Abstract

Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents the results of an examination of factors influencing ore dilution in a blasthole stoping environment. For the study, a comprehensive database was established, incorporating information related to the design, construction, excavation and cavity surveys of 172 sequentially mined long hole stope case histories from two orezones. Through a review of the case studies, it was demonstrated that, in addition to stope dimension, the amount of unplanned dilution differed according to stope type. Five stope types were identified, based on their position within a tabular blasthole mining sequence. Measured overbreak varies with stope type, with secondary stopes generating a greater volume of hanging-wall dilution than do primary stopes. Furthermore, a case study is presented to demonstrate the role cablebolts installed in the stope hanging-wall play to control ore dilution. The study illustrates relationships between measured hanging-wall overbreak, cablebolt orientation and stope type.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Anderson B, Grebenc B (1995) Controlling dilution at the Golden Giant mine. In: Proceedings of the 12th CIM mine operators conference, Timmins, February 1995 Anderson B, Grebenc B (1995) Controlling dilution at the Golden Giant mine. In: Proceedings of the 12th CIM mine operators conference, Timmins, February 1995
go back to reference Arjang B (1996) In situ ground stresses in the Abitibi Mining District. CIM Bull 89:996 Arjang B (1996) In situ ground stresses in the Abitibi Mining District. CIM Bull 89:996
go back to reference Arjang B (1988) Pre-mining ground stresses at the Bousquet/Dumagami mines, Cadillac, Quebec. Division Report MRL 88-132 (TR), CANMET, Energy, Mines and Resources Canada Arjang B (1988) Pre-mining ground stresses at the Bousquet/Dumagami mines, Cadillac, Quebec. Division Report MRL 88-132 (TR), CANMET, Energy, Mines and Resources Canada
go back to reference Barton N, Lien I, Lunde J (1974) Engineering classification of rock masses for the design of tunnel support. Rock Mech 6(4):186–236CrossRef Barton N, Lien I, Lunde J (1974) Engineering classification of rock masses for the design of tunnel support. Rock Mech 6(4):186–236CrossRef
go back to reference Bieniawski ZT (1984) Rock mechanics design in mining and tunnelling. A.A. Balkema, Rotterdam, p 272 Bieniawski ZT (1984) Rock mechanics design in mining and tunnelling. A.A. Balkema, Rotterdam, p 272
go back to reference Calvert TM, Simpson JB, Sandy MP (2000) Open stope design at Normandy Golden Grove Operations. In: Proceedings of MassMin 2000, Brisbane, Australia, 29 October–2 November 2000. pp 653–659 Calvert TM, Simpson JB, Sandy MP (2000) Open stope design at Normandy Golden Grove Operations. In: Proceedings of MassMin 2000, Brisbane, Australia, 29 October–2 November 2000. pp 653–659
go back to reference Canadian Mining Journal (2002) 2002 Mining Sourcebook, 111th annual edition. In: Scales M (ed) Business information group, Don Mills, Ontario. ISSN 0840–6723 Canadian Mining Journal (2002) 2002 Mining Sourcebook, 111th annual edition. In: Scales M (ed) Business information group, Don Mills, Ontario. ISSN 0840–6723
go back to reference Connors C, Wheeler L, Forsyth B, Clark L (1996) Determination of blast damage mechanisms in low quality rock masses. CANMET DSS File 02SQ.23440-4-1046 Connors C, Wheeler L, Forsyth B, Clark L (1996) Determination of blast damage mechanisms in low quality rock masses. CANMET DSS File 02SQ.23440-4-1046
go back to reference Deere DU (1968) Geological consideration. In: Stagg KG, Zienkiewicz OC (eds) Rock mechanics in engineering practice. Wiley, NewYork Deere DU (1968) Geological consideration. In: Stagg KG, Zienkiewicz OC (eds) Rock mechanics in engineering practice. Wiley, NewYork
go back to reference Dunne K, Pakalnis RC (1996) Dilution aspects of a sublevel retreat stope at Detour Lake Mine. In: Aubertin M, Hassani F, Mitri H (eds) Rock mechanics. Balkema, Rotterdam, pp 305–313. ISBN 90 5410 838 X Dunne K, Pakalnis RC (1996) Dilution aspects of a sublevel retreat stope at Detour Lake Mine. In: Aubertin M, Hassani F, Mitri H (eds) Rock mechanics. Balkema, Rotterdam, pp 305–313. ISBN 90 5410 838 X
go back to reference Elbrond J (1994) Economic effects of orelosses and rock dilution. CIM Bull 87(978):131–134 Elbrond J (1994) Economic effects of orelosses and rock dilution. CIM Bull 87(978):131–134
go back to reference Gauthier P (2001) Minage des zones étroites à la Mine Bousquet. In: Proceedings of the international symposium on mining techniques of narrow-vein deposits, Val-d’Or, Quebec, 1–4 October, 2001, pp 45–55 Gauthier P (2001) Minage des zones étroites à la Mine Bousquet. In: Proceedings of the international symposium on mining techniques of narrow-vein deposits, Val-d’Or, Quebec, 1–4 October, 2001, pp 45–55
go back to reference Germain P, Hadjigeorgiou J, Lessard JF (1996) On the relationship between stability prediction and observed stope overbreak. In: Aubertin M, Hassani F, Mitri H (eds) Rock mechanics. Balkema, Rotterdam, pp 277–283. ISBN 90 5410 838 X Germain P, Hadjigeorgiou J, Lessard JF (1996) On the relationship between stability prediction and observed stope overbreak. In: Aubertin M, Hassani F, Mitri H (eds) Rock mechanics. Balkema, Rotterdam, pp 277–283. ISBN 90 5410 838 X
go back to reference Henning JG (2007) Evaluation of long-hole mine design influences on unplanned ore dilution. Ph.D. Thesis, McGill University, Montreal, Quebec. p 331 Henning JG (2007) Evaluation of long-hole mine design influences on unplanned ore dilution. Ph.D. Thesis, McGill University, Montreal, Quebec. p 331
go back to reference Henning JG, Mitri HS (2007) Mine planning for ore dilution. In: Proceedings of the 109th CIM annual general meeting, Montreal, April 29–May 2, 2007, p 8 Henning JG, Mitri HS (2007) Mine planning for ore dilution. In: Proceedings of the 109th CIM annual general meeting, Montreal, April 29–May 2, 2007, p 8
go back to reference Henning JG, Mitri HS (2006) Numerical modelling of ore dilution in blasthole stoping. Int J Rock Mech Mining Sci 44(5):692–703CrossRef Henning JG, Mitri HS (2006) Numerical modelling of ore dilution in blasthole stoping. Int J Rock Mech Mining Sci 44(5):692–703CrossRef
go back to reference Hyett AJ, Bawden WF, Reichert (1992) The effect of rock mass confinement on the bond strength of fully grouted cable bolts. Int J Rock Mech Min Sci Geomech Abstr 29(5):503–524 Hyett AJ, Bawden WF, Reichert (1992) The effect of rock mass confinement on the bond strength of fully grouted cable bolts. Int J Rock Mech Min Sci Geomech Abstr 29(5):503–524
go back to reference Kaiser PK, Diederichs M, Yazici S (1992) Cable bolt performance during mining induced stress change – Three case examples. In: Kaiser PK, McCreath DR (eds) Rock support in mining and underground construction. Balkema, Rotterdam. ISBN 90 5410 044 3 Kaiser PK, Diederichs M, Yazici S (1992) Cable bolt performance during mining induced stress change – Three case examples. In: Kaiser PK, McCreath DR (eds) Rock support in mining and underground construction. Balkema, Rotterdam. ISBN 90 5410 044 3
go back to reference Mah SGL, Pakalnis RT, Poulin R, Clark, LM (1995) Obtaining quality cavity monitoring survey data. In: Proceedings of the CAMI’95: 3rd Canadian conference on computer applications in the mineral industry, Montréal, Québec, Oct 22–25, pp 400–407 Mah SGL, Pakalnis RT, Poulin R, Clark, LM (1995) Obtaining quality cavity monitoring survey data. In: Proceedings of the CAMI’95: 3rd Canadian conference on computer applications in the mineral industry, Montréal, Québec, Oct 22–25, pp 400–407
go back to reference Maloney S, Fearon R, Nose J, Kaiser PK (1992) Investigations into the effect of stress change on support capacity. In: Kaiser PK, McCreath DR (eds) Rock support in mining and underground construction. Balkema, Rotterdam. ISBN 90 5410 044 3 Maloney S, Fearon R, Nose J, Kaiser PK (1992) Investigations into the effect of stress change on support capacity. In: Kaiser PK, McCreath DR (eds) Rock support in mining and underground construction. Balkema, Rotterdam. ISBN 90 5410 044 3
go back to reference Mathews KE, Hoek E, Wyllie DC, Steward SBV (1981) Prediction of stable excavations for mining at depths below 1000 Metres in hard rock. CANMET Report DSS Serial No. OSQ80-00081, DSS File No. 17SQ.23440-0-9020. Ottawa. Dept. Energy, Mines and Resources Mathews KE, Hoek E, Wyllie DC, Steward SBV (1981) Prediction of stable excavations for mining at depths below 1000 Metres in hard rock. CANMET Report DSS Serial No. OSQ80-00081, DSS File No. 17SQ.23440-0-9020. Ottawa. Dept. Energy, Mines and Resources
go back to reference Miller F, Potvin Y, Jacob D (1992) Laser measurement for open stope dilution. CIM Bull 85(962):96–102 Miller F, Potvin Y, Jacob D (1992) Laser measurement for open stope dilution. CIM Bull 85(962):96–102
go back to reference Milne DM, Pakalnis RC, Lunder PJ (1996) Approach to the quantification of hanging-wall behaviour. Trans Instn Min Metall (Sect A: Min Industry) 105:A69–A74 Milne DM, Pakalnis RC, Lunder PJ (1996) Approach to the quantification of hanging-wall behaviour. Trans Instn Min Metall (Sect A: Min Industry) 105:A69–A74
go back to reference Pakalnis RC (1986) Empirical stope design in Canada. Ph.D. Thesis. University of British Columbia, 276 pp Pakalnis RC (1986) Empirical stope design in Canada. Ph.D. Thesis. University of British Columbia, 276 pp
go back to reference Pakalnis RC, Poulin R, Hadjigeorgiou J (1995) Quantifying the cost of dilution in underground mines. Mining Eng pp 1136–1141 Pakalnis RC, Poulin R, Hadjigeorgiou J (1995) Quantifying the cost of dilution in underground mines. Mining Eng pp 1136–1141
go back to reference Pakalnis R, Vongpaisal S (1998) Empirical design methods - UBC geomechanics. In: Proceedings of the 100th CIM annual general meeting, Montréal, Québec, 3–7 May 1998 Pakalnis R, Vongpaisal S (1998) Empirical design methods - UBC geomechanics. In: Proceedings of the 100th CIM annual general meeting, Montréal, Québec, 3–7 May 1998
go back to reference Pelley CW (1994) A study of sequencing strategy for steep, tabular, hardrock orebodies. Ph.D. Thesis. McGill University, 310 pp Pelley CW (1994) A study of sequencing strategy for steep, tabular, hardrock orebodies. Ph.D. Thesis. McGill University, 310 pp
go back to reference Potvin Y (1988) Empirical open stope design in Canada. Ph.D. thesis. Dept. Mining and Mineral Processing, University of British Columbia Potvin Y (1988) Empirical open stope design in Canada. Ph.D. thesis. Dept. Mining and Mineral Processing, University of British Columbia
go back to reference Scoble MJ, Moss A (1994) Dilution in underground bulk mining: Implications for Production Management, mineral resource evaluation II, methods and case histories, Geological Society Special Publication No. 79, 95–108 Scoble MJ, Moss A (1994) Dilution in underground bulk mining: Implications for Production Management, mineral resource evaluation II, methods and case histories, Geological Society Special Publication No. 79, 95–108
go back to reference Trevor SM (1991) Dilution control at Hudson Bay mining & smelting, Flin Flon operations. In Proceedings of the 93rd CIM annual general meeting, Vancouver, British Columbia Trevor SM (1991) Dilution control at Hudson Bay mining & smelting, Flin Flon operations. In Proceedings of the 93rd CIM annual general meeting, Vancouver, British Columbia
go back to reference Uggalla S (2001) Sublevel open stoping – design and planning at the Olympic Dam Mine. Underground mining methods: engineering fundamentals and international case studies. In: Hustrulid WA, Bullock RL (eds) Society for Mining, Metallurgy, and Exploration, Inc., Littleton, Colorado, USA, pp 239–244 Uggalla S (2001) Sublevel open stoping – design and planning at the Olympic Dam Mine. Underground mining methods: engineering fundamentals and international case studies. In: Hustrulid WA, Bullock RL (eds) Society for Mining, Metallurgy, and Exploration, Inc., Littleton, Colorado, USA, pp 239–244
go back to reference Vallée M, David M, Dagbert M, Desrochers C (1992) Guide to the evaluation of gold deposits; CIM Special volume 45. ISBN 0-919086-31-4 Vallée M, David M, Dagbert M, Desrochers C (1992) Guide to the evaluation of gold deposits; CIM Special volume 45. ISBN 0-919086-31-4
Metadata
Title
Assessment and Control of Ore Dilution in Long Hole Mining: Case Studies
Authors
John G. Henning
Hani S. Mitri
Publication date
01-08-2008
Publisher
Springer Netherlands
Published in
Geotechnical and Geological Engineering / Issue 4/2008
Print ISSN: 0960-3182
Electronic ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-008-9172-9

Other articles of this Issue 4/2008

Geotechnical and Geological Engineering 4/2008 Go to the issue