2020 | OriginalPaper | Chapter

Accuracy Influencing Factors for Pre-tender Cost Estimates for the Roads Sector in Zambia

Authors : Chipulu Chipulu, Erastus Mwanaumo, Balimu Mwiya, Lubinda Haabazoka, Sampa Chisumbe

Published in: The Construction Industry in the Fourth Industrial Revolution

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Inaccurate pre-tender cost estimates do not only contribute to cost overruns but also results in failure to implement viable projects. This study investigated factors that influence the accuracy of pre-tender cost estimates in the Zambian roads sector. The methodology adopted was a mixed method which included the use of both qualitative and quantitative approaches. The study established that the most severe accuracy-influencing factors for pre-tender cost estimates were completeness of the project information, which had SI of 87%. Clarity and details of the drawing as well as the specification having SI 85% was ranked second. The study therefore, recommends that, more time should be allocated to the design team to comprehensive prepare drawings and coordinate various players such as mechanical and civil consultants before the pre-tender estimate can be sought.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
2.
go back to reference Goverment of the Republic of Zambia: Zambia’s National Budget. Ministry of Finance, Lusaka (2015) Goverment of the Republic of Zambia: Zambia’s National Budget. Ministry of Finance, Lusaka (2015)
9.
go back to reference Oberlender, G.D., Trost, S.M.: Predicting accuracy of early cost estimates based on estimate quality. J. Constr. Eng. Manage. 127(3), 173–182 (2001)CrossRef Oberlender, G.D., Trost, S.M.: Predicting accuracy of early cost estimates based on estimate quality. J. Constr. Eng. Manage. 127(3), 173–182 (2001)CrossRef
10.
go back to reference Ali, A., Kamaruzzaman, S.: Cost performance for building construction projects in Klang Valley. J. Build. Perfom. 1(1), 110–118 (2010) Ali, A., Kamaruzzaman, S.: Cost performance for building construction projects in Klang Valley. J. Build. Perfom. 1(1), 110–118 (2010)
11.
go back to reference Kaliba, C.: Cost Escalation, Schedule overruns and Quality Shortfalls on Construction Projects, A Thesis submitted in partial fulfilment of the requirements of the University of Zambia for a Degree of Master of Engineering. Lusaka: University of Zambia, Lusaka. Unpublished (2010) Kaliba, C.: Cost Escalation, Schedule overruns and Quality Shortfalls on Construction Projects, A Thesis submitted in partial fulfilment of the requirements of the University of Zambia for a Degree of Master of Engineering. Lusaka: University of Zambia, Lusaka. Unpublished (2010)
12.
go back to reference Cantarelli, C.C., Flyvbjerg, B., Molin, E.J.E., van Wee, B.: Cost overruns in large-scale transportation infrastructure projects: explanations and their theoretical embeddedness. Eur. J. Transp. Infrastruct. Res. 10(1), 5–18 (2010) Cantarelli, C.C., Flyvbjerg, B., Molin, E.J.E., van Wee, B.: Cost overruns in large-scale transportation infrastructure projects: explanations and their theoretical embeddedness. Eur. J. Transp. Infrastruct. Res. 10(1), 5–18 (2010)
13.
go back to reference Cong, J., Mbachu, J., Domingo, N.: Factors influencing the accuracy of precontract stage estimation of final contract price in New Zealand. Int. J. Constr. 4(2), 51–64 (2014) Cong, J., Mbachu, J., Domingo, N.: Factors influencing the accuracy of precontract stage estimation of final contract price in New Zealand. Int. J. Constr. 4(2), 51–64 (2014)
14.
go back to reference Nor, A.A.B., et al.: Factors Influencing the Construction Cost of Industrialised. Elsevier, Malaysia (2012) Nor, A.A.B., et al.: Factors Influencing the Construction Cost of Industrialised. Elsevier, Malaysia (2012)
15.
go back to reference Ramabodu, M.S.: Procurement Guidelines for Project Success in Cost Planning of Construction project, Bloemfontein, Free State, University of the Free State: A thesis Submitted in partial fulfilment of the requirements of University of the Free State for the Degree of Doctor of Philosophy (2014) Ramabodu, M.S.: Procurement Guidelines for Project Success in Cost Planning of Construction project, Bloemfontein, Free State, University of the Free State: A thesis Submitted in partial fulfilment of the requirements of University of the Free State for the Degree of Doctor of Philosophy (2014)
16.
go back to reference Alumbugu, P.: Assessment of the factors affecting accuracy of pre-tender cost estimate in Kaduna state Nigeria. IOSR J. Environ. Sci,. Toxicol. Food Technol. 8(5), 19–27 (2014)CrossRef Alumbugu, P.: Assessment of the factors affecting accuracy of pre-tender cost estimate in Kaduna state Nigeria. IOSR J. Environ. Sci,. Toxicol. Food Technol. 8(5), 19–27 (2014)CrossRef
17.
go back to reference Ardianto, D.: Analysis of factors Affecting the Accuracy of Early Cost Estimates in Construction Projects, Johor Bahru, Johor, Malaysia: A thesis submitted in fulfilment of the requirements of Universiti Teknologi Malaysia for the degree master of science construction Management (2011) Ardianto, D.: Analysis of factors Affecting the Accuracy of Early Cost Estimates in Construction Projects, Johor Bahru, Johor, Malaysia: A thesis submitted in fulfilment of the requirements of Universiti Teknologi Malaysia for the degree master of science construction Management (2011)
18.
go back to reference Hair, J.F., Anderson, R.E., Tatham, R.L., Black, W.C.: Multivariate Data Analysis, 5th edn. Prentice-Hall International Inc., New Jersey (1998) Hair, J.F., Anderson, R.E., Tatham, R.L., Black, W.C.: Multivariate Data Analysis, 5th edn. Prentice-Hall International Inc., New Jersey (1998)
19.
go back to reference Peter, R., Peter, V.: An assessment of the internal consistency of measures of constructs used to revise the innovation decision framework. In: Conference Proceedings Academy of World Business, Marketing & Management Development, vol. 3, no. 1, July 2008 Peter, R., Peter, V.: An assessment of the internal consistency of measures of constructs used to revise the innovation decision framework. In: Conference Proceedings Academy of World Business, Marketing & Management Development, vol. 3, no. 1, July 2008
20.
go back to reference Jonsson, A., Svingby, G.: The use of scoring ubrics: reliability, validity and educational consequencies. ScienceDirect 2, 131–141 (2007) Jonsson, A., Svingby, G.: The use of scoring ubrics: reliability, validity and educational consequencies. ScienceDirect 2, 131–141 (2007)
21.
go back to reference Alinaitwe, H., Ruth, A., Tindiwensi, D.: Investigation into the causes of delays and cost overruns in Uganda’s public sector construction projects. J. Constr. Develop. Countries, Issue 18(2), 33–47 (2013) Alinaitwe, H., Ruth, A., Tindiwensi, D.: Investigation into the causes of delays and cost overruns in Uganda’s public sector construction projects. J. Constr. Develop. Countries, Issue 18(2), 33–47 (2013)
23.
go back to reference Eshofonie, F.P.: Factors Affecting Cost Construction in Nigeria, a thesis submitted in Patial fulfilment of the requirements of University of Lagos Akoka for the degree of master of Construction Management. University of Lagos, Akoka, Lagos (2008) Eshofonie, F.P.: Factors Affecting Cost Construction in Nigeria, a thesis submitted in Patial fulfilment of the requirements of University of Lagos Akoka for the degree of master of Construction Management. University of Lagos, Akoka, Lagos (2008)
24.
go back to reference US Goverment Accountability Office (2009). GAO COST ESTIMATING AND ASSESSMENT GUIDE, Best Practices for Developing and Managing Capital Program cost, Washington DC: US Goverment Accountability Office US Goverment Accountability Office (2009). GAO COST ESTIMATING AND ASSESSMENT GUIDE, Best Practices for Developing and Managing Capital Program cost, Washington DC: US Goverment Accountability Office
25.
go back to reference Mislick, G.K., Nussbaum, D.A.: Cost Estimation Methods and Tools. Wiley & Sons Inc, New Jersey (2015)CrossRef Mislick, G.K., Nussbaum, D.A.: Cost Estimation Methods and Tools. Wiley & Sons Inc, New Jersey (2015)CrossRef
Metadata
Title
Accuracy Influencing Factors for Pre-tender Cost Estimates for the Roads Sector in Zambia
Authors
Chipulu Chipulu
Erastus Mwanaumo
Balimu Mwiya
Lubinda Haabazoka
Sampa Chisumbe
Copyright Year
2020
DOI
https://doi.org/10.1007/978-3-030-26528-1_56