Skip to main content
Top
Published in: Rock Mechanics and Rock Engineering 5/2015

01-09-2015 | Original Paper

A Real-Time Analysis and Feedback System for Quality Control of Dam Foundation Grouting Engineering

Authors: D. H. Zhong, F. G. Yan, M. C. Li, C. X. Huang, K. Fan, J. F. Tang

Published in: Rock Mechanics and Rock Engineering | Issue 5/2015

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Real-time analysis and feedback systems play a vital role in obtaining good results from grouting processes. However, when there are intense construction schedules and complex geological structures, it is difficult for existing systems to provide to site engineers, prior to the borehole construction, prompt and accurate feedback, such as detailed geological information about grouting boreholes, which limits the use of such systems in practical applications. This paper proposes combining a three-dimensional (3D) geological model with real-time data collection technology in a system for both monitoring grouting, and providing analysis and feedback. This integrated grouting model, which comprises the geological model, the grouting borehole model and the grouting parameter database set, can be coupled and associated dynamically with grouting data. Additionally, the following methods are applied in this system: real-time grouting data processing and a monitoring alarm, prediction and visualization of geological conditions, forecasting of rock uplift, and visualization analysis of grouting parameters. The application of this system in Hydropower Project A, China is used as a case study. The predictions of geological conditions are closely matched with the actual situation, and this system can be used to monitor construction processes remotely and to help site engineers to design reasonable construction plans, optimize layouts for grouting boreholes and adjust construction measures.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Bao YG (2004) Research on intelligent grouting data recording system. Master’s thesis, Zhejiang University, Hang Zhou, China, 7 pp Bao YG (2004) Research on intelligent grouting data recording system. Master’s thesis, Zhejiang University, Hang Zhou, China, 7 pp
go back to reference Brantberger M, Stille H, Eriksson M (2000) Controlling the grout spread in tunnel grouting-analyses and developments of the GIN-method. Tunn Undergr Space Technol 15(4):343–352CrossRef Brantberger M, Stille H, Eriksson M (2000) Controlling the grout spread in tunnel grouting-analyses and developments of the GIN-method. Tunn Undergr Space Technol 15(4):343–352CrossRef
go back to reference Bruce DA (2012) Computer monitoring in the grouting industry. Geotechnical Engineering State of the Art and Practice 549–564 Bruce DA (2012) Computer monitoring in the grouting industry. Geotechnical Engineering State of the Art and Practice 549–564
go back to reference Chen YF, Zhou CB, Hu R, Li DQ, Rong G (2010) Key issues on seepage flow analysis in large scale hydropower projects. Chin J Geotech Eng 32(9):1448–1454 Chen YF, Zhou CB, Hu R, Li DQ, Rong G (2010) Key issues on seepage flow analysis in large scale hydropower projects. Chin J Geotech Eng 32(9):1448–1454
go back to reference Dreese TL, Wilson DB, Heenan DM, Cockburn J (2003) State of the Art in Computer Monitoring and Analysis of Grouting. Grouting Treat ASCE Geotech Spec Publ 120:1440–1453 Dreese TL, Wilson DB, Heenan DM, Cockburn J (2003) State of the Art in Computer Monitoring and Analysis of Grouting. Grouting Treat ASCE Geotech Spec Publ 120:1440–1453
go back to reference Eklund D, Stille H (2008) Penetrability due to filtration tendency of cement-based grout. Tunn Undergr Sp Tech 23:389–398CrossRef Eklund D, Stille H (2008) Penetrability due to filtration tendency of cement-based grout. Tunn Undergr Sp Tech 23:389–398CrossRef
go back to reference Ewert F-K (1985) Rock grouting with emphasis on dam sites. Springer, Berlin, p 428CrossRef Ewert F-K (1985) Rock grouting with emphasis on dam sites. Springer, Berlin, p 428CrossRef
go back to reference Ewert F-K (1997a) Permeability, groutability and grouting of rocks related to dam sites. Part 1: groutability and grouting of rock. Dam Eng 8(1):31–77 Ewert F-K (1997a) Permeability, groutability and grouting of rocks related to dam sites. Part 1: groutability and grouting of rock. Dam Eng 8(1):31–77
go back to reference Ewert F-K (1997b) Permeability, groutability and grouting of rocks related to dam sites. Part 2: groutability and grouting of rock. Dam Eng 8(2):123–176 Ewert F-K (1997b) Permeability, groutability and grouting of rocks related to dam sites. Part 2: groutability and grouting of rock. Dam Eng 8(2):123–176
go back to reference Ewert F-K (1997c) Permeability, groutability and grouting of rocks related to dam sites. Part 3: groutability and grouting of rock. Dam Eng 8(3):215–248 Ewert F-K (1997c) Permeability, groutability and grouting of rocks related to dam sites. Part 3: groutability and grouting of rock. Dam Eng 8(3):215–248
go back to reference Ewert F-K (1997d) Permeability, groutability and grouting of rocks related to dam sites. Part 4: groutability and grouting of rock. Dam Eng 8(4):271–325 Ewert F-K (1997d) Permeability, groutability and grouting of rocks related to dam sites. Part 4: groutability and grouting of rock. Dam Eng 8(4):271–325
go back to reference Fransson Å, Tsang CF, Rutqvist J, Gustafson G (2010) Estimation of deformation and stiffness of fractures close to tunnels using data from single-hole hydraulic testing and grouting. Int J Rock Mech Min 47(6):887–893CrossRef Fransson Å, Tsang CF, Rutqvist J, Gustafson G (2010) Estimation of deformation and stiffness of fractures close to tunnels using data from single-hole hydraulic testing and grouting. Int J Rock Mech Min 47(6):887–893CrossRef
go back to reference Gularte FB, Taylor GE, Shao LS (2007) Observational monitoring methods for improved grouting and soil improvement. ASCE Geo Institute, GeoDenver, Denver, CO18–21 Gularte FB, Taylor GE, Shao LS (2007) Observational monitoring methods for improved grouting and soil improvement. ASCE Geo Institute, GeoDenver, Denver, CO18–21
go back to reference Gularte FB, Ringen DA, Shao LS (2012) Advances in monitoring and control systems for high mobility grouting. In: Grouting and deep mixing 2012, ASCE, pp 1238–1247 Gularte FB, Ringen DA, Shao LS (2012) Advances in monitoring and control systems for high mobility grouting. In: Grouting and deep mixing 2012, ASCE, pp 1238–1247
go back to reference Gustafson G, Claesson J (2005) Steering parameters for rock grouting. Unpublished paper submitted to the Int J Rock Mech Min, pp 19. Received from Stille H (2009) in a private correspondence Gustafson G, Claesson J (2005) Steering parameters for rock grouting. Unpublished paper submitted to the Int J Rock Mech Min, pp 19. Received from Stille H (2009) in a private correspondence
go back to reference Gustafson G, Stille H (1996) Prediction of groutability from grout properties and hydrogeological data. Tunn Undergr Sp Tech 11(3):325–332CrossRef Gustafson G, Stille H (1996) Prediction of groutability from grout properties and hydrogeological data. Tunn Undergr Sp Tech 11(3):325–332CrossRef
go back to reference Gustafson G, Stille H (2005) Stop criteria for cement grouting. Felsbau 3:62–68 Gustafson G, Stille H (2005) Stop criteria for cement grouting. Felsbau 3:62–68
go back to reference Hang W, Zhao CH (2001) Development and application of grouting monitoring system of Xiaolangdi grouting project. Water Res Hydropower Eng 32(11):33–34 Hang W, Zhao CH (2001) Development and application of grouting monitoring system of Xiaolangdi grouting project. Water Res Hydropower Eng 32(11):33–34
go back to reference Hernqvist L, Butrón C, Fransson Å, Gustafson G, Funehag J (2012) A hard rock tunnel case study: Characterization of the water-bearing fracture system for tunnel grouting. Tunn Undergr Sp Tech 30:132–144CrossRef Hernqvist L, Butrón C, Fransson Å, Gustafson G, Funehag J (2012) A hard rock tunnel case study: Characterization of the water-bearing fracture system for tunnel grouting. Tunn Undergr Sp Tech 30:132–144CrossRef
go back to reference Hernqvist L, Gustafson G, Fransson Å, Norberg T (2013) A statistical grouting decision method based on water pressure tests for the tunnel construction stage-A case study. Tunn Undergr Sp Tech 33:54–62CrossRef Hernqvist L, Gustafson G, Fransson Å, Norberg T (2013) A statistical grouting decision method based on water pressure tests for the tunnel construction stage-A case study. Tunn Undergr Sp Tech 33:54–62CrossRef
go back to reference Høien AH, Nilsen B (2013) Rock mass grouting in the Løren tunnel: case study with the main focus on the groutability and feasibility of drill parameter interpretation. Rock Mech Rock Eng. doi:10.1007/s00603-013-0386-7 Høien AH, Nilsen B (2013) Rock mass grouting in the Løren tunnel: case study with the main focus on the groutability and feasibility of drill parameter interpretation. Rock Mech Rock Eng. doi:10.​1007/​s00603-013-0386-7
go back to reference Houlsby AC (1990) Construction and design of cement grouting. Wiley, New York 442 pp Houlsby AC (1990) Construction and design of cement grouting. Wiley, New York 442 pp
go back to reference Huo JQ (2010) Water resources and hydropower engineering grouting process control. Res Appl Build Mater: 47–48 Huo JQ (2010) Water resources and hydropower engineering grouting process control. Res Appl Build Mater: 47–48
go back to reference Kobayashi S, Stille H, Gustafson G, Stille B (2008) Real time grouting control method: development and application using Äspö HRL data, SKB. Technical Report R-08-133. Swedish Nuclear Fueland Waste Management Company, Stockholm, Sweden Kobayashi S, Stille H, Gustafson G, Stille B (2008) Real time grouting control method: development and application using Äspö HRL data, SKB. Technical Report R-08-133. Swedish Nuclear Fueland Waste Management Company, Stockholm, Sweden
go back to reference Liu XG (2012) The design and develop of material processing software for grouting construction, Master’s thesis. Central South University, ChangSha, China, pp 1–2 Liu XG (2012) The design and develop of material processing software for grouting construction, Master’s thesis. Central South University, ChangSha, China, pp 1–2
go back to reference Lombardi G, Deere D (1993) Grouting design and control using the GIN principle. Water Power Dam Constr 45(6):15–22 Lombardi G, Deere D (1993) Grouting design and control using the GIN principle. Water Power Dam Constr 45(6):15–22
go back to reference Rao XK, Wang H (2013) Application of B/S network-based digital grouting management system to hydroprojects. J Yangtze River Sci Res Inst 30(2):79–82 Rao XK, Wang H (2013) Application of B/S network-based digital grouting management system to hydroprojects. J Yangtze River Sci Res Inst 30(2):79–82
go back to reference Sadeghiyeh SM, Hashemi M, Ajalloeian R (2013) Comparison of permeability and groutability of Ostur dam site rock mass for grout curtain design. Rock Mech Rock Eng 46(2):341–357CrossRef Sadeghiyeh SM, Hashemi M, Ajalloeian R (2013) Comparison of permeability and groutability of Ostur dam site rock mass for grout curtain design. Rock Mech Rock Eng 46(2):341–357CrossRef
go back to reference Stille B, Stille H, Gustafson G, Kobayashi S (2009) Experience with the real time grouting control method. Geomech Tunn 2(5):447–459CrossRef Stille B, Stille H, Gustafson G, Kobayashi S (2009) Experience with the real time grouting control method. Geomech Tunn 2(5):447–459CrossRef
go back to reference Stille H, Gustafson G, Hassler L (2012) Application of new theories and technology for Grouting of Dams and Foundations on rock. Geotech Geol Eng 30(3):603–624CrossRef Stille H, Gustafson G, Hassler L (2012) Application of new theories and technology for Grouting of Dams and Foundations on rock. Geotech Geol Eng 30(3):603–624CrossRef
go back to reference Uromeihy A, Farrokhi R (2012) Evaluating groutability at the Kamal-Saleh dam based on Lugeon tests. Bull Eng Geol Environ 71(2):215–219CrossRef Uromeihy A, Farrokhi R (2012) Evaluating groutability at the Kamal-Saleh dam based on Lugeon tests. Bull Eng Geol Environ 71(2):215–219CrossRef
go back to reference Wilson DB, Dreese TL (2002) Advances in computer monitoring and analysis for grouting of dams. US Society on Dams Annual Conference Proceedings, San Diego, CA. USSD, Denver Wilson DB, Dreese TL (2002) Advances in computer monitoring and analysis for grouting of dams. US Society on Dams Annual Conference Proceedings, San Diego, CA. USSD, Denver
go back to reference Yan FG, Miao ZJ, Li MC, Zhong DH (2012) Visual analysis for grouting engineering of dam foundation based on 3D geological model. Chin J Geotech Eng 34(3):567–572 Yan FG, Miao ZJ, Li MC, Zhong DH (2012) Visual analysis for grouting engineering of dam foundation based on 3D geological model. Chin J Geotech Eng 34(3):567–572
go back to reference Zhong DH, Li MC, Wang G, Liu DH (2005) Visualization Analysis of Complex Geologic Body with NURBS Model. J Comput-Aided Design Comput Graph 17(2):284–290 Zhong DH, Li MC, Wang G, Liu DH (2005) Visualization Analysis of Complex Geologic Body with NURBS Model. J Comput-Aided Design Comput Graph 17(2):284–290
go back to reference Zhong DH, Li MC, Song LG, Wang G (2006) Enhanced NURBS model and visualization for large 3-D geo engineering applications: an example from the Jinping first level hydropower engineering project China. Comput Geosci-UK 32(9):1270–1282CrossRef Zhong DH, Li MC, Song LG, Wang G (2006) Enhanced NURBS model and visualization for large 3-D geo engineering applications: an example from the Jinping first level hydropower engineering project China. Comput Geosci-UK 32(9):1270–1282CrossRef
Metadata
Title
A Real-Time Analysis and Feedback System for Quality Control of Dam Foundation Grouting Engineering
Authors
D. H. Zhong
F. G. Yan
M. C. Li
C. X. Huang
K. Fan
J. F. Tang
Publication date
01-09-2015
Publisher
Springer Vienna
Published in
Rock Mechanics and Rock Engineering / Issue 5/2015
Print ISSN: 0723-2632
Electronic ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-014-0686-6

Other articles of this Issue 5/2015

Rock Mechanics and Rock Engineering 5/2015 Go to the issue