Skip to main content
Top

2018 | OriginalPaper | Chapter

A New Rescheduling Heuristic for Flexible Job Shop Problem with Machine Disruption

Authors : Maroua Nouiri, Abdelghani Bekrar, Abderrazak Jemai, Ahmed Chiheb Ammari, Smail Niar

Published in: Service Orientation in Holonic and Multi-Agent Manufacturing

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In real-world manufacturing systems, schedules are often confronted with uncertainty factors such as random machine breakdown, random process time, random job arrivals or job cancellations. A large number of impromptu disruptions frequently affect the scheduled operations and invalidate the original schedule. There is still the need for rescheduling methods that can work effectively in disruption management. In this work, an algorithm for rescheduling the affected operations in a flexible job shop is presented and its performance, with respect to measures of efficiency and stability, is compared with the Right Shift Rescheduling technique. The proposed method is tested on different benchmark scheduling problems with various disruption scenarios. Experimental results show that the proposed rescheduling method improves the efficiency and stability when compared to Right Shift Rescheduling method.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Nouiri, M., Bekrar, A., Jemai, A., Niar, S., Ammari, A.C.: An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem. J. Intell. Manuf. 1–13 (2015) Nouiri, M., Bekrar, A., Jemai, A., Niar, S., Ammari, A.C.: An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem. J. Intell. Manuf. 1–13 (2015)
2.
go back to reference Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D.: Scheduling under uncertainty : survey and research directions. Int. Conf. Adv. Logist. Trans. 267–272 (2014) Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D.: Scheduling under uncertainty : survey and research directions. Int. Conf. Adv. Logist. Trans. 267–272 (2014)
3.
go back to reference Cardin, O., Trentesaux, D., Thomas, A., Castagna, P., Berger, T., El-Haouzi, H.: Coupling predictive scheduling and reactive control in manufacturing hybrid control architectures: state of the art and future challenges. J. Intell. Manuf. 1–15 (2015) Cardin, O., Trentesaux, D., Thomas, A., Castagna, P., Berger, T., El-Haouzi, H.: Coupling predictive scheduling and reactive control in manufacturing hybrid control architectures: state of the art and future challenges. J. Intell. Manuf. 1–15 (2015)
4.
go back to reference Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies and methods. J. Sched. 6(1), 39–62 (2003)MathSciNetCrossRefMATH Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies and methods. J. Sched. 6(1), 39–62 (2003)MathSciNetCrossRefMATH
5.
go back to reference Katragjini, K., Vallada, E.: Rescheduling flowshops under simultaneous disruptions. Int. Conf. Ind. Eng. Syst. Manag. (IESM). Sevilla, Spain, 21–23 Oct (2015) Katragjini, K., Vallada, E.: Rescheduling flowshops under simultaneous disruptions. Int. Conf. Ind. Eng. Syst. Manag. (IESM). Sevilla, Spain, 21–23 Oct (2015)
6.
go back to reference Abumaizar, R.J., Svestka, J.A.: Rescheduling job shops under random disruptions. Int. J. Prod. Res. 35(7), 2065–2082 (1997)CrossRefMATH Abumaizar, R.J., Svestka, J.A.: Rescheduling job shops under random disruptions. Int. J. Prod. Res. 35(7), 2065–2082 (1997)CrossRefMATH
7.
go back to reference Subramaniam, V., Raheja, A.S.: mAOR: a heuristic-based reactive repair mechanism for job shop schedules. Int. J. Adv. Manuf. Technol. 22(9), 669–680 (2003)CrossRef Subramaniam, V., Raheja, A.S.: mAOR: a heuristic-based reactive repair mechanism for job shop schedules. Int. J. Adv. Manuf. Technol. 22(9), 669–680 (2003)CrossRef
8.
go back to reference Dong, Y., Jang, J.: Production rescheduling for machine breakdown at a job shop. Int. J. Prod. Res. 50(10), 2681–2691 (2012)CrossRef Dong, Y., Jang, J.: Production rescheduling for machine breakdown at a job shop. Int. J. Prod. Res. 50(10), 2681–2691 (2012)CrossRef
9.
go back to reference Unachak, P.: Goodman: adaptive representation for flexible job-shop scheduling and rescheduling. In: Proceedings of the First ACM/SIGEVO Summit on Genetic and Evolutionary Computation, pp. 511–516. Shanghai, China, 12–14 June (2009) Unachak, P.: Goodman: adaptive representation for flexible job-shop scheduling and rescheduling. In: Proceedings of the First ACM/SIGEVO Summit on Genetic and Evolutionary Computation, pp. 511–516. Shanghai, China, 12–14 June (2009)
10.
go back to reference Souier, M., Sari, Z., Hassam, A.: Real-time rescheduling metaheuristic algorithms applied to FMS with routing flexibility. Int. J. Adv. Manuf. Technol. 64(1), 145–164 (2013)CrossRef Souier, M., Sari, Z., Hassam, A.: Real-time rescheduling metaheuristic algorithms applied to FMS with routing flexibility. Int. J. Adv. Manuf. Technol. 64(1), 145–164 (2013)CrossRef
11.
go back to reference Kennedy, J., Eberhart, R.: Particle swarm optimization. IEEE Int. Conf. Neural Netw. 1942–1948 (1995) Kennedy, J., Eberhart, R.: Particle swarm optimization. IEEE Int. Conf. Neural Netw. 1942–1948 (1995)
12.
go back to reference Jia, Z., Chen, H., Tang, J.: An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem. Int. Conf. Grey Syst. 1587–1592 (2007) Jia, Z., Chen, H., Tang, J.: An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem. Int. Conf. Grey Syst. 1587–1592 (2007)
13.
go back to reference Nouiri, M., Bekrar, A., Jemai, A., Trentesaux, D., Ammari, A.C., Niar, S.: Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns. Comput. Ind. Eng. 112, 595–606 (2017) Nouiri, M., Bekrar, A., Jemai, A., Trentesaux, D., Ammari, A.C., Niar, S.: Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns. Comput. Ind. Eng. 112, 595–606 (2017)
14.
go back to reference Motaghedi-Larijani, A., Sabri-l, K., Heydari, M.: Solving flexible job shop scheduling with multi objective approach. Int. J. Industr. Eng. Prod. Res. 21(4), 197–209 (2010) Motaghedi-Larijani, A., Sabri-l, K., Heydari, M.: Solving flexible job shop scheduling with multi objective approach. Int. J. Industr. Eng. Prod. Res. 21(4), 197–209 (2010)
15.
go back to reference Gahm, C., Denz, F., Dirr, M., Tuma, A.: Energy efficient scheduling in manufacturing companies: a review and research framework. Eur. J. Oper. Res. 248(3), 744–757 (2016)MathSciNetCrossRefMATH Gahm, C., Denz, F., Dirr, M., Tuma, A.: Energy efficient scheduling in manufacturing companies: a review and research framework. Eur. J. Oper. Res. 248(3), 744–757 (2016)MathSciNetCrossRefMATH
16.
go back to reference Tonelli, F., Bruzzone, A., Paolucci, M., Carpanzano, E., Nicol, G., Giret, A., Salido, M., Trentesaux, D.: Assessment of mathematical programming and agent based modelling for off-line scheduling: application to energy aware manufacturing. CIRP Ann. Manuf. Technol. 65(1), 405–408 (2016) Tonelli, F., Bruzzone, A., Paolucci, M., Carpanzano, E., Nicol, G., Giret, A., Salido, M., Trentesaux, D.: Assessment of mathematical programming and agent based modelling for off-line scheduling: application to energy aware manufacturing. CIRP Ann. Manuf. Technol. 65(1), 405–408 (2016)
17.
go back to reference Salido, M., Escamilla, J., Barber, F., Giret, A.: Rescheduling in job-shop problems for sustainable manufacturing systems. J. Clean. Prod. 1–12 (2016) Salido, M., Escamilla, J., Barber, F., Giret, A.: Rescheduling in job-shop problems for sustainable manufacturing systems. J. Clean. Prod. 1–12 (2016)
18.
go back to reference Borangiu, T., Răileanu, S., Berger, T., Trentesaux, D.: Switching mode control strategy in manufacturing execution systems. Int. J. Prod. Res. 53(7), 1950–1963 (2015)CrossRef Borangiu, T., Răileanu, S., Berger, T., Trentesaux, D.: Switching mode control strategy in manufacturing execution systems. Int. J. Prod. Res. 53(7), 1950–1963 (2015)CrossRef
19.
go back to reference Giret, A., Trentesaux, D., Salido, M., Garcia, E., Adam, E.: A holonic multi-agent methodology to design sustainable intelligent manufacturing control systems. J. Clean. Prod. 1–17 (2017) Giret, A., Trentesaux, D., Salido, M., Garcia, E., Adam, E.: A holonic multi-agent methodology to design sustainable intelligent manufacturing control systems. J. Clean. Prod. 1–17 (2017)
20.
go back to reference Raileanu, S., Anton, F., Iatan, A., Borangiu, T., Morariu, O.: Resource scheduling based on energy consumption for sustainable manufacturing. J. Intell. Manuf. 1–12 (2015) Raileanu, S., Anton, F., Iatan, A., Borangiu, T., Morariu, O.: Resource scheduling based on energy consumption for sustainable manufacturing. J. Intell. Manuf. 1–12 (2015)
Metadata
Title
A New Rescheduling Heuristic for Flexible Job Shop Problem with Machine Disruption
Authors
Maroua Nouiri
Abdelghani Bekrar
Abderrazak Jemai
Ahmed Chiheb Ammari
Smail Niar
Copyright Year
2018
DOI
https://doi.org/10.1007/978-3-319-73751-5_35

Premium Partner