Skip to main content
Top
Published in: Journal of Intelligent Manufacturing 4/2018

25-07-2015

An effective L-MONG algorithm for solving multi-objective flow-shop inverse scheduling problems

Authors: Jianhui Mou, Xinyu Li, Liang Gao, Wenchao Yi

Published in: Journal of Intelligent Manufacturing | Issue 4/2018

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Generally, in handling traditional scheduling problems, ideal manufacturing system environments are assumed before determining effective scheduling. Unfortunately, “ideal environments” are not always possible. Real systems often encounter some uncertainties which will change the status of manufacturing systems. These may cause the original schedule to no longer to be optimal or even feasible. Traditional scheduling methods are not effective in coping with these cases. Therefore, a new scheduling strategy called “inverse scheduling” has been proposed to handle these problems. To the best of our knowledge, this research is the first to provide a comprehensive mathematical model for multi-objective permutation flow-shop inverse scheduling problem (PFISP). In this paper, first, a PFISP mathematical model is devised and an effective hybrid multi-objective evolutionary algorithm is proposed to handle uncertain processing parameters (uncertainties) and multiple objectives at the same time. In the proposed algorithm, we take an insert method NEH-based (Nawaz–Enscore–Ham) as a local improving procedure and propose several adaptations including efficient initialization, decimal system encoding, elitism and population diversity. Finally, 119 public problem instances with different scales and statistical performance comparisons are provided for the proposed algorithm. The results show that the proposed algorithm performs better than the traditional multi-objective evolution algorithm (MOEA) in terms of searching quality, diversity level and efficiency. This paper is the first to propose a mathematical model and develop a hybrid MOEA algorithm to solve PFISP in inverse scheduling domain.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Appendix
Available only for authorised users
Literature
go back to reference Arroyo, J. E. C., & Armentano, V. A. (2005). Genetic local search for multi-objective flow-shop scheduling problems. European Journal of Operational Research, 167(3), 717–738.CrossRef Arroyo, J. E. C., & Armentano, V. A. (2005). Genetic local search for multi-objective flow-shop scheduling problems. European Journal of Operational Research, 167(3), 717–738.CrossRef
go back to reference Billaut, J. C., Moukrim, A., & Sanlaville, E. (Eds.). (2013). Flexibility and robustness in scheduling. New York: Wiley. Billaut, J. C., Moukrim, A., & Sanlaville, E. (Eds.). (2013). Flexibility and robustness in scheduling. New York: Wiley.
go back to reference Brucker, P., & Shakhlevich, N. V. (2009). Inverse scheduling with maximum lateness objective. Journal of Scheduling, 12(5), 475–488.CrossRef Brucker, P., & Shakhlevich, N. V. (2009). Inverse scheduling with maximum lateness objective. Journal of Scheduling, 12(5), 475–488.CrossRef
go back to reference Brucker, P., & Shakhlevich, N. V. (2011). Inverse scheduling: Two-machine flow-shop problem. Journal of Scheduling, 14(3), 239–256.CrossRef Brucker, P., & Shakhlevich, N. V. (2011). Inverse scheduling: Two-machine flow-shop problem. Journal of Scheduling, 14(3), 239–256.CrossRef
go back to reference Bagchi, T. P. (2001). Pareto-optimal solutions for multi-objective production scheduling problems. In Evolutionary multi-criterion optimization (pp. 458–471). Berlin: Springer. Bagchi, T. P. (2001). Pareto-optimal solutions for multi-objective production scheduling problems. In Evolutionary multi-criterion optimization (pp. 458–471). Berlin: Springer.
go back to reference Babu, S. A. K. I., Pratap, S., Lahoti, G., Fernandes, K. J., Tiwari, M. K., Mount, M., et al. (2014). Minimizing delay of ships in bulk terminals by simultaneous ship scheduling, stockyard planning and train scheduling. Maritime Economics Logistics. doi:10.1057/mel.2014.20. Babu, S. A. K. I., Pratap, S., Lahoti, G., Fernandes, K. J., Tiwari, M. K., Mount, M., et al. (2014). Minimizing delay of ships in bulk terminals by simultaneous ship scheduling, stockyard planning and train scheduling. Maritime Economics Logistics. doi:10.​1057/​mel.​2014.​20.
go back to reference Chen, R. J., Chen, F., & Tang, G. C. (2005). Inverse problems of a single machine scheduling to minimize the total completion time. Journal Shanghai Second Polytechnic University, 22(2), 1–7. Chen, R. J., Chen, F., & Tang, G. C. (2005). Inverse problems of a single machine scheduling to minimize the total completion time. Journal Shanghai Second Polytechnic University, 22(2), 1–7.
go back to reference Chen, R. J., & Tang, G. C. (2009). Inverse problems of supply chain scheduling and flow shop scheduling. Operations Research and Management Science, 18(2), 80–84. Chen, R. J., & Tang, G. C. (2009). Inverse problems of supply chain scheduling and flow shop scheduling. Operations Research and Management Science, 18(2), 80–84.
go back to reference Chakravarthy, K., & Rajendran, C. (1999). A heuristic for scheduling in a flow-shop with the bicriteria of makespan and maximum tardiness minimization. Production Planning and Control, 10(7), 707–714.CrossRef Chakravarthy, K., & Rajendran, C. (1999). A heuristic for scheduling in a flow-shop with the bicriteria of makespan and maximum tardiness minimization. Production Planning and Control, 10(7), 707–714.CrossRef
go back to reference Corne, D. W., Knowles, J. D., & Oates, M. J. (2000). The pareto envelope-based selection algorithm for multi-objective optimization. In Parallel problem solving from nature PPSN VI (pp. 839–848). Berlin: Springer. Corne, D. W., Knowles, J. D., & Oates, M. J. (2000). The pareto envelope-based selection algorithm for multi-objective optimization. In Parallel problem solving from nature PPSN VI (pp. 839–848). Berlin: Springer.
go back to reference Corne, D. W., Jerram, N. R., Knowles, J. D., & Oates, M. J. (2001). PESA-II: Region-based selection in evolutionary multi-objective optimization. In Proceedings of the genetic and evolutionary computation conference (GECCO-2001). Corne, D. W., Jerram, N. R., Knowles, J. D., & Oates, M. J. (2001). PESA-II: Region-based selection in evolutionary multi-objective optimization. In Proceedings of the genetic and evolutionary computation conference (GECCO-2001).
go back to reference Chiang, T. C., Cheng, H. C., & Fu, L. C. (2011). NNMA: An effective memetic algorithm for solving multi-objective permutation flow shop scheduling problems. Expert Systems with Applications, 38(5), 5986–5999.CrossRef Chiang, T. C., Cheng, H. C., & Fu, L. C. (2011). NNMA: An effective memetic algorithm for solving multi-objective permutation flow shop scheduling problems. Expert Systems with Applications, 38(5), 5986–5999.CrossRef
go back to reference Deb, K. (2001). Multi-objective optimization using evolutionary algorithms. New York: Wiley. Deb, K. (2001). Multi-objective optimization using evolutionary algorithms. New York: Wiley.
go back to reference Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. A. M. T. (2002). A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation, 6(2), 182–197.CrossRef Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. A. M. T. (2002). A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation, 6(2), 182–197.CrossRef
go back to reference Fattahi, P., & Fallahi, A. (2010). Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability. CIRP Journal of Manufacturing Science and Technology, 2(2), 114–123.CrossRef Fattahi, P., & Fallahi, A. (2010). Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability. CIRP Journal of Manufacturing Science and Technology, 2(2), 114–123.CrossRef
go back to reference Geiger, M. J. (2007). On operators and search space topology in multi-objective flow shop scheding. European Journal of Operational Research, 181(1), 195–206.CrossRef Geiger, M. J. (2007). On operators and search space topology in multi-objective flow shop scheding. European Journal of Operational Research, 181(1), 195–206.CrossRef
go back to reference Gourgand, M., Grangeon, N., & Norre, S. (2008). Metaheuristics and performance evaluation models for the stochastic permutation flow-shop scheduling problem. In Flexibility and robustness in scheduling (pp. 143–170). Gourgand, M., Grangeon, N., & Norre, S. (2008). Metaheuristics and performance evaluation models for the stochastic permutation flow-shop scheduling problem. In Flexibility and robustness in scheduling (pp. 143–170).
go back to reference Goldberg, D. (1989). Genetic algorithms in search, optimization, and machine learning. Reading: Addison Wesley. Goldberg, D. (1989). Genetic algorithms in search, optimization, and machine learning. Reading: Addison Wesley.
go back to reference Goldberg, D., & Deb, K. (1991). A comparative analysis of selection schemes used in genetic algorithms. Foundations of Genetic Algorithms, 1, 69–93. Goldberg, D., & Deb, K. (1991). A comparative analysis of selection schemes used in genetic algorithms. Foundations of Genetic Algorithms, 1, 69–93.
go back to reference Heller, J. (1960). Some numerical experiments for an \(\text{ M } \times \text{ J }\) flow shop and its decision-theoretical aspects. Operations Research, 8(2), 178–184.CrossRef Heller, J. (1960). Some numerical experiments for an \(\text{ M } \times \text{ J }\) flow shop and its decision-theoretical aspects. Operations Research, 8(2), 178–184.CrossRef
go back to reference Hu, K., Zhang, X. F., & Gen, M., et al. (2015). A new model for single machine scheduling with uncertain processing time. Journal of Intelligent Manufacturing 1–9. Hu, K., Zhang, X. F., & Gen, M., et al. (2015). A new model for single machine scheduling with uncertain processing time. Journal of Intelligent Manufacturing 1–9.
go back to reference Ishibuchi, H., & Murata, T. (1998). A multi-objective genetic local search algorithm and its application to flow-shop scheduling. IEEE Transactions on Systems, Man and Cybernetics-Part C: Applications and Reviews, 28(3), 392–403.CrossRef Ishibuchi, H., & Murata, T. (1998). A multi-objective genetic local search algorithm and its application to flow-shop scheduling. IEEE Transactions on Systems, Man and Cybernetics-Part C: Applications and Reviews, 28(3), 392–403.CrossRef
go back to reference Kouvelis, P., Daniels, R. L., & Vairaktarakis, G. (2000). Robust scheduling of a two-machine flow shop with uncertain processing times. IIE Transactions, 32(5), 421–432. Kouvelis, P., Daniels, R. L., & Vairaktarakis, G. (2000). Robust scheduling of a two-machine flow shop with uncertain processing times. IIE Transactions, 32(5), 421–432.
go back to reference Koulamas, C. (2005). Inverse scheduling with controllable job parameters. International Journal of Services and Operations Management, 1(1), 35–43.CrossRef Koulamas, C. (2005). Inverse scheduling with controllable job parameters. International Journal of Services and Operations Management, 1(1), 35–43.CrossRef
go back to reference Li, S. S., Brucker, P., Ng, C. T., Cheng, T. E., Shakhlevich, N. V., & Yuan, J. J. (2013). A note on reverse scheduling with maximum lateness objective. Journal of Scheduling, 16(4), 417–422.CrossRef Li, S. S., Brucker, P., Ng, C. T., Cheng, T. E., Shakhlevich, N. V., & Yuan, J. J. (2013). A note on reverse scheduling with maximum lateness objective. Journal of Scheduling, 16(4), 417–422.CrossRef
go back to reference Loukil, T., Teghem, J., & Tuyttens, D. (2005). Solving multi-objective production scheduling problems using metaheuristics. European Journal of Operational Research, 161(1), 42–61.CrossRef Loukil, T., Teghem, J., & Tuyttens, D. (2005). Solving multi-objective production scheduling problems using metaheuristics. European Journal of Operational Research, 161(1), 42–61.CrossRef
go back to reference Murata, T., Ishibuchi, H., & Tanaka, H. (1996). Multi-objective genetic algorithm and its applications to flow-shop scheduling. Computers Industrial Engineering, 30(4), 957–968.CrossRef Murata, T., Ishibuchi, H., & Tanaka, H. (1996). Multi-objective genetic algorithm and its applications to flow-shop scheduling. Computers Industrial Engineering, 30(4), 957–968.CrossRef
go back to reference Murata, T., Ishibuchi, H., & Gen, M. (2001). Specification of genetic search directions in cellular multi-objective genetic algorithms. In Evolutionary multi-criterion optimization (pp. 82–95). Berlin: Springer. Murata, T., Ishibuchi, H., & Gen, M. (2001). Specification of genetic search directions in cellular multi-objective genetic algorithms. In Evolutionary multi-criterion optimization (pp. 82–95). Berlin: Springer.
go back to reference Nawaz, M., Enscore, E. E., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow-shop scheduling problem. Omega, 11(1), 91–95.CrossRef Nawaz, M., Enscore, E. E., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow-shop scheduling problem. Omega, 11(1), 91–95.CrossRef
go back to reference Nie, L., Gao, L., Li, P., & Li, X. (2013). A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates. Journal of Intelligent Manufacturing, 24(4), 763–774.CrossRef Nie, L., Gao, L., Li, P., & Li, X. (2013). A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates. Journal of Intelligent Manufacturing, 24(4), 763–774.CrossRef
go back to reference Ouelhadj, D., & Petrovic, S. (2009). A survey of dynamic scheduling in manufacturing systems. Journal of Scheduling, 12(4), 417–431.CrossRef Ouelhadj, D., & Petrovic, S. (2009). A survey of dynamic scheduling in manufacturing systems. Journal of Scheduling, 12(4), 417–431.CrossRef
go back to reference Pinedo, M. (2002). Scheduling: Theory, algorithms and systems. New Jersey: Prentice-Hall. Pinedo, M. (2002). Scheduling: Theory, algorithms and systems. New Jersey: Prentice-Hall.
go back to reference Pasupathy, T., Rajendran, C., & Suresh, R. K. (2006). A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs. International Journal of Advanced Manufacturing Technology, 27(7–8), 804–815.CrossRef Pasupathy, T., Rajendran, C., & Suresh, R. K. (2006). A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs. International Journal of Advanced Manufacturing Technology, 27(7–8), 804–815.CrossRef
go back to reference Pan, Q. K., Wang, L., & Qian, B. (2008). A novel multi-objective particle swarm optimization algorithm for no-wait flow shop scheduling problems. Journal of Engineering Manufacture, 222(4), 519–539.CrossRef Pan, Q. K., Wang, L., & Qian, B. (2008). A novel multi-objective particle swarm optimization algorithm for no-wait flow shop scheduling problems. Journal of Engineering Manufacture, 222(4), 519–539.CrossRef
go back to reference Plamer, D. S. (1965). Sequencing jobs through a multi-stage process in the minimum total time—A quick method of obtaining a near optimum. Operational Research 101–107. Plamer, D. S. (1965). Sequencing jobs through a multi-stage process in the minimum total time—A quick method of obtaining a near optimum. Operational Research 101–107.
go back to reference Pham, H., & Lu, X. W. (2012). Inverse problem of total weighted completion time objective with unit processing time on identical parallel machines. Journal of East China University of Science and Technology, 38(6), 757–761. Pham, H., & Lu, X. W. (2012). Inverse problem of total weighted completion time objective with unit processing time on identical parallel machines. Journal of East China University of Science and Technology, 38(6), 757–761.
go back to reference Qian, B., Wang, L., Hu, R., Wang, W. L., Huang, D. X., & Wang, X. (2008). A hybrid differential evolution method for permutation flow-shop scheduling. The International Journal of Advanced Manufacturing Technology, 38(7–8), 757–777.CrossRef Qian, B., Wang, L., Hu, R., Wang, W. L., Huang, D. X., & Wang, X. (2008). A hybrid differential evolution method for permutation flow-shop scheduling. The International Journal of Advanced Manufacturing Technology, 38(7–8), 757–777.CrossRef
go back to reference Qian, B., Wang, L., Huang, D. X., Wang, W. L., & Wang, X. (2009). An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers. Computers Operations Research, 36(1), 209–233.CrossRef Qian, B., Wang, L., Huang, D. X., Wang, W. L., & Wang, X. (2009). An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers. Computers Operations Research, 36(1), 209–233.CrossRef
go back to reference Ravindran, D., Selvakumar, S. J., Sivaraman, R., & Haq, A. N. (2005). Flow shop scheduling with multiple objective of minimizing makespan and total flow time. The International Journal of Advanced Manufacturing Technology, 25(9–10), 1007–1012.CrossRef Ravindran, D., Selvakumar, S. J., Sivaraman, R., & Haq, A. N. (2005). Flow shop scheduling with multiple objective of minimizing makespan and total flow time. The International Journal of Advanced Manufacturing Technology, 25(9–10), 1007–1012.CrossRef
go back to reference Rahimi-Vahed, A. R., & Mirghorbani, S. M. (2007). A multi-objective particle swarm for a flow shop scheduling problem. Journal of Combinatorial Optimization, 13(1), 79–102.CrossRef Rahimi-Vahed, A. R., & Mirghorbani, S. M. (2007). A multi-objective particle swarm for a flow shop scheduling problem. Journal of Combinatorial Optimization, 13(1), 79–102.CrossRef
go back to reference Reeves, C. R. (1995). A genetic algorithm for flow-shop sequencing. Computers Operations Research, 22(1), 5–13.CrossRef Reeves, C. R. (1995). A genetic algorithm for flow-shop sequencing. Computers Operations Research, 22(1), 5–13.CrossRef
go back to reference Suresh, R. K., & Mohanasundaram, K. M. (2004). Pareto archived simulated annealing for permutation flow shop scheduling with multiple objectives. In 2004 IEEE conference on cybernetics and intelligent systems (Vol. 2, pp. 712–717). Suresh, R. K., & Mohanasundaram, K. M. (2004). Pareto archived simulated annealing for permutation flow shop scheduling with multiple objectives. In 2004 IEEE conference on cybernetics and intelligent systems (Vol. 2, pp. 712–717).
go back to reference Srinivas, N., & Deb, K. (1994). Multi-objective optimization using non-dominated sorting in genetic algorithms. Evolutionary Computation, 2(3), 221–248.CrossRef Srinivas, N., & Deb, K. (1994). Multi-objective optimization using non-dominated sorting in genetic algorithms. Evolutionary Computation, 2(3), 221–248.CrossRef
go back to reference Solano-Charris, E. L., Montoya-Torres, J. R., & Paternina-Arboleda, C. D. (2011). Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem. Journal of Intelligent Manufacturing, 22(5), 815–822.CrossRef Solano-Charris, E. L., Montoya-Torres, J. R., & Paternina-Arboleda, C. D. (2011). Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem. Journal of Intelligent Manufacturing, 22(5), 815–822.CrossRef
go back to reference T’Kindt, V., Scott, H., & Billaut, J. C. (2006). Multicriteria scheduling: Theory, models and algorithms. Berlin: Springer Science Business Media. T’Kindt, V., Scott, H., & Billaut, J. C. (2006). Multicriteria scheduling: Theory, models and algorithms. Berlin: Springer Science Business Media.
go back to reference Tavakkoli-Moghaddam, R., Rahimi-Vahed, A. R., & Mirzaei, A. H. (2007). Solving a bi-criteria permutation flow shop problem using immune algorithm. In IEEE Symposium on Computational Intelligence in Scheduling, 2007. SCIS’07. (pp. 49–56). IEEE. Tavakkoli-Moghaddam, R., Rahimi-Vahed, A. R., & Mirzaei, A. H. (2007). Solving a bi-criteria permutation flow shop problem using immune algorithm. In IEEE Symposium on Computational Intelligence in Scheduling, 2007. SCIS’07. (pp. 49–56). IEEE.
go back to reference Taillard, E. (1993). Benchmarks for basic scheduling problems. European Journal of Operational Research, 64(2), 278–285.CrossRef Taillard, E. (1993). Benchmarks for basic scheduling problems. European Journal of Operational Research, 64(2), 278–285.CrossRef
go back to reference Varadharajan, T. K., & Rajendran, C. (2005). A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs. European Journal of Operational Research, 167(3), 772–795.CrossRef Varadharajan, T. K., & Rajendran, C. (2005). A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs. European Journal of Operational Research, 167(3), 772–795.CrossRef
go back to reference Van Veldhuizen, D. A., & Lamont, G. B. (1998). Multi-objective evolutionary algorithm research: A history and analysis. Technical Report TR-98-03, Department of Electrical and Computer Engineering, Graduate School of Engineering, Air Force Institute of Technology, Wright-Patterson AFB, Ohio. Van Veldhuizen, D. A., & Lamont, G. B. (1998). Multi-objective evolutionary algorithm research: A history and analysis. Technical Report TR-98-03, Department of Electrical and Computer Engineering, Graduate School of Engineering, Air Force Institute of Technology, Wright-Patterson AFB, Ohio.
go back to reference Watson, J. P., Barbulescu, L., Whitley, L. D., & Howe, A. E. (2002). Contrasting structured and random permutation flow-shop scheduling problems: Search-space topology and algorithm performance. INFORMS Journal on Computing, 14(2), 98–123.CrossRef Watson, J. P., Barbulescu, L., Whitley, L. D., & Howe, A. E. (2002). Contrasting structured and random permutation flow-shop scheduling problems: Search-space topology and algorithm performance. INFORMS Journal on Computing, 14(2), 98–123.CrossRef
go back to reference Wang, L., & Zheng, D. Z. (2003). An effective hybrid heuristic for flow shop scheduling. The International Journal of Advanced Manufacturing Technology, 21, 38–44.CrossRef Wang, L., & Zheng, D. Z. (2003). An effective hybrid heuristic for flow shop scheduling. The International Journal of Advanced Manufacturing Technology, 21, 38–44.CrossRef
go back to reference Zitzler, E., & Thiele, L. (1999). Multi-objective evolutionary algorithms: A comparative case study and the strength Pareto approach. IEEE Transactions on Evolutionary Computation, 3(4), 257–271.CrossRef Zitzler, E., & Thiele, L. (1999). Multi-objective evolutionary algorithms: A comparative case study and the strength Pareto approach. IEEE Transactions on Evolutionary Computation, 3(4), 257–271.CrossRef
go back to reference Zitzler, E., Laumanns, M., & Bleuler, S. (2004). A tutorial on evolutionary multi-objective optimization. In Metaheuristics for multi-objective optimisation (pp. 3–37). Berlin: Springer. Zitzler, E., Laumanns, M., & Bleuler, S. (2004). A tutorial on evolutionary multi-objective optimization. In Metaheuristics for multi-objective optimisation (pp. 3–37). Berlin: Springer.
go back to reference Zhou, B. H., Li, X., & Fung, R. Y. (2015). Dynamic scheduling of photolithography process based on Kohonen neural network. Journal of Intelligent Manufacturing, 26(1), 73–85.CrossRef Zhou, B. H., Li, X., & Fung, R. Y. (2015). Dynamic scheduling of photolithography process based on Kohonen neural network. Journal of Intelligent Manufacturing, 26(1), 73–85.CrossRef
Metadata
Title
An effective L-MONG algorithm for solving multi-objective flow-shop inverse scheduling problems
Authors
Jianhui Mou
Xinyu Li
Liang Gao
Wenchao Yi
Publication date
25-07-2015
Publisher
Springer US
Published in
Journal of Intelligent Manufacturing / Issue 4/2018
Print ISSN: 0956-5515
Electronic ISSN: 1572-8145
DOI
https://doi.org/10.1007/s10845-015-1129-2

Other articles of this Issue 4/2018

Journal of Intelligent Manufacturing 4/2018 Go to the issue

Premium Partners