Skip to main content
Top
Published in: Production Engineering 5/2022

27-03-2022 | Production Process

Developing a novel mathematical approach toward minimizing sustainable circular economy costs of one-shot systems

Authors: Meysam Azimian, Mahdi Karbasian, Karim Atashgar

Published in: Production Engineering | Issue 5/2022

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

A One-shot device is defined as a unit that can be used once only, hence it cannot be tested more than once. Some examples are pressure vessels, stand-by systems, and thermal batteries. In this regard, a sustainable circular economy- considered critical in decreasing environmental pollution- is one of the most important issues which involves high costs for those in charge of collecting and disposing of hazardous material. Indeed, appropriate life-cycle management can have a profound effect on sustainable circular economy costs in single-use systems. Although numerous research studies are devoted to investigating one-shots, this paper proposes a new mathematical method conducive toward choosing life-time for minimizing circular economy cost of the latter systems. In order to make an evaluation of the performance of the developed approach, a composite overwrapped pressure vessel is used as a real case study.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Azimian M, Karbasian M, Atashgar K, Kabir G (2021) A new approach to select the reliable suppliers for one-shot devices. Prod Eng Res Devel 15:371–382CrossRef Azimian M, Karbasian M, Atashgar K, Kabir G (2021) A new approach to select the reliable suppliers for one-shot devices. Prod Eng Res Devel 15:371–382CrossRef
3.
go back to reference Zhang C, Qian Y, Dui H, Wang S, Shi J (2020) Component failure recognition and maintenance optimization for offshore heave compensation systems based on importance measures. J Less Prevention Process Industr 63:103996CrossRef Zhang C, Qian Y, Dui H, Wang S, Shi J (2020) Component failure recognition and maintenance optimization for offshore heave compensation systems based on importance measures. J Less Prevention Process Industr 63:103996CrossRef
4.
go back to reference Felecia (2014) Fuzzy logic reliability centered maintenance. Jurnal Teknik Industri 16(2):121–126 Felecia (2014) Fuzzy logic reliability centered maintenance. Jurnal Teknik Industri 16(2):121–126
5.
go back to reference Nourelfath M, Nahas N, Ben Doya M (2016) Integrated preventive maintenance and production decisions for imperfect processes. Reliab Eng Syst Saf 148:21–31CrossRef Nourelfath M, Nahas N, Ben Doya M (2016) Integrated preventive maintenance and production decisions for imperfect processes. Reliab Eng Syst Saf 148:21–31CrossRef
6.
go back to reference Yang L, Ma X, Peng R, Zhai Q, Zhao Y (2017) A preventive maintenence policy based on dependent two-stage deterioration and external shocks. Reliab Eng Syst Saf 160:201–211CrossRef Yang L, Ma X, Peng R, Zhai Q, Zhao Y (2017) A preventive maintenence policy based on dependent two-stage deterioration and external shocks. Reliab Eng Syst Saf 160:201–211CrossRef
7.
go back to reference Azimian M, Shahin A, Alinaghiyan M, Badri M (2012) Development of integration approch of DEA and malmqueist for evaluation of proiect efficiency - case study. Industr Manag 5(1):43–62 (In Persian) Azimian M, Shahin A, Alinaghiyan M, Badri M (2012) Development of integration approch of DEA and malmqueist for evaluation of proiect efficiency - case study. Industr Manag 5(1):43–62 (In Persian)
8.
go back to reference Zio E, Di Maio F (2010) A data driven fuzzy approach for predicting the remaining useful life in dynamic failure scenarios of a nuclear system. Reliab Eng Syst Saf 95:49–57CrossRef Zio E, Di Maio F (2010) A data driven fuzzy approach for predicting the remaining useful life in dynamic failure scenarios of a nuclear system. Reliab Eng Syst Saf 95:49–57CrossRef
9.
go back to reference Li W, He M, Sun Y, Cao Q (2019) A novel layered Fuzzy petri nets modeling and reasoning method for process equipment failure risk assessment. J Less Prevention Process Industr 62:103953CrossRef Li W, He M, Sun Y, Cao Q (2019) A novel layered Fuzzy petri nets modeling and reasoning method for process equipment failure risk assessment. J Less Prevention Process Industr 62:103953CrossRef
10.
go back to reference Jianxing Y, Haicheng C, Yang Y, Zhenglong Y (2019) A weakest T-norm based Fuzzy fault tree approach for leakage risk assessment of submarine pipline. J Less Prevention Process Industr 62:103968CrossRef Jianxing Y, Haicheng C, Yang Y, Zhenglong Y (2019) A weakest T-norm based Fuzzy fault tree approach for leakage risk assessment of submarine pipline. J Less Prevention Process Industr 62:103968CrossRef
11.
go back to reference Kitagaw T, Yuge T, Yanagi S (2016) Periodic and non-perodic inspection policies for a one-shot system with minimal repir. J Jpn Industr Manage Assoc 66(4):387–395 Kitagaw T, Yuge T, Yanagi S (2016) Periodic and non-perodic inspection policies for a one-shot system with minimal repir. J Jpn Industr Manage Assoc 66(4):387–395
12.
go back to reference Dunson DB, Dinse GE (2002) Bayesian models for multivariate current status data with informative censoring. Biometrics 58:79–88MathSciNetCrossRef Dunson DB, Dinse GE (2002) Bayesian models for multivariate current status data with informative censoring. Biometrics 58:79–88MathSciNetCrossRef
13.
go back to reference Yates S, Mosleh A (2006) A Bayesian approach to reliability demonstration for aerospace systems. reliability and maintainability Symposium. Annual, Newport Beach, CA, USA Yates S, Mosleh A (2006) A Bayesian approach to reliability demonstration for aerospace systems. reliability and maintainability Symposium. Annual, Newport Beach, CA, USA
14.
go back to reference Vinter Z, Valis D (2008) Reliability modelling of automatic gun with pyrotechnic charging. Adv Military Technol 3(1):33 Vinter Z, Valis D (2008) Reliability modelling of automatic gun with pyrotechnic charging. Adv Military Technol 3(1):33
15.
go back to reference Fan T, Balakrishnam N, Chang C (2009) The Beysian approach for highly reliable electero-explosive decvices using one-shot device testing. J Stat Comput Simul 79(9):1143–1154MathSciNetCrossRef Fan T, Balakrishnam N, Chang C (2009) The Beysian approach for highly reliable electero-explosive decvices using one-shot device testing. J Stat Comput Simul 79(9):1143–1154MathSciNetCrossRef
16.
go back to reference Guo H, Honecker S, Mettes A, Ogden D (2010) Reliability estimation for one-shot systems with zero component test failures. Annual Reliability and Maintain Ability Symposium, IEEE Guo H, Honecker S, Mettes A, Ogden D (2010) Reliability estimation for one-shot systems with zero component test failures. Annual Reliability and Maintain Ability Symposium, IEEE
17.
go back to reference Ling MH, Hu X, W, (2020) Optimal design of simple step-stress accelerated life tests for one-shot devices under Weibull distributions. Reliab Eng Syst Saf 193:106630CrossRef Ling MH, Hu X, W, (2020) Optimal design of simple step-stress accelerated life tests for one-shot devices under Weibull distributions. Reliab Eng Syst Saf 193:106630CrossRef
18.
go back to reference Wu H, Li Y-F, Bérenguer C (2020) Optimal inspection and maintenance for a repairable k-out-of-n: G warm standby system. Reliab Eng Syst Saf 193:106669CrossRef Wu H, Li Y-F, Bérenguer C (2020) Optimal inspection and maintenance for a repairable k-out-of-n: G warm standby system. Reliab Eng Syst Saf 193:106669CrossRef
19.
go back to reference Kaio N, Dohi T, Osaki S (1994) Inspection policy with failure due to inspection. Microelectron Reliab 34:599–602CrossRef Kaio N, Dohi T, Osaki S (1994) Inspection policy with failure due to inspection. Microelectron Reliab 34:599–602CrossRef
20.
go back to reference Hariga M (1996) A maintenance inspection model for a single machine with general failure distribution. Microelectron Reliab 36:353–358CrossRef Hariga M (1996) A maintenance inspection model for a single machine with general failure distribution. Microelectron Reliab 36:353–358CrossRef
21.
go back to reference Ito K, Nakagawa T (2000) Optimal inspection policies for a storage system with degradation at periodic tests. Math Comput Model 31:191–195MathSciNetCrossRef Ito K, Nakagawa T (2000) Optimal inspection policies for a storage system with degradation at periodic tests. Math Comput Model 31:191–195MathSciNetCrossRef
22.
go back to reference Grall A, Bérenguer C, Dieulle L (2002) A condition-based maintenance policy for stochastically deteriorating systems. Reliab Eng Syst Saf 76:167–180CrossRef Grall A, Bérenguer C, Dieulle L (2002) A condition-based maintenance policy for stochastically deteriorating systems. Reliab Eng Syst Saf 76:167–180CrossRef
23.
go back to reference Li W, Pham H (2005) An inspection-maintenance model for systems with multiple competing processes. IEEE Trans Reliab 54:318–327CrossRef Li W, Pham H (2005) An inspection-maintenance model for systems with multiple competing processes. IEEE Trans Reliab 54:318–327CrossRef
24.
go back to reference Newby M (2008) Monitoring and maintenance of spares and one-shot devices. Reliab Eng Syst Saf 93:588–594CrossRef Newby M (2008) Monitoring and maintenance of spares and one-shot devices. Reliab Eng Syst Saf 93:588–594CrossRef
25.
go back to reference Yun W, Kim H, Han Y (2012) Simulation-based inspection policies for a one-shot system in storage. In: 5th Asia-Pacific Int. Symp. Advanced Reliability and Maintenance Modeling (APARM 2012) Yun W, Kim H, Han Y (2012) Simulation-based inspection policies for a one-shot system in storage. In: 5th Asia-Pacific Int. Symp. Advanced Reliability and Maintenance Modeling (APARM 2012)
26.
go back to reference Yun W-Y, Han YJ, Kim H-W (2014) Simulation-based inspection policies for a one-shot system in storage over a finite time span. Commun Stat-Simuat Comput 43:1979–2003MathSciNetCrossRef Yun W-Y, Han YJ, Kim H-W (2014) Simulation-based inspection policies for a one-shot system in storage over a finite time span. Commun Stat-Simuat Comput 43:1979–2003MathSciNetCrossRef
27.
go back to reference Morris MD (1987) A sequential experimental design for estimating a scale parameter from quantal life testing data. Technometrics 29:173–181MathSciNetCrossRef Morris MD (1987) A sequential experimental design for estimating a scale parameter from quantal life testing data. Technometrics 29:173–181MathSciNetCrossRef
28.
go back to reference Balakrishnan N, Castilla E, Martin N, Pardo L (2019) Robust estimators and test statistics for one-shot device testing under the exponential distribution. IEEE Trans Inf Theory 66(5):3080–3096MathSciNetCrossRef Balakrishnan N, Castilla E, Martin N, Pardo L (2019) Robust estimators and test statistics for one-shot device testing under the exponential distribution. IEEE Trans Inf Theory 66(5):3080–3096MathSciNetCrossRef
29.
go back to reference Sharifi M, Taghipour S (2020) Optimal inspection interval for a k-out-of-n system with non-identical components. J Manuf Syst 55:233–247CrossRef Sharifi M, Taghipour S (2020) Optimal inspection interval for a k-out-of-n system with non-identical components. J Manuf Syst 55:233–247CrossRef
30.
go back to reference Wu S-J, Hsu C-C, Huang S-R (2020) Optimal designs and reliability sampling plans for one-shot devices with cost considration. Reliab Eng Syst Saf 197:106795CrossRef Wu S-J, Hsu C-C, Huang S-R (2020) Optimal designs and reliability sampling plans for one-shot devices with cost considration. Reliab Eng Syst Saf 197:106795CrossRef
31.
go back to reference Sharifi S, Golami H, Karbasian M (2012) Relaibilty Engineering. Omid Enghelab, Tehran (In Persian) Sharifi S, Golami H, Karbasian M (2012) Relaibilty Engineering. Omid Enghelab, Tehran (In Persian)
33.
go back to reference Nakagawa T (2006) Maintenance theory of reliability. Springer Science and Business Media Nakagawa T (2006) Maintenance theory of reliability. Springer Science and Business Media
34.
go back to reference Kim ES, Choi S (2013) Risk analysis of CNG composite pressure vessel via computer-aided method and fractography. Eng Fail Anal 27:84–98CrossRef Kim ES, Choi S (2013) Risk analysis of CNG composite pressure vessel via computer-aided method and fractography. Eng Fail Anal 27:84–98CrossRef
35.
go back to reference McLaughlan P, Forth S, Grimes-Ledesma L(2011) Composite overwrapped pressure vessels: a primer, NASA McLaughlan P, Forth S, Grimes-Ledesma L(2011) Composite overwrapped pressure vessels: a primer, NASA
36.
go back to reference Crawford R, Martin P (2020) Plastics Engineering, 4th edn. Butterworth-Heinemann, USA Crawford R, Martin P (2020) Plastics Engineering, 4th edn. Butterworth-Heinemann, USA
37.
go back to reference Stansbury EE, Buchanan RA (2000) Fundamentals of electrochemical corrosion, ASM international Stansbury EE, Buchanan RA (2000) Fundamentals of electrochemical corrosion, ASM international
38.
go back to reference Dahmene S, Yaacoubi M, Mountassir ME, Langloi C, Langloi O (2016) Towards efficient acoustic emission testing of COPV, without felicity ratio criterion, during hydrogen-filling. Int J Hydrogen Energy 41(2):1359–1368CrossRef Dahmene S, Yaacoubi M, Mountassir ME, Langloi C, Langloi O (2016) Towards efficient acoustic emission testing of COPV, without felicity ratio criterion, during hydrogen-filling. Int J Hydrogen Energy 41(2):1359–1368CrossRef
39.
Metadata
Title
Developing a novel mathematical approach toward minimizing sustainable circular economy costs of one-shot systems
Authors
Meysam Azimian
Mahdi Karbasian
Karim Atashgar
Publication date
27-03-2022
Publisher
Springer Berlin Heidelberg
Published in
Production Engineering / Issue 5/2022
Print ISSN: 0944-6524
Electronic ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-022-01122-1

Other articles of this Issue 5/2022

Production Engineering 5/2022 Go to the issue

Premium Partners