Published in: Neural Computing and Applications 11/2017

07-03-2016 | Original Article

Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry

Authors: Vahid Mohagheghi, S. Meysam Mousavi, Behnam Vahdani

Published in: Neural Computing and Applications | Issue 11/2017

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Reliable knowledge of project cash flow is essential for effective project management. Since the nature of project is uncertain and easily effected by different criteria, considering uncertainty has become a vital part of any effective project management approach. Cash, as one of the most important project resources, requires reliable management techniques. In this paper, a new interval type-2 fuzzy project cash flow analysis model based on interval type-2 fuzzy project scheduling is proposed to predict project cash flow in different periods of project life cycle. Despite using type-2 fuzzy sets in various practical problems, they are new to project management; thus, they are used in this paper to address the uncertainty and lack of sufficient knowledge in project activity durations and costs. In the first part, interval type-2 fuzzy project scheduling model is introduced, and then the forward and the backward passes are defined. In order to improve this part, a new flexible and controllable method of interval type-2 fuzzy ranking is introduced. In the second part, a model of cash flow assessment is proposed under an interval type-2 fuzzy environment. This model is able to calculate the minimum and the maximum cash distribution, cash flow of project in different periods and total direct cost of projects in addition to cash flow uncertainty. The presented model provides the manager with a comprehensive insight into the cash required in different stages of project and helps the managers to locate the periods with highest uncertainty. The model also uses the concept of alpha-levels to analyze different levels of risk of uncertainty. For the purpose of illustration, the proposed interval type-2 fuzzy model is used to generate cash flow of main activities of a real construction project in a developing country, and the results are presented. The results present high flexibility of model in expressing and considering uncertainty and vagueness, in addition to its high capability in the risk evaluation. Finally, the results of the case study are used to present the managerial implications.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Almond B, Remer RS (1979) Models for present-worth analysis of selected industrial cash flow patterns. Eng Process Econ 4(4):455–466CrossRef Almond B, Remer RS (1979) Models for present-worth analysis of selected industrial cash flow patterns. Eng Process Econ 4(4):455–466CrossRef
2.
go back to reference Atkinson R, Crawford L, Ward S (2006) Fundamental uncertainties in projects and the scope of project management. Int J Project Manag 24(8):687–698CrossRef Atkinson R, Crawford L, Ward S (2006) Fundamental uncertainties in projects and the scope of project management. Int J Project Manag 24(8):687–698CrossRef
3.
go back to reference Barbosa PS, Pimentel PR (2001) A linear programming model for cash flow management in the Brazilian construction industry. Constr Manag Econ 19(5):469–479CrossRef Barbosa PS, Pimentel PR (2001) A linear programming model for cash flow management in the Brazilian construction industry. Constr Manag Econ 19(5):469–479CrossRef
4.
go back to reference Barraza GA, Back WE, Mata F (2000) Probabilistic monitoring of project performance using SS-curves. J Constr Eng Manag 126(2):142–148CrossRef Barraza GA, Back WE, Mata F (2000) Probabilistic monitoring of project performance using SS-curves. J Constr Eng Manag 126(2):142–148CrossRef
5.
go back to reference Bezdek JC (1981) Pattern recognition with fuzzy objective function algorithms. Kluwer, DordrechtCrossRefMATH Bezdek JC (1981) Pattern recognition with fuzzy objective function algorithms. Kluwer, DordrechtCrossRefMATH
6.
go back to reference Blyth K, Kaka A (2006) A novel multiple linear regression model for forecasting S-curves. Eng Constr Archit Manag 13(1):82–95CrossRef Blyth K, Kaka A (2006) A novel multiple linear regression model for forecasting S-curves. Eng Constr Archit Manag 13(1):82–95CrossRef
7.
go back to reference Boussabaine AH, Elhag T (1999) Applying fuzzy techniques to cash flow analysis. Constr Manag Econ 17(6):745–755CrossRef Boussabaine AH, Elhag T (1999) Applying fuzzy techniques to cash flow analysis. Constr Manag Econ 17(6):745–755CrossRef
8.
go back to reference Boussabaine AH, Kaka AP (1998) A neural networks approach for cost flow forecasting. Constr Manag Econ 16(4):471–479CrossRef Boussabaine AH, Kaka AP (1998) A neural networks approach for cost flow forecasting. Constr Manag Econ 16(4):471–479CrossRef
10.
go back to reference Celikyilmaz A, Turksen IB (2009) Modeling uncertainty with fuzzy logic. Studies in fuzziness and soft computing, vol 240. Springer, Berlin, Heidelberg. ISBN 978-3-540-89923-5MATH Celikyilmaz A, Turksen IB (2009) Modeling uncertainty with fuzzy logic. Studies in fuzziness and soft computing, vol 240. Springer, Berlin, Heidelberg. ISBN 978-3-540-89923-5MATH
11.
go back to reference Onar SC, Oztaysi B, Kahraman C (2014) Strategic decision selection using hesitant fuzzy TOPSIS and interval type-2 fuzzy AHP: a case study. Int J Comput Intell Syst 7(5):1002–1021CrossRef Onar SC, Oztaysi B, Kahraman C (2014) Strategic decision selection using hesitant fuzzy TOPSIS and interval type-2 fuzzy AHP: a case study. Int J Comput Intell Syst 7(5):1002–1021CrossRef
13.
go back to reference Chen HL, O’Brien WJ, Herbsman ZJ (2005) Assessing the accuracy of cash flow models: the significance of payment conditions. J Constr Eng Manag 131(6):669–676CrossRef Chen HL, O’Brien WJ, Herbsman ZJ (2005) Assessing the accuracy of cash flow models: the significance of payment conditions. J Constr Eng Manag 131(6):669–676CrossRef
14.
go back to reference Chen SM, Lee LW (2010) Fuzzy multiple attributes group decision-making based on the ranking values and the arithmetic operations of interval type-2 fuzzy sets. Expert Syst Appl 37(1):824–833MathSciNetCrossRef Chen SM, Lee LW (2010) Fuzzy multiple attributes group decision-making based on the ranking values and the arithmetic operations of interval type-2 fuzzy sets. Expert Syst Appl 37(1):824–833MathSciNetCrossRef
15.
go back to reference Chen SM, Yang MW, Lee LW, Yang SW (2012) Fuzzy multiple attributes group decision-making based on ranking interval type-2 fuzzy sets. Expert Syst Appl 39(5):5295–5308CrossRef Chen SM, Yang MW, Lee LW, Yang SW (2012) Fuzzy multiple attributes group decision-making based on ranking interval type-2 fuzzy sets. Expert Syst Appl 39(5):5295–5308CrossRef
16.
go back to reference Cioffi DF (2005) A tool for managing projects: an analytic parameterization of the S curve. Int J Project Manage 23(3):215–222CrossRef Cioffi DF (2005) A tool for managing projects: an analytic parameterization of the S curve. Int J Project Manage 23(3):215–222CrossRef
17.
18.
go back to reference Dereli T, Baykasoglu A, Altun K, Durmusoglu A, Türksen IB (2011) Industrial applications of type-2 fuzzy sets and systems: a concise review. Comput Ind 62(2):125–137CrossRef Dereli T, Baykasoglu A, Altun K, Durmusoglu A, Türksen IB (2011) Industrial applications of type-2 fuzzy sets and systems: a concise review. Comput Ind 62(2):125–137CrossRef
19.
go back to reference Gates M, Scarpa A (1979) Preliminary cumulative cash flow analysis. Cost Engineering 21(6):243–249 Gates M, Scarpa A (1979) Preliminary cumulative cash flow analysis. Cost Engineering 21(6):243–249
20.
go back to reference Göçken Tolunay (2013) Solution of fuzzy multi-objective project crashing problem. Neural Comput Appl 23(7–8):2167–2175CrossRef Göçken Tolunay (2013) Solution of fuzzy multi-objective project crashing problem. Neural Comput Appl 23(7–8):2167–2175CrossRef
21.
go back to reference Gormley FM, Meade N (2007) The utility of cash flow forecasts in the management of corporate cash balances. Eur J Oper Res 182(2):923–935CrossRefMATH Gormley FM, Meade N (2007) The utility of cash flow forecasts in the management of corporate cash balances. Eur J Oper Res 182(2):923–935CrossRefMATH
22.
go back to reference Hapke M, Slowinski R (1996) Fuzzy priority heuristics for project scheduling. Fuzzy Sets Syst 83(3):291–299CrossRef Hapke M, Slowinski R (1996) Fuzzy priority heuristics for project scheduling. Fuzzy Sets Syst 83(3):291–299CrossRef
23.
go back to reference Holland NL, Hobson D Jr (1999) Indirect cost categorization and allocation by construction contractors. J Archit Eng 5(2):49–56CrossRef Holland NL, Hobson D Jr (1999) Indirect cost categorization and allocation by construction contractors. J Archit Eng 5(2):49–56CrossRef
24.
go back to reference Hsu K (2003) Estimation of a double S-curve model. AACE Int Trans 1:IT13.1–IT13.5 Hsu K (2003) Estimation of a double S-curve model. AACE Int Trans 1:IT13.1–IT13.5
25.
go back to reference Hwee NG, Tiong RL (2002) Model on cash flow forecasting and risk analysis for contracting firms. Int J Project Manage 20(5):351–363CrossRef Hwee NG, Tiong RL (2002) Model on cash flow forecasting and risk analysis for contracting firms. Int J Project Manage 20(5):351–363CrossRef
26.
go back to reference Jarrah RE, Kulkarni D, O’Connor JT (2007) Cash flow projections for selected TxDoT highway projects. J Constr Eng Manag 133(3):235–241CrossRef Jarrah RE, Kulkarni D, O’Connor JT (2007) Cash flow projections for selected TxDoT highway projects. J Constr Eng Manag 133(3):235–241CrossRef
27.
go back to reference Jiang A, Issa RR, Malek M (2011) Construction project cash flow planning using the Pareto optimality efficiency network model. J Civil Eng Manag 17(4):510–519CrossRef Jiang A, Issa RR, Malek M (2011) Construction project cash flow planning using the Pareto optimality efficiency network model. J Civil Eng Manag 17(4):510–519CrossRef
28.
go back to reference Kaka AP, Price ADF (1991) Net cashflow models: are they reliable? Constr Manag Econ 9(3):291–308CrossRef Kaka AP, Price ADF (1991) Net cashflow models: are they reliable? Constr Manag Econ 9(3):291–308CrossRef
29.
go back to reference Kaka AP, Price ADF (1993) Modelling standard cost commitment curves for contractors’ cash flow forecasting. Constr Manag Econ 11(4):271–283CrossRef Kaka AP, Price ADF (1993) Modelling standard cost commitment curves for contractors’ cash flow forecasting. Constr Manag Econ 11(4):271–283CrossRef
30.
go back to reference Khosrowshahi F, Kaka AP (2007) A decision support model for construction cash flow management. Comput Aided Civil Infrastruct Eng 22(7):527–539CrossRef Khosrowshahi F, Kaka AP (2007) A decision support model for construction cash flow management. Comput Aided Civil Infrastruct Eng 22(7):527–539CrossRef
31.
go back to reference Kiliç M, Kaya İ (2015) Investment project evaluation by a decision making methodology based on type-2 fuzzy sets. Appl Soft Comput 27:399–410CrossRef Kiliç M, Kaya İ (2015) Investment project evaluation by a decision making methodology based on type-2 fuzzy sets. Appl Soft Comput 27:399–410CrossRef
32.
go back to reference Kumar VS, Hanna AS, Adams T (2000) Assessment of working capital requirements by fuzzy set theory. Eng Constr Archit Manag 7(1):93–103CrossRef Kumar VS, Hanna AS, Adams T (2000) Assessment of working capital requirements by fuzzy set theory. Eng Constr Archit Manag 7(1):93–103CrossRef
33.
go back to reference Lam KC, So ATP, Hu T, Ng T, Yuen RKK, Lo SM et al (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Constr Manag Econ 19(1):63–76CrossRef Lam KC, So ATP, Hu T, Ng T, Yuen RKK, Lo SM et al (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Constr Manag Econ 19(1):63–76CrossRef
34.
go back to reference Lee LW, Chen SM (2008) A new method for fuzzy multiple attributes group decision-making based on the arithmetic operations of interval type-2 fuzzy sets. In: IEEE 2008 international conference on machine learning and cybernetics, vol 6, pp 3084–3089 Lee LW, Chen SM (2008) A new method for fuzzy multiple attributes group decision-making based on the arithmetic operations of interval type-2 fuzzy sets. In: IEEE 2008 international conference on machine learning and cybernetics, vol 6, pp 3084–3089
35.
go back to reference Lee-Kwang H, Song YS, Lee KM (1994) Similarity measure between fuzzy sets and between elements. Fuzzy Sets Syst 62(3):291–293MathSciNetCrossRef Lee-Kwang H, Song YS, Lee KM (1994) Similarity measure between fuzzy sets and between elements. Fuzzy Sets Syst 62(3):291–293MathSciNetCrossRef
36.
go back to reference Liao TW (2015) Two interval type 2 fuzzy TOPSIS material selection methods. Mater Des 88:1088–1099CrossRef Liao TW (2015) Two interval type 2 fuzzy TOPSIS material selection methods. Mater Des 88:1088–1099CrossRef
37.
go back to reference Maity S, Sil J (2009) Color image segmentation using type-2 fuzzy sets. Int J Comput Electr Eng 1(3):1793–8163 Maity S, Sil J (2009) Color image segmentation using type-2 fuzzy sets. Int J Comput Electr Eng 1(3):1793–8163
38.
go back to reference Maravas A, Pantouvakis JP (2010) A study of cash flows in projects with fuzzy activity durations. In: Proceedings of the international conference on computing in civil and building engineering, Nottingham Maravas A, Pantouvakis JP (2010) A study of cash flows in projects with fuzzy activity durations. In: Proceedings of the international conference on computing in civil and building engineering, Nottingham
39.
go back to reference Maravas A, Pantouvakis JP (2012) Project cash flow analysis in the presence of uncertainty in activity duration and cost. Int J Project Manage 30(3):374–384CrossRef Maravas A, Pantouvakis JP (2012) Project cash flow analysis in the presence of uncertainty in activity duration and cost. Int J Project Manage 30(3):374–384CrossRef
40.
go back to reference McCahon CS, Lee ES (1988) Project network analysis with fuzzy activity times. Comput Math Appl 15(10):829–838CrossRefMATH McCahon CS, Lee ES (1988) Project network analysis with fuzzy activity times. Comput Math Appl 15(10):829–838CrossRefMATH
41.
go back to reference Mendel JM (2003) Type-2 fuzzy sets: some questions and answers. IEEE Connect Newsl IEEE Neural Netw Soc 1:10–13 Mendel JM (2003) Type-2 fuzzy sets: some questions and answers. IEEE Connect Newsl IEEE Neural Netw Soc 1:10–13
42.
go back to reference Mendel JM (2007) Type-2 fuzzy sets and systems: an overview. Comput Intell Mag IEEE 2(1):20–29CrossRef Mendel JM (2007) Type-2 fuzzy sets and systems: an overview. Comput Intell Mag IEEE 2(1):20–29CrossRef
43.
go back to reference Mendel JM, John RI, Liu F (2006) Interval type-2 fuzzy logic systems made simple. IEEE Trans Fuzzy Syst 14(6):808–821CrossRef Mendel JM, John RI, Liu F (2006) Interval type-2 fuzzy logic systems made simple. IEEE Trans Fuzzy Syst 14(6):808–821CrossRef
44.
go back to reference Mendel J, Wu D (2010) Perceptual computing: aiding people in making subjective judgments, vol 13. Wiley, New YorkCrossRef Mendel J, Wu D (2010) Perceptual computing: aiding people in making subjective judgments, vol 13. Wiley, New YorkCrossRef
45.
go back to reference Mendel JM (2013) Interval type-2 fuzzy logic systems and perceptual computers: their similarities and differences. In: Sadeghian A, Mendel J, Tahayori H (eds) Advances in type-2 fuzzy sets and systems. Springer, New York, pp 3–17CrossRef Mendel JM (2013) Interval type-2 fuzzy logic systems and perceptual computers: their similarities and differences. In: Sadeghian A, Mendel J, Tahayori H (eds) Advances in type-2 fuzzy sets and systems. Springer, New York, pp 3–17CrossRef
46.
go back to reference Mousavi SM, Tavakkoli-Moghaddam R, Vahdani B, Hashemi H, Sanjari MJ (2013) A new support vector model-based imperialist competitive algorithm for time estimation in new product development projects. Robot Comput Integr Manuf 29:157–168CrossRef Mousavi SM, Tavakkoli-Moghaddam R, Vahdani B, Hashemi H, Sanjari MJ (2013) A new support vector model-based imperialist competitive algorithm for time estimation in new product development projects. Robot Comput Integr Manuf 29:157–168CrossRef
47.
go back to reference Mousavi SM, Vahdani B, Abdollahzade M (2015) An intelligent model for cost prediction in new product development projects. J Intell Fuzzy Syst 29:2047–2057CrossRef Mousavi SM, Vahdani B, Abdollahzade M (2015) An intelligent model for cost prediction in new product development projects. J Intell Fuzzy Syst 29:2047–2057CrossRef
48.
go back to reference Navon R (1996) Company-level cash-flow management. J Constr Eng Manag 122(1):22–29CrossRef Navon R (1996) Company-level cash-flow management. J Constr Eng Manag 122(1):22–29CrossRef
50.
go back to reference Qin J, Liu X, Pedrycz W (2015) An extended VIKOR method based on prospect theory for multiple attribute decision making under interval type-2 fuzzy environment. Knowl Based Syst 86:116–130CrossRef Qin J, Liu X, Pedrycz W (2015) An extended VIKOR method based on prospect theory for multiple attribute decision making under interval type-2 fuzzy environment. Knowl Based Syst 86:116–130CrossRef
51.
go back to reference Renna P, Argoneto P (2012) Capacity investment decision in co-opetitive network by information sharing. Comput Ind Eng 62(1):359–367CrossRef Renna P, Argoneto P (2012) Capacity investment decision in co-opetitive network by information sharing. Comput Ind Eng 62(1):359–367CrossRef
52.
go back to reference Rostamy AA, Takanlou F, AnvaryRostamy A (2013) A fuzzy statistical expert system for cash flow analysis and management under uncertainty. Adv Econ Bus 1(2):89–102 Rostamy AA, Takanlou F, AnvaryRostamy A (2013) A fuzzy statistical expert system for cash flow analysis and management under uncertainty. Adv Econ Bus 1(2):89–102
54.
go back to reference Singh S, Lokanathan G (1992) Computer-based cash flow model. AACE Int Trans 2:R.5.1–R.5.14 Singh S, Lokanathan G (1992) Computer-based cash flow model. AACE Int Trans 2:R.5.1–R.5.14
55.
go back to reference Touran A, Atgun M, Bhurisith I (2004) Analysis of the United States Department of Transportation prompt pay provisions. J Constr Eng Manag 130(5):719–725CrossRef Touran A, Atgun M, Bhurisith I (2004) Analysis of the United States Department of Transportation prompt pay provisions. J Constr Eng Manag 130(5):719–725CrossRef
56.
57.
go back to reference Turk S, John R, Özcan E (2014) Interval type-2 fuzzy sets in supplier selection. Type-2 TOPSIS method. Expert Syst Appl 37(4):2790–2798 Turk S, John R, Özcan E (2014) Interval type-2 fuzzy sets in supplier selection. Type-2 TOPSIS method. Expert Syst Appl 37(4):2790–2798
59.
go back to reference Vahdani B, Mousavi SM, Mousakhani M, Sharifi M, Hashemi H (2012) A neural network model based on support vector machine for conceptual cost estimation in construction projects. J Optim Ind Eng 10:11–18 Vahdani B, Mousavi SM, Mousakhani M, Sharifi M, Hashemi H (2012) A neural network model based on support vector machine for conceptual cost estimation in construction projects. J Optim Ind Eng 10:11–18
60.
go back to reference Wang W, Liu X, Qin Y (2012) Multi-attribute group decision making models under interval type-2 fuzzy environment. Knowl Based Syst 30:121–128CrossRef Wang W, Liu X, Qin Y (2012) Multi-attribute group decision making models under interval type-2 fuzzy environment. Knowl Based Syst 30:121–128CrossRef
61.
go back to reference Xuecheng L (1992) Entropy, distance measure and similarity measure of fuzzy sets and their relations. Fuzzy Sets Syst 52(3):305–318MathSciNetCrossRefMATH Xuecheng L (1992) Entropy, distance measure and similarity measure of fuzzy sets and their relations. Fuzzy Sets Syst 52(3):305–318MathSciNetCrossRefMATH
62.
go back to reference Yao JS, Chen MS, Lu HF (2006) A fuzzy stochastic single-period model for cash management. Eur J Oper Res 170(1):72–90CrossRefMATH Yao JS, Chen MS, Lu HF (2006) A fuzzy stochastic single-period model for cash management. Eur J Oper Res 170(1):72–90CrossRefMATH
63.
go back to reference Zadeh LA (1974) The concept of a linguistic variable and its application to approximate reasoning. Springer, New York, pp 1–10 Zadeh LA (1974) The concept of a linguistic variable and its application to approximate reasoning. Springer, New York, pp 1–10
64.
go back to reference Zammori FA, Braglia M, Frosolini M (2009) A fuzzy multi-criteria approach for critical path definition. Int J Project Manage 27(3):278–291CrossRef Zammori FA, Braglia M, Frosolini M (2009) A fuzzy multi-criteria approach for critical path definition. Int J Project Manage 27(3):278–291CrossRef
65.
go back to reference Zhang Z, Zhang S (2013) A novel approach to multi attribute group decision making based on trapezoidal interval type-2 fuzzy soft sets. Appl Math Model 37(7):4948–4971MathSciNetCrossRef Zhang Z, Zhang S (2013) A novel approach to multi attribute group decision making based on trapezoidal interval type-2 fuzzy soft sets. Appl Math Model 37(7):4948–4971MathSciNetCrossRef
Metadata
Title
Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry
Authors
Vahid Mohagheghi
S. Meysam Mousavi
Behnam Vahdani
Publication date
07-03-2016
Publisher
Springer London
Published in
Neural Computing and Applications / Issue 11/2017
Print ISSN: 0941-0643
Electronic ISSN: 1433-3058
DOI
https://doi.org/10.1007/s00521-016-2235-6

Other articles of this Issue 11/2017

Neural Computing and Applications 11/2017 Go to the issue

Premium Partner