Skip to main content
Top
Published in: International Journal on Interactive Design and Manufacturing (IJIDeM) 4/2023

11-03-2023 | Original Paper

An assessment of key performance indicators and its relationship for implementation of total productive maintenance in manufacturing sector

Authors: Lalit K. Toke, Shyamkumar D. Kalpande

Published in: International Journal on Interactive Design and Manufacturing (IJIDeM) | Issue 4/2023

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This article focuses on empirical assessment of key performance indicators (KPIs) of total productive maintenance (TPM). It provides the implementation guidelines and facilitates measuring impact and support for business excellence in the manufacturing sector. The present study examines the current state of TPM and, identifies the key areas for TPM adoption using an analytical hierarchical process in a manufacturing environment. This study aids in the creation of a framework for judging the weights of TPM components. Together, qualitative and quantitative methods have produced reliable results. Data have been gathered using a questionnaire that was correctly constructed. The KPIs have been used to examine the impact of the external environment on internal manufacturing sector elements. By using the pair-wise comparison approach of the analytical hierarchical process, the weights of TPM key performance indicators were determined. It has been noted that in the studied manufacturing industries, work environment and competitive advantage are given less importance than increasing productivity and quality. To construct a model for today's needs based on actual data and philosophical justifications, this study's outcomes provide a thorough typology of TPM techniques and their performances in the manufacturing realm.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Appendix
Available only for authorised users
Literature
1.
go back to reference Ahmed, S., Hassan, M.H.J., Taha, Z.: TPM can go beyond maintenance: except from a case implementation. J. Qual. Maint. Eng. 11(1), 19–42 (2005)CrossRef Ahmed, S., Hassan, M.H.J., Taha, Z.: TPM can go beyond maintenance: except from a case implementation. J. Qual. Maint. Eng. 11(1), 19–42 (2005)CrossRef
2.
go back to reference Ahmed, S.M., Karmaker, C.M.: A critical success factors model for total productive maintenance in manufacturing industry. Int. J. Adv. Sci. Res. 4(6), 37–45 (2019) Ahmed, S.M., Karmaker, C.M.: A critical success factors model for total productive maintenance in manufacturing industry. Int. J. Adv. Sci. Res. 4(6), 37–45 (2019)
3.
go back to reference Ahuja, I.P.S., Khamba, J.S.: An evaluation of TPM implementation initiatives in an Indian manufacturing enterprise. J. Qual. Maint. Eng. 13(4), 338–352 (2007)CrossRef Ahuja, I.P.S., Khamba, J.S.: An evaluation of TPM implementation initiatives in an Indian manufacturing enterprise. J. Qual. Maint. Eng. 13(4), 338–352 (2007)CrossRef
4.
go back to reference Ahuja, I.P.S., Khamba, J.S.: Assessment of contributions of successful TPM initiatives towards competitive manufacturing. J. Qual. Maint. Eng. 14(4), 356–374 (2008)CrossRef Ahuja, I.P.S., Khamba, J.S.: Assessment of contributions of successful TPM initiatives towards competitive manufacturing. J. Qual. Maint. Eng. 14(4), 356–374 (2008)CrossRef
6.
go back to reference Allen, M.J., Yen, W.M.: Introduction to measurement theory. Brooks/Cole Pub. Co., Monterey, Calif (1979) Allen, M.J., Yen, W.M.: Introduction to measurement theory. Brooks/Cole Pub. Co., Monterey, Calif (1979)
7.
go back to reference Arunraj, K., Maran, M.: A review of tangible benefits of TPM implementation. Int. J. Appl. Sci. Eng. Res. 3(1), 171–176 (2014) Arunraj, K., Maran, M.: A review of tangible benefits of TPM implementation. Int. J. Appl. Sci. Eng. Res. 3(1), 171–176 (2014)
8.
go back to reference Badr, E., Anwar, M., E-n, Ahmed, Ahmed, M.: Towards a new model of industrial performance improvement for SMEs: a case study of TPM implementation in an industrial SME. Int. J. Process Manag. Benchmark. 9(4), 547 (2019)CrossRef Badr, E., Anwar, M., E-n, Ahmed, Ahmed, M.: Towards a new model of industrial performance improvement for SMEs: a case study of TPM implementation in an industrial SME. Int. J. Process Manag. Benchmark. 9(4), 547 (2019)CrossRef
9.
go back to reference Balouei Jamkhaneh, H., Khazaei Pool, J., Khaksar, S.M.S., Arabzad, S.M., Verij Kazemi, R.: Impacts of computerized maintenance management system and relevant supportive organizational factors on total productive maintenance. Benchmark. Int. J. 25(7), 2230–2247 (2018)CrossRef Balouei Jamkhaneh, H., Khazaei Pool, J., Khaksar, S.M.S., Arabzad, S.M., Verij Kazemi, R.: Impacts of computerized maintenance management system and relevant supportive organizational factors on total productive maintenance. Benchmark. Int. J. 25(7), 2230–2247 (2018)CrossRef
10.
go back to reference Bartz, T., Cezar, M.S., Paula, B.B.: Improvement of industrial performance with TPM implementation. J. Qual. Maint. Eng. 20(1), 2–19 (2014)CrossRef Bartz, T., Cezar, M.S., Paula, B.B.: Improvement of industrial performance with TPM implementation. J. Qual. Maint. Eng. 20(1), 2–19 (2014)CrossRef
11.
go back to reference Bolarinwa, O.K.: Principles and methods of validity and reliability testing of questionnaires used in social and health science researches. Niger. Postgrad. Med. J. 22(04), 195–201 (2015)CrossRef Bolarinwa, O.K.: Principles and methods of validity and reliability testing of questionnaires used in social and health science researches. Niger. Postgrad. Med. J. 22(04), 195–201 (2015)CrossRef
12.
15.
go back to reference Eti, M.C., Ogaji, S.O.T., Probert, S.D.: Maintenance schemes and their implementation for the thermal-power station. Appl. Energy 82(2005), 255–265 (2006) Eti, M.C., Ogaji, S.O.T., Probert, S.D.: Maintenance schemes and their implementation for the thermal-power station. Appl. Energy 82(2005), 255–265 (2006)
16.
go back to reference Gardas, B.B., Raut, R.D., Narkhede, B.E.: Analyzing the 3PL service provider’s evaluation criteria through a sustainable approach. Int. J. Product. Perform. Manag. 68(5), 958–980 (2019)CrossRef Gardas, B.B., Raut, R.D., Narkhede, B.E.: Analyzing the 3PL service provider’s evaluation criteria through a sustainable approach. Int. J. Product. Perform. Manag. 68(5), 958–980 (2019)CrossRef
18.
go back to reference Haddad, T.H., Jaaron, A.A.M.: The applicability of total productive maintenance for healthcare facilities: an implementation methodology. Int. J. Bus. Humanit. Technol. 2(2), 148–155 (2012) Haddad, T.H., Jaaron, A.A.M.: The applicability of total productive maintenance for healthcare facilities: an implementation methodology. Int. J. Bus. Humanit. Technol. 2(2), 148–155 (2012)
19.
go back to reference Ireland, F., Dale, B.G.: A study of total productive maintenance implementation. J. Qual. Maint. Eng. 7(3), 183–191 (2001)CrossRef Ireland, F., Dale, B.G.: A study of total productive maintenance implementation. J. Qual. Maint. Eng. 7(3), 183–191 (2001)CrossRef
20.
go back to reference Jaaron, A., Backhouse, C.: Value-adding to public services through the adoption of lean thinking. Int. J. Serv. Sci. Manag. Eng. Technol. 2(3), 33–50 (2011) Jaaron, A., Backhouse, C.: Value-adding to public services through the adoption of lean thinking. Int. J. Serv. Sci. Manag. Eng. Technol. 2(3), 33–50 (2011)
21.
go back to reference Jain, V., Ajmera, P.: Evaluation of performance factors of FMS by combined decision making methods as AHP, CMBA and ELECTRE methodology. Manag. Sci. Lett. 9(4), 519–534 (2019)CrossRef Jain, V., Ajmera, P.: Evaluation of performance factors of FMS by combined decision making methods as AHP, CMBA and ELECTRE methodology. Manag. Sci. Lett. 9(4), 519–534 (2019)CrossRef
22.
go back to reference Jain, V., Ajmera, P.: Modelling the enablers of industry 4.0 in the Indian manufacturing industry. Int. J. Product. Perform. Manag. 70(6), 1233–1262 (2021)CrossRef Jain, V., Ajmera, P.: Modelling the enablers of industry 4.0 in the Indian manufacturing industry. Int. J. Product. Perform. Manag. 70(6), 1233–1262 (2021)CrossRef
24.
go back to reference Johansson, B., Nord, C.: TPM-one way to increased competitiveness: examples from a medium sized company, (in Swedish). IVF–Skrift 96849, 16 (1996) Johansson, B., Nord, C.: TPM-one way to increased competitiveness: examples from a medium sized company, (in Swedish). IVF–Skrift 96849, 16 (1996)
25.
go back to reference Kalpande, S.D., Gupta, R.C., Dandekar, M.D.: Framework of TQM implementation in small businesses of an industrially backward region: a concept. Perform. Improv. J. 51(7), 07–13 (2012)CrossRef Kalpande, S.D., Gupta, R.C., Dandekar, M.D.: Framework of TQM implementation in small businesses of an industrially backward region: a concept. Perform. Improv. J. 51(7), 07–13 (2012)CrossRef
27.
go back to reference Kodali, R., Chandra, S.: Analytical hierarchy process for justification of TPM. Prod. Plan. Control 12(7), 695–705 (2001)CrossRef Kodali, R., Chandra, S.: Analytical hierarchy process for justification of TPM. Prod. Plan. Control 12(7), 695–705 (2001)CrossRef
28.
go back to reference Kordi, M.: Comparison of fuzzy and crisp analytic hierarchy process (AHP) methods for spatial multicriteria decision analysis in GIS. Master’s Thesis in Geomatics. Department of Technology and Built Environment, University of Gavle (2008) Kordi, M.: Comparison of fuzzy and crisp analytic hierarchy process (AHP) methods for spatial multicriteria decision analysis in GIS. Master’s Thesis in Geomatics. Department of Technology and Built Environment, University of Gavle (2008)
29.
go back to reference Kreuger, L., Neuman, W.L.: Social Work Research Methods: Qualitative and Quantitative Approaches: With Research Navigator. Pearson/Allyn and Bacon, Boston (2006) Kreuger, L., Neuman, W.L.: Social Work Research Methods: Qualitative and Quantitative Approaches: With Research Navigator. Pearson/Allyn and Bacon, Boston (2006)
30.
go back to reference Kumar, J., Soni, V.K., Agnihotri, G.: Impact of TPM implementation on Indian manufacturing industry. Int. J. Product. Perform. Manag. 63(1), 44–56 (2014)CrossRef Kumar, J., Soni, V.K., Agnihotri, G.: Impact of TPM implementation on Indian manufacturing industry. Int. J. Product. Perform. Manag. 63(1), 44–56 (2014)CrossRef
31.
go back to reference Malhotra, M.K., Grover, V.: An assessment of survey research in POM: from constructs to theory. J. Oper. Manag. 16(4), 407–425 (1998)CrossRef Malhotra, M.K., Grover, V.: An assessment of survey research in POM: from constructs to theory. J. Oper. Manag. 16(4), 407–425 (1998)CrossRef
32.
go back to reference Mobley, R.K.: AnIntroduction to Predictive Maintenance. Van Nostrand Reinhold, New York (2009) Mobley, R.K.: AnIntroduction to Predictive Maintenance. Van Nostrand Reinhold, New York (2009)
33.
go back to reference Murata, K., Harrison, A.: How to make Japanese management methods work in the West, p. 42. Aldershot, Glover (1991) Murata, K., Harrison, A.: How to make Japanese management methods work in the West, p. 42. Aldershot, Glover (1991)
34.
go back to reference Nakajima, S.: Introduction to total productive maintenance. Productivity Press, Cambridge, MA (1988) Nakajima, S.: Introduction to total productive maintenance. Productivity Press, Cambridge, MA (1988)
35.
go back to reference Nallusamy, S., Majumdar, G.: Enhancement of overall equipment effectiveness using total productive maintenance in a manufacturing industry. Int. J. Perform. Eng. 13(02), 173–188 (2017) Nallusamy, S., Majumdar, G.: Enhancement of overall equipment effectiveness using total productive maintenance in a manufacturing industry. Int. J. Perform. Eng. 13(02), 173–188 (2017)
36.
go back to reference Narkhede, B.E.: Advance manufacturing strategy and firm performance: an empirical study in a developing environment of small- and medium-sized firms. J. Benchmark. Int. J. 24(1), 62–101 (2017)CrossRef Narkhede, B.E.: Advance manufacturing strategy and firm performance: an empirical study in a developing environment of small- and medium-sized firms. J. Benchmark. Int. J. 24(1), 62–101 (2017)CrossRef
37.
go back to reference Omar, M.B.: The implementation of TPM at high volume company. Bachelor Degree Thesis, Universiti Teknikal Malaysia, Melaka (2007) Omar, M.B.: The implementation of TPM at high volume company. Bachelor Degree Thesis, Universiti Teknikal Malaysia, Melaka (2007)
38.
go back to reference Pai, M.P., Ramachandra, C.G., Srinivas, T.R., Raghavendra, M.J.: A study on usage of total productive maintenance (TPM) in selected SMEs. IOP Conf. Ser. Mater. Sci. Eng. 376, 012117 (2018)CrossRef Pai, M.P., Ramachandra, C.G., Srinivas, T.R., Raghavendra, M.J.: A study on usage of total productive maintenance (TPM) in selected SMEs. IOP Conf. Ser. Mater. Sci. Eng. 376, 012117 (2018)CrossRef
40.
go back to reference Saaty, T.L.: Decision making with the analytic hierarchy process. Int. J. Serv. Sci. 1(1), 16 (2008) Saaty, T.L.: Decision making with the analytic hierarchy process. Int. J. Serv. Sci. 1(1), 16 (2008)
41.
go back to reference Sarode, A.D., Bhaskarwar, V.S.: Development and evaluation of performance measure for the environmental management in Indian industries. Ind. Eng. J. 2, 31–34 (2011) Sarode, A.D., Bhaskarwar, V.S.: Development and evaluation of performance measure for the environmental management in Indian industries. Ind. Eng. J. 2, 31–34 (2011)
42.
go back to reference Shen, C.: Discussion on key successful factors of TPM in enterprises. J. Appl. Res. Technol. 13, 425–427 (2015)CrossRef Shen, C.: Discussion on key successful factors of TPM in enterprises. J. Appl. Res. Technol. 13, 425–427 (2015)CrossRef
43.
go back to reference Suresh, P.K.: TPM implementation in a food industry-A PDCA approach. Int. J. Sci. Res. Publ. 2(11), 01–09 (2012) Suresh, P.K.: TPM implementation in a food industry-A PDCA approach. Int. J. Sci. Res. Publ. 2(11), 01–09 (2012)
44.
go back to reference Tian Xiang, Z., Jeng Feng, C.: Implementing total productive maintenance in a manufacturing small or medium sized enterprise. J. Ind. Eng. Manag. 14(2), 152–175 (2021) Tian Xiang, Z., Jeng Feng, C.: Implementing total productive maintenance in a manufacturing small or medium sized enterprise. J. Ind. Eng. Manag. 14(2), 152–175 (2021)
45.
go back to reference Toke, L.K., Kalpande, S.D.: A framework of enabler’s relationship for implementation of green manufacturing in Indian context. Int. J. Sustain. Dev. World 25(4), 303–311 (2018)CrossRef Toke, L.K., Kalpande, S.D.: A framework of enabler’s relationship for implementation of green manufacturing in Indian context. Int. J. Sustain. Dev. World 25(4), 303–311 (2018)CrossRef
48.
go back to reference Tripathi, D.: Influence of experience and collaboration on effectiveness of quality management practices: the case of Indian manufacturing. Int. J. Product. Perform. Manag. 54(1), 23–33 (2005)CrossRef Tripathi, D.: Influence of experience and collaboration on effectiveness of quality management practices: the case of Indian manufacturing. Int. J. Product. Perform. Manag. 54(1), 23–33 (2005)CrossRef
49.
go back to reference Yu, J., Cooper, H.: Aquantitative review of research design effects on response rates to questionnaires. J. Market. Res. 36, 36–44 (1983)CrossRef Yu, J., Cooper, H.: Aquantitative review of research design effects on response rates to questionnaires. J. Market. Res. 36, 36–44 (1983)CrossRef
Metadata
Title
An assessment of key performance indicators and its relationship for implementation of total productive maintenance in manufacturing sector
Authors
Lalit K. Toke
Shyamkumar D. Kalpande
Publication date
11-03-2023
Publisher
Springer Paris
Published in
International Journal on Interactive Design and Manufacturing (IJIDeM) / Issue 4/2023
Print ISSN: 1955-2513
Electronic ISSN: 1955-2505
DOI
https://doi.org/10.1007/s12008-023-01252-5

Other articles of this Issue 4/2023

International Journal on Interactive Design and Manufacturing (IJIDeM) 4/2023 Go to the issue

Premium Partner