Skip to main content

2018 | OriginalPaper | Buchkapitel

A New Rescheduling Heuristic for Flexible Job Shop Problem with Machine Disruption

verfasst von : Maroua Nouiri, Abdelghani Bekrar, Abderrazak Jemai, Ahmed Chiheb Ammari, Smail Niar

Erschienen in: Service Orientation in Holonic and Multi-Agent Manufacturing

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In real-world manufacturing systems, schedules are often confronted with uncertainty factors such as random machine breakdown, random process time, random job arrivals or job cancellations. A large number of impromptu disruptions frequently affect the scheduled operations and invalidate the original schedule. There is still the need for rescheduling methods that can work effectively in disruption management. In this work, an algorithm for rescheduling the affected operations in a flexible job shop is presented and its performance, with respect to measures of efficiency and stability, is compared with the Right Shift Rescheduling technique. The proposed method is tested on different benchmark scheduling problems with various disruption scenarios. Experimental results show that the proposed rescheduling method improves the efficiency and stability when compared to Right Shift Rescheduling method.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Nouiri, M., Bekrar, A., Jemai, A., Niar, S., Ammari, A.C.: An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem. J. Intell. Manuf. 1–13 (2015) Nouiri, M., Bekrar, A., Jemai, A., Niar, S., Ammari, A.C.: An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem. J. Intell. Manuf. 1–13 (2015)
2.
Zurück zum Zitat Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D.: Scheduling under uncertainty : survey and research directions. Int. Conf. Adv. Logist. Trans. 267–272 (2014) Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D.: Scheduling under uncertainty : survey and research directions. Int. Conf. Adv. Logist. Trans. 267–272 (2014)
3.
Zurück zum Zitat Cardin, O., Trentesaux, D., Thomas, A., Castagna, P., Berger, T., El-Haouzi, H.: Coupling predictive scheduling and reactive control in manufacturing hybrid control architectures: state of the art and future challenges. J. Intell. Manuf. 1–15 (2015) Cardin, O., Trentesaux, D., Thomas, A., Castagna, P., Berger, T., El-Haouzi, H.: Coupling predictive scheduling and reactive control in manufacturing hybrid control architectures: state of the art and future challenges. J. Intell. Manuf. 1–15 (2015)
4.
Zurück zum Zitat Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies and methods. J. Sched. 6(1), 39–62 (2003)MathSciNetCrossRefMATH Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies and methods. J. Sched. 6(1), 39–62 (2003)MathSciNetCrossRefMATH
5.
Zurück zum Zitat Katragjini, K., Vallada, E.: Rescheduling flowshops under simultaneous disruptions. Int. Conf. Ind. Eng. Syst. Manag. (IESM). Sevilla, Spain, 21–23 Oct (2015) Katragjini, K., Vallada, E.: Rescheduling flowshops under simultaneous disruptions. Int. Conf. Ind. Eng. Syst. Manag. (IESM). Sevilla, Spain, 21–23 Oct (2015)
6.
Zurück zum Zitat Abumaizar, R.J., Svestka, J.A.: Rescheduling job shops under random disruptions. Int. J. Prod. Res. 35(7), 2065–2082 (1997)CrossRefMATH Abumaizar, R.J., Svestka, J.A.: Rescheduling job shops under random disruptions. Int. J. Prod. Res. 35(7), 2065–2082 (1997)CrossRefMATH
7.
Zurück zum Zitat Subramaniam, V., Raheja, A.S.: mAOR: a heuristic-based reactive repair mechanism for job shop schedules. Int. J. Adv. Manuf. Technol. 22(9), 669–680 (2003)CrossRef Subramaniam, V., Raheja, A.S.: mAOR: a heuristic-based reactive repair mechanism for job shop schedules. Int. J. Adv. Manuf. Technol. 22(9), 669–680 (2003)CrossRef
8.
Zurück zum Zitat Dong, Y., Jang, J.: Production rescheduling for machine breakdown at a job shop. Int. J. Prod. Res. 50(10), 2681–2691 (2012)CrossRef Dong, Y., Jang, J.: Production rescheduling for machine breakdown at a job shop. Int. J. Prod. Res. 50(10), 2681–2691 (2012)CrossRef
9.
Zurück zum Zitat Unachak, P.: Goodman: adaptive representation for flexible job-shop scheduling and rescheduling. In: Proceedings of the First ACM/SIGEVO Summit on Genetic and Evolutionary Computation, pp. 511–516. Shanghai, China, 12–14 June (2009) Unachak, P.: Goodman: adaptive representation for flexible job-shop scheduling and rescheduling. In: Proceedings of the First ACM/SIGEVO Summit on Genetic and Evolutionary Computation, pp. 511–516. Shanghai, China, 12–14 June (2009)
10.
Zurück zum Zitat Souier, M., Sari, Z., Hassam, A.: Real-time rescheduling metaheuristic algorithms applied to FMS with routing flexibility. Int. J. Adv. Manuf. Technol. 64(1), 145–164 (2013)CrossRef Souier, M., Sari, Z., Hassam, A.: Real-time rescheduling metaheuristic algorithms applied to FMS with routing flexibility. Int. J. Adv. Manuf. Technol. 64(1), 145–164 (2013)CrossRef
11.
Zurück zum Zitat Kennedy, J., Eberhart, R.: Particle swarm optimization. IEEE Int. Conf. Neural Netw. 1942–1948 (1995) Kennedy, J., Eberhart, R.: Particle swarm optimization. IEEE Int. Conf. Neural Netw. 1942–1948 (1995)
12.
Zurück zum Zitat Jia, Z., Chen, H., Tang, J.: An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem. Int. Conf. Grey Syst. 1587–1592 (2007) Jia, Z., Chen, H., Tang, J.: An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem. Int. Conf. Grey Syst. 1587–1592 (2007)
13.
Zurück zum Zitat Nouiri, M., Bekrar, A., Jemai, A., Trentesaux, D., Ammari, A.C., Niar, S.: Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns. Comput. Ind. Eng. 112, 595–606 (2017) Nouiri, M., Bekrar, A., Jemai, A., Trentesaux, D., Ammari, A.C., Niar, S.: Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns. Comput. Ind. Eng. 112, 595–606 (2017)
14.
Zurück zum Zitat Motaghedi-Larijani, A., Sabri-l, K., Heydari, M.: Solving flexible job shop scheduling with multi objective approach. Int. J. Industr. Eng. Prod. Res. 21(4), 197–209 (2010) Motaghedi-Larijani, A., Sabri-l, K., Heydari, M.: Solving flexible job shop scheduling with multi objective approach. Int. J. Industr. Eng. Prod. Res. 21(4), 197–209 (2010)
15.
Zurück zum Zitat Gahm, C., Denz, F., Dirr, M., Tuma, A.: Energy efficient scheduling in manufacturing companies: a review and research framework. Eur. J. Oper. Res. 248(3), 744–757 (2016)MathSciNetCrossRefMATH Gahm, C., Denz, F., Dirr, M., Tuma, A.: Energy efficient scheduling in manufacturing companies: a review and research framework. Eur. J. Oper. Res. 248(3), 744–757 (2016)MathSciNetCrossRefMATH
16.
Zurück zum Zitat Tonelli, F., Bruzzone, A., Paolucci, M., Carpanzano, E., Nicol, G., Giret, A., Salido, M., Trentesaux, D.: Assessment of mathematical programming and agent based modelling for off-line scheduling: application to energy aware manufacturing. CIRP Ann. Manuf. Technol. 65(1), 405–408 (2016) Tonelli, F., Bruzzone, A., Paolucci, M., Carpanzano, E., Nicol, G., Giret, A., Salido, M., Trentesaux, D.: Assessment of mathematical programming and agent based modelling for off-line scheduling: application to energy aware manufacturing. CIRP Ann. Manuf. Technol. 65(1), 405–408 (2016)
17.
Zurück zum Zitat Salido, M., Escamilla, J., Barber, F., Giret, A.: Rescheduling in job-shop problems for sustainable manufacturing systems. J. Clean. Prod. 1–12 (2016) Salido, M., Escamilla, J., Barber, F., Giret, A.: Rescheduling in job-shop problems for sustainable manufacturing systems. J. Clean. Prod. 1–12 (2016)
18.
Zurück zum Zitat Borangiu, T., Răileanu, S., Berger, T., Trentesaux, D.: Switching mode control strategy in manufacturing execution systems. Int. J. Prod. Res. 53(7), 1950–1963 (2015)CrossRef Borangiu, T., Răileanu, S., Berger, T., Trentesaux, D.: Switching mode control strategy in manufacturing execution systems. Int. J. Prod. Res. 53(7), 1950–1963 (2015)CrossRef
19.
Zurück zum Zitat Giret, A., Trentesaux, D., Salido, M., Garcia, E., Adam, E.: A holonic multi-agent methodology to design sustainable intelligent manufacturing control systems. J. Clean. Prod. 1–17 (2017) Giret, A., Trentesaux, D., Salido, M., Garcia, E., Adam, E.: A holonic multi-agent methodology to design sustainable intelligent manufacturing control systems. J. Clean. Prod. 1–17 (2017)
20.
Zurück zum Zitat Raileanu, S., Anton, F., Iatan, A., Borangiu, T., Morariu, O.: Resource scheduling based on energy consumption for sustainable manufacturing. J. Intell. Manuf. 1–12 (2015) Raileanu, S., Anton, F., Iatan, A., Borangiu, T., Morariu, O.: Resource scheduling based on energy consumption for sustainable manufacturing. J. Intell. Manuf. 1–12 (2015)
Metadaten
Titel
A New Rescheduling Heuristic for Flexible Job Shop Problem with Machine Disruption
verfasst von
Maroua Nouiri
Abdelghani Bekrar
Abderrazak Jemai
Ahmed Chiheb Ammari
Smail Niar
Copyright-Jahr
2018
DOI
https://doi.org/10.1007/978-3-319-73751-5_35