Skip to main content
Top
Published in:
Cover of the book

2017 | OriginalPaper | Chapter

1. Introduction

Authors : Limin Jia, Xuelei Meng, Yong Qin

Published in: Train Operation in Emergencies

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This chapter is the introduction on train operation problem during emergencies. It first defines the train operation problem. Then it introduces some typical dispatching systems in the world and discusses the possible future railway operation dispatching mode. Then, we give a demonstration of the significance and necessity to study this problem. A review on the related publications is proposed in the second part of it. At last the structure of this book is presented.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Abril, M., Salido, M. A., & Barber, F. (2008). Distributed search in railway scheduling problems. Engineering Applications of Artificial Intelligence, 21(5), 744–755.CrossRef Abril, M., Salido, M. A., & Barber, F. (2008). Distributed search in railway scheduling problems. Engineering Applications of Artificial Intelligence, 21(5), 744–755.CrossRef
go back to reference Araya, S., Abe, K., & Fukumori, K. (1983). An optimal re-scheduling for online train traffic control in distributed situation. In Proceedings of 22nd IEEE Conference Decision and Control (pp. 489–494). San Antonio, Tex, USA: IEEE. Araya, S., Abe, K., & Fukumori, K. (1983). An optimal re-scheduling for online train traffic control in distributed situation. In Proceedings of 22nd IEEE Conference Decision and Control (pp. 489–494). San Antonio, Tex, USA: IEEE.
go back to reference Bierlaire, M., & Frejinger, E. (2008). Route choice modeling with network-free data. Transportation Research Part C, 16(2), 187–198.CrossRef Bierlaire, M., & Frejinger, E. (2008). Route choice modeling with network-free data. Transportation Research Part C, 16(2), 187–198.CrossRef
go back to reference Cacchiani, V., Caprara, A., & Toth, P. (2010). Scheduling extra freight trains on railway networks. Transportation Research Part B, 44(2), 215–231.CrossRef Cacchiani, V., Caprara, A., & Toth, P. (2010). Scheduling extra freight trains on railway networks. Transportation Research Part B, 44(2), 215–231.CrossRef
go back to reference Cai, B., & Wang, J. (1992). A study on the expert system for train dispatching based on simulation. Journal of the China Railway Society, 14(3), 31–41. (in Chinese). Cai, B., & Wang, J. (1992). A study on the expert system for train dispatching based on simulation. Journal of the China Railway Society, 14(3), 31–41. (in Chinese).
go back to reference Cao, J. (1994). The optimization model and its algorithm for adjusting train diagram on single-track rail lines. Journal of the China Railway Society, 16(3), 72–78. (in Chinese). Cao, J. (1994). The optimization model and its algorithm for adjusting train diagram on single-track rail lines. Journal of the China Railway Society, 16(3), 72–78. (in Chinese).
go back to reference Caprara, A., Monaci, M., Toth, P., & Guida, P. L. (2006). A lagrangian heuristic algorithm for a real-world train timetabling problem. Discrete Applied Mathematics, 154(5), 738–753.MathSciNetCrossRefMATH Caprara, A., Monaci, M., Toth, P., & Guida, P. L. (2006). A lagrangian heuristic algorithm for a real-world train timetabling problem. Discrete Applied Mathematics, 154(5), 738–753.MathSciNetCrossRefMATH
go back to reference Castillo, E., Gallego, I., Ureña, J. M., & Coronado, J. M. (2011). Timetabling optimization of a mixed double-and single-tracked railway network. Applied Mathematical Modelling, 35(2), 859–878.MathSciNetCrossRefMATH Castillo, E., Gallego, I., Ureña, J. M., & Coronado, J. M. (2011). Timetabling optimization of a mixed double-and single-tracked railway network. Applied Mathematical Modelling, 35(2), 859–878.MathSciNetCrossRefMATH
go back to reference Chen, D., Li, Y., Zhang, & Gao, S. (2009). Discussion on train re-scheduling approach based on roughest theory. Chinese Railways, 7, 44–46. (in Chinese). Chen, D., Li, Y., Zhang, & Gao, S. (2009). Discussion on train re-scheduling approach based on roughest theory. Chinese Railways, 7, 44–46. (in Chinese).
go back to reference Chen, Y., Pu, Y., & Jiang, Y. (2002). A study on the satisfactory optimization model and solution for adjusting train diagram on double-track railway. Bulletin of Science and Technology, 18(6), 463–469. (in Chinese). Chen, Y., Pu, Y., & Jiang, Y. (2002). A study on the satisfactory optimization model and solution for adjusting train diagram on double-track railway. Bulletin of Science and Technology, 18(6), 463–469. (in Chinese).
go back to reference Chen, Y., Shi, F., Qin, J., & Zhou, W. (2001). optimization model and algorithm for routing passenger trains through a railway station. China Railway Science, 31(2), 101–107. (in Chinese). Chen, Y., Shi, F., Qin, J., & Zhou, W. (2001). optimization model and algorithm for routing passenger trains through a railway station. China Railway Science, 31(2), 101–107. (in Chinese).
go back to reference Chen, Y., & Zhou, L. (2010). Study on train operation adjustment algorithm based on ordinal optimization. Journal of the China Railway Society, 32(3), 1–8. (in Chinese).MathSciNet Chen, Y., & Zhou, L. (2010). Study on train operation adjustment algorithm based on ordinal optimization. Journal of the China Railway Society, 32(3), 1–8. (in Chinese).MathSciNet
go back to reference Cheng, Y. (1998). Hybrid simulation for resolving resource conflicts in train traffic re-scheduling. Computer in Industry, 35(3), 233–246.CrossRef Cheng, Y. (1998). Hybrid simulation for resolving resource conflicts in train traffic re-scheduling. Computer in Industry, 35(3), 233–246.CrossRef
go back to reference Cheng, Y., & Qin, R. (1992). Research on the expert system for the adjusting of the train diagram. Journal of the China Railway Society, 14(2), 42–50. (in Chinese).MathSciNet Cheng, Y., & Qin, R. (1992). Research on the expert system for the adjusting of the train diagram. Journal of the China Railway Society, 14(2), 42–50. (in Chinese).MathSciNet
go back to reference Cheng, Y. H., & Yang, L. (2009). A Fuzzy Petri Nets approach for railway traffic control in case of abnormality: Evidence from Taiwan railway. Expert Systems with Applications, 36(4), 8040–8048.CrossRef Cheng, Y. H., & Yang, L. (2009). A Fuzzy Petri Nets approach for railway traffic control in case of abnormality: Evidence from Taiwan railway. Expert Systems with Applications, 36(4), 8040–8048.CrossRef
go back to reference Chiang, T. W., & Hau, H. Y. (1998). Knowledge-based system for railway scheduling. Data & Knowledge Engineering, 27(3), 289–312.CrossRefMATH Chiang, T. W., & Hau, H. Y. (1998). Knowledge-based system for railway scheduling. Data & Knowledge Engineering, 27(3), 289–312.CrossRefMATH
go back to reference Chung, J. W., Oh, S. M., & Choi, I. C. (2009). A hybrid genetic algorithm for train sequencing in the Korea railway. Omega, 37(3), 555–565.CrossRef Chung, J. W., Oh, S. M., & Choi, I. C. (2009). A hybrid genetic algorithm for train sequencing in the Korea railway. Omega, 37(3), 555–565.CrossRef
go back to reference Cui, B. (1997). Discussion on railway passenger path algorithm. Railway Computer Application, 6(5), 10–11. (in Chinese). Cui, B. (1997). Discussion on railway passenger path algorithm. Railway Computer Application, 6(5), 10–11. (in Chinese).
go back to reference D’Ariano, A., Pacciarelli, D., & Pranzo, M. A. (2007). A branch and bound algorithm for scheduling trains in a railway network. European Journal of Operational Research, 183(2), 643–657.CrossRefMATH D’Ariano, A., Pacciarelli, D., & Pranzo, M. A. (2007). A branch and bound algorithm for scheduling trains in a railway network. European Journal of Operational Research, 183(2), 643–657.CrossRefMATH
go back to reference Dong, S., Wang, J., & Yan, H. (2005). Tabu search for train operation adjustment on double-track line. China Railway Science, 26(4), 114–119. (in Chinese). Dong, S., Wang, J., & Yan, H. (2005). Tabu search for train operation adjustment on double-track line. China Railway Science, 26(4), 114–119. (in Chinese).
go back to reference Dorfman, M. J., & Medanic, J. (2004). Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B, 38(1), 81–98.CrossRef Dorfman, M. J., & Medanic, J. (2004). Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B, 38(1), 81–98.CrossRef
go back to reference Du, J., Yao, X., & Huang, H. (2005). Satisfactory optimization of the wagon flow problem in railway network. Systems Engineering, 23(9), 47–49. (in Chinese). Du, J., Yao, X., & Huang, H. (2005). Satisfactory optimization of the wagon flow problem in railway network. Systems Engineering, 23(9), 47–49. (in Chinese).
go back to reference Ghoseiri, K., Szidarovszky, F., & Asgharpour, M. J. (2004). A multi-objective train scheduling model and solution. Transportation Research Part B, 38(10), 927–952.CrossRefMATH Ghoseiri, K., Szidarovszky, F., & Asgharpour, M. J. (2004). A multi-objective train scheduling model and solution. Transportation Research Part B, 38(10), 927–952.CrossRefMATH
go back to reference He, B. (1995). The transport organization patter for Beijing-Shanghai high-speed railway. China Railway Science, 16(3), 13–23. (in Chinese). He, B. (1995). The transport organization patter for Beijing-Shanghai high-speed railway. China Railway Science, 16(3), 13–23. (in Chinese).
go back to reference Hong, S. P., Kimb, K. M., Lee, K., & Parkd, B. H. (2009). A pragmatic algorithm for the train-set routing: The case of Korea high-speed railway. Omega. International Journal of Management Science, 37(3), 637–645.CrossRef Hong, S. P., Kimb, K. M., Lee, K., & Parkd, B. H. (2009). A pragmatic algorithm for the train-set routing: The case of Korea high-speed railway. Omega. International Journal of Management Science, 37(3), 637–645.CrossRef
go back to reference Iida, Y. (1983). Timetable preparation by A.I. approach. In Proceeding of European Simulation Multiconference (pp. 163–168). Nice France. Iida, Y. (1983). Timetable preparation by A.I. approach. In Proceeding of European Simulation Multiconference (pp. 163–168). Nice France.
go back to reference Jia, C., Hu, S., & Yang, Y. (2006). Study on the particle swarm optimization algorithm for train operation adjustment. Journal of the China Railway Society, 28(3), 6–11. (in Chinese). Jia, C., Hu, S., & Yang, Y. (2006). Study on the particle swarm optimization algorithm for train operation adjustment. Journal of the China Railway Society, 28(3), 6–11. (in Chinese).
go back to reference Jia, L., & Zhang, X. (1993). Distributed intelligent railway traffic control based on fuzzy decision making. Fuzzy Sets System, 62(3), 255–265.CrossRef Jia, L., & Zhang, X. (1993). Distributed intelligent railway traffic control based on fuzzy decision making. Fuzzy Sets System, 62(3), 255–265.CrossRef
go back to reference Jin, L., Ye, Y., Zhao, Y., & He, J. (2005). Choosing of regional railway network car flow routing. Chinese Railways, 12, 49–51. (in Chinese). Jin, L., Ye, Y., Zhao, Y., & He, J. (2005). Choosing of regional railway network car flow routing. Chinese Railways, 12, 49–51. (in Chinese).
go back to reference Jovanovic, D., & Harker, P. T. (1990). Decision support system for train dispatching: an optimization-based methodology. Transportation Research Record, 1314, 31–40. Jovanovic, D., & Harker, P. T. (1990). Decision support system for train dispatching: an optimization-based methodology. Transportation Research Record, 1314, 31–40.
go back to reference Kong, Q., Zhou, F., Wei, G., & Huang, K. (2008). A study of ensuring military railway transportation in large-scale unexpected demand. Traffic Engineering and Technology for National Defence, 6(9–10), 14. (in Chinese). Kong, Q., Zhou, F., Wei, G., & Huang, K. (2008). A study of ensuring military railway transportation in large-scale unexpected demand. Traffic Engineering and Technology for National Defence, 6(9–10), 14. (in Chinese).
go back to reference Lee, Y., & Chen, C. Y. (2009). A heuristic for the train pathing and timetabling problem. Transportation Research Part B, 43(8–9), 837–851.CrossRef Lee, Y., & Chen, C. Y. (2009). A heuristic for the train pathing and timetabling problem. Transportation Research Part B, 43(8–9), 837–851.CrossRef
go back to reference Li, F., Gao, Z., Li, K., & Yang, L. (2008). Efficient scheduling of railway traffic based on global information. Transportation Research Part B, 42(10), 1008–1030.CrossRef Li, F., Gao, Z., Li, K., & Yang, L. (2008). Efficient scheduling of railway traffic based on global information. Transportation Research Part B, 42(10), 1008–1030.CrossRef
go back to reference Li, Y., & Gu, S. (1997). Directional searching algorithm for finding shortest path between two vertexes in railway network. Journal of the China Railway Society, 19(2), 25–27. (in Chinese). Li, Y., & Gu, S. (1997). Directional searching algorithm for finding shortest path between two vertexes in railway network. Journal of the China Railway Society, 19(2), 25–27. (in Chinese).
go back to reference Li, X., Yang, Z., & Du, P. (2006). MAS-Based method for train operation adjustment. Journal of the China Railway Society, 27(1), 115–119. (in Chinese). Li, X., Yang, Z., & Du, P. (2006). MAS-Based method for train operation adjustment. Journal of the China Railway Society, 27(1), 115–119. (in Chinese).
go back to reference Li, P., & Zhang, Y. (1998). Study on internal coordinating expert system for train traffic regulation. China Railway Science, 19(3), 1–9. (in Chinese).CrossRef Li, P., & Zhang, Y. (1998). Study on internal coordinating expert system for train traffic regulation. China Railway Science, 19(3), 1–9. (in Chinese).CrossRef
go back to reference Lin, B., Peng, H., & Ren, B. (1996). Optimal weighted car routing in railway network. Journal of Northern Jiaotong University, 20(6), 645–650. (in Chinese). Lin, B., Peng, H., & Ren, B. (1996). Optimal weighted car routing in railway network. Journal of Northern Jiaotong University, 20(6), 645–650. (in Chinese).
go back to reference Lin, B., & Zhu, S. (1996). Synthetic optimization of train routing and makeup plan in a railway network. Journal of the China Railway Society, 18(1), 1–7. (in Chinese).MathSciNet Lin, B., & Zhu, S. (1996). Synthetic optimization of train routing and makeup plan in a railway network. Journal of the China Railway Society, 18(1), 1–7. (in Chinese).MathSciNet
go back to reference Liu, H. (2000). A study of train control system modeling with petri nets and train operation adjustment using genetic algorithm. Beijing: China Academy of Railway Sciences. (in Chinese). Liu, H. (2000). A study of train control system modeling with petri nets and train operation adjustment using genetic algorithm. Beijing: China Academy of Railway Sciences. (in Chinese).
go back to reference Liu, Z., Ji, L., & Ye, Y. (2007). Study on the shortest path problem in car optimizing in railway network. Journal of Guizhou Normal University (Natural Sciences), 25(2), 88–90. (in Chinese). Liu, Z., Ji, L., & Ye, Y. (2007). Study on the shortest path problem in car optimizing in railway network. Journal of Guizhou Normal University (Natural Sciences), 25(2), 88–90. (in Chinese).
go back to reference Liu, S., & Kozan, E. (2009). Scheduling trains as a blocking parallel-machine job shop scheduling problem. Computers & Operations Research, 36(10), 2840–2852.MathSciNetCrossRefMATH Liu, S., & Kozan, E. (2009). Scheduling trains as a blocking parallel-machine job shop scheduling problem. Computers & Operations Research, 36(10), 2840–2852.MathSciNetCrossRefMATH
go back to reference Lv, X., Liu, C., Shan, X., & Song, J. (2007). Optimization on route computation algorithm based on train-route restriction. China Railway Science, 28(3), 122–125. (in Chinese). Lv, X., Liu, C., Shan, X., & Song, J. (2007). Optimization on route computation algorithm based on train-route restriction. China Railway Science, 28(3), 122–125. (in Chinese).
go back to reference Ma, J., Zhou, L., & Hu, S. (2000). Research on train working diagram system of railway netted lines worked out with computer. Journal of the China Railway Society, 22(1), 7–11. (in Chinese). Ma, J., Zhou, L., & Hu, S. (2000). Research on train working diagram system of railway netted lines worked out with computer. Journal of the China Railway Society, 22(1), 7–11. (in Chinese).
go back to reference Meng, F., Gao, S., Yang, X., & Wang, Y. (2008). Optimal model for multi-path traffic assignment. Journal of Liaoning Technical University (Natural Science Edition), 27(supplement), 93–95. (in Chinese). Meng, F., Gao, S., Yang, X., & Wang, Y. (2008). Optimal model for multi-path traffic assignment. Journal of Liaoning Technical University (Natural Science Edition), 27(supplement), 93–95. (in Chinese).
go back to reference Min, Y. H., Park, M. J., Hong, S. P., & Hong, S. H. (2011). An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network. Transportation Research Part B, 45(2), 409–429.CrossRef Min, Y. H., Park, M. J., Hong, S. P., & Hong, S. H. (2011). An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network. Transportation Research Part B, 45(2), 409–429.CrossRef
go back to reference Mu, W., & Dong, Y. (2010). Research on train re-scheduling model and Three-particle-swarm coordination optimization algorithm. Railway Operation Technology, 16(2), 13–15. (in Chinese). Mu, W., & Dong, Y. (2010). Research on train re-scheduling model and Three-particle-swarm coordination optimization algorithm. Railway Operation Technology, 16(2), 13–15. (in Chinese).
go back to reference Nie, L., Zhang, X., Zhao, P., Yang, H., & Hu, A. (2001). Study on the strategy of train operation adjustment on high-speed railway. Journal of the China Railway Society, 23(4), 1–6. (in Chinese). Nie, L., Zhang, X., Zhao, P., Yang, H., & Hu, A. (2001). Study on the strategy of train operation adjustment on high-speed railway. Journal of the China Railway Society, 23(4), 1–6. (in Chinese).
go back to reference Nong, J., Wang, L., & Yin, H. (2010). Optimization design of railway car flow routing based on genetic algorithm. Journal of Tongji University (Natural Science), 38(1), 76–80. (in Chinese). Nong, J., Wang, L., & Yin, H. (2010). Optimization design of railway car flow routing based on genetic algorithm. Journal of Tongji University (Natural Science), 38(1), 76–80. (in Chinese).
go back to reference Peng, Q., Zhu, S., & Wang, P. (2001). Study on a general optimization model and its solution for railway network train diagram. Journal of the China Railway Society, 23(1), 1–8. (in Chinese). Peng, Q., Zhu, S., & Wang, P. (2001). Study on a general optimization model and its solution for railway network train diagram. Journal of the China Railway Society, 23(1), 1–8. (in Chinese).
go back to reference Petersen, E. R., & Taylor, A. J. (1982). A structured model for rail line simulation and optimization. Transportation Science, 16(2), 192–206.CrossRef Petersen, E. R., & Taylor, A. J. (1982). A structured model for rail line simulation and optimization. Transportation Science, 16(2), 192–206.CrossRef
go back to reference Pu, Y., Chen, Y., & Pu, S. (2001). A study on the genetic algorithm for model of the train operation dispatch manage system based on satisfactory optimization. World Sci-tech R & D, 23(6), 56–58. (in Chinese). Pu, Y., Chen, Y., & Pu, S. (2001). A study on the genetic algorithm for model of the train operation dispatch manage system based on satisfactory optimization. World Sci-tech R & D, 23(6), 56–58. (in Chinese).
go back to reference Qian, M., & Song, J. (2008). Train operation adjustment based on rough set theory. Journal of Transportation Systems Engineering and Information Technology, 8(4), 122–126. (in Chinese). Qian, M., & Song, J. (2008). Train operation adjustment based on rough set theory. Journal of Transportation Systems Engineering and Information Technology, 8(4), 122–126. (in Chinese).
go back to reference Rodriguez, J. (2007). A constraint programming model for real-time train scheduling at junctions. Transportation Research Part B, 41(2), 231–245.CrossRef Rodriguez, J. (2007). A constraint programming model for real-time train scheduling at junctions. Transportation Research Part B, 41(2), 231–245.CrossRef
go back to reference Salido, M. A., Abril, M., Barber, F., Ingolotti, L., Tormos, P., & Lova, A. (2007). Domain-dependent distributed models for railways scheduling. Knowledge-Based Systems, 20(2), 186–194.CrossRefMATH Salido, M. A., Abril, M., Barber, F., Ingolotti, L., Tormos, P., & Lova, A. (2007). Domain-dependent distributed models for railways scheduling. Knowledge-Based Systems, 20(2), 186–194.CrossRefMATH
go back to reference Salim, V., & Cai, X. (1997). A genetic algorithm for railway scheduling with environmental considerations. Environmental Modelling and Software, 12(4), 301–309.CrossRef Salim, V., & Cai, X. (1997). A genetic algorithm for railway scheduling with environmental considerations. Environmental Modelling and Software, 12(4), 301–309.CrossRef
go back to reference Sauder, R. L., & Westerman, W. M. (1987). Computer aided train dispatching: Decision support through optimization. Interfaces, 13(6), 24–37.CrossRef Sauder, R. L., & Westerman, W. M. (1987). Computer aided train dispatching: Decision support through optimization. Interfaces, 13(6), 24–37.CrossRef
go back to reference Schafer, H., & Pferdmenges, S. (1994). An expert system for real-time train dispatching. Transactions on the Built Environment, 7, 27–34. Schafer, H., & Pferdmenges, S. (1994). An expert system for real-time train dispatching. Transactions on the Built Environment, 7, 27–34.
go back to reference Shi, Q. (1996). Models for rail network system transportation capacity and traffic pathing. Journal of the China Railway Society, 18(4), 1–8. (in Chinese). Shi, Q. (1996). Models for rail network system transportation capacity and traffic pathing. Journal of the China Railway Society, 18(4), 1–8. (in Chinese).
go back to reference Shi, F., Kong, Q., & Hu, A. (1997). A network method of comprehensive optimization of wagon path and train formation plan. Journal of the China Railway Society, 19(1), 1–6. (in Chinese). Shi, F., Kong, Q., & Hu, A. (1997). A network method of comprehensive optimization of wagon path and train formation plan. Journal of the China Railway Society, 19(1), 1–6. (in Chinese).
go back to reference Shi, Q., & Shi, Y. (1999). Multi-objective linear-programming model and its algorithm for car flow routing with bidirectional heavy and empty cars in railway network. Journal of the China Railway Society, 21(1), 1–8. (in Chinese).MathSciNet Shi, Q., & Shi, Y. (1999). Multi-objective linear-programming model and its algorithm for car flow routing with bidirectional heavy and empty cars in railway network. Journal of the China Railway Society, 21(1), 1–8. (in Chinese).MathSciNet
go back to reference Su, S. H., & Chen, Z. Y. (2008). Studies on models and algorithms of optimizing train flow paths in railway network. Journal Of The China Railway Society, 30(6), 1–6. (In Chinese). Su, S. H., & Chen, Z. Y. (2008). Studies on models and algorithms of optimizing train flow paths in railway network. Journal Of The China Railway Society, 30(6), 1–6. (In Chinese).
go back to reference Sun, Y., & Jiang, L. (2005). Route optimizing method of loaded car flow with capacity limit in railway network. Rail Way Transport and Economy, 27(12), 82–84. (in Chinese). Sun, Y., & Jiang, L. (2005). Route optimizing method of loaded car flow with capacity limit in railway network. Rail Way Transport and Economy, 27(12), 82–84. (in Chinese).
go back to reference Sun, W., & Zhang, Y. (1999). Study on both CN model and its algorithm about railway transportation. Journal of the China Railway Society, 21(5), 106–108. (in Chinese). Sun, W., & Zhang, Y. (1999). Study on both CN model and its algorithm about railway transportation. Journal of the China Railway Society, 21(5), 106–108. (in Chinese).
go back to reference Szpigel, B. (1973). Optimal train scheduling on a single line railway. Operational Research, 7, 344–351. Szpigel, B. (1973). Optimal train scheduling on a single line railway. Operational Research, 7, 344–351.
go back to reference Tommii, N., & Satoh, N. (1990). A train traffic simulation system permitting application of knowledge engineering. Quarterly Reports of TRRI., 1990, 2. Tommii, N., & Satoh, N. (1990). A train traffic simulation system permitting application of knowledge engineering. Quarterly Reports of TRRI., 1990, 2.
go back to reference Törnquist, J., & Persson, J. A. (2007). N-Tracked railway traffic re-scheduling during disturbances. Transportation Research Part B, 41(3), 342–362. Törnquist, J., & Persson, J. A. (2007). N-Tracked railway traffic re-scheduling during disturbances. Transportation Research Part B, 41(3), 342–362.
go back to reference Wang, Z. (2008). Transportation systems engineering. Nanjing: Southeast University Press. Wang, Z. (2008). Transportation systems engineering. Nanjing: Southeast University Press.
go back to reference Wang, Z., & Du, W. (2004). Train operation regulation model for auto-block double line and study on its heredity algorithm. Rail Way Transport and Economy, 26(6), 61–63. (in Chinese). Wang, Z., & Du, W. (2004). Train operation regulation model for auto-block double line and study on its heredity algorithm. Rail Way Transport and Economy, 26(6), 61–63. (in Chinese).
go back to reference Wang, S., & Feng, Y. (1996). Research on region of vehicle flow paths. Journal of the China Railway Society, 18(supplement), 20–23. (in Chinese). Wang, S., & Feng, Y. (1996). Research on region of vehicle flow paths. Journal of the China Railway Society, 18(supplement), 20–23. (in Chinese).
go back to reference Wang, B., He, S., Song, R., & Wang, B. (2007). Stochastic dependent-chance programming model and hybrid genetic algorithm for car flow routing plan. Journal of the China Railway Society, 29(4), 6–11. (in Chinese). Wang, B., He, S., Song, R., & Wang, B. (2007). Stochastic dependent-chance programming model and hybrid genetic algorithm for car flow routing plan. Journal of the China Railway Society, 29(4), 6–11. (in Chinese).
go back to reference Wang, H., & Ji, L. (1999). Research a rational pathway assemble in our national railway. Journal of Shanghai Tiedao University (Natural Science Edition), 20(4), 51–54. (in Chinese).MathSciNet Wang, H., & Ji, L. (1999). Research a rational pathway assemble in our national railway. Journal of Shanghai Tiedao University (Natural Science Edition), 20(4), 51–54. (in Chinese).MathSciNet
go back to reference Wang, Z., & Peng, Q. (2007). Optimizing the design of MapX based passenger train operation routes. Rail Way Transport and Economy, 29(3), 85–88. (in Chinese). Wang, Z., & Peng, Q. (2007). Optimizing the design of MapX based passenger train operation routes. Rail Way Transport and Economy, 29(3), 85–88. (in Chinese).
go back to reference Wang, H., Zhang, Q., Wang, J., Wang, Z., & Zhang, Y. (2006). GA-Based model of train operation adjustment for high-speed railway. China Railway Science, 27(3), 96–100. (in Chinese). Wang, H., Zhang, Q., Wang, J., Wang, Z., & Zhang, Y. (2006). GA-Based model of train operation adjustment for high-speed railway. China Railway Science, 27(3), 96–100. (in Chinese).
go back to reference Wu, X., Zhou, L., & Sun, Q. (2008). Study on model and algorithm of emergency train operation plan. Journal of the China Railway Society, 30(5), 1–7. (in Chinese). Wu, X., Zhou, L., & Sun, Q. (2008). Study on model and algorithm of emergency train operation plan. Journal of the China Railway Society, 30(5), 1–7. (in Chinese).
go back to reference Xia, M., Zhou, L., Sun, Q., & Wang, M. (2008). Study on the train operation adjustment on double-track line based on ant colony algorithm. Logistics Technology, 27(6), 61–64, 71. (in Chinese). Xia, M., Zhou, L., Sun, Q., & Wang, M. (2008). Study on the train operation adjustment on double-track line based on ant colony algorithm. Logistics Technology, 27(6), 61–64, 71. (in Chinese).
go back to reference Xie, J., & Xu, H. (2009). Research on cars flow path and classification of cars flow algorithm. Railway Operation Technology, 15(3), 18–21. (in Chinese). Xie, J., & Xu, H. (2009). Research on cars flow path and classification of cars flow algorithm. Railway Operation Technology, 15(3), 18–21. (in Chinese).
go back to reference Xu, S. (1997). Cause of formation and types of railway natural disasters in China. Journal of Suzhou University of Science and Technology, 14(4), 3–39, 47. (in Chinese). Xu, S. (1997). Cause of formation and types of railway natural disasters in China. Journal of Suzhou University of Science and Technology, 14(4), 3–39, 47. (in Chinese).
go back to reference Yan, H. (2004). Study on containers transport organization between railway network container freight stations. Chengdu: Southwest Jiaotong University. (in Chinese). Yan, H. (2004). Study on containers transport organization between railway network container freight stations. Chengdu: Southwest Jiaotong University. (in Chinese).
go back to reference Yang, L., Li, K., & Gao, Z. (2009). Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Transactions on Fuzzy Systems, 17(3), 617–629.CrossRef Yang, L., Li, K., & Gao, Z. (2009). Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Transactions on Fuzzy Systems, 17(3), 617–629.CrossRef
go back to reference Zachariadis, E. E., & Kiranoudis, C. T. (2010). An open vehicle routing problem metaheuristic for examining wide solution neighborhoods. Computers & Operations Research, 37(4), 712–723.CrossRefMATH Zachariadis, E. E., & Kiranoudis, C. T. (2010). An open vehicle routing problem metaheuristic for examining wide solution neighborhoods. Computers & Operations Research, 37(4), 712–723.CrossRefMATH
go back to reference Zha, W., Chen, Z., & Li, X. (2000). Research of theory and method for train operation adjustment on double-track railway line. Journal of the China Railway Society, 22(1), 12–16. (in Chinese). Zha, W., Chen, Z., & Li, X. (2000). Research of theory and method for train operation adjustment on double-track railway line. Journal of the China Railway Society, 22(1), 12–16. (in Chinese).
go back to reference Zhang, C., Cao, C., Teng, Y., Liu, S., & Chen, L. (2010). Graph model and heuristic algorithm of train operation adjustment problem. Science Technology and Engineering, 10(2560–2564), 2573. (in Chinese). Zhang, C., Cao, C., Teng, Y., Liu, S., & Chen, L. (2010). Graph model and heuristic algorithm of train operation adjustment problem. Science Technology and Engineering, 10(2560–2564), 2573. (in Chinese).
go back to reference Zhang, X., Hu, A., & Yang, H. (1995). A Train operation simulation model based on constraints of control in random origin and control in random process. Journal of the China Railway Society, 17(3), 22–27. Zhang, X., Hu, A., & Yang, H. (1995). A Train operation simulation model based on constraints of control in random origin and control in random process. Journal of the China Railway Society, 17(3), 22–27.
go back to reference Zhang, Y., & Jin, W. (2005). Model and algorithm for train operation adjustment on single-track railways based on genetic algorithm. Journal of Southwest Jiaotong University, 40(2), 147–152. (in Chinese). Zhang, Y., & Jin, W. (2005). Model and algorithm for train operation adjustment on single-track railways based on genetic algorithm. Journal of Southwest Jiaotong University, 40(2), 147–152. (in Chinese).
go back to reference Zhang, X., Yang, H., Zhu, X., Hu, S., & Hu, A. (1998). Research on simulation experiment system of Jinghu high-speed railway. Journal of the China Railway Society, 20(4), 1–7. (in Chinese). Zhang, X., Yang, H., Zhu, X., Hu, S., & Hu, A. (1998). Research on simulation experiment system of Jinghu high-speed railway. Journal of the China Railway Society, 20(4), 1–7. (in Chinese).
go back to reference Zhao, Q. (1999). An optimal model and its algorithm for adjusting diagram on single-track railway. Systems Engineering, 17(6), 12–18. (in Chinese). Zhao, Q. (1999). An optimal model and its algorithm for adjusting diagram on single-track railway. Systems Engineering, 17(6), 12–18. (in Chinese).
go back to reference Zhao, S., & Dang, J. (2009). Study on chaos-improved genetic algorithm for passenger-dedicated line train operation adjustment. Computer Engineering and Applications, 45(9), 220–222. (in Chinese). Zhao, S., & Dang, J. (2009). Study on chaos-improved genetic algorithm for passenger-dedicated line train operation adjustment. Computer Engineering and Applications, 45(9), 220–222. (in Chinese).
go back to reference Zhou, P. (2002). A fast algorithm for finding the shortest path between arbitrary two point in a traffic road net. Computer Engineering & Science, 19(3), 81–84. (in Chinese).MathSciNet Zhou, P. (2002). A fast algorithm for finding the shortest path between arbitrary two point in a traffic road net. Computer Engineering & Science, 19(3), 81–84. (in Chinese).MathSciNet
go back to reference Zhou, L., Hu, S., Ma, J., & Yue, Y. (1998). Network hierarchy parallel algorithm of automatic train scheduling. Journal of the China Railway Society, 20(5), 15–21. (in Chinese). Zhou, L., Hu, S., Ma, J., & Yue, Y. (1998). Network hierarchy parallel algorithm of automatic train scheduling. Journal of the China Railway Society, 20(5), 15–21. (in Chinese).
go back to reference Zhou, X., & Zhong, M. (2005a). Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research, 167(3), 752–771.MathSciNetCrossRefMATH Zhou, X., & Zhong, M. (2005a). Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research, 167(3), 752–771.MathSciNetCrossRefMATH
go back to reference Zhou, X., & Zhong, M. (2005b). Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research, 167(3), 752–771.MathSciNetCrossRefMATH Zhou, X., & Zhong, M. (2005b). Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research, 167(3), 752–771.MathSciNetCrossRefMATH
go back to reference Zhou, M., & Zhong, M. (2007). Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds. Transportation Research Part B Methodological, 41(3), 320–341. Zhou, M., & Zhong, M. (2007). Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds. Transportation Research Part B Methodological, 41(3), 320–341.
Metadata
Title
Introduction
Authors
Limin Jia
Xuelei Meng
Yong Qin
Copyright Year
2017
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-4597-4_1

Premium Partner