01-05-2014 | Original Paper

Alp Transit: Crossing Faults 44 and 49

Authors: M. El Tani, R. Bremen

Published in: Rock Mechanics and Rock Engineering | Issue 3/2014

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper describes the crossing of faults 44 and 49 when constructing the 57 km Gotthard base tunnel of the Alp Transit project. Fault 44 is a permeable fault that triggered significant surface deformations 1,400 m above the tunnel when it was reached by the advancing excavation. The fault runs parallel to the downstream face of the Nalps arch dam. Significant deformations were measured at the dam crown. Fault 49 is sub-vertical and permeable, and runs parallel at the upstream face of the dam. It was necessary to assess the risk when crossing fault 49, as a limit was put on the acceptable dam deformation for structural safety. The simulation model, forecasts and action decided when crossing over the faults are presented, with a brief description of the tunnel, the dam, and the monitoring system.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Dhatt G, Touzot G (1984) Une présentation de la méthode des éléments finis. Maloine SA, Paris Dhatt G, Touzot G (1984) Une présentation de la méthode des éléments finis. Maloine SA, Paris
go back to reference Ehrbar H, Bremen R, Otto B (2010) Gotthard base tunnel—tunnelling in the influence zone of two concrete arch dams. Geomech Tunnel 3(5):428–441CrossRef Ehrbar H, Bremen R, Otto B (2010) Gotthard base tunnel—tunnelling in the influence zone of two concrete arch dams. Geomech Tunnel 3(5):428–441CrossRef
go back to reference El Tani M (2001) Surface displacements due to pressure modifications induced by tunnels. Modern tunnelling science and technology. Balkema, IS-Kyoto, pp 83–88 El Tani M (2001) Surface displacements due to pressure modifications induced by tunnels. Modern tunnelling science and technology. Balkema, IS-Kyoto, pp 83–88
go back to reference El Tani M (2007) Hydrostatic paradox of saturated media. Geotechnique 57(9):773–777CrossRef El Tani M (2007) Hydrostatic paradox of saturated media. Geotechnique 57(9):773–777CrossRef
go back to reference El Tani M, Bremen R (2006) Val Termine cyclic deformation due to seasonal variation of water table. Golden Rocks 2006, the 41st US Symposium on Rock Mechanics (USRMS). Golden. CO., USA El Tani M, Bremen R (2006) Val Termine cyclic deformation due to seasonal variation of water table. Golden Rocks 2006, the 41st US Symposium on Rock Mechanics (USRMS). Golden. CO., USA
go back to reference Guntli P (2011) Basistunnel. Urseren-Garvera-Zone/Gotthard Massiv. Rapporte Vorauserkundungen. Kernbohrungen. Bericht GR360B-3. (unpublished) Guntli P (2011) Basistunnel. Urseren-Garvera-Zone/Gotthard Massiv. Rapporte Vorauserkundungen. Kernbohrungen. Bericht GR360B-3. (unpublished)
go back to reference Guntli P (2013) Basistunnel. Urseren-Garvera-Zone/Gotthard Massiv. Schlussbericht. Geologie, Geotechnik, Hydrogeologie. In progress. (unpublished) Guntli P (2013) Basistunnel. Urseren-Garvera-Zone/Gotthard Massiv. Schlussbericht. Geologie, Geotechnik, Hydrogeologie. In progress. (unpublished)
go back to reference Hansmann J, Simon Loew S, Evans K (2011) Reversible rock-slope deformations caused by cyclic water-table fluctuations in mountain slopes of the Central Alps. Switzerland. Hydrogeol J 20(1):73–91CrossRef Hansmann J, Simon Loew S, Evans K (2011) Reversible rock-slope deformations caused by cyclic water-table fluctuations in mountain slopes of the Central Alps. Switzerland. Hydrogeol J 20(1):73–91CrossRef
go back to reference Hughes TJR (1987) The finite element method. Pretince-Hall, Englewood Cliffs Hughes TJR (1987) The finite element method. Pretince-Hall, Englewood Cliffs
go back to reference Lombardi G (1988) Les tassements exceptionnels au Barrage de Zeuzier. Publication de la société Suisse de mécanique des sols et des roches 118:39–47 Lombardi G (1988) Les tassements exceptionnels au Barrage de Zeuzier. Publication de la société Suisse de mécanique des sols et des roches 118:39–47
go back to reference Lombardi G (1992) The FES rock mass model, part 1. Dam Eng 3:49–76 Lombardi G (1992) The FES rock mass model, part 1. Dam Eng 3:49–76
go back to reference Morland L (1974) Elastic response of regularly jointed media. Geophys J R Adtr Soc 8:435–446CrossRef Morland L (1974) Elastic response of regularly jointed media. Geophys J R Adtr Soc 8:435–446CrossRef
go back to reference Rietmann D, Otto B (2009) Staumauer Nalps, Anordnung der Messpunkte. ATG-Tachimetrische Messungen bis 31.01.2009, Bericht 100 (unpublished) Rietmann D, Otto B (2009) Staumauer Nalps, Anordnung der Messpunkte. ATG-Tachimetrische Messungen bis 31.01.2009, Bericht 100 (unpublished)
go back to reference Rietmann D, Otto B (2009) Staumauer Curnera, Anordnung der Messpunkte. ATG-Tachimetrische Messungen bis 31.01.2009, Bericht 49 (unpublished) Rietmann D, Otto B (2009) Staumauer Curnera, Anordnung der Messpunkte. ATG-Tachimetrische Messungen bis 31.01.2009, Bericht 49 (unpublished)
go back to reference Schneider T, Fellner D (1997) Basistunnel. Geologie, Geotechnik und Hydrogeologie. Bericht 425cb. Alptransit, pp 147 (unpublished) Schneider T, Fellner D (1997) Basistunnel. Geologie, Geotechnik und Hydrogeologie. Bericht 425cb. Alptransit, pp 147 (unpublished)
go back to reference Studer M, Roos T (2008) Überwachung KVR-Stauanlagen. Grosse Nivellementkampagne 2008: Surselva, Nalps, Curnera, Lukmanier. Technischer Bericht. ARGE Los 349, AlpTransit Gotthard (unpublished) Studer M, Roos T (2008) Überwachung KVR-Stauanlagen. Grosse Nivellementkampagne 2008: Surselva, Nalps, Curnera, Lukmanier. Technischer Bericht. ARGE Los 349, AlpTransit Gotthard (unpublished)
go back to reference Zangerl C, Eberhardt E, Loew S (2003) Ground settlements above tunnels in fractured crystalline rock: numerical analysis of coupled hydro-mechanical mechanisms. Hydrogeol J 11:162–173CrossRef Zangerl C, Eberhardt E, Loew S (2003) Ground settlements above tunnels in fractured crystalline rock: numerical analysis of coupled hydro-mechanical mechanisms. Hydrogeol J 11:162–173CrossRef
go back to reference Zangerl C, Evans K, Eberhardt E, Loew S (2008) Consolidation settlements above deep tunnels in fractured crystalline rock, investigations above the Gotthard highway tunnel. Int J Roc Mech Min Sci 45(8):1195–1210CrossRef Zangerl C, Evans K, Eberhardt E, Loew S (2008) Consolidation settlements above deep tunnels in fractured crystalline rock, investigations above the Gotthard highway tunnel. Int J Roc Mech Min Sci 45(8):1195–1210CrossRef
Metadata
Title
Alp Transit: Crossing Faults 44 and 49
Authors
M. El Tani
R. Bremen
Publication date
01-05-2014
Publisher
Springer Vienna
Published in
Rock Mechanics and Rock Engineering / Issue 3/2014
Print ISSN: 0723-2632
Electronic ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-013-0473-9

Other articles of this Issue 3/2014

Rock Mechanics and Rock Engineering 3/2014 Go to the issue