim, R., Akintoye, A.: Performance indicators for successful construction project performance. In: 18th Annual ARCOM Conference, vol. 2, pp. 545–555 (2002) Takim, R., Akintoye, A.: Performance indicators for successful construction project performance. In: 18th Annual ARCOM Conference, vol. 2, pp. 545–555 (2002)
35.
go back to reference Toor, S.-ur-R., Ogunlana, S.O.: Beyond the «iron triangle»: stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. Int. J. Proj. Manag. 28(3), 228–236 (2010)CrossRef Toor, S.-ur-R., Ogunlana, S.O.: Beyond the «iron triangle»: stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. Int. J. Proj. Manag. 28(3), 228–236 (2010)CrossRef
36.
go back to reference Tsiga, Z.D., Emes, M., Smith, A.: Critical success factors for the construction industry. PM World J. 5(8), 1–12 (2016) Tsiga, Z.D., Emes, M., Smith, A.: Critical success factors for the construction industry. PM World J. 5(8), 1–12 (2016)
37.
go back to reference Won, J., Lee, C.: How to tell if a BIM project is successful: a goal-driven approach. Autom. Constr. 69, 34–43 (2016)CrossRef Won, J., Lee, C.: How to tell if a BIM project is successful: a goal-driven approach. Autom. Constr. 69, 34–43 (2016)CrossRef
38.
go back to reference Yu, I., Kim, K., Jung, Y., Chin, S.: Comparable performance measurement system for construction companies. J. Manag. Eng. 23(3), 131–139 (2007)CrossRef Yu, I., Kim, K., Jung, Y., Chin, S.: Comparable performance measurement system for construction companies. J. Manag. Eng. 23(3), 131–139 (2007)CrossRef
Metadata
Title
A Building Information Modelling-Integrated Model of Construction Project Performance Indicators
Authors
Oluseye Olugboyega
Abimbola Windapo
Copyright Year
2020
DOI
https://doi.org/10.1007/978-3-030-26528-1_15