Skip to main content
Top
Published in: Measurement Techniques 2/2013

01-05-2013 | Mechanical Measurements

Error in calculation of degree of flooding with the use of a pipe device for measurements of the quantity of crude oil and gas

Author: V. F. Shayakberov

Published in: Measurement Techniques | Issue 2/2013

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

A pipe plant for measurements of the quantity of crude oil and gas that assures a high precision in measurements of the volume flow rate of liquid is developed. The error of the computed degree of flooding is determined.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference A. G. Gazarov, V. F. Shayakberov, and A. A. Mugatabarova, “On the question of measurement of the quantity of oil and petroleum gas recovered from underground sources,” Territ. Neftegaz, No. 10, 14–17 (2009). A. G. Gazarov, V. F. Shayakberov, and A. A. Mugatabarova, “On the question of measurement of the quantity of oil and petroleum gas recovered from underground sources,” Territ. Neftegaz, No. 10, 14–17 (2009).
2.
go back to reference V. F. Shayakberov, R. R. Ismagilov, and I. A. Latypov, “New technologies for modernization of the equipment of older oil deposits,” Nauch.-Tekhn. Vestn. NK Rosneft, No. 1, 8–11 (2010). V. F. Shayakberov, R. R. Ismagilov, and I. A. Latypov, “New technologies for modernization of the equipment of older oil deposits,” Nauch.-Tekhn. Vestn. NK Rosneft, No. 1, 8–11 (2010).
3.
go back to reference S. M. Sokolov and V. A. Gorbatikov, “Design of oil deposit facilities in western Siberia: from design principles to problems of modernization,” Neft. Khoz., No. 5, 22–24 (2010). S. M. Sokolov and V. A. Gorbatikov, “Design of oil deposit facilities in western Siberia: from design principles to problems of modernization,” Neft. Khoz., No. 5, 22–24 (2010).
4.
go back to reference G. S. Abramov, “What does an oil well begin with?” KIPinfo, No. 1, 8–12 (2012). G. S. Abramov, “What does an oil well begin with?” KIPinfo, No. 1, 8–12 (2012).
5.
go back to reference V. F. Shayakberov, Patent 2342528 (Russian Federation), “Device for measurement of the quantity of oil and petroleum gas,” Izobret. Polez. Modeli, No. 36 (2008). V. F. Shayakberov, Patent 2342528 (Russian Federation), “Device for measurement of the quantity of oil and petroleum gas,” Izobret. Polez. Modeli, No. 36 (2008).
6.
go back to reference V. F. Shayakberov, “Test units for measurements of the quantity of petroleum and petroleum gas for wells and well clusters,” Izmer. Tekhn., No. 11, 36–40 (2011); Measur. Techn., 54, No. 11, 1249–1255 (2012).CrossRef V. F. Shayakberov, “Test units for measurements of the quantity of petroleum and petroleum gas for wells and well clusters,” Izmer. Tekhn., No. 11, 36–40 (2011); Measur. Techn., 54, No. 11, 1249–1255 (2012).CrossRef
7.
go back to reference GOST R 8.615–2005, GSI. Measurements of the Quantity of Recovered Oil and Petroleum Gas. General Metrological and Technical Requirements. GOST R 8.615–2005, GSI. Measurements of the Quantity of Recovered Oil and Petroleum Gas. General Metrological and Technical Requirements.
8.
go back to reference Modification No. 1, GOST R 8.615–2005, GSI. Measurements of the Quantity of Recovered Oil and Petroleum Gas. General Metrological and Technical Requirements. Modification No. 1, GOST R 8.615–2005, GSI. Measurements of the Quantity of Recovered Oil and Petroleum Gas. General Metrological and Technical Requirements.
9.
go back to reference A. R. Latypov et al., Patent 2421605 (Russian Federation), “A method of operating a well equipped with an electrostatic pump unit with frequency-controlled drive,” Izobret. Polez. Modeli, No. 17 (2011). A. R. Latypov et al., Patent 2421605 (Russian Federation), “A method of operating a well equipped with an electrostatic pump unit with frequency-controlled drive,” Izobret. Polez. Modeli, No. 17 (2011).
Metadata
Title
Error in calculation of degree of flooding with the use of a pipe device for measurements of the quantity of crude oil and gas
Author
V. F. Shayakberov
Publication date
01-05-2013
Publisher
Springer US
Published in
Measurement Techniques / Issue 2/2013
Print ISSN: 0543-1972
Electronic ISSN: 1573-8906
DOI
https://doi.org/10.1007/s11018-013-0172-7

Other articles of this Issue 2/2013

Measurement Techniques 2/2013 Go to the issue

General Problems of Metrology and Measurement Technique

Evaluation of external effects on the state of dynamic objects