Skip to main content
Top

2013 | OriginalPaper | Chapter

33. Estimation of Lead Time in the RFID-Enabled Real-Time Shopfloor Production with a Data Mining Model

Authors : Ray Y. Zhong, George Q. Huang, Qing-yun Dai, Tao Zhang

Published in: The 19th International Conference on Industrial Engineering and Engineering Management

Publisher: Springer Berlin Heidelberg

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Lead time estimation (LTE) is difficult to carry out, especially within the RFID-enabled real-time manufacturing shopfloor environment since large number of factors may greatly affect its precision. This paper proposes a data mining approach with four steps each of which is equipped with suitable mathematical models to analysis the LTE from a real-life case and then to quantitatively examine its key impact factors such as processing routine, batching strategy, scheduling rules and critical parameters of specification. Experiments are carried out for this purpose and results imply that batching strategy, scheduling rules and two specification parameters largely influence the LTE, while, processing routine has less impact in this case.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Alexander MS (1980) Manufacturing lead time estimation and the implementation of a material requirements planning system: a computer simulation study. The University of Western Ontario, Canada Alexander MS (1980) Manufacturing lead time estimation and the implementation of a material requirements planning system: a computer simulation study. The University of Western Ontario, Canada
go back to reference Chen JS, Prorok PC (1983) Lead time estimation in a controlled screening program. Am J Epidemiol 118(5):740 Chen JS, Prorok PC (1983) Lead time estimation in a controlled screening program. Am J Epidemiol 118(5):740
go back to reference Choudhary A, Harding J, Tiwari M (2009) Data mining in manufacturing: a review based on the kind of knowledge. J Intell Manuf 20(5):501–521CrossRef Choudhary A, Harding J, Tiwari M (2009) Data mining in manufacturing: a review based on the kind of knowledge. J Intell Manuf 20(5):501–521CrossRef
go back to reference Dai QY, Zhong RY et al (2012) Radio frequency identification-enabled real-time manufacturing execution system: a case study in an automotive part manufacturer. Int J Comput Integr Manuf 25(1):51–65CrossRef Dai QY, Zhong RY et al (2012) Radio frequency identification-enabled real-time manufacturing execution system: a case study in an automotive part manufacturer. Int J Comput Integr Manuf 25(1):51–65CrossRef
go back to reference Erdirik-Dogan M, Grossmann IE (2008) Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines. Comput Chem Eng 32(11):2664–2683CrossRef Erdirik-Dogan M, Grossmann IE (2008) Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines. Comput Chem Eng 32(11):2664–2683CrossRef
go back to reference Frank J (2007) Using data mining to enhance automated planning and scheduling. In: Proceedings of IEEE symposium on computational intelligence and data mining, IEEE, March 1–April 5, pp 251–260 Frank J (2007) Using data mining to enhance automated planning and scheduling. In: Proceedings of IEEE symposium on computational intelligence and data mining, IEEE, March 1–April 5, pp 251–260
go back to reference Geladi P, Kowalski BR (1986) Partial least-squares regression: a tutorial. Anal Chim Acta 185:1–17CrossRef Geladi P, Kowalski BR (1986) Partial least-squares regression: a tutorial. Anal Chim Acta 185:1–17CrossRef
go back to reference Graves SC (1999) Manufacturing planning and control. Handbook of applied optimization, Massachusetts Institute of Technology, MA, pp 728–746 Graves SC (1999) Manufacturing planning and control. Handbook of applied optimization, Massachusetts Institute of Technology, MA, pp 728–746
go back to reference Han J, Kamber M, Pei J (2011) Data mining: concepts and techniques. Morgan Kaufmann, San Francisco Han J, Kamber M, Pei J (2011) Data mining: concepts and techniques. Morgan Kaufmann, San Francisco
go back to reference Huang GQ, Fang J, Lv HL et al (2009) RFID-enabled real-time mass-customized production planning and scheduling. In: Proceedings of 19th international conference on flexible automation and intelligent manufacturing, 6–8 July, Teesside, UK Huang GQ, Fang J, Lv HL et al (2009) RFID-enabled real-time mass-customized production planning and scheduling. In: Proceedings of 19th international conference on flexible automation and intelligent manufacturing, 6–8 July, Teesside, UK
go back to reference Jeffery SR, Garofalakis M, Franklin MJ (2006) Adaptive cleaning for RFID data streams. In: Proceedings of the 32nd international conference on very large databases. VLDB Endowment, pp 163–174 Jeffery SR, Garofalakis M, Franklin MJ (2006) Adaptive cleaning for RFID data streams. In: Proceedings of the 32nd international conference on very large databases. VLDB Endowment, pp 163–174
go back to reference Joachims T (1999) Making large-scale SVM learning practical. MIT Press, Cambridge Joachims T (1999) Making large-scale SVM learning practical. MIT Press, Cambridge
go back to reference Jun HB, Park JY, Suh HW (2006) Lead time estimation method for complex product development process. Concurr Eng 14(4):313–328CrossRef Jun HB, Park JY, Suh HW (2006) Lead time estimation method for complex product development process. Concurr Eng 14(4):313–328CrossRef
go back to reference Maravelias CT, Sung C (2009) Integration of production planning and scheduling: overview, challenges and opportunities. Comput Chem Eng 33(12):1919–1930CrossRef Maravelias CT, Sung C (2009) Integration of production planning and scheduling: overview, challenges and opportunities. Comput Chem Eng 33(12):1919–1930CrossRef
go back to reference Ozturk A, Kayaligil S, Ozdemirel NE (2006) Manufacturing lead time estimation using data mining. Eur J Oper Res 173(2):683–700CrossRef Ozturk A, Kayaligil S, Ozdemirel NE (2006) Manufacturing lead time estimation using data mining. Eur J Oper Res 173(2):683–700CrossRef
go back to reference Rao J, Doraiswamy S, Thakkar H, Colby LS (2006) A deferred cleansing method for RFID data analytics. In: Proceedings of the 32nd international conference on very large databases, pp 175–186 Rao J, Doraiswamy S, Thakkar H, Colby LS (2006) A deferred cleansing method for RFID data analytics. In: Proceedings of the 32nd international conference on very large databases, pp 175–186
go back to reference Ruben RA, Mahmoodi F (2000) Lead time prediction in unbalanced production systems. Int J Prod Res 38(7):1711–1729CrossRef Ruben RA, Mahmoodi F (2000) Lead time prediction in unbalanced production systems. Int J Prod Res 38(7):1711–1729CrossRef
go back to reference Sudiarso A, Putranto RA (2010) Lead time estimation of a production system using fuzzy logic approach for various batch sizes. Proc World Congr Eng 3:1–3 Sudiarso A, Putranto RA (2010) Lead time estimation of a production system using fuzzy logic approach for various batch sizes. Proc World Congr Eng 3:1–3
go back to reference Wang K (2007) Applying data mining to manufacturing: the nature and implications. J Intell Manuf 18(4):487–495CrossRef Wang K (2007) Applying data mining to manufacturing: the nature and implications. J Intell Manuf 18(4):487–495CrossRef
go back to reference Wang Y, Wong J, Miner A (2004) Anomaly intrusion detection using one class SVM. In: Proceedings of the 5th annual IEEE SMC information assurance workshop. IEEE, pp 358–364 Wang Y, Wong J, Miner A (2004) Anomaly intrusion detection using one class SVM. In: Proceedings of the 5th annual IEEE SMC information assurance workshop. IEEE, pp 358–364
go back to reference Wang W, Chang CP, Huang CT, Wang BS (2009) A RFID-enabled with data mining model for exhibition industry. In: Proceedings of the 6th international conference on service systems and service management. IEEE, Xiamen, China, 8–10 June, pp 664–668 Wang W, Chang CP, Huang CT, Wang BS (2009) A RFID-enabled with data mining model for exhibition industry. In: Proceedings of the 6th international conference on service systems and service management. IEEE, Xiamen, China, 8–10 June, pp 664–668
go back to reference Ward MN (1998) Diagnosis and short-lead time prediction of summer rainfall in tropical North Africa at interannual and multidecadal timescales. J Clim 11(12):3167–3191CrossRef Ward MN (1998) Diagnosis and short-lead time prediction of summer rainfall in tropical North Africa at interannual and multidecadal timescales. J Clim 11(12):3167–3191CrossRef
Metadata
Title
Estimation of Lead Time in the RFID-Enabled Real-Time Shopfloor Production with a Data Mining Model
Authors
Ray Y. Zhong
George Q. Huang
Qing-yun Dai
Tao Zhang
Copyright Year
2013
Publisher
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-38391-5_33

Premium Partner