Skip to main content
Top
Published in: Bulletin of Engineering Geology and the Environment 5/2022

01-05-2022 | Original Paper

EPB excavation in transitional mixed face: Line 5—Lilac (São Paulo Metro, Brazil)

Authors: Luís Cesar Esteves Flamínio Filho, Marcos Eduardo Hartwig, Cesar Augusto Moreira

Published in: Bulletin of Engineering Geology and the Environment | Issue 5/2022

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The use of Earth Pressure Balance (EPB) shields is still very modest for tunneling in urban areas in Brazil. This study analyzed and integrated geological data and excavation parameters of a segment of Route 2 (Lot 3) of the Line 5—Lilac (São Paulo Metro), between Campo Belo Station and Jesuíno Maciel Shaft. This segment is 557 m long and represents one of the first experiences on tunneling in transitional mixed face with pressurized shield machines in Brazil. The excavation performed an average advance rate of 7.7 m/day and intercepted different proportions of gneisses, saprolites, and residual soils. The results show how the excavation parameters respond to different geological materials. The sections excavated in mixed transitional ground conditions had several negative effects on the excavation process, similarly to that described in other projects worldwide. Finally, results also suggested the nominal torque was insufficient for excavation of the segment.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Aguiar G, Silva MAAP, Katayama L, Rocha HC (2017) Acompanhamento técnico de tuneladora EPB: avaliação dos parâmetros operacionais da máquina. Congresso Brasileiro de Túneis, 4, São Paulo, (in Portuguese) Aguiar G, Silva MAAP, Katayama L, Rocha HC (2017) Acompanhamento técnico de tuneladora EPB: avaliação dos parâmetros operacionais da máquina. Congresso Brasileiro de Túneis, 4, São Paulo, (in Portuguese)
go back to reference ASTM - American Society for Testing and Materials (2012) Standard test method for laboratory determination of abrasiveness of rock using the CERCHAR method. Designation D7625–10, 6 p ASTM - American Society for Testing and Materials (2012) Standard test method for laboratory determination of abrasiveness of rock using the CERCHAR method. Designation D7625–10, 6 p
go back to reference Babendererde S, Hoek E, Marinos PG, Cardoso AS (2005) EPB-TBM face support control in the Metro do Porto Project, Portugal. Proc Rapid Excav Tunn Conf Seattle pp 1–12 Babendererde S, Hoek E, Marinos PG, Cardoso AS (2005) EPB-TBM face support control in the Metro do Porto Project, Portugal. Proc Rapid Excav Tunn Conf Seattle pp 1–12
go back to reference Comulada M, Maidl U, Silva MAAP, Aguiar G, Ferreira A (2016) Experiences gained in heterogeneous ground conditions at the twin tube EPB Shield tunnels in São Paulo Metro Line 5. Proceedings of the ITA 2016 World Tunnel Congress, San Francisco, pp 1–11. Comulada M, Maidl U, Silva MAAP, Aguiar G, Ferreira A (2016) Experiences gained in heterogeneous ground conditions at the twin tube EPB Shield tunnels in São Paulo Metro Line 5. Proceedings of the ITA 2016 World Tunnel Congress, San Francisco, pp 1–11.
go back to reference Fortes RS, Aragão FEP, Blanes JR, Leme RM (2011) Uso de TBM em areia: Uma solução para a Linha Leste do Metrô de Fortaleza. 17ª Semana de Tecnologia Metroferroviária, Aeamesp, São Paulo, (in Portuguese). Fortes RS, Aragão FEP, Blanes JR, Leme RM (2011) Uso de TBM em areia: Uma solução para a Linha Leste do Metrô de Fortaleza. 17ª Semana de Tecnologia Metroferroviária, Aeamesp, São Paulo, (in Portuguese).
go back to reference Futai MM, Cecílio MO Jr, Abramento M (2012) Resistência ao cisalhamento e deformabilidade de solos residuais da Região Metropolitana de São Paulo. Twin Cities: Solos das Regiões Metropolitanas de São Paulo e Curitiba, pp. 155–187, (in Portuguese). Futai MM, Cecílio MO Jr, Abramento M (2012) Resistência ao cisalhamento e deformabilidade de solos residuais da Região Metropolitana de São Paulo. Twin Cities: Solos das Regiões Metropolitanas de São Paulo e Curitiba, pp. 155–187, (in Portuguese).
go back to reference Gerace M, Grasso P, Soares D, Filgueiras L (2017) Extensão da Linha 5 do Metrô de São Paulo: resumo das principais lições aprendidas na conclusão do projeto e do acompanhamento técnico de obra. 4º Congresso Brasileiro de Túneis e Estruturas Subterrâneas. Seminário Internacional “Latin American Tunneling Seminar - Lat 2017”. São Paulo, (in Portuguese). Gerace M, Grasso P, Soares D, Filgueiras L (2017) Extensão da Linha 5 do Metrô de São Paulo: resumo das principais lições aprendidas na conclusão do projeto e do acompanhamento técnico de obra. 4º Congresso Brasileiro de Túneis e Estruturas Subterrâneas. Seminário Internacional “Latin American Tunneling Seminar - Lat 2017”. São Paulo, (in Portuguese).
go back to reference Guglielmetti V, Grasso P, Mahtab A, Shulin X (2008) Mechanized tunneling in urban areas: design methodology and construction control. Balkema: Taylor & Francis, ISBN 978-0-415-42010-5 Guglielmetti V, Grasso P, Mahtab A, Shulin X (2008) Mechanized tunneling in urban areas: design methodology and construction control. Balkema: Taylor & Francis, ISBN 978-0-415-42010-5
go back to reference ITA - International Tunneling and Underground Space Association (2018) Working group no. 5 health and safety in works: guidelines for good working practice in high pressure compressed air. ITA Report no. 010-v3, 51p ITA - International Tunneling and Underground Space Association (2018) Working group no. 5 health and safety in works: guidelines for good working practice in high pressure compressed air. ITA Report no. 010-v3, 51p
go back to reference Maidl B, Herrenknecht M, Maidl U, Wehrmeyer G (2012) Mechanised shield tunneling, 2nd edn. Ernst & Sohn, BerlinCrossRef Maidl B, Herrenknecht M, Maidl U, Wehrmeyer G (2012) Mechanised shield tunneling, 2nd edn. Ernst & Sohn, BerlinCrossRef
go back to reference Maidl U, Pierri J (2014) Innovative hybrid EPB tunneling in Rio de Janeiro. Geomech Tunn 7(1):55–63CrossRef Maidl U, Pierri J (2014) Innovative hybrid EPB tunneling in Rio de Janeiro. Geomech Tunn 7(1):55–63CrossRef
go back to reference Monteiro MD, Rocha HC (2014) A abrasividade de rochas nos estudos do metrô de São Paulo: ensaios, classificações, influência do grau de alteração e considerações sobre o consumo de ferramentas de corte em escavações subterrâneas. Revista Brasileira de Geologia e Engenharia Ambiental, pp. 71–86, (in Portuguese). Monteiro MD, Rocha HC (2014) A abrasividade de rochas nos estudos do metrô de São Paulo: ensaios, classificações, influência do grau de alteração e considerações sobre o consumo de ferramentas de corte em escavações subterrâneas. Revista Brasileira de Geologia e Engenharia Ambiental, pp. 71–86, (in Portuguese).
go back to reference Mori L (2016) Advancing understanding of the relationship between soil conditioning and Earth pressure balance tunnel boring machine chamber and shield annulus behavior. Thesis, Colorado School of Mines. Mori L (2016) Advancing understanding of the relationship between soil conditioning and Earth pressure balance tunnel boring machine chamber and shield annulus behavior. Thesis, Colorado School of Mines.
go back to reference Oliveira DGG, Diederichs MS (2016) TBM interaction with soil-rock transitional ground. Tunnel Assoc Can 2016 Ann Conf Ottawa Oliveira DGG, Diederichs MS (2016) TBM interaction with soil-rock transitional ground. Tunnel Assoc Can 2016 Ann Conf Ottawa
go back to reference Oliveira DGG, Diederichs MS, Silva MAAP (2017a) Interação de tuneladoras com face mista transicional. Conf Paper (in Portuguese) Oliveira DGG, Diederichs MS, Silva MAAP (2017a) Interação de tuneladoras com face mista transicional. Conf Paper (in Portuguese)
go back to reference Oliveira DGG, Monteiro MD, Rocha HC, Dias CC (2017b) Aspectos geotécnicos dos maciços ao longo do trecho entre Vila Sonia e Taboão da Linha 4-amarela, do metrô de São Paulo. 4th Congresso Brasileiro de Túneis (in Portuguese) Oliveira DGG, Monteiro MD, Rocha HC, Dias CC (2017b) Aspectos geotécnicos dos maciços ao longo do trecho entre Vila Sonia e Taboão da Linha 4-amarela, do metrô de São Paulo. 4th Congresso Brasileiro de Túneis (in Portuguese)
go back to reference Plinninger RJ (2010) Hardrock abrasivity investigation using the rock abrasivity index (RAI). In: Williams et al. (Eds.). Geologically alive. London: Taylor & Francis. pp. 3445–3452 Plinninger RJ (2010) Hardrock abrasivity investigation using the rock abrasivity index (RAI). In: Williams et al. (Eds.). Geologically alive. London: Taylor & Francis. pp. 3445–3452
go back to reference Rafie K, Skelhorn S (2012) Interpretation of EPB TBM graphical data. Tunn Assoc Can Montreal. Rafie K, Skelhorn S (2012) Interpretation of EPB TBM graphical data. Tunn Assoc Can Montreal.
go back to reference Reilly BJ (1999) EPBMs for the northeast line project. Tunn Undergr Space Technol 14(4):491–508CrossRef Reilly BJ (1999) EPBMs for the northeast line project. Tunn Undergr Space Technol 14(4):491–508CrossRef
go back to reference Rocha HC (2004) Perfis de alteração de rocha e classificação geomecânica. Relatório interno da Companhia do Metropolitano de São Paulo (CMSP). São Paulo, (in Portuguese) Rocha HC (2004) Perfis de alteração de rocha e classificação geomecânica. Relatório interno da Companhia do Metropolitano de São Paulo (CMSP). São Paulo, (in Portuguese)
go back to reference Saavedra FM, Martínez RF (2011) Escavacíon em túneles com máquinas integrales para rocas y suelos. In: Jimeno, C.L. Manual de Túneles y Obras Subterráneas. Madrid: Universidad Politécnica de Madrid, pp. 567–616, (in Spanish). Saavedra FM, Martínez RF (2011) Escavacíon em túneles com máquinas integrales para rocas y suelos. In: Jimeno, C.L. Manual de Túneles y Obras Subterráneas. Madrid: Universidad Politécnica de Madrid, pp. 567–616, (in Spanish).
go back to reference Shirlaw JN (2016a) Pressurised TBM tunneling in mixed face conditions resulting from tropical weathering of igneous rock. Tunn Undergr Space Technol 57:225–240CrossRef Shirlaw JN (2016a) Pressurised TBM tunneling in mixed face conditions resulting from tropical weathering of igneous rock. Tunn Undergr Space Technol 57:225–240CrossRef
go back to reference Silva MAAP, Aguiar G, Argimiro AF, Rocha HC, Hartwig ME (2016) Experience gained in the excavation of two parallel shields tunnels of 6.0 m for the São Paulo Metro. Brazilian Conference on Soil Mechanics and Geotechnical Engineering, Cobramseg, 18, Anais, Belo Horizonte, Associação Brasileira de Mecânica dos Solos e Engenharia Geotécnica Silva MAAP, Aguiar G, Argimiro AF, Rocha HC, Hartwig ME (2016) Experience gained in the excavation of two parallel shields tunnels of 6.0 m for the São Paulo Metro. Brazilian Conference on Soil Mechanics and Geotechnical Engineering, Cobramseg, 18, Anais, Belo Horizonte, Associação Brasileira de Mecânica dos Solos e Engenharia Geotécnica
go back to reference Silva MAAP, Aguiar G, Teixeira IF, Ferreira AA (2017) Desafios e soluções construtivas aplicadas na escavação de um túnel em saprólito e solo residual de gnaisse da Linha 5 – Lilás do metro de São Paulo. Congresso Brasileiro de Túneis, São Paulo. Silva MAAP, Aguiar G, Teixeira IF, Ferreira AA (2017) Desafios e soluções construtivas aplicadas na escavação de um túnel em saprólito e solo residual de gnaisse da Linha 5 – Lilás do metro de São Paulo. Congresso Brasileiro de Túneis, São Paulo.
Metadata
Title
EPB excavation in transitional mixed face: Line 5—Lilac (São Paulo Metro, Brazil)
Authors
Luís Cesar Esteves Flamínio Filho
Marcos Eduardo Hartwig
Cesar Augusto Moreira
Publication date
01-05-2022
Publisher
Springer Berlin Heidelberg
Published in
Bulletin of Engineering Geology and the Environment / Issue 5/2022
Print ISSN: 1435-9529
Electronic ISSN: 1435-9537
DOI
https://doi.org/10.1007/s10064-022-02694-z

Other articles of this Issue 5/2022

Bulletin of Engineering Geology and the Environment 5/2022 Go to the issue