Skip to main content
Erschienen in: Journal of Failure Analysis and Prevention 5/2017

01.10.2017 | Technical Article---Peer-Reviewed

Developing a New Probabilistic Approach for Risk Analysis, Application in Underground Coal Mining

verfasst von: Mohammad Javadi, Gholamreza Saeedi, Kourosh Shahriar

Erschienen in: Journal of Failure Analysis and Prevention | Ausgabe 5/2017

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Underground coal mining is one of the most hazardous activities in all around the word. Therefore, risk analysis has a remarkable role in the coal mining works. In this study, a new probabilistic approach is developed to evaluate the most important hazard of coal mining. For this aim, at first a fuzzy TOPSIS model is applied to rank the risks of the mining. By this way, it is possible to overcome the existing uncertainty of the risk ranking process. Application of the proposed procedure shows that the roof fall is the most important hazard in the Tabas Coal Mine in Iran. Afterward, this study tried to quantify the roof fall risk as the most important hazard in underground coal mining. Due to the related uncertainties associated with every mine, it is very difficult to predict the roof fall. As a result, development of a methodology for evaluation of roof fall risk under uncertainty condition has a key role in safety of underground coal mines. In this paper, a new approach for analyzing the risk of roof fall is presented. For this aim, the major factors influencing the stability of the roof are utilized in a Bayesian network-based model. The proposed method is illustrated with an application in Tabas Coal Mine. The results show that that BN-based model is a capable method for adjusting to uncertainties in the roof fall risk evaluation.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Anhänge
Nur mit Berechtigung zugänglich
Literatur
1.
Zurück zum Zitat H.S.B. Duzgun, H.H. Einstein, Assessment and management of roof fall risks in underground coal mines. Saf. Sci. 42(1), 23–41 (2004)CrossRef H.S.B. Duzgun, H.H. Einstein, Assessment and management of roof fall risks in underground coal mines. Saf. Sci. 42(1), 23–41 (2004)CrossRef
2.
Zurück zum Zitat D.F. Cooper, The Australian and New Zealand standard on risk management, AS/NZS 4360: 2004, Tutor. Notes Broadleaf Cap. Int. Pty Ltd, pp. 128–151, 2004 D.F. Cooper, The Australian and New Zealand standard on risk management, AS/NZS 4360: 2004, Tutor. Notes Broadleaf Cap. Int. Pty Ltd, pp. 128–151, 2004
3.
Zurück zum Zitat N. Banaitienė, A. Banaitis, A. Norkus, Risk management in projects: peculiarities of Lithuanian construction companies. Int. J. Strateg. Prop. Manag. 15(1), 60–73 (2011)CrossRef N. Banaitienė, A. Banaitis, A. Norkus, Risk management in projects: peculiarities of Lithuanian construction companies. Int. J. Strateg. Prop. Manag. 15(1), 60–73 (2011)CrossRef
4.
Zurück zum Zitat A.T. Iannacchione, T.M. Brady, F. Varley, The application of major hazard risk assessment (MHRA) to eliminate multiple fatality occurrences in the US minerals industry. US Department of Health and Human Services, Public Health Service, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, Spokane Research Laboratory, 2008 A.T. Iannacchione, T.M. Brady, F. Varley, The application of major hazard risk assessment (MHRA) to eliminate multiple fatality occurrences in the US minerals industry. US Department of Health and Human Services, Public Health Service, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, Spokane Research Laboratory, 2008
5.
Zurück zum Zitat M. Sarı, Risk assessment approach on underground coal mine safety analysis. Middle East Technical University. Department of Mining Engineering, 2002 M. Sarı, Risk assessment approach on underground coal mine safety analysis. Middle East Technical University. Department of Mining Engineering, 2002
6.
Zurück zum Zitat A.V.Z. Durrheim, S.M. Roberts et al., Comparative seismology of the Witwatersrand Basin and Bushveld Complex and emerging technologies to manage the risk of rockbursting. J. South. Afr. Inst. Min. Metall. 105(6), 409–416 (2005) A.V.Z. Durrheim, S.M. Roberts et al., Comparative seismology of the Witwatersrand Basin and Bushveld Complex and emerging technologies to manage the risk of rockbursting. J. South. Afr. Inst. Min. Metall. 105(6), 409–416 (2005)
7.
Zurück zum Zitat S. Jian, W. Lian-guo, Z. Hua-lei, S. Yi-feng, Application of fuzzy neural network in predicting the risk of rock burst. Proc. Earth Planet. Sci. 1(1), 536–543 (2009)CrossRef S. Jian, W. Lian-guo, Z. Hua-lei, S. Yi-feng, Application of fuzzy neural network in predicting the risk of rock burst. Proc. Earth Planet. Sci. 1(1), 536–543 (2009)CrossRef
8.
Zurück zum Zitat R.L. Grayson, H. Kinilakodi, V. Kecojevic, Pilot sample risk analysis for underground coal mine fires and explosions using MSHA citation data. Saf. Sci. 47(10), 1371–1378 (2009)CrossRef R.L. Grayson, H. Kinilakodi, V. Kecojevic, Pilot sample risk analysis for underground coal mine fires and explosions using MSHA citation data. Saf. Sci. 47(10), 1371–1378 (2009)CrossRef
9.
Zurück zum Zitat J. Joy, Occupational safety risk management in Australian mining. Occup. Med. (Chic. III) 54(5), 311–315 (2004)CrossRef J. Joy, Occupational safety risk management in Australian mining. Occup. Med. (Chic. III) 54(5), 311–315 (2004)CrossRef
10.
Zurück zum Zitat S.K. Palei, S.K. Das, Logistic regression model for prediction of roof fall risks in bord and pillar workings in coal mines: an approach. Saf. Sci. 47(1), 88–96 (2009)CrossRef S.K. Palei, S.K. Das, Logistic regression model for prediction of roof fall risks in bord and pillar workings in coal mines: an approach. Saf. Sci. 47(1), 88–96 (2009)CrossRef
11.
Zurück zum Zitat V.V. Khanzode, J. Maiti, P.K. Ray, A methodology for evaluation and monitoring of recurring hazards in underground coal mining. Saf. Sci. 49(8), 1172–1179 (2011)CrossRef V.V. Khanzode, J. Maiti, P.K. Ray, A methodology for evaluation and monitoring of recurring hazards in underground coal mining. Saf. Sci. 49(8), 1172–1179 (2011)CrossRef
12.
Zurück zum Zitat Y. Jiang, H. Wang, S. Xue, Y. Zhao, J. Zhu, X. Pang, Assessment and mitigation of coal bump risk during extraction of an island longwall panel. Int. J. Coal Geol. 95, 20–33 (2012)CrossRef Y. Jiang, H. Wang, S. Xue, Y. Zhao, J. Zhu, X. Pang, Assessment and mitigation of coal bump risk during extraction of an island longwall panel. Int. J. Coal Geol. 95, 20–33 (2012)CrossRef
13.
Zurück zum Zitat E. Ghasemi, M. Ataei, K. Shahriar, F. Sereshki, S.E. Jalali, A. Ramazanzadeh, Assessment of roof fall risk during retreat mining in room and pillar coal mines. Int. J. Rock Mech. Min. Sci. 54, 80–89 (2012) E. Ghasemi, M. Ataei, K. Shahriar, F. Sereshki, S.E. Jalali, A. Ramazanzadeh, Assessment of roof fall risk during retreat mining in room and pillar coal mines. Int. J. Rock Mech. Min. Sci. 54, 80–89 (2012)
14.
Zurück zum Zitat A. Badri, S. Nadeau, A. Gbodossou, A new practical approach to risk management for underground mining project in Quebec. J. Loss Prev. Process Ind. 26(6), 1145–1158 (2013)CrossRef A. Badri, S. Nadeau, A. Gbodossou, A new practical approach to risk management for underground mining project in Quebec. J. Loss Prev. Process Ind. 26(6), 1145–1158 (2013)CrossRef
15.
Zurück zum Zitat O.D. Eratak, Analysis and Modelling for Risk Management for Underground Coal Mines Safety (Middle East Technical University, Ankara, 2014) O.D. Eratak, Analysis and Modelling for Risk Management for Underground Coal Mines Safety (Middle East Technical University, Ankara, 2014)
16.
Zurück zum Zitat C. Mark, M. Gauna, Evaluating the risk of coal bursts in underground coal mines. Int. J. Min. Sci. Technol. 26(1), 47–52 (2016)CrossRef C. Mark, M. Gauna, Evaluating the risk of coal bursts in underground coal mines. Int. J. Min. Sci. Technol. 26(1), 47–52 (2016)CrossRef
17.
Zurück zum Zitat S. Sadi Nezhad, K.K. Damghani, Application of a fuzzy TOPSIS method base on modified preference ratio and fuzzy distance measurement in assessment of traffic police centers performance. Appl. Soft. Comput. 10, 1028–1039 (2010)CrossRef S. Sadi Nezhad, K.K. Damghani, Application of a fuzzy TOPSIS method base on modified preference ratio and fuzzy distance measurement in assessment of traffic police centers performance. Appl. Soft. Comput. 10, 1028–1039 (2010)CrossRef
18.
Zurück zum Zitat E.K. Zavadskas, A. Zakarevicius, J. Antucheviciene, Evaluation of ranking accuracy in multi-criteria decisions. Informatica 17(4), 601–618 (2006) E.K. Zavadskas, A. Zakarevicius, J. Antucheviciene, Evaluation of ranking accuracy in multi-criteria decisions. Informatica 17(4), 601–618 (2006)
19.
Zurück zum Zitat L. Tupenaite, E.K. Zavadskas, A. Kaklauskas, Z. Turskis, M. Seniut, Multiple criteria assessment of alternatives for built and human environment renovation. J. Civ. Eng. Manag. 16(2), 257–266 (2010)CrossRef L. Tupenaite, E.K. Zavadskas, A. Kaklauskas, Z. Turskis, M. Seniut, Multiple criteria assessment of alternatives for built and human environment renovation. J. Civ. Eng. Manag. 16(2), 257–266 (2010)CrossRef
20.
Zurück zum Zitat P. Liu, Z. Han et al., A fuzzy multi-attribute decision-making method under risk with unknown attribute weights. Technol. Econ. Dev. Econ. 17(2), 246–258 (2011)CrossRef P. Liu, Z. Han et al., A fuzzy multi-attribute decision-making method under risk with unknown attribute weights. Technol. Econ. Dev. Econ. 17(2), 246–258 (2011)CrossRef
21.
Zurück zum Zitat J. Antuchevičienė, A. Zakarevičius, E.K. Zavadskas et al., Multiple criteria construction management decisions considering relations between criteria. Technol. Econ. Dev. Econ. 16(1), 109–125 (2010)CrossRef J. Antuchevičienė, A. Zakarevičius, E.K. Zavadskas et al., Multiple criteria construction management decisions considering relations between criteria. Technol. Econ. Dev. Econ. 16(1), 109–125 (2010)CrossRef
22.
Zurück zum Zitat P. Liu et al., Multi-attribute decision-making method research based on interval vague set and TOPSIS method. Technol. Econ. Dev. Econ. 15(3), 453–463 (2009)CrossRef P. Liu et al., Multi-attribute decision-making method research based on interval vague set and TOPSIS method. Technol. Econ. Dev. Econ. 15(3), 453–463 (2009)CrossRef
23.
Zurück zum Zitat D. Kalibatas, E.K. Zavadskas, D. Kalibatiene, The concept of the ideal indoor environment in multi-attribute assessment of dwelling-houses. Arch. Civ. Mech. Eng. 11(1), 89–101 (2011)CrossRef D. Kalibatas, E.K. Zavadskas, D. Kalibatiene, The concept of the ideal indoor environment in multi-attribute assessment of dwelling-houses. Arch. Civ. Mech. Eng. 11(1), 89–101 (2011)CrossRef
24.
Zurück zum Zitat C. Çetinkaya, E. Özceylan, M. Erbaş, M. Kabak, GIS-based fuzzy MCDA approach for siting refugee camp: a case study for southeastern Turkey. Int. J. Disaster Risk Reduct. 18, 218–231 (2016)CrossRef C. Çetinkaya, E. Özceylan, M. Erbaş, M. Kabak, GIS-based fuzzy MCDA approach for siting refugee camp: a case study for southeastern Turkey. Int. J. Disaster Risk Reduct. 18, 218–231 (2016)CrossRef
25.
Zurück zum Zitat M. Gul, A.F. Guneri, A fuzzy multi criteria risk assessment based on decision matrix technique: a case study for aluminum industry. J. Loss Prev. Process Ind. 40, 89–100 (2016)CrossRef M. Gul, A.F. Guneri, A fuzzy multi criteria risk assessment based on decision matrix technique: a case study for aluminum industry. J. Loss Prev. Process Ind. 40, 89–100 (2016)CrossRef
26.
Zurück zum Zitat X. Yu, S. Guo, J. Guo, X. Huang, Rank B2C e-commerce websites in e-alliance based on AHP and fuzzy TOPSIS. Expert Syst. Appl. 38(4), 3550–3557 (2011)CrossRef X. Yu, S. Guo, J. Guo, X. Huang, Rank B2C e-commerce websites in e-alliance based on AHP and fuzzy TOPSIS. Expert Syst. Appl. 38(4), 3550–3557 (2011)CrossRef
27.
Zurück zum Zitat D. Heckerman, A. Mamdani, M.P. Wellman, Real-world applications of Bayesian networks. Commun. ACM 38(3), 24–26 (1995)CrossRef D. Heckerman, A. Mamdani, M.P. Wellman, Real-world applications of Bayesian networks. Commun. ACM 38(3), 24–26 (1995)CrossRef
28.
Zurück zum Zitat C.-F. Fan, Y.-C. Yu, BBN-based software project risk management. J. Syst. Softw. 73(2), 193–203 (2004)CrossRef C.-F. Fan, Y.-C. Yu, BBN-based software project risk management. J. Syst. Softw. 73(2), 193–203 (2004)CrossRef
29.
Zurück zum Zitat F. Ülengin, Ş. Önsel, Y.I. Topçu, E. Aktaş, Ö. Kabak, An integrated transportation decision support system for transportation policy decisions: the case of Turkey. Transp. Res. Part A Policy Pract. 41(1), 80–97 (2007)CrossRef F. Ülengin, Ş. Önsel, Y.I. Topçu, E. Aktaş, Ö. Kabak, An integrated transportation decision support system for transportation policy decisions: the case of Turkey. Transp. Res. Part A Policy Pract. 41(1), 80–97 (2007)CrossRef
30.
Zurück zum Zitat V. Khodakarami, N. Fenton, M. Neil, Project scheduling: improved approach to incorporate uncertainty using Bayesian networks. Proj. Manag. J. 38(2), 39 (2007) V. Khodakarami, N. Fenton, M. Neil, Project scheduling: improved approach to incorporate uncertainty using Bayesian networks. Proj. Manag. J. 38(2), 39 (2007)
31.
Zurück zum Zitat K.-S. Chin, D.-W. Tang, J.-B. Yang, S.Y. Wong, H. Wang, Assessing new product development project risk by Bayesian network with a systematic probability generation methodology. Expert Syst. Appl. 36(6), 9879–9890 (2009)CrossRef K.-S. Chin, D.-W. Tang, J.-B. Yang, S.Y. Wong, H. Wang, Assessing new product development project risk by Bayesian network with a systematic probability generation methodology. Expert Syst. Appl. 36(6), 9879–9890 (2009)CrossRef
32.
Zurück zum Zitat T.-T. Chen, S.-S. Leu, Fall risk assessment of cantilever bridge projects using Bayesian network. Saf. Sci. 70, 161–171 (2014)CrossRef T.-T. Chen, S.-S. Leu, Fall risk assessment of cantilever bridge projects using Bayesian network. Saf. Sci. 70, 161–171 (2014)CrossRef
33.
Zurück zum Zitat L. Zhang, X. Wu, M.J. Skibniewski, J. Zhong, Y. Lu, Bayesian-network-based safety risk analysis in construction projects. Reliab. Eng. Syst. Saf. 131, 29–39 (2014)CrossRef L. Zhang, X. Wu, M.J. Skibniewski, J. Zhong, Y. Lu, Bayesian-network-based safety risk analysis in construction projects. Reliab. Eng. Syst. Saf. 131, 29–39 (2014)CrossRef
34.
Zurück zum Zitat M. Abimbola, F. Khan, N. Khakzad, S. Butt, Safety and risk analysis of managed pressure drilling operation using Bayesian network. Saf. Sci. 76, 133–144 (2015)CrossRef M. Abimbola, F. Khan, N. Khakzad, S. Butt, Safety and risk analysis of managed pressure drilling operation using Bayesian network. Saf. Sci. 76, 133–144 (2015)CrossRef
35.
Zurück zum Zitat B. Cai, Y. Liu, Q. Fan, A multiphase dynamic Bayesian networks methodology for the determination of safety integrity levels. Reliab. Eng. Syst. Saf. 150, 105–115 (2016)CrossRef B. Cai, Y. Liu, Q. Fan, A multiphase dynamic Bayesian networks methodology for the determination of safety integrity levels. Reliab. Eng. Syst. Saf. 150, 105–115 (2016)CrossRef
36.
Zurück zum Zitat J. Wu, R. Zhou, S. Xu, Z. Wu, Probabilistic analysis of natural gas pipeline network accident based on Bayesian network. J. Loss Prev. Process Ind. 46, 126–136 (2017)CrossRef J. Wu, R. Zhou, S. Xu, Z. Wu, Probabilistic analysis of natural gas pipeline network accident based on Bayesian network. J. Loss Prev. Process Ind. 46, 126–136 (2017)CrossRef
37.
Zurück zum Zitat X. Tian, Z. Xie, A. Wang, X. Yang, A new approach for Bayesian model averaging. Sci. China Earth Sci. 55(8), 1336–1344 (2012)CrossRef X. Tian, Z. Xie, A. Wang, X. Yang, A new approach for Bayesian model averaging. Sci. China Earth Sci. 55(8), 1336–1344 (2012)CrossRef
38.
Zurück zum Zitat H. Zerrouki, A. Tamrabet, Safety and risk analysis of an operational heater using Bayesian network. J. Fail. Anal. Prev. 15(5), 657–661 (2015)CrossRef H. Zerrouki, A. Tamrabet, Safety and risk analysis of an operational heater using Bayesian network. J. Fail. Anal. Prev. 15(5), 657–661 (2015)CrossRef
39.
Zurück zum Zitat H. Zerrouki, H. Smadi, Bayesian belief network used in the chemical and process industry: a review and application. J. Fail. Anal. Prev. 17(1), 159–165 (2017)CrossRef H. Zerrouki, H. Smadi, Bayesian belief network used in the chemical and process industry: a review and application. J. Fail. Anal. Prev. 17(1), 159–165 (2017)CrossRef
40.
Zurück zum Zitat A. Pillay, J. Wang, Modified failure mode and effects analysis using approximate reasoning. Reliab. Eng. Syst. Saf. 79(1), 69–85 (2003)CrossRef A. Pillay, J. Wang, Modified failure mode and effects analysis using approximate reasoning. Reliab. Eng. Syst. Saf. 79(1), 69–85 (2003)CrossRef
41.
Zurück zum Zitat A. Gegov, Complexity management in fuzzy systems (Springer, Berlin, 2007) A. Gegov, Complexity management in fuzzy systems (Springer, Berlin, 2007)
42.
43.
Zurück zum Zitat B. Chang, C.-W. Chang, C.-H. Wu, Fuzzy DEMATEL method for developing supplier selection criteria. Expert Syst. Appl. 38(3), 1850–1858 (2011)CrossRef B. Chang, C.-W. Chang, C.-H. Wu, Fuzzy DEMATEL method for developing supplier selection criteria. Expert Syst. Appl. 38(3), 1850–1858 (2011)CrossRef
44.
Zurück zum Zitat C.-L. Hwang, K. Yoon, Multiple attribute decision making: methods and applications a state-of-the-art survey, vol. 186 (Springer, Berlin, 2012) C.-L. Hwang, K. Yoon, Multiple attribute decision making: methods and applications a state-of-the-art survey, vol. 186 (Springer, Berlin, 2012)
45.
Zurück zum Zitat K. Abhishek, V.R. Kumar, S. Datta, S.S. Mahapatra, Application of JAYA algorithm for the optimization of machining performance characteristics during the turning of CFRP (epoxy) composites: comparison with TLBO, GA, and ICA. Eng. Comput. 33, 1–19 (2016) K. Abhishek, V.R. Kumar, S. Datta, S.S. Mahapatra, Application of JAYA algorithm for the optimization of machining performance characteristics during the turning of CFRP (epoxy) composites: comparison with TLBO, GA, and ICA. Eng. Comput. 33, 1–19 (2016)
46.
Zurück zum Zitat H.-J. Zimmermann, Fuzzy set theory and its applications (Springer, Berlin, 2011) H.-J. Zimmermann, Fuzzy set theory and its applications (Springer, Berlin, 2011)
47.
Zurück zum Zitat N. Jaramillo, M.L. Carreño, N. Lantada, Evaluation of social context integrated into the study of seismic risk for urban areas. Int. J. Disaster Risk Reduct. 17, 185–198 (2016)CrossRef N. Jaramillo, M.L. Carreño, N. Lantada, Evaluation of social context integrated into the study of seismic risk for urban areas. Int. J. Disaster Risk Reduct. 17, 185–198 (2016)CrossRef
48.
Zurück zum Zitat G. Kabra, A. Ramesh, K. Arshinder, Identification and prioritization of coordination barriers in humanitarian supply chain management. Int. J. Disaster Risk Reduct. 13, 128–138 (2015)CrossRef G. Kabra, A. Ramesh, K. Arshinder, Identification and prioritization of coordination barriers in humanitarian supply chain management. Int. J. Disaster Risk Reduct. 13, 128–138 (2015)CrossRef
49.
Zurück zum Zitat M.Z. Naghadehi, R. Mikaeil, M. Ataei, The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran. Expert Syst. Appl. 36(4), 8218–8226 (2009)CrossRef M.Z. Naghadehi, R. Mikaeil, M. Ataei, The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran. Expert Syst. Appl. 36(4), 8218–8226 (2009)CrossRef
50.
Zurück zum Zitat S.K. Patil, R. Kant, A fuzzy AHP-TOPSIS framework for ranking the solutions of Knowledge Management adoption in Supply Chain to overcome its barriers. Expert Syst. Appl. 41(2), 679–693 (2014)CrossRef S.K. Patil, R. Kant, A fuzzy AHP-TOPSIS framework for ranking the solutions of Knowledge Management adoption in Supply Chain to overcome its barriers. Expert Syst. Appl. 41(2), 679–693 (2014)CrossRef
51.
Zurück zum Zitat I. Macuzić, D. Tadić, A. Aleksić, M. Stefanović, A two step fuzzy model for the assessment and ranking of organizational resilience factors in the process industry. J. Loss Prev. Process Ind. 40, 122–130 (2016)CrossRef I. Macuzić, D. Tadić, A. Aleksić, M. Stefanović, A two step fuzzy model for the assessment and ranking of organizational resilience factors in the process industry. J. Loss Prev. Process Ind. 40, 122–130 (2016)CrossRef
52.
Zurück zum Zitat C.-T. Chen, Extensions of the TOPSIS for group decision-making under fuzzy environment. Fuzzy Sets Syst. 114(1), 1–9 (2000)CrossRef C.-T. Chen, Extensions of the TOPSIS for group decision-making under fuzzy environment. Fuzzy Sets Syst. 114(1), 1–9 (2000)CrossRef
53.
Zurück zum Zitat R.L. Sousa, H.H. Einstein, Risk analysis during tunnel construction using bayesian networks: porto metro case study. Tunn. Undergr. Space Technol. 27(1), 86–100 (2012)CrossRef R.L. Sousa, H.H. Einstein, Risk analysis during tunnel construction using bayesian networks: porto metro case study. Tunn. Undergr. Space Technol. 27(1), 86–100 (2012)CrossRef
54.
Zurück zum Zitat L. Uusitalo, Advantages and challenges of Bayesian networks in environmental modelling. Ecol. Modell. 203(3), 312–318 (2007)CrossRef L. Uusitalo, Advantages and challenges of Bayesian networks in environmental modelling. Ecol. Modell. 203(3), 312–318 (2007)CrossRef
55.
Zurück zum Zitat G. Wang, T. Xu, T. Tang, T. Yuan, H. Wang, A Bayesian network model for prediction of weather-related failures in railway turnout systems. Expert Syst. Appl. 69, 247–256 (2017)CrossRef G. Wang, T. Xu, T. Tang, T. Yuan, H. Wang, A Bayesian network model for prediction of weather-related failures in railway turnout systems. Expert Syst. Appl. 69, 247–256 (2017)CrossRef
56.
Zurück zum Zitat B. Yet, A. Constantinou, N. Fenton, M. Neil, E. Luedeling, K. Shepherd, A Bayesian network framework for project cost, benefit and risk analysis with an agricultural development case study. Expert Syst. Appl. 60, 141–155 (2016)CrossRef B. Yet, A. Constantinou, N. Fenton, M. Neil, E. Luedeling, K. Shepherd, A Bayesian network framework for project cost, benefit and risk analysis with an agricultural development case study. Expert Syst. Appl. 60, 141–155 (2016)CrossRef
57.
Zurück zum Zitat S.J. Russell, P. Norvig, J.F. Canny, J.M. Malik, D.D. Edwards, Artificial intelligence: a modern approach, vol. 2 (Prentice Hall, Upper Saddle River, 2003) S.J. Russell, P. Norvig, J.F. Canny, J.M. Malik, D.D. Edwards, Artificial intelligence: a modern approach, vol. 2 (Prentice Hall, Upper Saddle River, 2003)
58.
Zurück zum Zitat T.D. Nielsen, F.V. Jensen, Bayesian networks and decision graphs (Springer, Berlin, 2009) T.D. Nielsen, F.V. Jensen, Bayesian networks and decision graphs (Springer, Berlin, 2009)
59.
Zurück zum Zitat Anon, Basic design of Tabas Coal Mine Project. p. Vol 1 of 5, 2005 Anon, Basic design of Tabas Coal Mine Project. p. Vol 1 of 5, 2005
60.
Zurück zum Zitat P. Guide, A guide to the project management body of knowledge, vol. 3 (Project Management Institute, Newtown Square, 2004) P. Guide, A guide to the project management body of knowledge, vol. 3 (Project Management Institute, Newtown Square, 2004)
61.
Zurück zum Zitat Z.T. Bieniawski, Rock mechanics design in mining and tunnelling (Balkema, Boca Raton, 1984) Z.T. Bieniawski, Rock mechanics design in mining and tunnelling (Balkema, Boca Raton, 1984)
62.
Zurück zum Zitat B. Das, Generating conditional probabilities for Bayesian networks: easing the knowledge acquisition problem. arXiv Prepr. cs/0411034, 2004 B. Das, Generating conditional probabilities for Bayesian networks: easing the knowledge acquisition problem. arXiv Prepr. cs/0411034, 2004
Metadaten
Titel
Developing a New Probabilistic Approach for Risk Analysis, Application in Underground Coal Mining
verfasst von
Mohammad Javadi
Gholamreza Saeedi
Kourosh Shahriar
Publikationsdatum
01.10.2017
Verlag
Springer US
Erschienen in
Journal of Failure Analysis and Prevention / Ausgabe 5/2017
Print ISSN: 1547-7029
Elektronische ISSN: 1864-1245
DOI
https://doi.org/10.1007/s11668-017-0325-0

Weitere Artikel der Ausgabe 5/2017

Journal of Failure Analysis and Prevention 5/2017 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.