Double shield TBM performance analysis in difficult ground conditions: a case study in the Gerede water tunnel, Turkey

Authors: Aydin Shaterpour-Mamaghani, Deniz Tumac, Emre Avunduk

Published in: Bulletin of Engineering Geology and the Environment | Issue 1/2016

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The performance analysis of double shield TBMs in difficult ground conditions in the Gerede tunnel is presented in this study. The strength of the encountered formations along the tunnel route varied from medium strength (sandstone, limestone) to high strength (basalt). The total length of tunnels is 31.6 km, which was excavated by three double shield TBMs having diameter of 5.57 m. Literature studies are first carried out in order to review the difficult ground conditions and their impacts on mechanized tunnelling. Later, the project, geology, and the characteristics of the TBMs are given in detail. Then the factors affecting the performance of the TBMs, machine utilization, and operational parameters (torque, thrust) are discussed in detail. In the light of these facts, the main objective of this study is to describe the possible improvement methods to reduce the effect of these difficulties on TBM performance.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Avunduk E (2011) Performance analysis of EPB-TBM in difficult geological conditions for Kadikoy-Kartal metro project. MSc Thesis, Istanbul Technical University Avunduk E (2011) Performance analysis of EPB-TBM in difficult geological conditions for Kadikoy-Kartal metro project. MSc Thesis, Istanbul Technical University
go back to reference Barla G (2001) Tunnelling under squeezing rock conditions. In: Kolymbas D (ed) Euro summer school on tunnelling mechanics, Innsbruck, Oct 08–11, pp 169–268 Barla G (2001) Tunnelling under squeezing rock conditions. In: Kolymbas D (ed) Euro summer school on tunnelling mechanics, Innsbruck, Oct 08–11, pp 169–268
go back to reference Barla G, Pelizza S (2000) TBM tunnelling in difficult ground conditions. In: Geo Eng 2000-An International Conference on Geotechnical & Geological Engineering, Melbourne, Australia Barla G, Pelizza S (2000) TBM tunnelling in difficult ground conditions. In: Geo Eng 2000-An International Conference on Geotechnical & Geological Engineering, Melbourne, Australia
go back to reference Barton N, Lien R, Lunde J (1974) Engineering classification of rock masses for the design of tunnel support. Rock Mech 6(4):189–236CrossRef Barton N, Lien R, Lunde J (1974) Engineering classification of rock masses for the design of tunnel support. Rock Mech 6(4):189–236CrossRef
go back to reference Bieniawski ZT (1989) Engineering rock mass classifications: a complete manual for engineers and geologists in mining, civil and petroleum engineering. Wiley, New York, p 251 Bieniawski ZT (1989) Engineering rock mass classifications: a complete manual for engineers and geologists in mining, civil and petroleum engineering. Wiley, New York, p 251
go back to reference Bilgin N, Algan M (2012) The performance of a TBM in a squeezing ground at Uluabat, Turkey. Tunn Undergr Space Technol 32:58–65CrossRef Bilgin N, Algan M (2012) The performance of a TBM in a squeezing ground at Uluabat, Turkey. Tunn Undergr Space Technol 32:58–65CrossRef
go back to reference Bilgin N, Balci C, Acaroglu O, Tuncdemir H, Eskikaya S, Akgul M, Algan M (1999) The performance prediction of a TBM in Tuzla-Dragos Sewerage Tunnel. World Tunnel Congress, Challenges for the 21st Century, Balkema, Rotterdam, pp 817–827 Bilgin N, Balci C, Acaroglu O, Tuncdemir H, Eskikaya S, Akgul M, Algan M (1999) The performance prediction of a TBM in Tuzla-Dragos Sewerage Tunnel. World Tunnel Congress, Challenges for the 21st Century, Balkema, Rotterdam, pp 817–827
go back to reference Buhan P, Cuvillier A, Dormieux L, Maghous S (1999) Face stability of shallow circular tunnels driven under the water table: a numerical analysis. Int J Numer Anal Methods Geomech 23:79–95CrossRef Buhan P, Cuvillier A, Dormieux L, Maghous S (1999) Face stability of shallow circular tunnels driven under the water table: a numerical analysis. Int J Numer Anal Methods Geomech 23:79–95CrossRef
go back to reference Clark J, Chorley S (2014) The greatest challenges in TBM tunneling: experiences from the field. In: North American Tunneling Conference, pp 101–108. ISBN 9780873353984 Clark J, Chorley S (2014) The greatest challenges in TBM tunneling: experiences from the field. In: North American Tunneling Conference, pp 101–108. ISBN 9780873353984
go back to reference Deere DU, Hendron AJ, Patton FD, Cording EJ (1967) Design of surface and near surface construction in rock. In: Fairhurst C (ed) Proceedings of 8th US symposium on rock mechanics. AIME, New York, pp 237–302 Deere DU, Hendron AJ, Patton FD, Cording EJ (1967) Design of surface and near surface construction in rock. In: Fairhurst C (ed) Proceedings of 8th US symposium on rock mechanics. AIME, New York, pp 237–302
go back to reference Duke SK, Arabshahi J (2007) Evaluating ground conditions ahead of a TBM using probe drill data. In: Traylor MT, Townsend JW (ed) Rapid Excavation and Tunnelling Conference. Society of Mining Engineers, pp 430–441 Duke SK, Arabshahi J (2007) Evaluating ground conditions ahead of a TBM using probe drill data. In: Traylor MT, Townsend JW (ed) Rapid Excavation and Tunnelling Conference. Society of Mining Engineers, pp 430–441
go back to reference Farrokh E, Rostami J (2009) Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project. Tunn Undergr Space Technol 24:436–446CrossRef Farrokh E, Rostami J (2009) Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project. Tunn Undergr Space Technol 24:436–446CrossRef
go back to reference Hamidi JK, Shahriar K, Rostami J (2009) Double shield TBM in challenging, difficult ground conditions-a case study from Zagros long water transfer tunnel, Iran. 2009 Rapid Excavation and Tunnelling Conference, Proceedings, pp 1321–1333 Hamidi JK, Shahriar K, Rostami J (2009) Double shield TBM in challenging, difficult ground conditions-a case study from Zagros long water transfer tunnel, Iran. 2009 Rapid Excavation and Tunnelling Conference, Proceedings, pp 1321–1333
go back to reference Hassanpour J, Rostami J, Khamehchiyan M, Bruland A, Tavakoli HR (2010) TBM performance analysis in Pyroclastic rocks: a case history of Karaj water conveyance tunnel. Rock Mech Rock Eng 43:427–445CrossRef Hassanpour J, Rostami J, Khamehchiyan M, Bruland A, Tavakoli HR (2010) TBM performance analysis in Pyroclastic rocks: a case history of Karaj water conveyance tunnel. Rock Mech Rock Eng 43:427–445CrossRef
go back to reference International Tunnelling and Underground Space Association (2003) Long traffic tunnels at great depth. ITA Working group N° 17 “Long tunnels at great depth”, ITA Lausanne International Tunnelling and Underground Space Association (2003) Long traffic tunnels at great depth. ITA Working group N° 17 “Long tunnels at great depth”, ITA Lausanne
go back to reference Lee IM, Nam SW (2001) The study of seepage forces acting on the tunnel lining and tunnel face in shallow tunnels. Tunn Undergr Space Technol 16:31–40CrossRef Lee IM, Nam SW (2001) The study of seepage forces acting on the tunnel lining and tunnel face in shallow tunnels. Tunn Undergr Space Technol 16:31–40CrossRef
go back to reference Lee IM, Lee JS, Nam SW (2004) Effect of seepage force on tunnel face stability reinforced with multi-step pipe grouting. Tunn Undergr Space Technol 19:551–565CrossRef Lee IM, Lee JS, Nam SW (2004) Effect of seepage force on tunnel face stability reinforced with multi-step pipe grouting. Tunn Undergr Space Technol 19:551–565CrossRef
go back to reference Myer LR, Brekke Tl, Korbin GE, Kavazanjian E, Mitchell JK (1977) Stand-up time of tunnel in squeezing ground—part I: physical model study, Report No. DOT-TST-77-59, Department of Civil Eng., University of California, Berkeley, June Myer LR, Brekke Tl, Korbin GE, Kavazanjian E, Mitchell JK (1977) Stand-up time of tunnel in squeezing ground—part I: physical model study, Report No. DOT-TST-77-59, Department of Civil Eng., University of California, Berkeley, June
go back to reference Nilsen B (2014) Characteristics of water ingress in Norwegian subsea tunnels. Rock Mech Rock Eng 47:933–945CrossRef Nilsen B (2014) Characteristics of water ingress in Norwegian subsea tunnels. Rock Mech Rock Eng 47:933–945CrossRef
go back to reference Ozaslan H (2007) Final geotechnical report of second stage of Isikli Tunnel, vol 1, p 389 (In Turkish) Ozaslan H (2007) Final geotechnical report of second stage of Isikli Tunnel, vol 1, p 389 (In Turkish)
go back to reference Ramoni M (2010) On the feasibility of TBM drives in squeezing ground and the risk of shield jamming. PhD Thesis, ETH Zurich University Ramoni M (2010) On the feasibility of TBM drives in squeezing ground and the risk of shield jamming. PhD Thesis, ETH Zurich University
go back to reference Ramoni M, Anagnostou G (2010a) Thrust force requirements for TBMs in squeezing ground. Tunn Undergr Space Technol 25:433–455CrossRef Ramoni M, Anagnostou G (2010a) Thrust force requirements for TBMs in squeezing ground. Tunn Undergr Space Technol 25:433–455CrossRef
go back to reference Ramoni M, Anagnostou G (2010b) Tunnel boring machines under squeezing conditions. Tunn Undergr Space Technol 25:139–157CrossRef Ramoni M, Anagnostou G (2010b) Tunnel boring machines under squeezing conditions. Tunn Undergr Space Technol 25:139–157CrossRef
go back to reference Ramoni M, Anagnostou G (2011a) The effect of consolidation on TBM shield loading in water-bearing squeezing ground. Rock Mech Rock Eng 44:63–83CrossRef Ramoni M, Anagnostou G (2011a) The effect of consolidation on TBM shield loading in water-bearing squeezing ground. Rock Mech Rock Eng 44:63–83CrossRef
go back to reference Ramoni M, Anagnostou G (2011b) The interaction between shield, ground and tunnel support in TBM tunnelling through squeezing ground. Rock Mech Rock Eng 44:37–61CrossRef Ramoni M, Anagnostou G (2011b) The interaction between shield, ground and tunnel support in TBM tunnelling through squeezing ground. Rock Mech Rock Eng 44:37–61CrossRef
go back to reference Serlev AF (2010) Assessing the impact of squeezing ground on TBM excavation. Dissertation, University of Barcelona Serlev AF (2010) Assessing the impact of squeezing ground on TBM excavation. Dissertation, University of Barcelona
go back to reference Shrestha PK, Panthi KK (2014) Groundwater effect on faulted rock mass: an evaluation of ModiKhola pressure tunnel in the Nepal Himalaya. Rock Mech Rock Eng 47:1021–1035CrossRef Shrestha PK, Panthi KK (2014) Groundwater effect on faulted rock mass: an evaluation of ModiKhola pressure tunnel in the Nepal Himalaya. Rock Mech Rock Eng 47:1021–1035CrossRef
go back to reference Zarei HR, Uromeihy A, Sharifzadeh M (2011) Evaluation of high local groundwater inflow to a rock tunnel by characterization of geological features. Tunn Undergr Space Technol 26:364–373CrossRef Zarei HR, Uromeihy A, Sharifzadeh M (2011) Evaluation of high local groundwater inflow to a rock tunnel by characterization of geological features. Tunn Undergr Space Technol 26:364–373CrossRef
Metadata
Title
Double shield TBM performance analysis in difficult ground conditions: a case study in the Gerede water tunnel, Turkey
Authors
Aydin Shaterpour-Mamaghani
Deniz Tumac
Emre Avunduk
Publication date
01-02-2016
Publisher
Springer Berlin Heidelberg
Published in
Bulletin of Engineering Geology and the Environment / Issue 1/2016
Print ISSN: 1435-9529
Electronic ISSN: 1435-9537
DOI
https://doi.org/10.1007/s10064-015-0743-8

Other articles of this Issue 1/2016

Bulletin of Engineering Geology and the Environment 1/2016 Go to the issue