Skip to main content
Top
Published in: Production Engineering 5/2018

07-06-2018 | Assembly

A novel competitive hybrid approach based on grouping evolution strategy algorithm for solving U-shaped assembly line balancing problems

Authors: Mazyar Ghadiri Nejad, Ali Husseinzadeh Kashan, Seyed Mahdi Shavarani

Published in: Production Engineering | Issue 5/2018

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Assembly line balancing problems (ALBPs) are among the well-known problems in manufacturing systems that belong to NP-hard class of problems. In the literature, there are various metaheuristic methods proposed to solve different models of such a problem under various assumptions. This research considers the U-shaped ALBP and proposes a hybrid solution method based on grouping evolution strategy algorithm. To develop a competitive approach, two most popular constructive methods of solving ALBP including the ranked positional weight method, and COMSOAL algorithm are modified and improved. We investigate the effectiveness of the proposed improvements and evaluate the performance of the proposed approach via solving a number of existing problems in the literature and compare the results with some current methods in the literature. Computational results indicate that the proposed approach for solving U-shaped ALBP test problems performs efficiently and is able to obtain the global optimal solution of the most of high dimensional problems.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Abbasi-Pooya A, Husseinzadeh Kashan A (2017) New mathematical models and a hybrid grouping evolution strategy algorithm for optimal helicopter routing and crew pickup and delivery. Comput Ind Eng 112:35–56CrossRef Abbasi-Pooya A, Husseinzadeh Kashan A (2017) New mathematical models and a hybrid grouping evolution strategy algorithm for optimal helicopter routing and crew pickup and delivery. Comput Ind Eng 112:35–56CrossRef
2.
go back to reference Agustı L, Salcedo-Sanz S, Jiménez-Fernández S, Carro-Calvo L, Del Ser J, Portilla-Figueras JA (2012) A new grouping genetic algorithm for clustering problems. Expert Syst Appl 39(10):9695–9703CrossRef Agustı L, Salcedo-Sanz S, Jiménez-Fernández S, Carro-Calvo L, Del Ser J, Portilla-Figueras JA (2012) A new grouping genetic algorithm for clustering problems. Expert Syst Appl 39(10):9695–9703CrossRef
3.
go back to reference Alavidoost M, Zarandi MF, Tarimoradi M, Nemati Y (2017) Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times. J Intell Manuf 28(2):313–336CrossRef Alavidoost M, Zarandi MF, Tarimoradi M, Nemati Y (2017) Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times. J Intell Manuf 28(2):313–336CrossRef
4.
go back to reference Arcus AL (1965) A computer method of sequencing operations for assembly lines. Int J Prod Res 4(4):259–277CrossRef Arcus AL (1965) A computer method of sequencing operations for assembly lines. Int J Prod Res 4(4):259–277CrossRef
5.
go back to reference Brimberg J, Mladenović N, Urošević D (2015) Solving the maximally diverse grouping problem by skewed general variable neighborhood search. Inf Sci 295:650–675CrossRef Brimberg J, Mladenović N, Urošević D (2015) Solving the maximally diverse grouping problem by skewed general variable neighborhood search. Inf Sci 295:650–675CrossRef
6.
go back to reference Falkenauer E, Delchambre A (1992) A genetic algorithm for bin packing and line balancing. In: IEEE international conference on paper presented at the robotics and automation, 1992. Proceedings, 1992 Falkenauer E, Delchambre A (1992) A genetic algorithm for bin packing and line balancing. In: IEEE international conference on paper presented at the robotics and automation, 1992. Proceedings, 1992
7.
go back to reference Fathi M, Alvarez M, Rodriguez V (2011) A new heuristic approach to solving U-shape assembly line balancing problems type. World Acad Sci Eng Technol 59:413–421 Fathi M, Alvarez M, Rodriguez V (2011) A new heuristic approach to solving U-shape assembly line balancing problems type. World Acad Sci Eng Technol 59:413–421
8.
go back to reference Ghadiri Nejad M, Banar M (2018) Emergency response time minimization by incorporating ground and aerial transportation. Ann Optim Theory Pract 1(1):43–57 Ghadiri Nejad M, Banar M (2018) Emergency response time minimization by incorporating ground and aerial transportation. Ann Optim Theory Pract 1(1):43–57
9.
go back to reference Ghadiri Nejad M, Husseinzadeh Kashan A, Rismanchian F (2013) A new competitive method for solving assembly line balancing problem. In: 1st international conference on new directions in business, management, finance and economics, Famagusta, Cyprus Ghadiri Nejad M, Husseinzadeh Kashan A, Rismanchian F (2013) A new competitive method for solving assembly line balancing problem. In: 1st international conference on new directions in business, management, finance and economics, Famagusta, Cyprus
10.
go back to reference Ghadiri Nejad M, Shavarani SM, Vizvári B, Vatankhah Barenji R (2018) Trade-off between process scheduling and production cost in cyclic flexible robotic cell. Int J Adv Manuf Technol 96(1–4):1081–1091 Ghadiri Nejad M, Shavarani SM, Vizvári B, Vatankhah Barenji R (2018) Trade-off between process scheduling and production cost in cyclic flexible robotic cell. Int J Adv Manuf Technol 96(1–4):1081–1091
11.
go back to reference Glonegger M, Reinhart G (2015) Planning of synchronized assembly lines taking into consideration human performance fluctuations. Prod Eng Res Dev 9(2):277–287CrossRef Glonegger M, Reinhart G (2015) Planning of synchronized assembly lines taking into consideration human performance fluctuations. Prod Eng Res Dev 9(2):277–287CrossRef
12.
go back to reference Grzechca W (2014) Assembly line balancing problem with reduced number of workstations. IFAC Proc Vol 47(3):6180–6185CrossRef Grzechca W (2014) Assembly line balancing problem with reduced number of workstations. IFAC Proc Vol 47(3):6180–6185CrossRef
13.
go back to reference Helgeson W, Birnie D (1961) Assembly line balancing using the ranked positional weight technique. J Ind Eng 12(6):394–398 Helgeson W, Birnie D (1961) Assembly line balancing using the ranked positional weight technique. J Ind Eng 12(6):394–398
14.
go back to reference Husseinzadeh Kashan A, Akbari AA, Ostadi B (2015) Grouping evolution strategies: an effective approach for grouping problems. Appl Math Model 39(9):2703–2720MathSciNetCrossRef Husseinzadeh Kashan A, Akbari AA, Ostadi B (2015) Grouping evolution strategies: an effective approach for grouping problems. Appl Math Model 39(9):2703–2720MathSciNetCrossRef
15.
go back to reference Husseinzadeh Kashan A, Jenabi M, Husseinzadeh Kashan M (2009) A new solution approach for grouping problems based on evolution strategies. In: Paper presented at the 2009 international conference of soft computing and pattern recognition Husseinzadeh Kashan A, Jenabi M, Husseinzadeh Kashan M (2009) A new solution approach for grouping problems based on evolution strategies. In: Paper presented at the 2009 international conference of soft computing and pattern recognition
17.
go back to reference Husseinzadeh Kashan A, Rezaee B, Karimiyan S (2013) An efficient approach for unsupervised fuzzy clustering based on grouping evolution strategies. Pattern Recognit 46(5):1240–1254CrossRef Husseinzadeh Kashan A, Rezaee B, Karimiyan S (2013) An efficient approach for unsupervised fuzzy clustering based on grouping evolution strategies. Pattern Recognit 46(5):1240–1254CrossRef
18.
go back to reference Hwang RK, Katayama H, Gen M (2008) U-shaped assembly line balancing problem with genetic algorithm. Int J Prod Res 46(16):4637–4649CrossRef Hwang RK, Katayama H, Gen M (2008) U-shaped assembly line balancing problem with genetic algorithm. Int J Prod Res 46(16):4637–4649CrossRef
19.
go back to reference Jonnalagedda V, Dabade B (2014) Application of simple genetic algorithm to U-shaped assembly line balancing problem of type II. IFAC Proc Vol 47(3):6168–6173CrossRef Jonnalagedda V, Dabade B (2014) Application of simple genetic algorithm to U-shaped assembly line balancing problem of type II. IFAC Proc Vol 47(3):6168–6173CrossRef
20.
go back to reference Kucukkoc I, Zhang DZ (2015) Balancing of parallel U-shaped assembly lines. Comput Oper Res 64(Supplement C):233–244MathSciNetCrossRef Kucukkoc I, Zhang DZ (2015) Balancing of parallel U-shaped assembly lines. Comput Oper Res 64(Supplement C):233–244MathSciNetCrossRef
21.
go back to reference Li Z, Kucukkoc I, Nilakantan JM (2017) Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem. Comput Oper Res 84:146–161MathSciNetCrossRef Li Z, Kucukkoc I, Nilakantan JM (2017) Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem. Comput Oper Res 84:146–161MathSciNetCrossRef
22.
go back to reference Li Z, Tang Q, Zhang L (2017) Two-sided assembly line balancing problem of type I: Improvements, a simple algorithm and a comprehensive study. Comput Oper Res 79:78–93MathSciNetCrossRef Li Z, Tang Q, Zhang L (2017) Two-sided assembly line balancing problem of type I: Improvements, a simple algorithm and a comprehensive study. Comput Oper Res 79:78–93MathSciNetCrossRef
23.
go back to reference Mosallaeipour S, Ghadiri Nejad M, Shavarani SM, Nazerian R (2018) Mobile robot scheduling for cycle time optimization in flow-shop cells, a case study. Prod Eng Res Dev 12(1):83–93CrossRef Mosallaeipour S, Ghadiri Nejad M, Shavarani SM, Nazerian R (2018) Mobile robot scheduling for cycle time optimization in flow-shop cells, a case study. Prod Eng Res Dev 12(1):83–93CrossRef
24.
go back to reference Mukund Nilakantan J, Ponnambalam S (2016) Robotic U-shaped assembly line balancing using particle swarm optimization. Eng Optim 48(2):231–252MathSciNetCrossRef Mukund Nilakantan J, Ponnambalam S (2016) Robotic U-shaped assembly line balancing using particle swarm optimization. Eng Optim 48(2):231–252MathSciNetCrossRef
25.
go back to reference Ogan D, Azizoglu M (2015). A branch and bound method for the line balancing problem in U-shaped assembly lines with equipment requirements. J Manuf Syst 36(Supplement C), 46–54CrossRef Ogan D, Azizoglu M (2015). A branch and bound method for the line balancing problem in U-shaped assembly lines with equipment requirements. J Manuf Syst 36(Supplement C), 46–54CrossRef
26.
go back to reference Oksuz MK, Buyukozkan K, Satoglu SI (2017) U-shaped assembly line worker assignment and balancing problem: A mathematical model and two meta-heuristics. Comput Ind Eng 112(Supplement C):246–263CrossRef Oksuz MK, Buyukozkan K, Satoglu SI (2017) U-shaped assembly line worker assignment and balancing problem: A mathematical model and two meta-heuristics. Comput Ind Eng 112(Supplement C):246–263CrossRef
27.
go back to reference Rechenberg I (1973) Evolution strategy: optimization of technical systems by means of biological evolution, vol 104. Fromman-Holzboog, Stuttgart Rechenberg I (1973) Evolution strategy: optimization of technical systems by means of biological evolution, vol 104. Fromman-Holzboog, Stuttgart
28.
go back to reference Reinhart G, Werner J, Lange F (2009) Robot based system for the automation of flow assembly lines. Prod Eng Res Dev 3(1):121–126CrossRef Reinhart G, Werner J, Lange F (2009) Robot based system for the automation of flow assembly lines. Prod Eng Res Dev 3(1):121–126CrossRef
29.
go back to reference Scholl A, Klein R (1999) ULINO: Optimally balancing U-shaped JIT assembly lines. Int J Prod Res 37(4):721–736CrossRef Scholl A, Klein R (1999) ULINO: Optimally balancing U-shaped JIT assembly lines. Int J Prod Res 37(4):721–736CrossRef
30.
go back to reference Shavarani SM, Ghadiri Nejad M, Rismanchian F, Izbirak G (2018) Application of hierarchical facility location problem for optimization of a drone delivery system: a case study of Amazon prime air in the city of San Francisco. Int J Adv Manuf Technol 95(9–12):3141–3153CrossRef Shavarani SM, Ghadiri Nejad M, Rismanchian F, Izbirak G (2018) Application of hierarchical facility location problem for optimization of a drone delivery system: a case study of Amazon prime air in the city of San Francisco. Int J Adv Manuf Technol 95(9–12):3141–3153CrossRef
31.
go back to reference Zhou Y, Hao J-K, Duval B (2016) Reinforcement learning based local search for grouping problems: a case study on graph coloring. Expert Syst Appl 64:412–422CrossRef Zhou Y, Hao J-K, Duval B (2016) Reinforcement learning based local search for grouping problems: a case study on graph coloring. Expert Syst Appl 64:412–422CrossRef
Metadata
Title
A novel competitive hybrid approach based on grouping evolution strategy algorithm for solving U-shaped assembly line balancing problems
Authors
Mazyar Ghadiri Nejad
Ali Husseinzadeh Kashan
Seyed Mahdi Shavarani
Publication date
07-06-2018
Publisher
Springer Berlin Heidelberg
Published in
Production Engineering / Issue 5/2018
Print ISSN: 0944-6524
Electronic ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-018-0836-x

Other articles of this Issue 5/2018

Production Engineering 5/2018 Go to the issue

Premium Partners