Skip to main content
Top

2018 | OriginalPaper | Chapter

10. Intelligent Management of Mega Infrastructure Construction

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The exploration and reflection of the management theory of mega infrastructure construction is founded on the construction practice within a certain period and certain scope and on the current technological environment confronted by construction projects. However, the advancements in society’s technological environment, much like those in practice, are endless.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6), 728–739.CrossRef Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6), 728–739.CrossRef
go back to reference Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., & Zhang, W. (2015). Practices and effectiveness of building information modelling in construction projects in China. Automation in Construction, 49, 113–122.CrossRef Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., & Zhang, W. (2015). Practices and effectiveness of building information modelling in construction projects in China. Automation in Construction, 49, 113–122.CrossRef
go back to reference Gu, N., & London, K. (2010). Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction, 19(8), 988–999.CrossRef Gu, N., & London, K. (2010). Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction, 19(8), 988–999.CrossRef
go back to reference Halttula, H., Aapaoja, A., & Haapasalo, H. (2015). The contemporaneous use of building information modeling and relational project delivery arrangements. Procedia Economics and Finance, 21, 532–539.CrossRef Halttula, H., Aapaoja, A., & Haapasalo, H. (2015). The contemporaneous use of building information modeling and relational project delivery arrangements. Procedia Economics and Finance, 21, 532–539.CrossRef
go back to reference Holland, J. H. (1995). Hidden order: How adaptation builds complexity. Reading: Addison-Wesley. Holland, J. H. (1995). Hidden order: How adaptation builds complexity. Reading: Addison-Wesley.
go back to reference Lu, G. Y., Fu, C., Wu, J. Y., & Liu, Y. (2008). Research on decision making process and characteristics of mega project: A case study of Three Gorges Project. Forum on Science and Technology in China, 8, 20–24. Lu, G. Y., Fu, C., Wu, J. Y., & Liu, Y. (2008). Research on decision making process and characteristics of mega project: A case study of Three Gorges Project. Forum on Science and Technology in China, 8, 20–24.
go back to reference Mishra, S., Khasnabis, S., & Dhingra, S. L. (2013). A simulation approach for estimating value at risk in transportation infrastructure investment decisions. Research in Transportation Economics, 38(1), 128–138.CrossRef Mishra, S., Khasnabis, S., & Dhingra, S. L. (2013). A simulation approach for estimating value at risk in transportation infrastructure investment decisions. Research in Transportation Economics, 38(1), 128–138.CrossRef
go back to reference Puddicombe, M. S. (2011). Novelty and technical complexity: Critical constructs in capital projects. Journal of Construction Engineering and Management, 138(5), 613–620.CrossRef Puddicombe, M. S. (2011). Novelty and technical complexity: Critical constructs in capital projects. Journal of Construction Engineering and Management, 138(5), 613–620.CrossRef
go back to reference Sheng, Z. H., & You, Q. Z. (2007). Meta-synthesis management: Methodology and paradigms—The exploration of engineering management theory in Sutong Bridge. Complex System and Complexity Science, 4(2), 1–9. Sheng, Z. H., & You, Q. Z. (2007). Meta-synthesis management: Methodology and paradigms—The exploration of engineering management theory in Sutong Bridge. Complex System and Complexity Science, 4(2), 1–9.
go back to reference Sheng, Z. H., & Jin, S. (2012). Computational experiments for complexity analysis of lake-watershed system. Journal of Systems and Management, 21(6), 771–780. Sheng, Z. H., & Jin, S. (2012). Computational experiments for complexity analysis of lake-watershed system. Journal of Systems and Management, 21(6), 771–780.
go back to reference Sheng, Z. H., You, Q. Z., & Li, Q. (2008). Methodology and method of large scale complex engineering management: Meta-synthesis management. Science and Technology Progress and Policy, 25(10), 193–197. Sheng, Z. H., You, Q. Z., & Li, Q. (2008). Methodology and method of large scale complex engineering management: Meta-synthesis management. Science and Technology Progress and Policy, 25(10), 193–197.
go back to reference Stetson, G., & Mumme, S. (2016). Sustainable development in the Bering Strait: Indigenous values and the challenge of collaborative governance. Society & Natural Resources, 29(7), 791–806.CrossRef Stetson, G., & Mumme, S. (2016). Sustainable development in the Bering Strait: Indigenous values and the challenge of collaborative governance. Society & Natural Resources, 29(7), 791–806.CrossRef
go back to reference Tolone, W. J., Wilson, D., Raja, A., Xiang, W. N., Hao, H., Phelps, S., & Johnson, E. W. (2004). Critical infrastructure integration modeling and simulation. International conference on intelligence and security informatics, Lecture Notes in Computer Science, 3073 (pp. 214–225). Tolone, W. J., Wilson, D., Raja, A., Xiang, W. N., Hao, H., Phelps, S., & Johnson, E. W. (2004). Critical infrastructure integration modeling and simulation. International conference on intelligence and security informatics, Lecture Notes in Computer Science, 3073 (pp. 214–225).
go back to reference Wang, H., Xu, Z., Fujita, H., & Liu, S. (2016). Towards felicitous decision making: An overview on challenges and trends of Big Data. Information Sciences, 367, 747–765.CrossRef Wang, H., Xu, Z., Fujita, H., & Liu, S. (2016). Towards felicitous decision making: An overview on challenges and trends of Big Data. Information Sciences, 367, 747–765.CrossRef
go back to reference Whyte, J., Stasis, A., & Lindkvist, C. (2016). Managing change in the delivery of complex projects: Configuration management, asset information and ‘big data’. International Journal of Project Management, 34(2), 339–351.CrossRef Whyte, J., Stasis, A., & Lindkvist, C. (2016). Managing change in the delivery of complex projects: Configuration management, asset information and ‘big data’. International Journal of Project Management, 34(2), 339–351.CrossRef
go back to reference Yang, S. L., & Zhou, K. L. (2015). Management issues in Big Data: The resource-based view of Big Data. Journal of Management Sciences in China, 5, 1–8. Yang, S. L., & Zhou, K. L. (2015). Management issues in Big Data: The resource-based view of Big Data. Journal of Management Sciences in China, 5, 1–8.
go back to reference Zhang, J. W., & Sheng, Z. H. (2014). Study on the relationship of the “government” principal-agent in the decision-making of the major projects: Based on the practice of the Hong Kong-Zhuhai-Macao bridge project. Scientific Decision-Making, 12, 23–34. Zhang, J. W., & Sheng, Z. H. (2014). Study on the relationship of the “government” principal-agent in the decision-making of the major projects: Based on the practice of the Hong Kong-Zhuhai-Macao bridge project. Scientific Decision-Making, 12, 23–34.
Metadata
Title
Intelligent Management of Mega Infrastructure Construction
Author
Zhaohan Sheng
Copyright Year
2018
DOI
https://doi.org/10.1007/978-3-319-61974-3_10