Published in: Journal of Failure Analysis and Prevention 5/2017

01-10-2017 | Technical Article---Peer-Reviewed

Developing a New Probabilistic Approach for Risk Analysis, Application in Underground Coal Mining

Authors: Mohammad Javadi, Gholamreza Saeedi, Kourosh Shahriar

Published in: Journal of Failure Analysis and Prevention | Issue 5/2017

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Underground coal mining is one of the most hazardous activities in all around the word. Therefore, risk analysis has a remarkable role in the coal mining works. In this study, a new probabilistic approach is developed to evaluate the most important hazard of coal mining. For this aim, at first a fuzzy TOPSIS model is applied to rank the risks of the mining. By this way, it is possible to overcome the existing uncertainty of the risk ranking process. Application of the proposed procedure shows that the roof fall is the most important hazard in the Tabas Coal Mine in Iran. Afterward, this study tried to quantify the roof fall risk as the most important hazard in underground coal mining. Due to the related uncertainties associated with every mine, it is very difficult to predict the roof fall. As a result, development of a methodology for evaluation of roof fall risk under uncertainty condition has a key role in safety of underground coal mines. In this paper, a new approach for analyzing the risk of roof fall is presented. For this aim, the major factors influencing the stability of the roof are utilized in a Bayesian network-based model. The proposed method is illustrated with an application in Tabas Coal Mine. The results show that that BN-based model is a capable method for adjusting to uncertainties in the roof fall risk evaluation.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Appendix
Available only for authorised users
Literature
1.
go back to reference H.S.B. Duzgun, H.H. Einstein, Assessment and management of roof fall risks in underground coal mines. Saf. Sci. 42(1), 23–41 (2004)CrossRef H.S.B. Duzgun, H.H. Einstein, Assessment and management of roof fall risks in underground coal mines. Saf. Sci. 42(1), 23–41 (2004)CrossRef
2.
go back to reference D.F. Cooper, The Australian and New Zealand standard on risk management, AS/NZS 4360: 2004, Tutor. Notes Broadleaf Cap. Int. Pty Ltd, pp. 128–151, 2004 D.F. Cooper, The Australian and New Zealand standard on risk management, AS/NZS 4360: 2004, Tutor. Notes Broadleaf Cap. Int. Pty Ltd, pp. 128–151, 2004
3.
go back to reference N. Banaitienė, A. Banaitis, A. Norkus, Risk management in projects: peculiarities of Lithuanian construction companies. Int. J. Strateg. Prop. Manag. 15(1), 60–73 (2011)CrossRef N. Banaitienė, A. Banaitis, A. Norkus, Risk management in projects: peculiarities of Lithuanian construction companies. Int. J. Strateg. Prop. Manag. 15(1), 60–73 (2011)CrossRef
4.
go back to reference A.T. Iannacchione, T.M. Brady, F. Varley, The application of major hazard risk assessment (MHRA) to eliminate multiple fatality occurrences in the US minerals industry. US Department of Health and Human Services, Public Health Service, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, Spokane Research Laboratory, 2008 A.T. Iannacchione, T.M. Brady, F. Varley, The application of major hazard risk assessment (MHRA) to eliminate multiple fatality occurrences in the US minerals industry. US Department of Health and Human Services, Public Health Service, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, Spokane Research Laboratory, 2008
5.
go back to reference M. Sarı, Risk assessment approach on underground coal mine safety analysis. Middle East Technical University. Department of Mining Engineering, 2002 M. Sarı, Risk assessment approach on underground coal mine safety analysis. Middle East Technical University. Department of Mining Engineering, 2002
6.
go back to reference A.V.Z. Durrheim, S.M. Roberts et al., Comparative seismology of the Witwatersrand Basin and Bushveld Complex and emerging technologies to manage the risk of rockbursting. J. South. Afr. Inst. Min. Metall. 105(6), 409–416 (2005) A.V.Z. Durrheim, S.M. Roberts et al., Comparative seismology of the Witwatersrand Basin and Bushveld Complex and emerging technologies to manage the risk of rockbursting. J. South. Afr. Inst. Min. Metall. 105(6), 409–416 (2005)
7.
go back to reference S. Jian, W. Lian-guo, Z. Hua-lei, S. Yi-feng, Application of fuzzy neural network in predicting the risk of rock burst. Proc. Earth Planet. Sci. 1(1), 536–543 (2009)CrossRef S. Jian, W. Lian-guo, Z. Hua-lei, S. Yi-feng, Application of fuzzy neural network in predicting the risk of rock burst. Proc. Earth Planet. Sci. 1(1), 536–543 (2009)CrossRef
8.
go back to reference R.L. Grayson, H. Kinilakodi, V. Kecojevic, Pilot sample risk analysis for underground coal mine fires and explosions using MSHA citation data. Saf. Sci. 47(10), 1371–1378 (2009)CrossRef R.L. Grayson, H. Kinilakodi, V. Kecojevic, Pilot sample risk analysis for underground coal mine fires and explosions using MSHA citation data. Saf. Sci. 47(10), 1371–1378 (2009)CrossRef
9.
go back to reference J. Joy, Occupational safety risk management in Australian mining. Occup. Med. (Chic. III) 54(5), 311–315 (2004)CrossRef J. Joy, Occupational safety risk management in Australian mining. Occup. Med. (Chic. III) 54(5), 311–315 (2004)CrossRef
10.
go back to reference S.K. Palei, S.K. Das, Logistic regression model for prediction of roof fall risks in bord and pillar workings in coal mines: an approach. Saf. Sci. 47(1), 88–96 (2009)CrossRef S.K. Palei, S.K. Das, Logistic regression model for prediction of roof fall risks in bord and pillar workings in coal mines: an approach. Saf. Sci. 47(1), 88–96 (2009)CrossRef
11.
go back to reference V.V. Khanzode, J. Maiti, P.K. Ray, A methodology for evaluation and monitoring of recurring hazards in underground coal mining. Saf. Sci. 49(8), 1172–1179 (2011)CrossRef V.V. Khanzode, J. Maiti, P.K. Ray, A methodology for evaluation and monitoring of recurring hazards in underground coal mining. Saf. Sci. 49(8), 1172–1179 (2011)CrossRef
12.
go back to reference Y. Jiang, H. Wang, S. Xue, Y. Zhao, J. Zhu, X. Pang, Assessment and mitigation of coal bump risk during extraction of an island longwall panel. Int. J. Coal Geol. 95, 20–33 (2012)CrossRef Y. Jiang, H. Wang, S. Xue, Y. Zhao, J. Zhu, X. Pang, Assessment and mitigation of coal bump risk during extraction of an island longwall panel. Int. J. Coal Geol. 95, 20–33 (2012)CrossRef
13.
go back to reference E. Ghasemi, M. Ataei, K. Shahriar, F. Sereshki, S.E. Jalali, A. Ramazanzadeh, Assessment of roof fall risk during retreat mining in room and pillar coal mines. Int. J. Rock Mech. Min. Sci. 54, 80–89 (2012) E. Ghasemi, M. Ataei, K. Shahriar, F. Sereshki, S.E. Jalali, A. Ramazanzadeh, Assessment of roof fall risk during retreat mining in room and pillar coal mines. Int. J. Rock Mech. Min. Sci. 54, 80–89 (2012)
14.
go back to reference A. Badri, S. Nadeau, A. Gbodossou, A new practical approach to risk management for underground mining project in Quebec. J. Loss Prev. Process Ind. 26(6), 1145–1158 (2013)CrossRef A. Badri, S. Nadeau, A. Gbodossou, A new practical approach to risk management for underground mining project in Quebec. J. Loss Prev. Process Ind. 26(6), 1145–1158 (2013)CrossRef
15.
go back to reference O.D. Eratak, Analysis and Modelling for Risk Management for Underground Coal Mines Safety (Middle East Technical University, Ankara, 2014) O.D. Eratak, Analysis and Modelling for Risk Management for Underground Coal Mines Safety (Middle East Technical University, Ankara, 2014)
16.
go back to reference C. Mark, M. Gauna, Evaluating the risk of coal bursts in underground coal mines. Int. J. Min. Sci. Technol. 26(1), 47–52 (2016)CrossRef C. Mark, M. Gauna, Evaluating the risk of coal bursts in underground coal mines. Int. J. Min. Sci. Technol. 26(1), 47–52 (2016)CrossRef
17.
go back to reference S. Sadi Nezhad, K.K. Damghani, Application of a fuzzy TOPSIS method base on modified preference ratio and fuzzy distance measurement in assessment of traffic police centers performance. Appl. Soft. Comput. 10, 1028–1039 (2010)CrossRef S. Sadi Nezhad, K.K. Damghani, Application of a fuzzy TOPSIS method base on modified preference ratio and fuzzy distance measurement in assessment of traffic police centers performance. Appl. Soft. Comput. 10, 1028–1039 (2010)CrossRef
18.
go back to reference E.K. Zavadskas, A. Zakarevicius, J. Antucheviciene, Evaluation of ranking accuracy in multi-criteria decisions. Informatica 17(4), 601–618 (2006) E.K. Zavadskas, A. Zakarevicius, J. Antucheviciene, Evaluation of ranking accuracy in multi-criteria decisions. Informatica 17(4), 601–618 (2006)
19.
go back to reference L. Tupenaite, E.K. Zavadskas, A. Kaklauskas, Z. Turskis, M. Seniut, Multiple criteria assessment of alternatives for built and human environment renovation. J. Civ. Eng. Manag. 16(2), 257–266 (2010)CrossRef L. Tupenaite, E.K. Zavadskas, A. Kaklauskas, Z. Turskis, M. Seniut, Multiple criteria assessment of alternatives for built and human environment renovation. J. Civ. Eng. Manag. 16(2), 257–266 (2010)CrossRef
20.
go back to reference P. Liu, Z. Han et al., A fuzzy multi-attribute decision-making method under risk with unknown attribute weights. Technol. Econ. Dev. Econ. 17(2), 246–258 (2011)CrossRef P. Liu, Z. Han et al., A fuzzy multi-attribute decision-making method under risk with unknown attribute weights. Technol. Econ. Dev. Econ. 17(2), 246–258 (2011)CrossRef
21.
go back to reference J. Antuchevičienė, A. Zakarevičius, E.K. Zavadskas et al., Multiple criteria construction management decisions considering relations between criteria. Technol. Econ. Dev. Econ. 16(1), 109–125 (2010)CrossRef J. Antuchevičienė, A. Zakarevičius, E.K. Zavadskas et al., Multiple criteria construction management decisions considering relations between criteria. Technol. Econ. Dev. Econ. 16(1), 109–125 (2010)CrossRef
22.
go back to reference P. Liu et al., Multi-attribute decision-making method research based on interval vague set and TOPSIS method. Technol. Econ. Dev. Econ. 15(3), 453–463 (2009)CrossRef P. Liu et al., Multi-attribute decision-making method research based on interval vague set and TOPSIS method. Technol. Econ. Dev. Econ. 15(3), 453–463 (2009)CrossRef
23.
go back to reference D. Kalibatas, E.K. Zavadskas, D. Kalibatiene, The concept of the ideal indoor environment in multi-attribute assessment of dwelling-houses. Arch. Civ. Mech. Eng. 11(1), 89–101 (2011)CrossRef D. Kalibatas, E.K. Zavadskas, D. Kalibatiene, The concept of the ideal indoor environment in multi-attribute assessment of dwelling-houses. Arch. Civ. Mech. Eng. 11(1), 89–101 (2011)CrossRef
24.
go back to reference C. Çetinkaya, E. Özceylan, M. Erbaş, M. Kabak, GIS-based fuzzy MCDA approach for siting refugee camp: a case study for southeastern Turkey. Int. J. Disaster Risk Reduct. 18, 218–231 (2016)CrossRef C. Çetinkaya, E. Özceylan, M. Erbaş, M. Kabak, GIS-based fuzzy MCDA approach for siting refugee camp: a case study for southeastern Turkey. Int. J. Disaster Risk Reduct. 18, 218–231 (2016)CrossRef
25.
go back to reference M. Gul, A.F. Guneri, A fuzzy multi criteria risk assessment based on decision matrix technique: a case study for aluminum industry. J. Loss Prev. Process Ind. 40, 89–100 (2016)CrossRef M. Gul, A.F. Guneri, A fuzzy multi criteria risk assessment based on decision matrix technique: a case study for aluminum industry. J. Loss Prev. Process Ind. 40, 89–100 (2016)CrossRef
26.
go back to reference X. Yu, S. Guo, J. Guo, X. Huang, Rank B2C e-commerce websites in e-alliance based on AHP and fuzzy TOPSIS. Expert Syst. Appl. 38(4), 3550–3557 (2011)CrossRef X. Yu, S. Guo, J. Guo, X. Huang, Rank B2C e-commerce websites in e-alliance based on AHP and fuzzy TOPSIS. Expert Syst. Appl. 38(4), 3550–3557 (2011)CrossRef
27.
go back to reference D. Heckerman, A. Mamdani, M.P. Wellman, Real-world applications of Bayesian networks. Commun. ACM 38(3), 24–26 (1995)CrossRef D. Heckerman, A. Mamdani, M.P. Wellman, Real-world applications of Bayesian networks. Commun. ACM 38(3), 24–26 (1995)CrossRef
28.
go back to reference C.-F. Fan, Y.-C. Yu, BBN-based software project risk management. J. Syst. Softw. 73(2), 193–203 (2004)CrossRef C.-F. Fan, Y.-C. Yu, BBN-based software project risk management. J. Syst. Softw. 73(2), 193–203 (2004)CrossRef
29.
go back to reference F. Ülengin, Ş. Önsel, Y.I. Topçu, E. Aktaş, Ö. Kabak, An integrated transportation decision support system for transportation policy decisions: the case of Turkey. Transp. Res. Part A Policy Pract. 41(1), 80–97 (2007)CrossRef F. Ülengin, Ş. Önsel, Y.I. Topçu, E. Aktaş, Ö. Kabak, An integrated transportation decision support system for transportation policy decisions: the case of Turkey. Transp. Res. Part A Policy Pract. 41(1), 80–97 (2007)CrossRef
30.
go back to reference V. Khodakarami, N. Fenton, M. Neil, Project scheduling: improved approach to incorporate uncertainty using Bayesian networks. Proj. Manag. J. 38(2), 39 (2007) V. Khodakarami, N. Fenton, M. Neil, Project scheduling: improved approach to incorporate uncertainty using Bayesian networks. Proj. Manag. J. 38(2), 39 (2007)
31.
go back to reference K.-S. Chin, D.-W. Tang, J.-B. Yang, S.Y. Wong, H. Wang, Assessing new product development project risk by Bayesian network with a systematic probability generation methodology. Expert Syst. Appl. 36(6), 9879–9890 (2009)CrossRef K.-S. Chin, D.-W. Tang, J.-B. Yang, S.Y. Wong, H. Wang, Assessing new product development project risk by Bayesian network with a systematic probability generation methodology. Expert Syst. Appl. 36(6), 9879–9890 (2009)CrossRef
32.
go back to reference T.-T. Chen, S.-S. Leu, Fall risk assessment of cantilever bridge projects using Bayesian network. Saf. Sci. 70, 161–171 (2014)CrossRef T.-T. Chen, S.-S. Leu, Fall risk assessment of cantilever bridge projects using Bayesian network. Saf. Sci. 70, 161–171 (2014)CrossRef
33.
go back to reference L. Zhang, X. Wu, M.J. Skibniewski, J. Zhong, Y. Lu, Bayesian-network-based safety risk analysis in construction projects. Reliab. Eng. Syst. Saf. 131, 29–39 (2014)CrossRef L. Zhang, X. Wu, M.J. Skibniewski, J. Zhong, Y. Lu, Bayesian-network-based safety risk analysis in construction projects. Reliab. Eng. Syst. Saf. 131, 29–39 (2014)CrossRef
34.
go back to reference M. Abimbola, F. Khan, N. Khakzad, S. Butt, Safety and risk analysis of managed pressure drilling operation using Bayesian network. Saf. Sci. 76, 133–144 (2015)CrossRef M. Abimbola, F. Khan, N. Khakzad, S. Butt, Safety and risk analysis of managed pressure drilling operation using Bayesian network. Saf. Sci. 76, 133–144 (2015)CrossRef
35.
go back to reference B. Cai, Y. Liu, Q. Fan, A multiphase dynamic Bayesian networks methodology for the determination of safety integrity levels. Reliab. Eng. Syst. Saf. 150, 105–115 (2016)CrossRef B. Cai, Y. Liu, Q. Fan, A multiphase dynamic Bayesian networks methodology for the determination of safety integrity levels. Reliab. Eng. Syst. Saf. 150, 105–115 (2016)CrossRef
36.
go back to reference J. Wu, R. Zhou, S. Xu, Z. Wu, Probabilistic analysis of natural gas pipeline network accident based on Bayesian network. J. Loss Prev. Process Ind. 46, 126–136 (2017)CrossRef J. Wu, R. Zhou, S. Xu, Z. Wu, Probabilistic analysis of natural gas pipeline network accident based on Bayesian network. J. Loss Prev. Process Ind. 46, 126–136 (2017)CrossRef
37.
go back to reference X. Tian, Z. Xie, A. Wang, X. Yang, A new approach for Bayesian model averaging. Sci. China Earth Sci. 55(8), 1336–1344 (2012)CrossRef X. Tian, Z. Xie, A. Wang, X. Yang, A new approach for Bayesian model averaging. Sci. China Earth Sci. 55(8), 1336–1344 (2012)CrossRef
38.
go back to reference H. Zerrouki, A. Tamrabet, Safety and risk analysis of an operational heater using Bayesian network. J. Fail. Anal. Prev. 15(5), 657–661 (2015)CrossRef H. Zerrouki, A. Tamrabet, Safety and risk analysis of an operational heater using Bayesian network. J. Fail. Anal. Prev. 15(5), 657–661 (2015)CrossRef
39.
go back to reference H. Zerrouki, H. Smadi, Bayesian belief network used in the chemical and process industry: a review and application. J. Fail. Anal. Prev. 17(1), 159–165 (2017)CrossRef H. Zerrouki, H. Smadi, Bayesian belief network used in the chemical and process industry: a review and application. J. Fail. Anal. Prev. 17(1), 159–165 (2017)CrossRef
40.
go back to reference A. Pillay, J. Wang, Modified failure mode and effects analysis using approximate reasoning. Reliab. Eng. Syst. Saf. 79(1), 69–85 (2003)CrossRef A. Pillay, J. Wang, Modified failure mode and effects analysis using approximate reasoning. Reliab. Eng. Syst. Saf. 79(1), 69–85 (2003)CrossRef
41.
go back to reference A. Gegov, Complexity management in fuzzy systems (Springer, Berlin, 2007) A. Gegov, Complexity management in fuzzy systems (Springer, Berlin, 2007)
43.
go back to reference B. Chang, C.-W. Chang, C.-H. Wu, Fuzzy DEMATEL method for developing supplier selection criteria. Expert Syst. Appl. 38(3), 1850–1858 (2011)CrossRef B. Chang, C.-W. Chang, C.-H. Wu, Fuzzy DEMATEL method for developing supplier selection criteria. Expert Syst. Appl. 38(3), 1850–1858 (2011)CrossRef
44.
go back to reference C.-L. Hwang, K. Yoon, Multiple attribute decision making: methods and applications a state-of-the-art survey, vol. 186 (Springer, Berlin, 2012) C.-L. Hwang, K. Yoon, Multiple attribute decision making: methods and applications a state-of-the-art survey, vol. 186 (Springer, Berlin, 2012)
45.
go back to reference K. Abhishek, V.R. Kumar, S. Datta, S.S. Mahapatra, Application of JAYA algorithm for the optimization of machining performance characteristics during the turning of CFRP (epoxy) composites: comparison with TLBO, GA, and ICA. Eng. Comput. 33, 1–19 (2016) K. Abhishek, V.R. Kumar, S. Datta, S.S. Mahapatra, Application of JAYA algorithm for the optimization of machining performance characteristics during the turning of CFRP (epoxy) composites: comparison with TLBO, GA, and ICA. Eng. Comput. 33, 1–19 (2016)
46.
go back to reference H.-J. Zimmermann, Fuzzy set theory and its applications (Springer, Berlin, 2011) H.-J. Zimmermann, Fuzzy set theory and its applications (Springer, Berlin, 2011)
47.
go back to reference N. Jaramillo, M.L. Carreño, N. Lantada, Evaluation of social context integrated into the study of seismic risk for urban areas. Int. J. Disaster Risk Reduct. 17, 185–198 (2016)CrossRef N. Jaramillo, M.L. Carreño, N. Lantada, Evaluation of social context integrated into the study of seismic risk for urban areas. Int. J. Disaster Risk Reduct. 17, 185–198 (2016)CrossRef
48.
go back to reference G. Kabra, A. Ramesh, K. Arshinder, Identification and prioritization of coordination barriers in humanitarian supply chain management. Int. J. Disaster Risk Reduct. 13, 128–138 (2015)CrossRef G. Kabra, A. Ramesh, K. Arshinder, Identification and prioritization of coordination barriers in humanitarian supply chain management. Int. J. Disaster Risk Reduct. 13, 128–138 (2015)CrossRef
49.
go back to reference M.Z. Naghadehi, R. Mikaeil, M. Ataei, The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran. Expert Syst. Appl. 36(4), 8218–8226 (2009)CrossRef M.Z. Naghadehi, R. Mikaeil, M. Ataei, The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran. Expert Syst. Appl. 36(4), 8218–8226 (2009)CrossRef
50.
go back to reference S.K. Patil, R. Kant, A fuzzy AHP-TOPSIS framework for ranking the solutions of Knowledge Management adoption in Supply Chain to overcome its barriers. Expert Syst. Appl. 41(2), 679–693 (2014)CrossRef S.K. Patil, R. Kant, A fuzzy AHP-TOPSIS framework for ranking the solutions of Knowledge Management adoption in Supply Chain to overcome its barriers. Expert Syst. Appl. 41(2), 679–693 (2014)CrossRef
51.
go back to reference I. Macuzić, D. Tadić, A. Aleksić, M. Stefanović, A two step fuzzy model for the assessment and ranking of organizational resilience factors in the process industry. J. Loss Prev. Process Ind. 40, 122–130 (2016)CrossRef I. Macuzić, D. Tadić, A. Aleksić, M. Stefanović, A two step fuzzy model for the assessment and ranking of organizational resilience factors in the process industry. J. Loss Prev. Process Ind. 40, 122–130 (2016)CrossRef
52.
go back to reference C.-T. Chen, Extensions of the TOPSIS for group decision-making under fuzzy environment. Fuzzy Sets Syst. 114(1), 1–9 (2000)CrossRef C.-T. Chen, Extensions of the TOPSIS for group decision-making under fuzzy environment. Fuzzy Sets Syst. 114(1), 1–9 (2000)CrossRef
53.
go back to reference R.L. Sousa, H.H. Einstein, Risk analysis during tunnel construction using bayesian networks: porto metro case study. Tunn. Undergr. Space Technol. 27(1), 86–100 (2012)CrossRef R.L. Sousa, H.H. Einstein, Risk analysis during tunnel construction using bayesian networks: porto metro case study. Tunn. Undergr. Space Technol. 27(1), 86–100 (2012)CrossRef
54.
go back to reference L. Uusitalo, Advantages and challenges of Bayesian networks in environmental modelling. Ecol. Modell. 203(3), 312–318 (2007)CrossRef L. Uusitalo, Advantages and challenges of Bayesian networks in environmental modelling. Ecol. Modell. 203(3), 312–318 (2007)CrossRef
55.
go back to reference G. Wang, T. Xu, T. Tang, T. Yuan, H. Wang, A Bayesian network model for prediction of weather-related failures in railway turnout systems. Expert Syst. Appl. 69, 247–256 (2017)CrossRef G. Wang, T. Xu, T. Tang, T. Yuan, H. Wang, A Bayesian network model for prediction of weather-related failures in railway turnout systems. Expert Syst. Appl. 69, 247–256 (2017)CrossRef
56.
go back to reference B. Yet, A. Constantinou, N. Fenton, M. Neil, E. Luedeling, K. Shepherd, A Bayesian network framework for project cost, benefit and risk analysis with an agricultural development case study. Expert Syst. Appl. 60, 141–155 (2016)CrossRef B. Yet, A. Constantinou, N. Fenton, M. Neil, E. Luedeling, K. Shepherd, A Bayesian network framework for project cost, benefit and risk analysis with an agricultural development case study. Expert Syst. Appl. 60, 141–155 (2016)CrossRef
57.
go back to reference S.J. Russell, P. Norvig, J.F. Canny, J.M. Malik, D.D. Edwards, Artificial intelligence: a modern approach, vol. 2 (Prentice Hall, Upper Saddle River, 2003) S.J. Russell, P. Norvig, J.F. Canny, J.M. Malik, D.D. Edwards, Artificial intelligence: a modern approach, vol. 2 (Prentice Hall, Upper Saddle River, 2003)
58.
go back to reference T.D. Nielsen, F.V. Jensen, Bayesian networks and decision graphs (Springer, Berlin, 2009) T.D. Nielsen, F.V. Jensen, Bayesian networks and decision graphs (Springer, Berlin, 2009)
59.
go back to reference Anon, Basic design of Tabas Coal Mine Project. p. Vol 1 of 5, 2005 Anon, Basic design of Tabas Coal Mine Project. p. Vol 1 of 5, 2005
60.
go back to reference P. Guide, A guide to the project management body of knowledge, vol. 3 (Project Management Institute, Newtown Square, 2004) P. Guide, A guide to the project management body of knowledge, vol. 3 (Project Management Institute, Newtown Square, 2004)
61.
go back to reference Z.T. Bieniawski, Rock mechanics design in mining and tunnelling (Balkema, Boca Raton, 1984) Z.T. Bieniawski, Rock mechanics design in mining and tunnelling (Balkema, Boca Raton, 1984)
62.
go back to reference B. Das, Generating conditional probabilities for Bayesian networks: easing the knowledge acquisition problem. arXiv Prepr. cs/0411034, 2004 B. Das, Generating conditional probabilities for Bayesian networks: easing the knowledge acquisition problem. arXiv Prepr. cs/0411034, 2004
Metadata
Title
Developing a New Probabilistic Approach for Risk Analysis, Application in Underground Coal Mining
Authors
Mohammad Javadi
Gholamreza Saeedi
Kourosh Shahriar
Publication date
01-10-2017
Publisher
Springer US
Published in
Journal of Failure Analysis and Prevention / Issue 5/2017
Print ISSN: 1547-7029
Electronic ISSN: 1864-1245
DOI
https://doi.org/10.1007/s11668-017-0325-0