Skip to main content
Top
Published in: Geotechnical and Geological Engineering 2/2014

01-04-2014 | Original paper

Construction of Large-Span Twin Tunnels Below a High-Rise Transmission Tower: A Case Study

Authors: Shuying Wang, Junsheng Yang, Yuanhong Yang, Fangping Zhong

Published in: Geotechnical and Geological Engineering | Issue 2/2014

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The structure on the ground bears impact from the tunneling-induced settlement, especially when the tunnel is shallow and its span is large. This paper presents the construction of Lijiachong twin tunnels below a high-rise transmission tower and the prevention techniques to avoid the failure of the tower. The span of each tunnel is about 18 m, and the tunnel embedded depth below the tower foundations is only 15.5 m. There was a high risk of influencing the performance of the tower during the tunneling. To reduce the risk of collapse of the transmission tower, the available methods in field to reinforce the tower foundations were proposed. For engineering cost and construction convenience, the separated pile foundations were connected with framed girders, resulting in that the separated foundations worked as a whole. The effectiveness of the reinforcement was evaluated by monitoring deformation and stress in the tower, indicating that the measured values were lower than their respective allowable ones. With reinforcing the tower foundations using the framed girders, the Lijiachong twin tunnels safely passed beneath the transmission tower, and the continuous performance of the transmission tower was ensured.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Deere DU, Hendron AJ, Patton FD, Cording EJ (1967) Design of surface and near surface construction in rock. In: Fairhurst C (ed), Failure and breakage of rock, Proceedings of 8th U.S. symposium Rock mech., 237–302. New York: Soc. Min. Engrs, Am. Inst. Min. Metall. Petrolm Engrs Deere DU, Hendron AJ, Patton FD, Cording EJ (1967) Design of surface and near surface construction in rock. In: Fairhurst C (ed), Failure and breakage of rock, Proceedings of 8th U.S. symposium Rock mech., 237–302. New York: Soc. Min. Engrs, Am. Inst. Min. Metall. Petrolm Engrs
go back to reference Dobashi H, Shiratori A, Miyama D, Nagura H, Miyawaki T (2006) Design and construction of enlarging shield tunnel sections of large dimensional shield tunnels for the non-open-cut method. Tunn Undergr Space Technol 21:249CrossRef Dobashi H, Shiratori A, Miyama D, Nagura H, Miyawaki T (2006) Design and construction of enlarging shield tunnel sections of large dimensional shield tunnels for the non-open-cut method. Tunn Undergr Space Technol 21:249CrossRef
go back to reference Harris DI, Mair RJ, Love JP, Taylor RN, Henderson TO (1994) Oberservations of ground and structure movements for compensation grouting during tunnel construction at waterloo station. Geotechnique 44(4):691–713CrossRef Harris DI, Mair RJ, Love JP, Taylor RN, Henderson TO (1994) Oberservations of ground and structure movements for compensation grouting during tunnel construction at waterloo station. Geotechnique 44(4):691–713CrossRef
go back to reference Inose K, Kamegaya I, Ueda A, Tomii T, Imanaka Y (2006) Construction of the underground ventilation station while shield machines pass 1.5 m underneath. Tunn Undergr Space Technol 21:335–336CrossRef Inose K, Kamegaya I, Ueda A, Tomii T, Imanaka Y (2006) Construction of the underground ventilation station while shield machines pass 1.5 m underneath. Tunn Undergr Space Technol 21:335–336CrossRef
go back to reference Shanghai Construction and Communications Commission (2007) Code for design of high-rise structures. China Plan Press, Beijing (in Chinese) Shanghai Construction and Communications Commission (2007) Code for design of high-rise structures. China Plan Press, Beijing (in Chinese)
go back to reference Wang JH, Chen LH, Zhang L (2011) Research on excavation sequence of shallow-depth unsymmetrical loading small spacing tunnel. Technol Highw Transp 1:99–101 (in Chinese) Wang JH, Chen LH, Zhang L (2011) Research on excavation sequence of shallow-depth unsymmetrical loading small spacing tunnel. Technol Highw Transp 1:99–101 (in Chinese)
go back to reference Xiang Y, Jiang Z, He H (2008) Assessment and control of metro-construction induced settlement of a pile-supported urban overpass. Tunn Undergr Space Technol 23:300–307CrossRef Xiang Y, Jiang Z, He H (2008) Assessment and control of metro-construction induced settlement of a pile-supported urban overpass. Tunn Undergr Space Technol 23:300–307CrossRef
go back to reference Yang YH (2011) The interaction of the large-span Lijiachong tunnel and the overlaid high-rise transmission tower. MS thesis, Central South University, China (in Chinese) Yang YH (2011) The interaction of the large-span Lijiachong tunnel and the overlaid high-rise transmission tower. MS thesis, Central South University, China (in Chinese)
go back to reference Yang JS, Gou DM, Zhang YX (2008) Field measurements and numerical analyses of double-layer pipe roof reinforcement in a shallow multiarch tunnel. Transp Res Rec: J Transp Res Board 2050:145–153CrossRef Yang JS, Gou DM, Zhang YX (2008) Field measurements and numerical analyses of double-layer pipe roof reinforcement in a shallow multiarch tunnel. Transp Res Rec: J Transp Res Board 2050:145–153CrossRef
go back to reference Yang JS, Yang YH, Yan L, Zhang HL, Hu X, Tang P (2012) Construction scheme choice of large-span tunnels under-passing high voltage transmission tower and its application. Chin J Rock Mech Eng 31(6):1184–1191 (in Chinese) Yang JS, Yang YH, Yan L, Zhang HL, Hu X, Tang P (2012) Construction scheme choice of large-span tunnels under-passing high voltage transmission tower and its application. Chin J Rock Mech Eng 31(6):1184–1191 (in Chinese)
Metadata
Title
Construction of Large-Span Twin Tunnels Below a High-Rise Transmission Tower: A Case Study
Authors
Shuying Wang
Junsheng Yang
Yuanhong Yang
Fangping Zhong
Publication date
01-04-2014
Publisher
Springer International Publishing
Published in
Geotechnical and Geological Engineering / Issue 2/2014
Print ISSN: 0960-3182
Electronic ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-013-9726-3

Other articles of this Issue 2/2014

Geotechnical and Geological Engineering 2/2014 Go to the issue