Abstract

This paper presents a new approach of estimating pile setup starts from the end-of-drive (EOD) resistance by the use of a power function model followed by a log-linear function. Often pile setup is estimated using the Skov and Denver(in: Proceedings of the 3rd international conference on the application of stress-wave theory to piles, Canada, 1988) model, which requires knowing the pile resistance at a reference time (to). This requires additional effort for testing the pile at the reference time (to). This effort may cause delay in the foundation construction and thus increasing the cost of construction. Pile load testing program was conducted on seven 914 (36 in.) square close-ended prestressed concrete (PSC) test piles at the Caminada Bay bridge project in coastal Louisiana to develop a methodology to estimate pile setup effectively starting from EOD resistance. Several dynamic load tests (DLTs) were performed on each test pile, with waiting periods of 60 min to 55 days after installation, to measure the magnitude and rate of setup. Static load tests (SLTs) were also performed at the end of the load testing program to validate the results of dynamic load tests. The load testing results showed that the total resistance increased up to 12 times of the EOD resistances after 28 days from EOD. The Skov and Denver (1988) setup parameter “A” was calculated for each test pile using different initial reference times (to). The results showed that the setup parameter “A” was highly variable and uncertain for to less than 1 day. This paper proposes a new power pile setup model that can be used to estimate pile setup immediately after EOD to the initial reference time, to, which is usually 1 day for a log-linear model. The proposed model was validated using results from published case studies for various geological conditions, which shows that the results of the model effectively match the setup test results within a small tolerance.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Axelsson G (2000) Long term set-up of piles in sand. Doctoral Thesis, Royal Institute of Technology, Stockholm, Sweden Axelsson G (2000) Long term set-up of piles in sand. Doctoral Thesis, Royal Institute of Technology, Stockholm, Sweden
go back to reference Bullock PJ, Schmertmann JH, McVay MC, Townsend FC (2005) Side shear setup I: test piles driven in Florida. J Geotech Geoenviron Eng 13:292–300CrossRef Bullock PJ, Schmertmann JH, McVay MC, Townsend FC (2005) Side shear setup I: test piles driven in Florida. J Geotech Geoenviron Eng 13:292–300CrossRef
go back to reference Chen Q, Haque MdN, Abu-Farsakh M, Fernandez BA (2014) Field investigation of pile setup in mixed soil. Geotech Test J 37(2):268–281CrossRef Chen Q, Haque MdN, Abu-Farsakh M, Fernandez BA (2014) Field investigation of pile setup in mixed soil. Geotech Test J 37(2):268–281CrossRef
go back to reference Chow FC, Jardine RJ, Nauroy JF, Brucy F (1997) Time related increase in shaft capacities of driven piles in sand. Geotechnique 47(2):353–361CrossRef Chow FC, Jardine RJ, Nauroy JF, Brucy F (1997) Time related increase in shaft capacities of driven piles in sand. Geotechnique 47(2):353–361CrossRef
go back to reference Davisson MT (1972) High capacity piles. In: Proceedings of the soil mechanics lecture series on innovations in foundation construction, ASCE, Reston, VA, pp 81–112 Davisson MT (1972) High capacity piles. In: Proceedings of the soil mechanics lecture series on innovations in foundation construction, ASCE, Reston, VA, pp 81–112
go back to reference Fellenius BH (2014) Pile aging in cohesive soil-Discussion. J Geotech Geoenviron Eng 139(9):1620–1624 Fellenius BH (2014) Pile aging in cohesive soil-Discussion. J Geotech Geoenviron Eng 139(9):1620–1624
go back to reference Fellenius BH, Riker RE, O’Brien AJ, Tracy GR (1989) Dynamic and static testing in soil exhibiting set-up. J Geotech Eng 115(7):984–1001CrossRef Fellenius BH, Riker RE, O’Brien AJ, Tracy GR (1989) Dynamic and static testing in soil exhibiting set-up. J Geotech Eng 115(7):984–1001CrossRef
go back to reference Haque MdN, Chen Q, Abu-Farsakh M, Tsai C (2014) Effects of pile size on set-up behavior of cohesive soils. In: Proceedings of geo-congress 2014, geocharacterization and modeling for sustainability, 23–26 Feb, GSP No. 234. Georgia, pp 1743–1749 Haque MdN, Chen Q, Abu-Farsakh M, Tsai C (2014) Effects of pile size on set-up behavior of cohesive soils. In: Proceedings of geo-congress 2014, geocharacterization and modeling for sustainability, 23–26 Feb, GSP No. 234. Georgia, pp 1743–1749
go back to reference Haque MdN, Abu-Farsakh M, Tsai C (2016a) Field investigation to evaluate the effects of pile installation sequence on pile set-up behavior for instrumented test piles. Geotech Test J 39(5):769–785CrossRef Haque MdN, Abu-Farsakh M, Tsai C (2016a) Field investigation to evaluate the effects of pile installation sequence on pile set-up behavior for instrumented test piles. Geotech Test J 39(5):769–785CrossRef
go back to reference Haque MdN, Abu-Farsakh M, Zhang Z, Okeil A (2016b) Developing a model to estimate pile setup for individual soil layers on the basis of piezocone penetration test data. J Transp Res Board No 2579:17–31CrossRef Haque MdN, Abu-Farsakh M, Zhang Z, Okeil A (2016b) Developing a model to estimate pile setup for individual soil layers on the basis of piezocone penetration test data. J Transp Res Board No 2579:17–31CrossRef
go back to reference Haque MdN, Abu-Farsakh M, Tsai C, Zhang Z (2016c) Load-testing program to evaluate pile-setup behavior for individual soil layers and correlation of setup with Soil properties. J Geotech Geoenviron Eng (ASCE) 143(4):1–19 Haque MdN, Abu-Farsakh M, Tsai C, Zhang Z (2016c) Load-testing program to evaluate pile-setup behavior for individual soil layers and correlation of setup with Soil properties. J Geotech Geoenviron Eng (ASCE) 143(4):1–19
go back to reference Karlsrud K, Clausen CJF, Aas PM (2005) Bearing capacity of driven piles in clay, the NGI approach. In: Proceedings of the 1st international symposium on frontiers in offshore geotechnics, Taylor & Francis, Perth, pp 775–782 Karlsrud K, Clausen CJF, Aas PM (2005) Bearing capacity of driven piles in clay, the NGI approach. In: Proceedings of the 1st international symposium on frontiers in offshore geotechnics, Taylor & Francis, Perth, pp 775–782
go back to reference Komurka VE, Wagner AB, Edil TB (2003) Estimating soil/pile set-up. Wisconsin Highway Research Prog. #0092-00-14, Wisconsin Department of Transportation Komurka VE, Wagner AB, Edil TB (2003) Estimating soil/pile set-up. Wisconsin Highway Research Prog. #0092-00-14, Wisconsin Department of Transportation
go back to reference Lee W, Kim D, Salgado R, Zaheer M (2010) Setup of driven piles in layered soil. Soils Found 50(5):585–598CrossRef Lee W, Kim D, Salgado R, Zaheer M (2010) Setup of driven piles in layered soil. Soils Found 50(5):585–598CrossRef
go back to reference Lim JK, Lehane BM (2014) Characterisation of the effects of time on the shaft friction of displacement piles in sand. Geotechnique 64(6):476–485CrossRef Lim JK, Lehane BM (2014) Characterisation of the effects of time on the shaft friction of displacement piles in sand. Geotechnique 64(6):476–485CrossRef
go back to reference Long JH, Kerrigan JA, Wysockey M (1999) Measured time effects for axial capacity of driven piling. J Transp Res Board No 1663:8–15CrossRef Long JH, Kerrigan JA, Wysockey M (1999) Measured time effects for axial capacity of driven piling. J Transp Res Board No 1663:8–15CrossRef
go back to reference Lutful K, Decapite K (2011) Prediction of pile set-up for Ohio soils. Report No FHWA/OH-2011/3 Lutful K, Decapite K (2011) Prediction of pile set-up for Ohio soils. Report No FHWA/OH-2011/3
go back to reference McVay MC, Schmertmann J, Townsend F, Bullock P (1999) Pile friction freeze: a field investigation study. Research Report No. WPI 0510632, Vol. 1 McVay MC, Schmertmann J, Townsend F, Bullock P (1999) Pile friction freeze: a field investigation study. Research Report No. WPI 0510632, Vol. 1
go back to reference Mesri G, Feng TW, Benak JM (1990) Postdensification penetration resistance of clean sands. J Geotech Eng 116(7):1095–1115CrossRef Mesri G, Feng TW, Benak JM (1990) Postdensification penetration resistance of clean sands. J Geotech Eng 116(7):1095–1115CrossRef
go back to reference Ng KW, Roling M, AbdelSalam SS, Suleiman MT, Sritharan S (2013) Pile set-up in cohesive soil. II: analytical quantifications and design recommendations. J Geotech Geoenviron Eng 139(2):210–222CrossRef Ng KW, Roling M, AbdelSalam SS, Suleiman MT, Sritharan S (2013) Pile set-up in cohesive soil. II: analytical quantifications and design recommendations. J Geotech Geoenviron Eng 139(2):210–222CrossRef
go back to reference Pei J, Wang Y (1986) Practical experiences on pile dynamic measurement in Shnaghai. In: Proceedings of the international conference on deep foundations, China Building Industry Press, Beijing, pp 2.36–2.41 Pei J, Wang Y (1986) Practical experiences on pile dynamic measurement in Shnaghai. In: Proceedings of the international conference on deep foundations, China Building Industry Press, Beijing, pp 2.36–2.41
go back to reference Rausche MF, Robinson B, Likins G (2004) On the prediction of long term pile capacity from End-Of-Driving information. In: Proceedings of the current practices and future trends in deep foundation, GSP No. 125, CA, pp 77–95 Rausche MF, Robinson B, Likins G (2004) On the prediction of long term pile capacity from End-Of-Driving information. In: Proceedings of the current practices and future trends in deep foundation, GSP No. 125, CA, pp 77–95
go back to reference Schmertmann JH (1991) The mechanical aging of soils. J Geotech Eng 117(9):1288–1330CrossRef Schmertmann JH (1991) The mechanical aging of soils. J Geotech Eng 117(9):1288–1330CrossRef
go back to reference Skov R, Denver H (1988) Time dependence of bearing capacity of piles. In: Proceedings of the 3rd international conference on the application of stress-wave theory to piles, Canada, pp 879–888 Skov R, Denver H (1988) Time dependence of bearing capacity of piles. In: Proceedings of the 3rd international conference on the application of stress-wave theory to piles, Canada, pp 879–888
go back to reference Steward E, Wang X (2011) Predicting pile setup (freeze): a new approach considering soil aging and pore pressure dissipation. In: Proceedings of the geo-frontier conference of advances of geotechnical engineering, Dallas, TX, pp 11–19 Steward E, Wang X (2011) Predicting pile setup (freeze): a new approach considering soil aging and pore pressure dissipation. In: Proceedings of the geo-frontier conference of advances of geotechnical engineering, Dallas, TX, pp 11–19
go back to reference Svinkin MR (1996) Setup and relaxation in glacial sand-discussion. J Geotech Eng 122(4):319–321CrossRef Svinkin MR (1996) Setup and relaxation in glacial sand-discussion. J Geotech Eng 122(4):319–321CrossRef
go back to reference Thompson WR III, Held L, Saye S (2009) Test pile program to determine axial capacity and pile set-up for the Biloxi Bay Bridge. DFI J 3:13–22 Thompson WR III, Held L, Saye S (2009) Test pile program to determine axial capacity and pile set-up for the Biloxi Bay Bridge. DFI J 3:13–22
go back to reference Titi HH (1996) The increase in shaft capacity with time for friction piles driven into saturated clay. Ph.D. Dissertation, Department of Civil and Environmental Engineering, Louisiana State University, Baton Rouge, Louisiana Titi HH (1996) The increase in shaft capacity with time for friction piles driven into saturated clay. Ph.D. Dissertation, Department of Civil and Environmental Engineering, Louisiana State University, Baton Rouge, Louisiana
go back to reference Titi HH, Wathugala GW (1999) Numerical procedure for predicting pile capacity setup/freeze. J Transp Res Board No 1663:25–32CrossRef Titi HH, Wathugala GW (1999) Numerical procedure for predicting pile capacity setup/freeze. J Transp Res Board No 1663:25–32CrossRef
go back to reference Wang YH, Gao Y (2013) Mechanisms of Aging-Induced modulus changes in sand with inherent fabric anisotropy. J Geotech Geoenviron Eng 139(9):1590–1603CrossRef Wang YH, Gao Y (2013) Mechanisms of Aging-Induced modulus changes in sand with inherent fabric anisotropy. J Geotech Geoenviron Eng 139(9):1590–1603CrossRef
go back to reference Yan WM, Yuen KV (2010) Prediction of pile setup in clays and sands. IOP Conf Ser Mater Sci Eng 10:012104CrossRef Yan WM, Yuen KV (2010) Prediction of pile setup in clays and sands. IOP Conf Ser Mater Sci Eng 10:012104CrossRef
go back to reference Yang S, Andersen KH (2016) Thixotropy of marine clays. Geotech Test J 39(2):331–339CrossRef Yang S, Andersen KH (2016) Thixotropy of marine clays. Geotech Test J 39(2):331–339CrossRef
Metadata
Title
Combination of Power Function and Log-Linear Models to Estimate Pile Setup
Authors
Murad Y. Abu-Farsakh
Md. Nafiul Haque
Ching Tsai
Zhongjie Zhang
Publication date
10-04-2018
Publisher
Springer International Publishing
Published in
Geotechnical and Geological Engineering / Issue 5/2018
Print ISSN: 0960-3182
Electronic ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-018-0534-7

Other articles of this Issue 5/2018

Geotechnical and Geological Engineering 5/2018 Go to the issue