Skip to main content
Erschienen in:
Buchtitelbild

2017 | OriginalPaper | Buchkapitel

1. Introduction

verfasst von : Limin Jia, Xuelei Meng, Yong Qin

Erschienen in: Train Operation in Emergencies

Verlag: Springer Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This chapter is the introduction on train operation problem during emergencies. It first defines the train operation problem. Then it introduces some typical dispatching systems in the world and discusses the possible future railway operation dispatching mode. Then, we give a demonstration of the significance and necessity to study this problem. A review on the related publications is proposed in the second part of it. At last the structure of this book is presented.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Abril, M., Salido, M. A., & Barber, F. (2008). Distributed search in railway scheduling problems. Engineering Applications of Artificial Intelligence, 21(5), 744–755.CrossRef Abril, M., Salido, M. A., & Barber, F. (2008). Distributed search in railway scheduling problems. Engineering Applications of Artificial Intelligence, 21(5), 744–755.CrossRef
Zurück zum Zitat Araya, S., Abe, K., & Fukumori, K. (1983). An optimal re-scheduling for online train traffic control in distributed situation. In Proceedings of 22nd IEEE Conference Decision and Control (pp. 489–494). San Antonio, Tex, USA: IEEE. Araya, S., Abe, K., & Fukumori, K. (1983). An optimal re-scheduling for online train traffic control in distributed situation. In Proceedings of 22nd IEEE Conference Decision and Control (pp. 489–494). San Antonio, Tex, USA: IEEE.
Zurück zum Zitat Bierlaire, M., & Frejinger, E. (2008). Route choice modeling with network-free data. Transportation Research Part C, 16(2), 187–198.CrossRef Bierlaire, M., & Frejinger, E. (2008). Route choice modeling with network-free data. Transportation Research Part C, 16(2), 187–198.CrossRef
Zurück zum Zitat Cacchiani, V., Caprara, A., & Toth, P. (2010). Scheduling extra freight trains on railway networks. Transportation Research Part B, 44(2), 215–231.CrossRef Cacchiani, V., Caprara, A., & Toth, P. (2010). Scheduling extra freight trains on railway networks. Transportation Research Part B, 44(2), 215–231.CrossRef
Zurück zum Zitat Cai, B., & Wang, J. (1992). A study on the expert system for train dispatching based on simulation. Journal of the China Railway Society, 14(3), 31–41. (in Chinese). Cai, B., & Wang, J. (1992). A study on the expert system for train dispatching based on simulation. Journal of the China Railway Society, 14(3), 31–41. (in Chinese).
Zurück zum Zitat Cao, J. (1994). The optimization model and its algorithm for adjusting train diagram on single-track rail lines. Journal of the China Railway Society, 16(3), 72–78. (in Chinese). Cao, J. (1994). The optimization model and its algorithm for adjusting train diagram on single-track rail lines. Journal of the China Railway Society, 16(3), 72–78. (in Chinese).
Zurück zum Zitat Caprara, A., Monaci, M., Toth, P., & Guida, P. L. (2006). A lagrangian heuristic algorithm for a real-world train timetabling problem. Discrete Applied Mathematics, 154(5), 738–753.MathSciNetCrossRefMATH Caprara, A., Monaci, M., Toth, P., & Guida, P. L. (2006). A lagrangian heuristic algorithm for a real-world train timetabling problem. Discrete Applied Mathematics, 154(5), 738–753.MathSciNetCrossRefMATH
Zurück zum Zitat Castillo, E., Gallego, I., Ureña, J. M., & Coronado, J. M. (2011). Timetabling optimization of a mixed double-and single-tracked railway network. Applied Mathematical Modelling, 35(2), 859–878.MathSciNetCrossRefMATH Castillo, E., Gallego, I., Ureña, J. M., & Coronado, J. M. (2011). Timetabling optimization of a mixed double-and single-tracked railway network. Applied Mathematical Modelling, 35(2), 859–878.MathSciNetCrossRefMATH
Zurück zum Zitat Chen, D., Li, Y., Zhang, & Gao, S. (2009). Discussion on train re-scheduling approach based on roughest theory. Chinese Railways, 7, 44–46. (in Chinese). Chen, D., Li, Y., Zhang, & Gao, S. (2009). Discussion on train re-scheduling approach based on roughest theory. Chinese Railways, 7, 44–46. (in Chinese).
Zurück zum Zitat Chen, Y., Pu, Y., & Jiang, Y. (2002). A study on the satisfactory optimization model and solution for adjusting train diagram on double-track railway. Bulletin of Science and Technology, 18(6), 463–469. (in Chinese). Chen, Y., Pu, Y., & Jiang, Y. (2002). A study on the satisfactory optimization model and solution for adjusting train diagram on double-track railway. Bulletin of Science and Technology, 18(6), 463–469. (in Chinese).
Zurück zum Zitat Chen, Y., Shi, F., Qin, J., & Zhou, W. (2001). optimization model and algorithm for routing passenger trains through a railway station. China Railway Science, 31(2), 101–107. (in Chinese). Chen, Y., Shi, F., Qin, J., & Zhou, W. (2001). optimization model and algorithm for routing passenger trains through a railway station. China Railway Science, 31(2), 101–107. (in Chinese).
Zurück zum Zitat Chen, Y., & Zhou, L. (2010). Study on train operation adjustment algorithm based on ordinal optimization. Journal of the China Railway Society, 32(3), 1–8. (in Chinese).MathSciNet Chen, Y., & Zhou, L. (2010). Study on train operation adjustment algorithm based on ordinal optimization. Journal of the China Railway Society, 32(3), 1–8. (in Chinese).MathSciNet
Zurück zum Zitat Cheng, Y. (1998). Hybrid simulation for resolving resource conflicts in train traffic re-scheduling. Computer in Industry, 35(3), 233–246.CrossRef Cheng, Y. (1998). Hybrid simulation for resolving resource conflicts in train traffic re-scheduling. Computer in Industry, 35(3), 233–246.CrossRef
Zurück zum Zitat Cheng, Y., & Qin, R. (1992). Research on the expert system for the adjusting of the train diagram. Journal of the China Railway Society, 14(2), 42–50. (in Chinese).MathSciNet Cheng, Y., & Qin, R. (1992). Research on the expert system for the adjusting of the train diagram. Journal of the China Railway Society, 14(2), 42–50. (in Chinese).MathSciNet
Zurück zum Zitat Cheng, Y. H., & Yang, L. (2009). A Fuzzy Petri Nets approach for railway traffic control in case of abnormality: Evidence from Taiwan railway. Expert Systems with Applications, 36(4), 8040–8048.CrossRef Cheng, Y. H., & Yang, L. (2009). A Fuzzy Petri Nets approach for railway traffic control in case of abnormality: Evidence from Taiwan railway. Expert Systems with Applications, 36(4), 8040–8048.CrossRef
Zurück zum Zitat Chiang, T. W., & Hau, H. Y. (1998). Knowledge-based system for railway scheduling. Data & Knowledge Engineering, 27(3), 289–312.CrossRefMATH Chiang, T. W., & Hau, H. Y. (1998). Knowledge-based system for railway scheduling. Data & Knowledge Engineering, 27(3), 289–312.CrossRefMATH
Zurück zum Zitat Chung, J. W., Oh, S. M., & Choi, I. C. (2009). A hybrid genetic algorithm for train sequencing in the Korea railway. Omega, 37(3), 555–565.CrossRef Chung, J. W., Oh, S. M., & Choi, I. C. (2009). A hybrid genetic algorithm for train sequencing in the Korea railway. Omega, 37(3), 555–565.CrossRef
Zurück zum Zitat Cui, B. (1997). Discussion on railway passenger path algorithm. Railway Computer Application, 6(5), 10–11. (in Chinese). Cui, B. (1997). Discussion on railway passenger path algorithm. Railway Computer Application, 6(5), 10–11. (in Chinese).
Zurück zum Zitat D’Ariano, A., Pacciarelli, D., & Pranzo, M. A. (2007). A branch and bound algorithm for scheduling trains in a railway network. European Journal of Operational Research, 183(2), 643–657.CrossRefMATH D’Ariano, A., Pacciarelli, D., & Pranzo, M. A. (2007). A branch and bound algorithm for scheduling trains in a railway network. European Journal of Operational Research, 183(2), 643–657.CrossRefMATH
Zurück zum Zitat Dong, S., Wang, J., & Yan, H. (2005). Tabu search for train operation adjustment on double-track line. China Railway Science, 26(4), 114–119. (in Chinese). Dong, S., Wang, J., & Yan, H. (2005). Tabu search for train operation adjustment on double-track line. China Railway Science, 26(4), 114–119. (in Chinese).
Zurück zum Zitat Dorfman, M. J., & Medanic, J. (2004). Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B, 38(1), 81–98.CrossRef Dorfman, M. J., & Medanic, J. (2004). Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B, 38(1), 81–98.CrossRef
Zurück zum Zitat Du, J., Yao, X., & Huang, H. (2005). Satisfactory optimization of the wagon flow problem in railway network. Systems Engineering, 23(9), 47–49. (in Chinese). Du, J., Yao, X., & Huang, H. (2005). Satisfactory optimization of the wagon flow problem in railway network. Systems Engineering, 23(9), 47–49. (in Chinese).
Zurück zum Zitat Ghoseiri, K., Szidarovszky, F., & Asgharpour, M. J. (2004). A multi-objective train scheduling model and solution. Transportation Research Part B, 38(10), 927–952.CrossRefMATH Ghoseiri, K., Szidarovszky, F., & Asgharpour, M. J. (2004). A multi-objective train scheduling model and solution. Transportation Research Part B, 38(10), 927–952.CrossRefMATH
Zurück zum Zitat He, B. (1995). The transport organization patter for Beijing-Shanghai high-speed railway. China Railway Science, 16(3), 13–23. (in Chinese). He, B. (1995). The transport organization patter for Beijing-Shanghai high-speed railway. China Railway Science, 16(3), 13–23. (in Chinese).
Zurück zum Zitat Hong, S. P., Kimb, K. M., Lee, K., & Parkd, B. H. (2009). A pragmatic algorithm for the train-set routing: The case of Korea high-speed railway. Omega. International Journal of Management Science, 37(3), 637–645.CrossRef Hong, S. P., Kimb, K. M., Lee, K., & Parkd, B. H. (2009). A pragmatic algorithm for the train-set routing: The case of Korea high-speed railway. Omega. International Journal of Management Science, 37(3), 637–645.CrossRef
Zurück zum Zitat Iida, Y. (1983). Timetable preparation by A.I. approach. In Proceeding of European Simulation Multiconference (pp. 163–168). Nice France. Iida, Y. (1983). Timetable preparation by A.I. approach. In Proceeding of European Simulation Multiconference (pp. 163–168). Nice France.
Zurück zum Zitat Jia, C., Hu, S., & Yang, Y. (2006). Study on the particle swarm optimization algorithm for train operation adjustment. Journal of the China Railway Society, 28(3), 6–11. (in Chinese). Jia, C., Hu, S., & Yang, Y. (2006). Study on the particle swarm optimization algorithm for train operation adjustment. Journal of the China Railway Society, 28(3), 6–11. (in Chinese).
Zurück zum Zitat Jia, L., & Zhang, X. (1993). Distributed intelligent railway traffic control based on fuzzy decision making. Fuzzy Sets System, 62(3), 255–265.CrossRef Jia, L., & Zhang, X. (1993). Distributed intelligent railway traffic control based on fuzzy decision making. Fuzzy Sets System, 62(3), 255–265.CrossRef
Zurück zum Zitat Jin, L., Ye, Y., Zhao, Y., & He, J. (2005). Choosing of regional railway network car flow routing. Chinese Railways, 12, 49–51. (in Chinese). Jin, L., Ye, Y., Zhao, Y., & He, J. (2005). Choosing of regional railway network car flow routing. Chinese Railways, 12, 49–51. (in Chinese).
Zurück zum Zitat Jovanovic, D., & Harker, P. T. (1990). Decision support system for train dispatching: an optimization-based methodology. Transportation Research Record, 1314, 31–40. Jovanovic, D., & Harker, P. T. (1990). Decision support system for train dispatching: an optimization-based methodology. Transportation Research Record, 1314, 31–40.
Zurück zum Zitat Kong, Q., Zhou, F., Wei, G., & Huang, K. (2008). A study of ensuring military railway transportation in large-scale unexpected demand. Traffic Engineering and Technology for National Defence, 6(9–10), 14. (in Chinese). Kong, Q., Zhou, F., Wei, G., & Huang, K. (2008). A study of ensuring military railway transportation in large-scale unexpected demand. Traffic Engineering and Technology for National Defence, 6(9–10), 14. (in Chinese).
Zurück zum Zitat Lee, Y., & Chen, C. Y. (2009). A heuristic for the train pathing and timetabling problem. Transportation Research Part B, 43(8–9), 837–851.CrossRef Lee, Y., & Chen, C. Y. (2009). A heuristic for the train pathing and timetabling problem. Transportation Research Part B, 43(8–9), 837–851.CrossRef
Zurück zum Zitat Li, F., Gao, Z., Li, K., & Yang, L. (2008). Efficient scheduling of railway traffic based on global information. Transportation Research Part B, 42(10), 1008–1030.CrossRef Li, F., Gao, Z., Li, K., & Yang, L. (2008). Efficient scheduling of railway traffic based on global information. Transportation Research Part B, 42(10), 1008–1030.CrossRef
Zurück zum Zitat Li, Y., & Gu, S. (1997). Directional searching algorithm for finding shortest path between two vertexes in railway network. Journal of the China Railway Society, 19(2), 25–27. (in Chinese). Li, Y., & Gu, S. (1997). Directional searching algorithm for finding shortest path between two vertexes in railway network. Journal of the China Railway Society, 19(2), 25–27. (in Chinese).
Zurück zum Zitat Li, X., Yang, Z., & Du, P. (2006). MAS-Based method for train operation adjustment. Journal of the China Railway Society, 27(1), 115–119. (in Chinese). Li, X., Yang, Z., & Du, P. (2006). MAS-Based method for train operation adjustment. Journal of the China Railway Society, 27(1), 115–119. (in Chinese).
Zurück zum Zitat Li, P., & Zhang, Y. (1998). Study on internal coordinating expert system for train traffic regulation. China Railway Science, 19(3), 1–9. (in Chinese).CrossRef Li, P., & Zhang, Y. (1998). Study on internal coordinating expert system for train traffic regulation. China Railway Science, 19(3), 1–9. (in Chinese).CrossRef
Zurück zum Zitat Lin, B., Peng, H., & Ren, B. (1996). Optimal weighted car routing in railway network. Journal of Northern Jiaotong University, 20(6), 645–650. (in Chinese). Lin, B., Peng, H., & Ren, B. (1996). Optimal weighted car routing in railway network. Journal of Northern Jiaotong University, 20(6), 645–650. (in Chinese).
Zurück zum Zitat Lin, B., & Zhu, S. (1996). Synthetic optimization of train routing and makeup plan in a railway network. Journal of the China Railway Society, 18(1), 1–7. (in Chinese).MathSciNet Lin, B., & Zhu, S. (1996). Synthetic optimization of train routing and makeup plan in a railway network. Journal of the China Railway Society, 18(1), 1–7. (in Chinese).MathSciNet
Zurück zum Zitat Liu, H. (2000). A study of train control system modeling with petri nets and train operation adjustment using genetic algorithm. Beijing: China Academy of Railway Sciences. (in Chinese). Liu, H. (2000). A study of train control system modeling with petri nets and train operation adjustment using genetic algorithm. Beijing: China Academy of Railway Sciences. (in Chinese).
Zurück zum Zitat Liu, Z., Ji, L., & Ye, Y. (2007). Study on the shortest path problem in car optimizing in railway network. Journal of Guizhou Normal University (Natural Sciences), 25(2), 88–90. (in Chinese). Liu, Z., Ji, L., & Ye, Y. (2007). Study on the shortest path problem in car optimizing in railway network. Journal of Guizhou Normal University (Natural Sciences), 25(2), 88–90. (in Chinese).
Zurück zum Zitat Liu, S., & Kozan, E. (2009). Scheduling trains as a blocking parallel-machine job shop scheduling problem. Computers & Operations Research, 36(10), 2840–2852.MathSciNetCrossRefMATH Liu, S., & Kozan, E. (2009). Scheduling trains as a blocking parallel-machine job shop scheduling problem. Computers & Operations Research, 36(10), 2840–2852.MathSciNetCrossRefMATH
Zurück zum Zitat Lv, X., Liu, C., Shan, X., & Song, J. (2007). Optimization on route computation algorithm based on train-route restriction. China Railway Science, 28(3), 122–125. (in Chinese). Lv, X., Liu, C., Shan, X., & Song, J. (2007). Optimization on route computation algorithm based on train-route restriction. China Railway Science, 28(3), 122–125. (in Chinese).
Zurück zum Zitat Ma, J., Zhou, L., & Hu, S. (2000). Research on train working diagram system of railway netted lines worked out with computer. Journal of the China Railway Society, 22(1), 7–11. (in Chinese). Ma, J., Zhou, L., & Hu, S. (2000). Research on train working diagram system of railway netted lines worked out with computer. Journal of the China Railway Society, 22(1), 7–11. (in Chinese).
Zurück zum Zitat Meng, F., Gao, S., Yang, X., & Wang, Y. (2008). Optimal model for multi-path traffic assignment. Journal of Liaoning Technical University (Natural Science Edition), 27(supplement), 93–95. (in Chinese). Meng, F., Gao, S., Yang, X., & Wang, Y. (2008). Optimal model for multi-path traffic assignment. Journal of Liaoning Technical University (Natural Science Edition), 27(supplement), 93–95. (in Chinese).
Zurück zum Zitat Min, Y. H., Park, M. J., Hong, S. P., & Hong, S. H. (2011). An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network. Transportation Research Part B, 45(2), 409–429.CrossRef Min, Y. H., Park, M. J., Hong, S. P., & Hong, S. H. (2011). An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network. Transportation Research Part B, 45(2), 409–429.CrossRef
Zurück zum Zitat Mu, W., & Dong, Y. (2010). Research on train re-scheduling model and Three-particle-swarm coordination optimization algorithm. Railway Operation Technology, 16(2), 13–15. (in Chinese). Mu, W., & Dong, Y. (2010). Research on train re-scheduling model and Three-particle-swarm coordination optimization algorithm. Railway Operation Technology, 16(2), 13–15. (in Chinese).
Zurück zum Zitat Nie, L., Zhang, X., Zhao, P., Yang, H., & Hu, A. (2001). Study on the strategy of train operation adjustment on high-speed railway. Journal of the China Railway Society, 23(4), 1–6. (in Chinese). Nie, L., Zhang, X., Zhao, P., Yang, H., & Hu, A. (2001). Study on the strategy of train operation adjustment on high-speed railway. Journal of the China Railway Society, 23(4), 1–6. (in Chinese).
Zurück zum Zitat Nong, J., Wang, L., & Yin, H. (2010). Optimization design of railway car flow routing based on genetic algorithm. Journal of Tongji University (Natural Science), 38(1), 76–80. (in Chinese). Nong, J., Wang, L., & Yin, H. (2010). Optimization design of railway car flow routing based on genetic algorithm. Journal of Tongji University (Natural Science), 38(1), 76–80. (in Chinese).
Zurück zum Zitat Peng, Q., Zhu, S., & Wang, P. (2001). Study on a general optimization model and its solution for railway network train diagram. Journal of the China Railway Society, 23(1), 1–8. (in Chinese). Peng, Q., Zhu, S., & Wang, P. (2001). Study on a general optimization model and its solution for railway network train diagram. Journal of the China Railway Society, 23(1), 1–8. (in Chinese).
Zurück zum Zitat Petersen, E. R., & Taylor, A. J. (1982). A structured model for rail line simulation and optimization. Transportation Science, 16(2), 192–206.CrossRef Petersen, E. R., & Taylor, A. J. (1982). A structured model for rail line simulation and optimization. Transportation Science, 16(2), 192–206.CrossRef
Zurück zum Zitat Pu, Y., Chen, Y., & Pu, S. (2001). A study on the genetic algorithm for model of the train operation dispatch manage system based on satisfactory optimization. World Sci-tech R & D, 23(6), 56–58. (in Chinese). Pu, Y., Chen, Y., & Pu, S. (2001). A study on the genetic algorithm for model of the train operation dispatch manage system based on satisfactory optimization. World Sci-tech R & D, 23(6), 56–58. (in Chinese).
Zurück zum Zitat Qian, M., & Song, J. (2008). Train operation adjustment based on rough set theory. Journal of Transportation Systems Engineering and Information Technology, 8(4), 122–126. (in Chinese). Qian, M., & Song, J. (2008). Train operation adjustment based on rough set theory. Journal of Transportation Systems Engineering and Information Technology, 8(4), 122–126. (in Chinese).
Zurück zum Zitat Rodriguez, J. (2007). A constraint programming model for real-time train scheduling at junctions. Transportation Research Part B, 41(2), 231–245.CrossRef Rodriguez, J. (2007). A constraint programming model for real-time train scheduling at junctions. Transportation Research Part B, 41(2), 231–245.CrossRef
Zurück zum Zitat Salido, M. A., Abril, M., Barber, F., Ingolotti, L., Tormos, P., & Lova, A. (2007). Domain-dependent distributed models for railways scheduling. Knowledge-Based Systems, 20(2), 186–194.CrossRefMATH Salido, M. A., Abril, M., Barber, F., Ingolotti, L., Tormos, P., & Lova, A. (2007). Domain-dependent distributed models for railways scheduling. Knowledge-Based Systems, 20(2), 186–194.CrossRefMATH
Zurück zum Zitat Salim, V., & Cai, X. (1997). A genetic algorithm for railway scheduling with environmental considerations. Environmental Modelling and Software, 12(4), 301–309.CrossRef Salim, V., & Cai, X. (1997). A genetic algorithm for railway scheduling with environmental considerations. Environmental Modelling and Software, 12(4), 301–309.CrossRef
Zurück zum Zitat Sauder, R. L., & Westerman, W. M. (1987). Computer aided train dispatching: Decision support through optimization. Interfaces, 13(6), 24–37.CrossRef Sauder, R. L., & Westerman, W. M. (1987). Computer aided train dispatching: Decision support through optimization. Interfaces, 13(6), 24–37.CrossRef
Zurück zum Zitat Schafer, H., & Pferdmenges, S. (1994). An expert system for real-time train dispatching. Transactions on the Built Environment, 7, 27–34. Schafer, H., & Pferdmenges, S. (1994). An expert system for real-time train dispatching. Transactions on the Built Environment, 7, 27–34.
Zurück zum Zitat Shi, Q. (1996). Models for rail network system transportation capacity and traffic pathing. Journal of the China Railway Society, 18(4), 1–8. (in Chinese). Shi, Q. (1996). Models for rail network system transportation capacity and traffic pathing. Journal of the China Railway Society, 18(4), 1–8. (in Chinese).
Zurück zum Zitat Shi, F., Kong, Q., & Hu, A. (1997). A network method of comprehensive optimization of wagon path and train formation plan. Journal of the China Railway Society, 19(1), 1–6. (in Chinese). Shi, F., Kong, Q., & Hu, A. (1997). A network method of comprehensive optimization of wagon path and train formation plan. Journal of the China Railway Society, 19(1), 1–6. (in Chinese).
Zurück zum Zitat Shi, Q., & Shi, Y. (1999). Multi-objective linear-programming model and its algorithm for car flow routing with bidirectional heavy and empty cars in railway network. Journal of the China Railway Society, 21(1), 1–8. (in Chinese).MathSciNet Shi, Q., & Shi, Y. (1999). Multi-objective linear-programming model and its algorithm for car flow routing with bidirectional heavy and empty cars in railway network. Journal of the China Railway Society, 21(1), 1–8. (in Chinese).MathSciNet
Zurück zum Zitat Su, S. H., & Chen, Z. Y. (2008). Studies on models and algorithms of optimizing train flow paths in railway network. Journal Of The China Railway Society, 30(6), 1–6. (In Chinese). Su, S. H., & Chen, Z. Y. (2008). Studies on models and algorithms of optimizing train flow paths in railway network. Journal Of The China Railway Society, 30(6), 1–6. (In Chinese).
Zurück zum Zitat Sun, Y., & Jiang, L. (2005). Route optimizing method of loaded car flow with capacity limit in railway network. Rail Way Transport and Economy, 27(12), 82–84. (in Chinese). Sun, Y., & Jiang, L. (2005). Route optimizing method of loaded car flow with capacity limit in railway network. Rail Way Transport and Economy, 27(12), 82–84. (in Chinese).
Zurück zum Zitat Sun, W., & Zhang, Y. (1999). Study on both CN model and its algorithm about railway transportation. Journal of the China Railway Society, 21(5), 106–108. (in Chinese). Sun, W., & Zhang, Y. (1999). Study on both CN model and its algorithm about railway transportation. Journal of the China Railway Society, 21(5), 106–108. (in Chinese).
Zurück zum Zitat Szpigel, B. (1973). Optimal train scheduling on a single line railway. Operational Research, 7, 344–351. Szpigel, B. (1973). Optimal train scheduling on a single line railway. Operational Research, 7, 344–351.
Zurück zum Zitat Tommii, N., & Satoh, N. (1990). A train traffic simulation system permitting application of knowledge engineering. Quarterly Reports of TRRI., 1990, 2. Tommii, N., & Satoh, N. (1990). A train traffic simulation system permitting application of knowledge engineering. Quarterly Reports of TRRI., 1990, 2.
Zurück zum Zitat Törnquist, J., & Persson, J. A. (2007). N-Tracked railway traffic re-scheduling during disturbances. Transportation Research Part B, 41(3), 342–362. Törnquist, J., & Persson, J. A. (2007). N-Tracked railway traffic re-scheduling during disturbances. Transportation Research Part B, 41(3), 342–362.
Zurück zum Zitat Wang, Z. (2008). Transportation systems engineering. Nanjing: Southeast University Press. Wang, Z. (2008). Transportation systems engineering. Nanjing: Southeast University Press.
Zurück zum Zitat Wang, Z., & Du, W. (2004). Train operation regulation model for auto-block double line and study on its heredity algorithm. Rail Way Transport and Economy, 26(6), 61–63. (in Chinese). Wang, Z., & Du, W. (2004). Train operation regulation model for auto-block double line and study on its heredity algorithm. Rail Way Transport and Economy, 26(6), 61–63. (in Chinese).
Zurück zum Zitat Wang, S., & Feng, Y. (1996). Research on region of vehicle flow paths. Journal of the China Railway Society, 18(supplement), 20–23. (in Chinese). Wang, S., & Feng, Y. (1996). Research on region of vehicle flow paths. Journal of the China Railway Society, 18(supplement), 20–23. (in Chinese).
Zurück zum Zitat Wang, B., He, S., Song, R., & Wang, B. (2007). Stochastic dependent-chance programming model and hybrid genetic algorithm for car flow routing plan. Journal of the China Railway Society, 29(4), 6–11. (in Chinese). Wang, B., He, S., Song, R., & Wang, B. (2007). Stochastic dependent-chance programming model and hybrid genetic algorithm for car flow routing plan. Journal of the China Railway Society, 29(4), 6–11. (in Chinese).
Zurück zum Zitat Wang, H., & Ji, L. (1999). Research a rational pathway assemble in our national railway. Journal of Shanghai Tiedao University (Natural Science Edition), 20(4), 51–54. (in Chinese).MathSciNet Wang, H., & Ji, L. (1999). Research a rational pathway assemble in our national railway. Journal of Shanghai Tiedao University (Natural Science Edition), 20(4), 51–54. (in Chinese).MathSciNet
Zurück zum Zitat Wang, Z., & Peng, Q. (2007). Optimizing the design of MapX based passenger train operation routes. Rail Way Transport and Economy, 29(3), 85–88. (in Chinese). Wang, Z., & Peng, Q. (2007). Optimizing the design of MapX based passenger train operation routes. Rail Way Transport and Economy, 29(3), 85–88. (in Chinese).
Zurück zum Zitat Wang, H., Zhang, Q., Wang, J., Wang, Z., & Zhang, Y. (2006). GA-Based model of train operation adjustment for high-speed railway. China Railway Science, 27(3), 96–100. (in Chinese). Wang, H., Zhang, Q., Wang, J., Wang, Z., & Zhang, Y. (2006). GA-Based model of train operation adjustment for high-speed railway. China Railway Science, 27(3), 96–100. (in Chinese).
Zurück zum Zitat Wu, X., Zhou, L., & Sun, Q. (2008). Study on model and algorithm of emergency train operation plan. Journal of the China Railway Society, 30(5), 1–7. (in Chinese). Wu, X., Zhou, L., & Sun, Q. (2008). Study on model and algorithm of emergency train operation plan. Journal of the China Railway Society, 30(5), 1–7. (in Chinese).
Zurück zum Zitat Xia, M., Zhou, L., Sun, Q., & Wang, M. (2008). Study on the train operation adjustment on double-track line based on ant colony algorithm. Logistics Technology, 27(6), 61–64, 71. (in Chinese). Xia, M., Zhou, L., Sun, Q., & Wang, M. (2008). Study on the train operation adjustment on double-track line based on ant colony algorithm. Logistics Technology, 27(6), 61–64, 71. (in Chinese).
Zurück zum Zitat Xie, J., & Xu, H. (2009). Research on cars flow path and classification of cars flow algorithm. Railway Operation Technology, 15(3), 18–21. (in Chinese). Xie, J., & Xu, H. (2009). Research on cars flow path and classification of cars flow algorithm. Railway Operation Technology, 15(3), 18–21. (in Chinese).
Zurück zum Zitat Xu, S. (1997). Cause of formation and types of railway natural disasters in China. Journal of Suzhou University of Science and Technology, 14(4), 3–39, 47. (in Chinese). Xu, S. (1997). Cause of formation and types of railway natural disasters in China. Journal of Suzhou University of Science and Technology, 14(4), 3–39, 47. (in Chinese).
Zurück zum Zitat Yan, H. (2004). Study on containers transport organization between railway network container freight stations. Chengdu: Southwest Jiaotong University. (in Chinese). Yan, H. (2004). Study on containers transport organization between railway network container freight stations. Chengdu: Southwest Jiaotong University. (in Chinese).
Zurück zum Zitat Yang, L., Li, K., & Gao, Z. (2009). Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Transactions on Fuzzy Systems, 17(3), 617–629.CrossRef Yang, L., Li, K., & Gao, Z. (2009). Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Transactions on Fuzzy Systems, 17(3), 617–629.CrossRef
Zurück zum Zitat Zachariadis, E. E., & Kiranoudis, C. T. (2010). An open vehicle routing problem metaheuristic for examining wide solution neighborhoods. Computers & Operations Research, 37(4), 712–723.CrossRefMATH Zachariadis, E. E., & Kiranoudis, C. T. (2010). An open vehicle routing problem metaheuristic for examining wide solution neighborhoods. Computers & Operations Research, 37(4), 712–723.CrossRefMATH
Zurück zum Zitat Zha, W., Chen, Z., & Li, X. (2000). Research of theory and method for train operation adjustment on double-track railway line. Journal of the China Railway Society, 22(1), 12–16. (in Chinese). Zha, W., Chen, Z., & Li, X. (2000). Research of theory and method for train operation adjustment on double-track railway line. Journal of the China Railway Society, 22(1), 12–16. (in Chinese).
Zurück zum Zitat Zhang, C., Cao, C., Teng, Y., Liu, S., & Chen, L. (2010). Graph model and heuristic algorithm of train operation adjustment problem. Science Technology and Engineering, 10(2560–2564), 2573. (in Chinese). Zhang, C., Cao, C., Teng, Y., Liu, S., & Chen, L. (2010). Graph model and heuristic algorithm of train operation adjustment problem. Science Technology and Engineering, 10(2560–2564), 2573. (in Chinese).
Zurück zum Zitat Zhang, X., Hu, A., & Yang, H. (1995). A Train operation simulation model based on constraints of control in random origin and control in random process. Journal of the China Railway Society, 17(3), 22–27. Zhang, X., Hu, A., & Yang, H. (1995). A Train operation simulation model based on constraints of control in random origin and control in random process. Journal of the China Railway Society, 17(3), 22–27.
Zurück zum Zitat Zhang, Y., & Jin, W. (2005). Model and algorithm for train operation adjustment on single-track railways based on genetic algorithm. Journal of Southwest Jiaotong University, 40(2), 147–152. (in Chinese). Zhang, Y., & Jin, W. (2005). Model and algorithm for train operation adjustment on single-track railways based on genetic algorithm. Journal of Southwest Jiaotong University, 40(2), 147–152. (in Chinese).
Zurück zum Zitat Zhang, X., Yang, H., Zhu, X., Hu, S., & Hu, A. (1998). Research on simulation experiment system of Jinghu high-speed railway. Journal of the China Railway Society, 20(4), 1–7. (in Chinese). Zhang, X., Yang, H., Zhu, X., Hu, S., & Hu, A. (1998). Research on simulation experiment system of Jinghu high-speed railway. Journal of the China Railway Society, 20(4), 1–7. (in Chinese).
Zurück zum Zitat Zhao, Q. (1999). An optimal model and its algorithm for adjusting diagram on single-track railway. Systems Engineering, 17(6), 12–18. (in Chinese). Zhao, Q. (1999). An optimal model and its algorithm for adjusting diagram on single-track railway. Systems Engineering, 17(6), 12–18. (in Chinese).
Zurück zum Zitat Zhao, S., & Dang, J. (2009). Study on chaos-improved genetic algorithm for passenger-dedicated line train operation adjustment. Computer Engineering and Applications, 45(9), 220–222. (in Chinese). Zhao, S., & Dang, J. (2009). Study on chaos-improved genetic algorithm for passenger-dedicated line train operation adjustment. Computer Engineering and Applications, 45(9), 220–222. (in Chinese).
Zurück zum Zitat Zhou, P. (2002). A fast algorithm for finding the shortest path between arbitrary two point in a traffic road net. Computer Engineering & Science, 19(3), 81–84. (in Chinese).MathSciNet Zhou, P. (2002). A fast algorithm for finding the shortest path between arbitrary two point in a traffic road net. Computer Engineering & Science, 19(3), 81–84. (in Chinese).MathSciNet
Zurück zum Zitat Zhou, L., Hu, S., Ma, J., & Yue, Y. (1998). Network hierarchy parallel algorithm of automatic train scheduling. Journal of the China Railway Society, 20(5), 15–21. (in Chinese). Zhou, L., Hu, S., Ma, J., & Yue, Y. (1998). Network hierarchy parallel algorithm of automatic train scheduling. Journal of the China Railway Society, 20(5), 15–21. (in Chinese).
Zurück zum Zitat Zhou, X., & Zhong, M. (2005a). Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research, 167(3), 752–771.MathSciNetCrossRefMATH Zhou, X., & Zhong, M. (2005a). Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research, 167(3), 752–771.MathSciNetCrossRefMATH
Zurück zum Zitat Zhou, X., & Zhong, M. (2005b). Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research, 167(3), 752–771.MathSciNetCrossRefMATH Zhou, X., & Zhong, M. (2005b). Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research, 167(3), 752–771.MathSciNetCrossRefMATH
Zurück zum Zitat Zhou, M., & Zhong, M. (2007). Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds. Transportation Research Part B Methodological, 41(3), 320–341. Zhou, M., & Zhong, M. (2007). Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds. Transportation Research Part B Methodological, 41(3), 320–341.
Metadaten
Titel
Introduction
verfasst von
Limin Jia
Xuelei Meng
Yong Qin
Copyright-Jahr
2017
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-4597-4_1

    Premium Partner