Skip to main content
Top
Published in:
Cover of the book

2013 | OriginalPaper | Chapter

1. Introduction

Authors : Lars Mönch, John W. Fowler, Scott J. Mason

Published in: Production Planning and Control for Semiconductor Wafer Fabrication Facilities

Publisher: Springer New York

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The purpose of this chapter is to provide an overview of the book. Therefore, we start by discussing motivation for modeling and analysis of semiconductor manufacturing. Semiconductor manufacturing is an extreme environment for production planning and control, scheduling, and simulation models. The enormous size of the facilities and supply chains in the semiconductor industry, the permanent appearance of uncertainty, and rapid technological changes lead to an environment that brings approaches developed for other industries under stress (see Chien et al. [49] for a related discussion). The capital intensive nature of the semiconductor industry requires manufacturing systems to run consistently at high utilization levels, reentrant flows create complex competition for limited resource capacity, and the ever-increasing level of automation reduces the ability to rely solely on people for production planning and control. Models that are successful in the semiconductor industry will likely find reasonable applications in other areas. A second source of academic interest in modeling and analysis of semiconductor manufacturing is the insight that the semiconductor manufacturing environment initiates on the formulation of some problems that had not been widely studied in other industries (cf. Chien et al. [49]).

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Adams, J., Balas, E., Zawack, D.: The shifting bottleneck procedure for job-shop scheduling. Manag. Sci. 34(3), 391–401 (1988) Adams, J., Balas, E., Zawack, D.: The shifting bottleneck procedure for job-shop scheduling. Manag. Sci. 34(3), 391–401 (1988)
2.
go back to reference Adelsberger, H.H., Kanet, J.J.: The Leitstand—a new tool in computer-integrated manufacturing. Prod. Inventory Manag. J. 32(1), 43–48 (1991) Adelsberger, H.H., Kanet, J.J.: The Leitstand—a new tool in computer-integrated manufacturing. Prod. Inventory Manag. J. 32(1), 43–48 (1991)
3.
go back to reference Agrawal, G.K., Heragu, S.S.: A survey of automated material handling systems in 300-mm semiconductor fabs. IEEE Trans. Semicond. Manuf. 19(1), 112–120 (2006) Agrawal, G.K., Heragu, S.S.: A survey of automated material handling systems in 300-mm semiconductor fabs. IEEE Trans. Semicond. Manuf. 19(1), 112–120 (2006)
4.
go back to reference Akali, E., Uzsoy, R.: A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography. In: Proceedings of the Twenty-Sixth IEEE/CPMT International Electronics Manufacturing Technology Symposium, pp. 374–381 (2000) Akali, E., Uzsoy, R.: A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography. In: Proceedings of the Twenty-Sixth IEEE/CPMT International Electronics Manufacturing Technology Symposium, pp. 374–381 (2000)
5.
go back to reference Akali, E., Nemoto, K., Uzsoy, R.: Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 14(1), 48–56 (2001) Akali, E., Nemoto, K., Uzsoy, R.: Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 14(1), 48–56 (2001)
6.
go back to reference Allen, C.: The impact of network topology on rational-function models of the cycle time-throughput curve. Master’s thesis, Northwestern University (2004) Allen, C.: The impact of network topology on rational-function models of the cycle time-throughput curve. Master’s thesis, Northwestern University (2004)
7.
go back to reference Almeder, C., Preusser, M., Hartl, R.F.: Simulation and optimization of supply chains: alternative or complementary approaches? OR Spectrum 31(1), 95–119 (2009) Almeder, C., Preusser, M., Hartl, R.F.: Simulation and optimization of supply chains: alternative or complementary approaches? OR Spectrum 31(1), 95–119 (2009)
8.
go back to reference Ankenman, B.E., Bekki, J.M., Fowler, J.W., Mackulak, G.T., Nelson, B.L.: Simulation in production planning—an overview with emphasis on recent developments in cycle time estimation. In: Kempf, K.G., Keskinozak, P., Uzsoy, R. (eds.) Planning Production and Inventories in the Extended Enterprise, pp. 565–591. Springer, Berlin (2011) Ankenman, B.E., Bekki, J.M., Fowler, J.W., Mackulak, G.T., Nelson, B.L.: Simulation in production planning—an overview with emphasis on recent developments in cycle time estimation. In: Kempf, K.G., Keskinozak, P., Uzsoy, R. (eds.) Planning Production and Inventories in the Extended Enterprise, pp. 565–591. Springer, Berlin (2011)
9.
go back to reference Appleton-Day, K., Shao, L.: Real-time dispatch gets real-time results in AMD’s Fab 25. In: Proceedings of the 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 444–447 (1997) Appleton-Day, K., Shao, L.: Real-time dispatch gets real-time results in AMD’s Fab 25. In: Proceedings of the 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 444–447 (1997)
11.
go back to reference Ashby, J.R., Uzsoy, R.: Scheduling and order release in a single stage production system. J. Manuf. Syst. 14(4), 290–305 (1995) Ashby, J.R., Uzsoy, R.: Scheduling and order release in a single stage production system. J. Manuf. Syst. 14(4), 290–305 (1995)
12.
go back to reference Asmundsson, J., Rardin, R.L., Uzsoy, R.: Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(1), 95–111 (2006) Asmundsson, J., Rardin, R.L., Uzsoy, R.: Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(1), 95–111 (2006)
13.
go back to reference Asmundsson, J., Rardin, R.L., Turkseven, C.H., Uzsoy, R.: Production planning with resources subject to congestion. Nav. Res. Logist. 56(2), 142–157 (2009) Asmundsson, J., Rardin, R.L., Turkseven, C.H., Uzsoy, R.: Production planning with resources subject to congestion. Nav. Res. Logist. 56(2), 142–157 (2009)
14.
go back to reference Atherton, L.F., Atherton, R.W.: Wafer Fabrication: Factory Performance and Analysis. Kluwer Academic Publishers, Norwell (1995) Atherton, L.F., Atherton, R.W.: Wafer Fabrication: Factory Performance and Analysis. Kluwer Academic Publishers, Norwell (1995)
15.
go back to reference Aytug, H., Kempf, K., Uzsoy, R.: Measures of subproblem criticality in decomposition algorithms for shop scheduling. Int. J. Prod. Res. 41(5), 865–882 (2003) Aytug, H., Kempf, K., Uzsoy, R.: Measures of subproblem criticality in decomposition algorithms for shop scheduling. Int. J. Prod. Res. 41(5), 865–882 (2003)
16.
go back to reference Bahaji, N., Kuhl, M.E.: A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication. Int. J. Prod. Res. 46(14), 3801–3824 (2008) Bahaji, N., Kuhl, M.E.: A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication. Int. J. Prod. Res. 46(14), 3801–3824 (2008)
17.
go back to reference Bai, X., Srivatsan, N., Gershwin, S.B.: Hierarchical real-time scheduling of a semiconductor fabrication facility. In: Proceedings of the Ninth IEEE International Electronics Manufacturing Technology Symposium, pp. 312–317 (1990) Bai, X., Srivatsan, N., Gershwin, S.B.: Hierarchical real-time scheduling of a semiconductor fabrication facility. In: Proceedings of the Ninth IEEE International Electronics Manufacturing Technology Symposium, pp. 312–317 (1990)
18.
go back to reference Balasubramanian, H., Mnch, L., Fowler, J.W., Pfund, M.E.: Genetic algorithm based scheduling of jobs with incompatible families on parallel batch machines. Int. J. Prod. Res. 42(8), 1621–1638 (2004) Balasubramanian, H., Mnch, L., Fowler, J.W., Pfund, M.E.: Genetic algorithm based scheduling of jobs with incompatible families on parallel batch machines. Int. J. Prod. Res. 42(8), 1621–1638 (2004)
19.
go back to reference Balasubramanian, H., Fowler, J.W., Pfund, M.E.: Single machine bicriteria scheduling using the apparent tardiness cost heuristic. In: Proceedings of the 2006 Industrial Engineering Research Conference (2006) Balasubramanian, H., Fowler, J.W., Pfund, M.E.: Single machine bicriteria scheduling using the apparent tardiness cost heuristic. In: Proceedings of the 2006 Industrial Engineering Research Conference (2006)
20.
go back to reference Banerjee, A.: Global trends in supply chain planning in semiconductor industry. SETLabs Briefings 5(3), 1–11 (2007) Banerjee, A.: Global trends in supply chain planning in semiconductor industry. SETLabs Briefings 5(3), 1–11 (2007)
21.
go back to reference Banks, J., Carson, J.S., Nelson, B.L.: Discrete-Event System Simulation, 2nd edn. Prentice Hall, Upper Saddle River (1999) Banks, J., Carson, J.S., Nelson, B.L.: Discrete-Event System Simulation, 2nd edn. Prentice Hall, Upper Saddle River (1999)
22.
go back to reference Barahona, F., Bermon, S., Gnlk, O., Hood, S.J.: Robust capacity planning in semiconductor manufacturing. Nav. Res. Logist. 52(5), 459–468 (2005) Barahona, F., Bermon, S., Gnlk, O., Hood, S.J.: Robust capacity planning in semiconductor manufacturing. Nav. Res. Logist. 52(5), 459–468 (2005)
23.
go back to reference Barua, A., Raghavan, N., Upasani, A.A., Uzsoy, R.: Implementing global factory schedules in the face of stochastic disruptions. Int. J. Prod. Res. 43(4), 793–818 (2005) Barua, A., Raghavan, N., Upasani, A.A., Uzsoy, R.: Implementing global factory schedules in the face of stochastic disruptions. Int. J. Prod. Res. 43(4), 793–818 (2005)
24.
go back to reference Bermon, S., Hood, S.J.: Capacity optimization planning system (CAPS). Interfaces 29(5), 31–50 (1999) Bermon, S., Hood, S.J.: Capacity optimization planning system (CAPS). Interfaces 29(5), 31–50 (1999)
25.
go back to reference Bertsimas, D., Tsitsiklis, J.N.: Introduction to Linear Optimization. Athena Scientific, Dynamic Ideas, Belmont (1997) Bertsimas, D., Tsitsiklis, J.N.: Introduction to Linear Optimization. Athena Scientific, Dynamic Ideas, Belmont (1997)
26.
go back to reference Bianco, L., Ricciardelli, S., Rinaldi, G., Sassano, A.: Scheduling tasks with sequence-dependent processing times. Nav. Res. Logist. 35(2), 177–184 (1988) Bianco, L., Ricciardelli, S., Rinaldi, G., Sassano, A.: Scheduling tasks with sequence-dependent processing times. Nav. Res. Logist. 35(2), 177–184 (1988)
27.
go back to reference Birge, J.R., Louveaux, F.: Introduction to Stochastic Programming. Springer, New York (1997) Birge, J.R., Louveaux, F.: Introduction to Stochastic Programming. Springer, New York (1997)
28.
go back to reference Bixby, R., Burda, R., Miller, D.: Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming. In: Proceedings of the 2006 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 148–154 (2006) Bixby, R., Burda, R., Miller, D.: Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming. In: Proceedings of the 2006 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 148–154 (2006)
29.
go back to reference Blackstone, J.H., Hogg, G.L., Phillips, D.T.: A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res. 20(1), 27–45 (1982) Blackstone, J.H., Hogg, G.L., Phillips, D.T.: A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res. 20(1), 27–45 (1982)
30.
go back to reference Blazewicz, J., Pesch, E., Sterna, M.: The disjunctive graph machine representation of the job shop scheduling problem. Eur. J. Oper. Res. 127(2), 317–331 (2000) Blazewicz, J., Pesch, E., Sterna, M.: The disjunctive graph machine representation of the job shop scheduling problem. Eur. J. Oper. Res. 127(2), 317–331 (2000)
31.
go back to reference Box, G.E.P.: Robustness in the strategy of model building. In: Launer, R.L., Wilkinson, G.N. (eds.) Robustness in Statistics. Academic Press, New York (1979) Box, G.E.P.: Robustness in the strategy of model building. In: Launer, R.L., Wilkinson, G.N. (eds.) Robustness in Statistics. Academic Press, New York (1979)
32.
go back to reference Brandimarte, P., Rigodanza, M., Roero, L.: Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure. IIE Trans. 32(10), 921–929 (2000) Brandimarte, P., Rigodanza, M., Roero, L.: Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure. IIE Trans. 32(10), 921–929 (2000)
33.
go back to reference Brown, S., Chance, F., Fowler, J.W., Robinson, J.K.: A centralized approach to factory simulation. Future Fab Int. 3, 83–86 (1997) Brown, S., Chance, F., Fowler, J.W., Robinson, J.K.: A centralized approach to factory simulation. Future Fab Int. 3, 83–86 (1997)
34.
go back to reference Brucker, P.: Scheduling Algorithms, 5th edn. Springer, Berlin (2007) Brucker, P.: Scheduling Algorithms, 5th edn. Springer, Berlin (2007)
35.
go back to reference Brucker, P., Knust, S.: Complex Scheduling. Springer, Berlin (2006) Brucker, P., Knust, S.: Complex Scheduling. Springer, Berlin (2006)
36.
go back to reference Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M.Y., Potts, C.N., Tautenhahn, T., van de Velde, S.: Scheduling a batching machine. J. Scheduling 1(1), 31–54 (1998) Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M.Y., Potts, C.N., Tautenhahn, T., van de Velde, S.: Scheduling a batching machine. J. Scheduling 1(1), 31–54 (1998)
37.
go back to reference Bullock, M., Fowler, J.W., Pfund, M.E.: Evaluation of lot dispatching rules for semiconductor manufacturing. In: Proceedings of the 11th Annual Industrial Engineering Research Conference (2003) Bullock, M., Fowler, J.W., Pfund, M.E.: Evaluation of lot dispatching rules for semiconductor manufacturing. In: Proceedings of the 11th Annual Industrial Engineering Research Conference (2003)
38.
go back to reference Bussmann, S.: An agent-oriented design methodology for production control. PhD thesis, University of Southampton (2003) Bussmann, S.: An agent-oriented design methodology for production control. PhD thesis, University of Southampton (2003)
39.
go back to reference Bussmann, S., Jennings, N.R., Wooldridge, M.: On the identification of agents in the design of production control systems. In: Proceedings First International Workshop on Agent-Oriented Software Engineering, pp. 141–162 (2001) Bussmann, S., Jennings, N.R., Wooldridge, M.: On the identification of agents in the design of production control systems. In: Proceedings First International Workshop on Agent-Oriented Software Engineering, pp. 141–162 (2001)
40.
go back to reference Bussmann, S., Jennings, N.R., Wooldridge, M.: Re-use of interaction protocols for agent-based control applications. In: Proceedings Third International Workshop on Agent-Oriented Software Engineering, pp. 73–87 (2003) Bussmann, S., Jennings, N.R., Wooldridge, M.: Re-use of interaction protocols for agent-based control applications. In: Proceedings Third International Workshop on Agent-Oriented Software Engineering, pp. 73–87 (2003)
41.
go back to reference Byrne, P.J.: An analysis of semiconductor reticle management using discrete event simulation. In: Proceedings of the 2007 Summer Computer Simulation Conference, pp. 593–600 (2007) Byrne, P.J.: An analysis of semiconductor reticle management using discrete event simulation. In: Proceedings of the 2007 Summer Computer Simulation Conference, pp. 593–600 (2007)
42.
go back to reference Cakici, E., Mason, S.J.: Parallel machine scheduling subject to auxiliary resource constraints. Prod. Plann. Contr. 18(3), 217–225 (2007) Cakici, E., Mason, S.J.: Parallel machine scheduling subject to auxiliary resource constraints. Prod. Plann. Contr. 18(3), 217–225 (2007)
43.
go back to reference Chambers, R.J., Carraway, R.L., Lowe, T.J., Morin, T.L.: Dominance and decomposition heuristics for single machine scheduling. Oper. Res. 39(4), 639–647 (1991) Chambers, R.J., Carraway, R.L., Lowe, T.J., Morin, T.L.: Dominance and decomposition heuristics for single machine scheduling. Oper. Res. 39(4), 639–647 (1991)
44.
go back to reference Chandra, P., Gupta, S.: Managing batch processors to reduce lead time in a semiconductor packaging line. Int. J. Prod. Res. 35(3), 611–633 (1997) Chandra, P., Gupta, S.: Managing batch processors to reduce lead time in a semiconductor packaging line. Int. J. Prod. Res. 35(3), 611–633 (1997)
45.
go back to reference Chen, Y., Pfund, M.E., Fowler, J.W., Montgomery, D.C., Callarman, T.E.: Robust scaling parameters for composite dispatching rules. IIE Trans. 42(11), 842–853 (2010) Chen, Y., Pfund, M.E., Fowler, J.W., Montgomery, D.C., Callarman, T.E.: Robust scaling parameters for composite dispatching rules. IIE Trans. 42(11), 842–853 (2010)
46.
go back to reference Cheng, R.C.H., Kleijnen, J.P.C.: Improved design of queueing simulation experiments with highly heteroscedastic responses. Oper. Res. 47(5), 762–777 (1999) Cheng, R.C.H., Kleijnen, J.P.C.: Improved design of queueing simulation experiments with highly heteroscedastic responses. Oper. Res. 47(5), 762–777 (1999)
48.
go back to reference Chiang, T.-C., Cheng, H.-C., Fu, L.-C.: A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival. Comput. Oper. Res. 37(12), 2257–2269 (2010) Chiang, T.-C., Cheng, H.-C., Fu, L.-C.: A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival. Comput. Oper. Res. 37(12), 2257–2269 (2010)
49.
go back to reference Chien, C.-F., Dauzère-Pérès, S., Ehm, H., Fowler, J.W., Jiang, Z., Krishnaswamy, S., Mönch, L., Uzsoy, R.: Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes. Eur. J. Ind. Eng. 5(3), 254–271 (2011) Chien, C.-F., Dauzère-Pérès, S., Ehm, H., Fowler, J.W., Jiang, Z., Krishnaswamy, S., Mönch, L., Uzsoy, R.: Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes. Eur. J. Ind. Eng. 5(3), 254–271 (2011)
50.
go back to reference Chung, S.-L., Jeng, M.: An overview of semiconductor fab automation systems. In: Proceedings of the 2003 IEEE International Conference on Robotics and Automation, pp. 1050–1055 (2003) Chung, S.-L., Jeng, M.: An overview of semiconductor fab automation systems. In: Proceedings of the 2003 IEEE International Conference on Robotics and Automation, pp. 1050–1055 (2003)
51.
go back to reference Cigolini, R., Perona, M., Portioli, A.: Comparison of order review and release techniques in a dynamic and uncertain job shop environment. Int. J. Prod. Res. 36(11), 2931–2951 (1998) Cigolini, R., Perona, M., Portioli, A.: Comparison of order review and release techniques in a dynamic and uncertain job shop environment. Int. J. Prod. Res. 36(11), 2931–2951 (1998)
52.
go back to reference Cigolini, R., Perona, M., Portioli, A., Zambelli, T.: A new dynamic look-ahead scheduling procedure for batching machines. J. Scheduling 5(2), 185–204 (2002) Cigolini, R., Perona, M., Portioli, A., Zambelli, T.: A new dynamic look-ahead scheduling procedure for batching machines. J. Scheduling 5(2), 185–204 (2002)
53.
go back to reference Cochran, J.K., Horng, S.M., Fowler, J.W.: A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput. Oper. Res. 30(7), 1087–1102 (2003) Cochran, J.K., Horng, S.M., Fowler, J.W.: A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput. Oper. Res. 30(7), 1087–1102 (2003)
54.
go back to reference Cogez, P.: The effect of uncertainty on production release policies. Master’s thesis, University of California, Berkeley (1990) Cogez, P.: The effect of uncertainty on production release policies. Master’s thesis, University of California, Berkeley (1990)
55.
go back to reference Curry, G.L., Feldmann, R.M.: Manufacturing Systems Modeling and Analysis. Springer, Berlin (2009) Curry, G.L., Feldmann, R.M.: Manufacturing Systems Modeling and Analysis. Springer, Berlin (2009)
56.
go back to reference Dabbas, R.M., Chen, H.-N., Fowler, J.W., Shunk, D.L.: A combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Comput. Ind. Eng. 39(3-4), 307–324 (2001) Dabbas, R.M., Chen, H.-N., Fowler, J.W., Shunk, D.L.: A combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Comput. Ind. Eng. 39(3-4), 307–324 (2001)
57.
go back to reference Dabbas, R.M., Fowler, J.W.: A new scheduling approach using combined dispatching criteria in wafer fabs. IEEE Trans. Semicond. Manuf. 16(3), 501–510 (2003) Dabbas, R.M., Fowler, J.W.: A new scheduling approach using combined dispatching criteria in wafer fabs. IEEE Trans. Semicond. Manuf. 16(3), 501–510 (2003)
58.
go back to reference Dabbas, R.M., Fowler, J.W., Rollier, D.A., McCarville, D.: Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling. Int. J. Prod. Res. 41(5), 939–961 (2003) Dabbas, R.M., Fowler, J.W., Rollier, D.A., McCarville, D.: Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling. Int. J. Prod. Res. 41(5), 939–961 (2003)
59.
go back to reference Dauzère-Pérès, S., Lassere, J.B.: A modified shifting bottleneck procedure for job-shop scheduling. Int. J. Prod. Res. 31(4), 923–932 (1993) Dauzère-Pérès, S., Lassere, J.B.: A modified shifting bottleneck procedure for job-shop scheduling. Int. J. Prod. Res. 31(4), 923–932 (1993)
60.
go back to reference Davis, W.J.: On-line simulation: need and evolving research requirements. In: Banks, J. (ed.) Handbook of Simulation, pp. 465–516. Wiley, New York (1998) Davis, W.J.: On-line simulation: need and evolving research requirements. In: Banks, J. (ed.) Handbook of Simulation, pp. 465–516. Wiley, New York (1998)
61.
go back to reference Dayhoff, J.E., Atherton, R.W.: Signature analysis of dispatch schemes in wafer fabrication. IEEE Trans. Compon.Hybrids Manuf. Tech. 9(4), 518–525 (1986) Dayhoff, J.E., Atherton, R.W.: Signature analysis of dispatch schemes in wafer fabrication. IEEE Trans. Compon.Hybrids Manuf. Tech. 9(4), 518–525 (1986)
62.
go back to reference Deb, R., Serfozo, R.F.: Optimal control of batch service queues. Adv. Appl. Probab. 5(2), 340–361 (1973) Deb, R., Serfozo, R.F.: Optimal control of batch service queues. Adv. Appl. Probab. 5(2), 340–361 (1973)
63.
go back to reference Demirkol, E., Uzsoy, R.: Performance of decomposition methods for complex workshops under multiple criteria. Comput. Ind. Eng. 33(1/2), 261–264 (1997) Demirkol, E., Uzsoy, R.: Performance of decomposition methods for complex workshops under multiple criteria. Comput. Ind. Eng. 33(1/2), 261–264 (1997)
64.
go back to reference Demirkol, E., Uzsoy, R.: Decomposition methods for reentrant flow shops with sequence dependent setup-times. J. Scheduling 3(3), 155–177 (2000) Demirkol, E., Uzsoy, R.: Decomposition methods for reentrant flow shops with sequence dependent setup-times. J. Scheduling 3(3), 155–177 (2000)
65.
go back to reference Demirkol, E., Mehta, S., Uzsoy, R.: A computational study of shifting bottleneck procedures for shop scheduling problems. J. Heuristics 3(2), 111–137 (1997) Demirkol, E., Mehta, S., Uzsoy, R.: A computational study of shifting bottleneck procedures for shop scheduling problems. J. Heuristics 3(2), 111–137 (1997)
66.
go back to reference Derringer, G., Suich, R.: Simultaneous optimization of several response variables. J. Qual. Tech. 12(4), 214–219 (1980) Derringer, G., Suich, R.: Simultaneous optimization of several response variables. J. Qual. Tech. 12(4), 214–219 (1980)
67.
go back to reference Devpura, A., Fowler, J.W., Carlyle, M.W., Perez, I.: Minimizing total weighted tardiness on single batch process machine with incompatible job families. In: Proceedings of the Symposium on Operations Research (OR 2000), pp. 366–371 (2000) Devpura, A., Fowler, J.W., Carlyle, M.W., Perez, I.: Minimizing total weighted tardiness on single batch process machine with incompatible job families. In: Proceedings of the Symposium on Operations Research (OR 2000), pp. 366–371 (2000)
68.
go back to reference Dìaz, S.L., Fowler, J.W., Pfund, M.E., Mackulak, G.T., Hickie, M.: Evaluating the impact of reticle requirements in semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 18(4), 622–632 (2005) Dìaz, S.L., Fowler, J.W., Pfund, M.E., Mackulak, G.T., Hickie, M.: Evaluating the impact of reticle requirements in semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 18(4), 622–632 (2005)
69.
go back to reference Dorndorf, U., Pesch, E.: Evolution based learning in a job shop scheduling environment. Comput. Oper. Res. 22(1), 25–40 (1995) Dorndorf, U., Pesch, E.: Evolution based learning in a job shop scheduling environment. Comput. Oper. Res. 22(1), 25–40 (1995)
70.
go back to reference Dowsland, K., Dowsland, W.: Packing problems. Eur. J. Oper. Res. 56(1), 2–14 (1992) Dowsland, K., Dowsland, W.: Packing problems. Eur. J. Oper. Res. 56(1), 2–14 (1992)
71.
go back to reference Driessel, R., Mnch, L.: Simulation framework for complex manufacturing systems with automated material handling. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1713–1721 (2007) Driessel, R., Mnch, L.: Simulation framework for complex manufacturing systems with automated material handling. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1713–1721 (2007)
72.
go back to reference Driessel, R., Mnch, L.: Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times. Comput. Ind. Eng. 61(2), 336–345 (2011) Driessel, R., Mnch, L.: Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times. Comput. Ind. Eng. 61(2), 336–345 (2011)
73.
go back to reference Driessel, R., Mnch, L.: An integrated scheduling and material handling approach for complex job shops: a computational study. Int. J. Prod. Res., accepted for publication (2012) Driessel, R., Mnch, L.: An integrated scheduling and material handling approach for complex job shops: a computational study. Int. J. Prod. Res., accepted for publication (2012)
74.
go back to reference Duarte, B.M., Fowler, J.W., Knutson, K., Gel, E., Shunk, D.L.: A compact abstraction of manufacturing nodes in a supply network. Int. J. Simulat. Process Model. 3(3), 115–126 (2007) Duarte, B.M., Fowler, J.W., Knutson, K., Gel, E., Shunk, D.L.: A compact abstraction of manufacturing nodes in a supply network. Int. J. Simulat. Process Model. 3(3), 115–126 (2007)
75.
go back to reference Dümmler, M.: Using simulation and genetic algorithms to improve cluster tool performance. In: Proceedings of the 1999 Winter Simulation Conference, pp. 875–879 (1999) Dümmler, M.: Using simulation and genetic algorithms to improve cluster tool performance. In: Proceedings of the 1999 Winter Simulation Conference, pp. 875–879 (1999)
76.
go back to reference Dümmler, M.: Modeling and optimization of cluster tools in semiconductor manufacturing. PhD thesis, University of Würzburg (2004) Dümmler, M.: Modeling and optimization of cluster tools in semiconductor manufacturing. PhD thesis, University of Würzburg (2004)
78.
go back to reference Falkenauer, E.: Genetic Algorithms and Grouping Problems. Wiley, Chichester (1998) Falkenauer, E.: Genetic Algorithms and Grouping Problems. Wiley, Chichester (1998)
80.
go back to reference Fischmann, C., Bttinger, F., Wertz, R., Kunz, C.: Buffer management for automated material handling systems in semiconductor industries. In: Proceedings 22nd European Conference on Modeling and Simulation (ECMS 2008), pp. 423–427 (2008) Fischmann, C., Bttinger, F., Wertz, R., Kunz, C.: Buffer management for automated material handling systems in semiconductor industries. In: Proceedings 22nd European Conference on Modeling and Simulation (ECMS 2008), pp. 423–427 (2008)
81.
go back to reference Fleischmann, B., Meyr, H., Wagner, M.: Advanced planning. In: Stadtler, H., Kilger, C. (eds.) Supply Chain Management and Advanced Planning, 4th edn., pp. 81–106. Springer, Berlin (2008) Fleischmann, B., Meyr, H., Wagner, M.: Advanced planning. In: Stadtler, H., Kilger, C. (eds.) Supply Chain Management and Advanced Planning, 4th edn., pp. 81–106. Springer, Berlin (2008)
82.
go back to reference Foster, L., Pillai, D.: 300 mm wafer fab logistics and automated material handling systems. In: Doering, R., Nishi, Y. (eds.) Handbook of Semiconductor Manufacturing Technology, pp. 33–1–33–67. CRC Press, USA (2007) Foster, L., Pillai, D.: 300 mm wafer fab logistics and automated material handling systems. In: Doering, R., Nishi, Y. (eds.) Handbook of Semiconductor Manufacturing Technology, pp. 33–1–33–67. CRC Press, USA (2007)
83.
go back to reference Fowler, J.W., Robinson, J.: Measurement and improvement of manufacturing capacity (MIMAC): Final report. Technical Report 95062861A-TR, SEMA-TECH, Austin, TX (1995) Fowler, J.W., Robinson, J.: Measurement and improvement of manufacturing capacity (MIMAC): Final report. Technical Report 95062861A-TR, SEMA-TECH, Austin, TX (1995)
84.
go back to reference Fowler, J.W., Phillips, D.T., Hogg, G.L.: Real-time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Trans. Semicond. Manuf. 5(2), 158–163 (1992) Fowler, J.W., Phillips, D.T., Hogg, G.L.: Real-time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Trans. Semicond. Manuf. 5(2), 158–163 (1992)
85.
go back to reference Fowler, J.W., Hogg, G.L., Phillips, D.T.: Control of multiproduct bulk server diffusion/oxidation processes. Part 2: multiple servers. IIE Trans. Scheduling Logistics 32(2), 167–176 (2000) Fowler, J.W., Hogg, G.L., Phillips, D.T.: Control of multiproduct bulk server diffusion/oxidation processes. Part 2: multiple servers. IIE Trans. Scheduling Logistics 32(2), 167–176 (2000)
86.
go back to reference Fowler, J.W., Park, S., Mackulak, G.T., Shunk, D.L.: Efficient cycle time-throughput curve generation using a fixed sample size procedure. Int. J. Prod. Res. 39(12), 2595–2613 (2001) Fowler, J.W., Park, S., Mackulak, G.T., Shunk, D.L.: Efficient cycle time-throughput curve generation using a fixed sample size procedure. Int. J. Prod. Res. 39(12), 2595–2613 (2001)
87.
go back to reference Fowler, J.W., Hogg, G.L., Mason, S.J.: Workload control in the semiconductor industry. Prod. Plann. Contr. 13(7), 568–578 (2002) Fowler, J.W., Hogg, G.L., Mason, S.J.: Workload control in the semiconductor industry. Prod. Plann. Contr. 13(7), 568–578 (2002)
88.
go back to reference Fowler, J.W., Horng, S., Cochran, J.K.: A hybridized genetic algorithm to solve parallel machine scheduling problems with sequence dependent setups. Int. J. Ind. Eng. 10(3), 232–243 (2003) Fowler, J.W., Horng, S., Cochran, J.K.: A hybridized genetic algorithm to solve parallel machine scheduling problems with sequence dependent setups. Int. J. Ind. Eng. 10(3), 232–243 (2003)
89.
go back to reference Fowler, J.W., Rose, O.: Grand challenges in modeling and simulation of complex manufacturing systems. SIMULATION—Trans. Soc. Model. Simulat. Int. 80(9), 469–476 (2004) Fowler, J.W., Rose, O.: Grand challenges in modeling and simulation of complex manufacturing systems. SIMULATION—Trans. Soc. Model. Simulat. Int. 80(9), 469–476 (2004)
90.
go back to reference Framinan, J.M., Ruiz, R.: Architecture of manufacturing scheduling systems: literature review and an integrated proposal. Eur. J. Oper. Res. 205(2), 237–246 (2010) Framinan, J.M., Ruiz, R.: Architecture of manufacturing scheduling systems: literature review and an integrated proposal. Eur. J. Oper. Res. 205(2), 237–246 (2010)
91.
go back to reference Fu, M.C., Antradttir, S., Carson, J.S., Glover, F., Harrell, C.R., Ho, Y.-C., Kelly, J.P., Robinson, S.M.: Integrating optimization and simulation: research and practice. In: Proceedings of the 2000 Winter Simulation Conference, pp. 610–616 (2000) Fu, M.C., Antradttir, S., Carson, J.S., Glover, F., Harrell, C.R., Ho, Y.-C., Kelly, J.P., Robinson, S.M.: Integrating optimization and simulation: research and practice. In: Proceedings of the 2000 Winter Simulation Conference, pp. 610–616 (2000)
92.
go back to reference Fu, M.C.: Optimization for simulation: theory vs. practice. INFORMS J. Comput. 14(3), 192–215 (2002) Fu, M.C.: Optimization for simulation: theory vs. practice. INFORMS J. Comput. 14(3), 192–215 (2002)
93.
go back to reference Gan, B.P., Liow, M., Gupta, A.K., Lendermann, P., Turner, S.J., Wang, X.G.: Analysis of a borderless fab using interoperating AutoSched AP models. Int. J. Prod. Res. 45(3), 675–697 (2007) Gan, B.P., Liow, M., Gupta, A.K., Lendermann, P., Turner, S.J., Wang, X.G.: Analysis of a borderless fab using interoperating AutoSched AP models. Int. J. Prod. Res. 45(3), 675–697 (2007)
94.
go back to reference Garey, M.R., Johnson, D.S.: Computers and Intractability: A Guide to the Theory of NP-Completeness. Freeman, New York (1979) Garey, M.R., Johnson, D.S.: Computers and Intractability: A Guide to the Theory of NP-Completeness. Freeman, New York (1979)
95.
go back to reference Geiger, C.D., Uzsoy, R.: Learning effective dispatching rules for batch processor scheduling. Int. J. Prod. Res. 46(6), 1431–1454 (2008) Geiger, C.D., Uzsoy, R.: Learning effective dispatching rules for batch processor scheduling. Int. J. Prod. Res. 46(6), 1431–1454 (2008)
96.
go back to reference Geiger, C.D., Uzsoy, R., Aytug, H.: Rapid modeling and discovery of priority dispatching rules: an autonomous learning approach. J. Scheduling 9(1), 7–34 (2006) Geiger, C.D., Uzsoy, R., Aytug, H.: Rapid modeling and discovery of priority dispatching rules: an autonomous learning approach. J. Scheduling 9(1), 7–34 (2006)
97.
go back to reference Geng, N., Jiang, Z.: A review on strategic capacity planning in the semiconductor manufacturing industry. Int. J. Prod. Res. 47(13), 3639–3655 (2009) Geng, N., Jiang, Z.: A review on strategic capacity planning in the semiconductor manufacturing industry. Int. J. Prod. Res. 47(13), 3639–3655 (2009)
98.
go back to reference Geng, N., Jiang, Z., Chen, F.: Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand. Eur. J. Oper. Res. 198, 899–908 (2009) Geng, N., Jiang, Z., Chen, F.: Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand. Eur. J. Oper. Res. 198, 899–908 (2009)
99.
go back to reference Glassey, P.G.: A comparison of release rules using BLOCS/M simulation. Master’s thesis, University of California, Berkeley (1990) Glassey, P.G.: A comparison of release rules using BLOCS/M simulation. Master’s thesis, University of California, Berkeley (1990)
100.
go back to reference Glassey, C.R., Resende, M.G.C.: Closed-loop job release control for VLSI circuit manufacturing. IEEE Trans. Semicond. Manuf. 1(1), 36–46 (1988) Glassey, C.R., Resende, M.G.C.: Closed-loop job release control for VLSI circuit manufacturing. IEEE Trans. Semicond. Manuf. 1(1), 36–46 (1988)
101.
go back to reference Glassey, C.R., Weng, W.W.: Dynamic batching heuristic for simultaneous processing. IEEE Trans. Semicond. Manuf. 4(2), 77–82 (1991) Glassey, C.R., Weng, W.W.: Dynamic batching heuristic for simultaneous processing. IEEE Trans. Semicond. Manuf. 4(2), 77–82 (1991)
102.
go back to reference Glover, F., Laguna, M.: Tabu Search. Kluwer Academic Publisher, Norwell, MA (1997) Glover, F., Laguna, M.: Tabu Search. Kluwer Academic Publisher, Norwell, MA (1997)
103.
go back to reference Goldberg, D.E.: Genetic Algorithms in Search, Optimization and Machine Learning. Addison-Wesley, Reading (1989) Goldberg, D.E.: Genetic Algorithms in Search, Optimization and Machine Learning. Addison-Wesley, Reading (1989)
104.
go back to reference Goldratt, E.M., Cox, J.I.: The Goal: A Process of Ongoing Improvement. North River Press, Croton-on-Hudson, New York (1986) Goldratt, E.M., Cox, J.I.: The Goal: A Process of Ongoing Improvement. North River Press, Croton-on-Hudson, New York (1986)
105.
go back to reference Goldratt, E.M., Fox, R.: The Race. North River Press, Croton-on-Hudson, New York (1986) Goldratt, E.M., Fox, R.: The Race. North River Press, Croton-on-Hudson, New York (1986)
106.
go back to reference Gören, S., Sabuncuoglu, I.: Robustness and stability measures for scheduling: single-machine environment. IIE Trans. 40(1), 66–83 (2008) Gören, S., Sabuncuoglu, I.: Robustness and stability measures for scheduling: single-machine environment. IIE Trans. 40(1), 66–83 (2008)
107.
go back to reference Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5, 287–326 (1979) Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5, 287–326 (1979)
108.
go back to reference Graves, S.C.: A tactical planning model for a job shop. Oper. Res. 34(4), 522–533 (1986) Graves, S.C.: A tactical planning model for a job shop. Oper. Res. 34(4), 522–533 (1986)
109.
go back to reference Gnther, H.-O.: Supply chain management and advanced planning systems: a tutorial. In: Gnther, H.-O., Mattfeld, D.C., Suhl, L. (eds.) Supply Chain Management und Logistik: Optimierung, Simulation, Decision Support, pp. 3–40. Physica, Heidelberg (2005) Gnther, H.-O.: Supply chain management and advanced planning systems: a tutorial. In: Gnther, H.-O., Mattfeld, D.C., Suhl, L. (eds.) Supply Chain Management und Logistik: Optimierung, Simulation, Decision Support, pp. 3–40. Physica, Heidelberg (2005)
110.
go back to reference Gupta, J.N.D., Ruiz, R., Fowler, J.W., Mason, S.J.: Operational planning and control of semiconductor wafer production. Prod. Plann. Contr. 17(7), 639–647 (2006) Gupta, J.N.D., Ruiz, R., Fowler, J.W., Mason, S.J.: Operational planning and control of semiconductor wafer production. Prod. Plann. Contr. 17(7), 639–647 (2006)
111.
go back to reference Gurnani, H., Anupindi, R., Akella, R.: Control of batch processing systems in semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 5(4), 319–328 (1992) Gurnani, H., Anupindi, R., Akella, R.: Control of batch processing systems in semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 5(4), 319–328 (1992)
112.
go back to reference Habenicht, I., Mönch, L.: A finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1406–1413 (2002) Habenicht, I., Mönch, L.: A finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1406–1413 (2002)
113.
go back to reference Habla, C., Mnch, L.: Solving volume and capacity planning problems in semiconductor manufacturing: a computational study. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2260–2266 (2008) Habla, C., Mnch, L.: Solving volume and capacity planning problems in semiconductor manufacturing: a computational study. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2260–2266 (2008)
114.
go back to reference Ham, M., Fowler, J.W.: Scheduling of wet etch and furnace operations with next arrival control heuristic. Int. J. Adv. Manuf. Technol. 38, 1006–1017 (2008) Ham, M., Fowler, J.W.: Scheduling of wet etch and furnace operations with next arrival control heuristic. Int. J. Adv. Manuf. Technol. 38, 1006–1017 (2008)
115.
go back to reference Hansen, P., Mladenović, N.: Variable neighborhood search: principles and applications. Eur. J. Oper. Res. 130(3), 449–467 (2001) Hansen, P., Mladenović, N.: Variable neighborhood search: principles and applications. Eur. J. Oper. Res. 130(3), 449–467 (2001)
116.
go back to reference Haupt, R.: A survey of priority rule-based scheduling. OR Spektrum 11(1), 3–16 (1989) Haupt, R.: A survey of priority rule-based scheduling. OR Spektrum 11(1), 3–16 (1989)
117.
go back to reference Hood, S.J., Bermon, S., Barahona, F.: Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 16(2), 273–280 (2003) Hood, S.J., Bermon, S., Barahona, F.: Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 16(2), 273–280 (2003)
118.
go back to reference Hooke, R., Jeeves, T.A.: Direct search solution of numerical statistical problems. J ACM 8(2), 212–229 (1961) Hooke, R., Jeeves, T.A.: Direct search solution of numerical statistical problems. J ACM 8(2), 212–229 (1961)
119.
go back to reference Hopp, W.J., Spearman, M.L.: Factory Physics, 2nd edn. Irwin, McGraw-Hill, Boston (2000) Hopp, W.J., Spearman, M.L.: Factory Physics, 2nd edn. Irwin, McGraw-Hill, Boston (2000)
120.
go back to reference Hung, Y.-F., Leachman, R.C.: A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans. Semicond. Manuf. 9(2), 257–269 (1996) Hung, Y.-F., Leachman, R.C.: A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans. Semicond. Manuf. 9(2), 257–269 (1996)
121.
go back to reference Hung, Y.-F., Leachman, R.C.: Reduced simulation models of wafer fabrication facilities. Int. J. Prod. Res. 37(12), 2685–2701 (1999) Hung, Y.-F., Leachman, R.C.: Reduced simulation models of wafer fabrication facilities. Int. J. Prod. Res. 37(12), 2685–2701 (1999)
122.
go back to reference Hutcheson, J.D.: Introduction to semiconductor equipment. In: Nishi, Y., Doering, R. (eds.) Handbook of Semiconductor Manufacturing Technology, pp. 23–33. Marcel Dekker, New York (2000) Hutcheson, J.D.: Introduction to semiconductor equipment. In: Nishi, Y., Doering, R. (eds.) Handbook of Semiconductor Manufacturing Technology, pp. 23–33. Marcel Dekker, New York (2000)
123.
go back to reference Irdem, D.F.: Evaluation of clearing functions’ fitting methodology and performance of production planning models. Master’s thesis, North Carolina State University, Raleigh, North Carolina (2009) Irdem, D.F.: Evaluation of clearing functions’ fitting methodology and performance of production planning models. Master’s thesis, North Carolina State University, Raleigh, North Carolina (2009)
124.
go back to reference Irdem, D.F., Kacar, N.B., Uzsoy, R.: An exploratory analysis of two iterative linear programming—simulation approaches for production planning. IEEE Trans. Semicond. Manuf. 23(3), 442–455 (2010) Irdem, D.F., Kacar, N.B., Uzsoy, R.: An exploratory analysis of two iterative linear programming—simulation approaches for production planning. IEEE Trans. Semicond. Manuf. 23(3), 442–455 (2010)
125.
go back to reference Jacobs, F.R.: OPT uncovered: many production and scheduling concepts can be applied with or without the software. J. Ind. Eng. 16(10), 32–41 (1984) Jacobs, F.R.: OPT uncovered: many production and scheduling concepts can be applied with or without the software. J. Ind. Eng. 16(10), 32–41 (1984)
126.
go back to reference Jampani, J., Mason, S.J.: Column generation heuristic for complex job shop multiple orders per job scheduling. Comput. Ind. Eng. 58(1), 108–118 (2010) Jampani, J., Mason, S.J.: Column generation heuristic for complex job shop multiple orders per job scheduling. Comput. Ind. Eng. 58(1), 108–118 (2010)
127.
go back to reference Jampani, J., Pohl, E.A., Mason, S.J., Mnch, L.: Integrated heuristics for scheduling multiple order jobs in a complex job shop. IJMHeur 1(2), 156–180 (2010) Jampani, J., Pohl, E.A., Mason, S.J., Mnch, L.: Integrated heuristics for scheduling multiple order jobs in a complex job shop. IJMHeur 1(2), 156–180 (2010)
128.
go back to reference Jeong, B.H., Randhawa, S.U.: A multi-attribute dispatching rule for automated guided vehicle systems. Int. J. Prod. Res. 39(13), 2817–2832 (2001) Jeong, B.H., Randhawa, S.U.: A multi-attribute dispatching rule for automated guided vehicle systems. Int. J. Prod. Res. 39(13), 2817–2832 (2001)
129.
go back to reference Jia, J., Mason, S.J.: Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines. Int. J. Prod. Res. 47(10), 2565–2585 (2009) Jia, J., Mason, S.J.: Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines. Int. J. Prod. Res. 47(10), 2565–2585 (2009)
130.
go back to reference Jimenez, J., Kim, B., Fowler, J.W., Mackulak, G., Choung, Y.I., Kim, D.-J.: Operational modeling and simulation of an inter-bay AMHS in semiconductor wafer fabrication. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1377–1382 (2002) Jimenez, J., Kim, B., Fowler, J.W., Mackulak, G., Choung, Y.I., Kim, D.-J.: Operational modeling and simulation of an inter-bay AMHS in semiconductor wafer fabrication. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1377–1382 (2002)
131.
go back to reference Jimenez, J., Mackulak, G.T., Fowler, J.W.: Levels of capacity and material handling system modeling for factory integration decision making in semiconductor wafer fabs. IEEE Trans. Semicond. Manuf. 21(4), 600–613 (2008) Jimenez, J., Mackulak, G.T., Fowler, J.W.: Levels of capacity and material handling system modeling for factory integration decision making in semiconductor wafer fabs. IEEE Trans. Semicond. Manuf. 21(4), 600–613 (2008)
132.
go back to reference Johnson, R.T., Yang, F., Ankenman, B.E., Nelson, B.L.: Nonlinear regression fits for simulated cycle time vs. throughput curves for semiconductor manufacturing. In: Proceedings of the 2004 Winter Simulation Conference, pp. 1951–1955 (2004) Johnson, R.T., Yang, F., Ankenman, B.E., Nelson, B.L.: Nonlinear regression fits for simulated cycle time vs. throughput curves for semiconductor manufacturing. In: Proceedings of the 2004 Winter Simulation Conference, pp. 1951–1955 (2004)
133.
go back to reference Johnzén, C.: Modeling and optimizing flexible capacity allocation in semiconductor manufacturing. PhD thesis, Ecole Nationale Supérieure des Mines de Saint-Etienne (2009) Johnzén, C.: Modeling and optimizing flexible capacity allocation in semiconductor manufacturing. PhD thesis, Ecole Nationale Supérieure des Mines de Saint-Etienne (2009)
134.
go back to reference Kacar, N.B., Uzsoy, R.: Estimating clearing functions from simulation data. In: Proceedings of the 2010 Winter Simulation Conference, pp. 1699–1710 (2010) Kacar, N.B., Uzsoy, R.: Estimating clearing functions from simulation data. In: Proceedings of the 2010 Winter Simulation Conference, pp. 1699–1710 (2010)
135.
go back to reference Kallrath, J., Maindl, T.I.: Real Optimization with SAP APO. Springer, Berlin (2006) Kallrath, J., Maindl, T.I.: Real Optimization with SAP APO. Springer, Berlin (2006)
136.
go back to reference Karmarkar, U.S.: Capacitiy loading and release planning with work-in-progress (WIP) and lead-times. J. Manuf. Oper. Manag. 2, 105–123 (1989) Karmarkar, U.S.: Capacitiy loading and release planning with work-in-progress (WIP) and lead-times. J. Manuf. Oper. Manag. 2, 105–123 (1989)
137.
go back to reference Kempf, K., Uzsoy, R., Wang, C.-S.: Scheduling a single batch processing machine with secondary ressource constraints. J. Manuf. Syst. 17(1), 37–51 (1998) Kempf, K., Uzsoy, R., Wang, C.-S.: Scheduling a single batch processing machine with secondary ressource constraints. J. Manuf. Syst. 17(1), 37–51 (1998)
138.
go back to reference Kendall, D.G.: Stochastic processes occuring in the theory of queues and their analysis by the method of the imbedded Markov chain. Ann. Math. Stochast. 24(3), 338–354 (1953) Kendall, D.G.: Stochastic processes occuring in the theory of queues and their analysis by the method of the imbedded Markov chain. Ann. Math. Stochast. 24(3), 338–354 (1953)
139.
go back to reference Kim, B., Kim, S.: Extended model for a hybrid production planning approach. Int. J. Prod. Econ. 73(2), 165–173 (2001) Kim, B., Kim, S.: Extended model for a hybrid production planning approach. Int. J. Prod. Econ. 73(2), 165–173 (2001)
140.
go back to reference Kim, S.Y., Lee, Y.H., Agnihotri, D.: A hybrid approach to sequencing jobs using heuristic rules and neural networks. Prod. Plann. Contr. 6(5), 445–454 (1995) Kim, S.Y., Lee, Y.H., Agnihotri, D.: A hybrid approach to sequencing jobs using heuristic rules and neural networks. Prod. Plann. Contr. 6(5), 445–454 (1995)
141.
go back to reference Kimms, A.: Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling and lot sizing. Omega—Int. J. Manag. Sci. 26(3), 355–366 (1998) Kimms, A.: Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling and lot sizing. Omega—Int. J. Manag. Sci. 26(3), 355–366 (1998)
142.
go back to reference Kirkpatrick, S., Gelatt, C.D., Vecchi, M.P.: Optimization by simulated annealing. Science 220(4598), 671–680 (1983) Kirkpatrick, S., Gelatt, C.D., Vecchi, M.P.: Optimization by simulated annealing. Science 220(4598), 671–680 (1983)
143.
go back to reference Kleijnen, J.P.C., van Beers, W.C.M.: Application-driven sequential designs for simulation experiments: Kriging metamodeling. J. Oper. Res. Soc. 55(9), 876–883 (2004) Kleijnen, J.P.C., van Beers, W.C.M.: Application-driven sequential designs for simulation experiments: Kriging metamodeling. J. Oper. Res. Soc. 55(9), 876–883 (2004)
144.
go back to reference Kleinberg, J., Tardos, E.: Algorithm Design. Pearson/Addison-Wesley, Boston (2006) Kleinberg, J., Tardos, E.: Algorithm Design. Pearson/Addison-Wesley, Boston (2006)
145.
go back to reference Klemmt, A., Horn, S., Weigert, G., Hielscher, T.: Simulation-based and solver-based optimization approaches for batch processes in semiconductor manufacturing. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2041–2049 (2008) Klemmt, A., Horn, S., Weigert, G., Hielscher, T.: Simulation-based and solver-based optimization approaches for batch processes in semiconductor manufacturing. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2041–2049 (2008)
146.
go back to reference Klemmt, A., Weigert, G., Almeder, C., Mnch, L.: A comparison of MIP-based decomposition techniques and VNS approaches for batch scheduling problems. In: Proceedings of the 2009 Winter Simulation Conference, pp. 1686–1694 (2009) Klemmt, A., Weigert, G., Almeder, C., Mnch, L.: A comparison of MIP-based decomposition techniques and VNS approaches for batch scheduling problems. In: Proceedings of the 2009 Winter Simulation Conference, pp. 1686–1694 (2009)
147.
go back to reference Klemmt, A., Lange, J., Weigert, G., Lehmann, F., Seyfert, J.: A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2474–2485 (2010) Klemmt, A., Lange, J., Weigert, G., Lehmann, F., Seyfert, J.: A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2474–2485 (2010)
148.
go back to reference Knust, S.: Shop-scheduling problems with transportation. PhD thesis, University of Osnabrck (1999) Knust, S.: Shop-scheduling problems with transportation. PhD thesis, University of Osnabrck (1999)
149.
go back to reference Laub, J.D., Fowler, J.W., Keha, A.B.: Minimizing makespan with multiple-orders-per-job in a two-machine flowshop. Eur. J. Oper. Res. 182(1), 63–79 (2007) Laub, J.D., Fowler, J.W., Keha, A.B.: Minimizing makespan with multiple-orders-per-job in a two-machine flowshop. Eur. J. Oper. Res. 182(1), 63–79 (2007)
150.
go back to reference Law, A.W.: Simulation Modeling and Analysis, 4th edn. McGraw-Hill, Boston (2007) Law, A.W.: Simulation Modeling and Analysis, 4th edn. McGraw-Hill, Boston (2007)
151.
go back to reference Lawler, E.L.: A “pseudopolynomial” time algorithm for sequencing jobs to minimize total weighted tardiness. Ann. Discrete Math. 1, 331–342 (1977) Lawler, E.L.: A “pseudopolynomial” time algorithm for sequencing jobs to minimize total weighted tardiness. Ann. Discrete Math. 1, 331–342 (1977)
152.
go back to reference Le Pape, C.: Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems. Intell. Syst. Eng. 3(2), 55–66 (1994) Le Pape, C.: Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems. Intell. Syst. Eng. 3(2), 55–66 (1994)
153.
go back to reference Leach, S.E., Fowler, J.W., Mackulak, G.T., Nelson, B.L., Marquis, J.L.: Asymptotic variance-based sampling for simulating cycle time—throughput curves. ASU Working Paper Series ASUIE-ORPS-2005-003, Arizona State University, Tempe (2005) Leach, S.E., Fowler, J.W., Mackulak, G.T., Nelson, B.L., Marquis, J.L.: Asymptotic variance-based sampling for simulating cycle time—throughput curves. ASU Working Paper Series ASUIE-ORPS-2005-003, Arizona State University, Tempe (2005)
154.
go back to reference Leachman, R.C.: Production planning and scheduling practises across the semiconductor industry. SEMATECH Technology Transfer 94092559A-XFR (1995) Leachman, R.C.: Production planning and scheduling practises across the semiconductor industry. SEMATECH Technology Transfer 94092559A-XFR (1995)
155.
go back to reference Leachman, R.C., Hodges, D.A.: Benchmarking semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 9(2), 158–169 (1996) Leachman, R.C., Hodges, D.A.: Benchmarking semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 9(2), 158–169 (1996)
156.
go back to reference Leachman, R.C., Solorzano, M., Glassey, C.R.: A queue management policy for the release of factory work orders. In: Proceedings of the ORSA/TIMS Conference (1989) Leachman, R.C., Solorzano, M., Glassey, C.R.: A queue management policy for the release of factory work orders. In: Proceedings of the ORSA/TIMS Conference (1989)
157.
go back to reference Lee, T.-E.: A review of scheduling theory and methods for semiconductor manufacturing cluster tools. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2127–2135 (2008) Lee, T.-E.: A review of scheduling theory and methods for semiconductor manufacturing cluster tools. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2127–2135 (2008)
158.
go back to reference Lee, T.-E.: Semiconductor manufacturing automation. In: Nof, S. (ed.) Handbook on Automation, pp. 911–926. Springer, Berlin (2009) Lee, T.-E.: Semiconductor manufacturing automation. In: Nof, S. (ed.) Handbook on Automation, pp. 911–926. Springer, Berlin (2009)
159.
go back to reference Lee, Y.-H., Pinedo, M.: Scheduling jobs on parallel machines with sequence-dependent setup times. Eur. J. Oper. Res. 100(3), 464–474 (1997) Lee, Y.-H., Pinedo, M.: Scheduling jobs on parallel machines with sequence-dependent setup times. Eur. J. Oper. Res. 100(3), 464–474 (1997)
160.
go back to reference Levine, D.: Application of a hybrid genetic algorithm to airline crew scheduling. Comput. Oper. Res. 23(6), 547–558 (1996) Levine, D.: Application of a hybrid genetic algorithm to airline crew scheduling. Comput. Oper. Res. 23(6), 547–558 (1996)
161.
go back to reference Liao, D.-Y., Fu, H.-S.: Speedy delivery—dynamic OHT allocation and dispatching in large-scale, 300-mm AMHS management. IEEE Robot. Autom. Mag. 11(3), 22–32 (2004) Liao, D.-Y., Fu, H.-S.: Speedy delivery—dynamic OHT allocation and dispatching in large-scale, 300-mm AMHS management. IEEE Robot. Autom. Mag. 11(3), 22–32 (2004)
162.
go back to reference Liao, D.-Y., Wang, C.-N.: Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry. Int. J. Adv. Manuf. Tech. 29(9-10), 890–896 (2005) Liao, D.-Y., Wang, C.-N.: Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry. Int. J. Adv. Manuf. Tech. 29(9-10), 890–896 (2005)
163.
go back to reference Lin, J.T., Wang, F.-K., Yen, P.-Y.: Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab. Int. J. Prod. Res. 39(6), 1221–1238 (2001) Lin, J.T., Wang, F.-K., Yen, P.-Y.: Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab. Int. J. Prod. Res. 39(6), 1221–1238 (2001)
164.
go back to reference Lin, C.-H., Hwang, S.-L., Wang, M.-Y.E.: The mythical advanced planning systems in complex manufacturing environment. In: Proceedings of the 12th IFAC Conference on Information Control Problems in Manufacturing, pp. 691–696 (2006) Lin, C.-H., Hwang, S.-L., Wang, M.-Y.E.: The mythical advanced planning systems in complex manufacturing environment. In: Proceedings of the 12th IFAC Conference on Information Control Problems in Manufacturing, pp. 691–696 (2006)
165.
go back to reference Little, J.D.C.: A proof for the queuing formula L = λW. Oper. Res. 9(3), 383–387 (1961) Little, J.D.C.: A proof for the queuing formula L = λW. Oper. Res. 9(3), 383–387 (1961)
166.
go back to reference Lou, S.X., Kager, P.W.: A robust production control policy for VLSI wafer fabrication. IEEE Trans. Semicond. Manuf. 2(4), 159–164 (1989) Lou, S.X., Kager, P.W.: A robust production control policy for VLSI wafer fabrication. IEEE Trans. Semicond. Manuf. 2(4), 159–164 (1989)
167.
go back to reference Lou, S., Yan, H., Sethi, S., Gardel, A., Deosthali, P.: Hub-centred production control of wafer fabrication. In: Proceedings of the 1990 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 27–32 (1990) Lou, S., Yan, H., Sethi, S., Gardel, A., Deosthali, P.: Hub-centred production control of wafer fabrication. In: Proceedings of the 1990 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 27–32 (1990)
168.
go back to reference Lozinski, C., Glassey, C.R.: Bottleneck starvation indicators for shop floor control. IEEE Trans. Semicond. Manuf. 1(4), 147–153 (1988) Lozinski, C., Glassey, C.R.: Bottleneck starvation indicators for shop floor control. IEEE Trans. Semicond. Manuf. 1(4), 147–153 (1988)
169.
go back to reference Lu, S.C.H., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans. Semicond. Manuf. 7(3), 374–388 (1994) Lu, S.C.H., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans. Semicond. Manuf. 7(3), 374–388 (1994)
170.
go back to reference Martin-Vega, L.A., Pippin, M., Gerdon, E., Burcham, R.: Applying just-in-time in a wafer fab: a case study. IEEE Trans. Semicond. Manuf. 2(1), 16–21 (1989) Martin-Vega, L.A., Pippin, M., Gerdon, E., Burcham, R.: Applying just-in-time in a wafer fab: a case study. IEEE Trans. Semicond. Manuf. 2(1), 16–21 (1989)
171.
go back to reference Mason, S.J., Chen, J.-S.: Scheduling multiple orders per job in a single machine to minimize total completion time. Eur. J. Oper. Res. 207(1), 70–77 (2010) Mason, S.J., Chen, J.-S.: Scheduling multiple orders per job in a single machine to minimize total completion time. Eur. J. Oper. Res. 207(1), 70–77 (2010)
172.
go back to reference Mason, S.J., Fowler, J.W., Carlyle, M.W.: A modified shifting bottleneck heuristic for minimizing the total weighted tardiness in a semiconductor wafer fab. J. Scheduling 5(3), 247–262 (2002) Mason, S.J., Fowler, J.W., Carlyle, M.W.: A modified shifting bottleneck heuristic for minimizing the total weighted tardiness in a semiconductor wafer fab. J. Scheduling 5(3), 247–262 (2002)
173.
go back to reference Mason, S.J., Jin, S., Wessels, M.C.: Rescheduling strategies for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res. 42(3), 613–628 (2004) Mason, S.J., Jin, S., Wessels, M.C.: Rescheduling strategies for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res. 42(3), 613–628 (2004)
174.
go back to reference Mason, S.J., Qu, P., Kutanoglu, E., Fowler, J.W.: The single machine multiple orders per job scheduling problem. Technical Report ASUIE-ORPS-2004-004, Arizona State University, Tempe, AZ (2004) Mason, S.J., Qu, P., Kutanoglu, E., Fowler, J.W.: The single machine multiple orders per job scheduling problem. Technical Report ASUIE-ORPS-2004-004, Arizona State University, Tempe, AZ (2004)
175.
go back to reference Mason, S.J., Fowler, J.W., Carlyle, M.W., Montgomery, D.C.: Heuristics for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res. 43(10), 1943–1963 (2005) Mason, S.J., Fowler, J.W., Carlyle, M.W., Montgomery, D.C.: Heuristics for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res. 43(10), 1943–1963 (2005)
176.
go back to reference Mathirajan, M., Sivakumar, A.I.: A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. Int. J. Adv. Manuf. Tech. 29(9-10), 990–1001 (2006) Mathirajan, M., Sivakumar, A.I.: A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. Int. J. Adv. Manuf. Tech. 29(9-10), 990–1001 (2006)
177.
go back to reference McAllister, C.D., Altunas, B., Frank, M., Potoradi, J.: Implementation of response surface methodology using variance reduction techniques in semiconductor manufacturing. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1225–1230 (2001) McAllister, C.D., Altunas, B., Frank, M., Potoradi, J.: Implementation of response surface methodology using variance reduction techniques in semiconductor manufacturing. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1225–1230 (2001)
178.
go back to reference McClellan, M.: Applying Manufacturing Execution Systems. St. Lucie Press, Boca Raton (1997) McClellan, M.: Applying Manufacturing Execution Systems. St. Lucie Press, Boca Raton (1997)
179.
go back to reference McFarlane, D.C., Bussmann, S.: Holonic manufacturing control: rationales, developments and open issues. In: Deen, M.S. (ed.) Agent-Based Manufacturing—Advances in the Holonic Approach, pp. 303–326. Springer, Berlin (2003) McFarlane, D.C., Bussmann, S.: Holonic manufacturing control: rationales, developments and open issues. In: Deen, M.S. (ed.) Agent-Based Manufacturing—Advances in the Holonic Approach, pp. 303–326. Springer, Berlin (2003)
180.
go back to reference Mehta, S.V., Uzsoy, R.: Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Trans. 30(2), 165–178 (1998) Mehta, S.V., Uzsoy, R.: Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Trans. 30(2), 165–178 (1998)
181.
go back to reference Mesarović, M.D., Takahara, Y.: Abstract Systems Theory. Lecture Notes in Control and Information Sciences. Springer, Berlin (1989) Mesarović, M.D., Takahara, Y.: Abstract Systems Theory. Lecture Notes in Control and Information Sciences. Springer, Berlin (1989)
182.
go back to reference Meyer, H., Fuchs, F., Thiel, K.: Manufacturing Execution Systems: Optimal Design, Planning, and Deployment. McGraw-Hill, New York (2009) Meyer, H., Fuchs, F., Thiel, K.: Manufacturing Execution Systems: Optimal Design, Planning, and Deployment. McGraw-Hill, New York (2009)
183.
go back to reference Michalewicz, Z.: Genetic Algorithms + Data Structures = Evolution Programs. 3rd edn. Springer, Berlin (1996) Michalewicz, Z.: Genetic Algorithms + Data Structures = Evolution Programs. 3rd edn. Springer, Berlin (1996)
184.
go back to reference Miller, D.J.: Simulation of a semiconductor manufacturing line. Comm. ACM 30(10), 98–108 (1990) Miller, D.J.: Simulation of a semiconductor manufacturing line. Comm. ACM 30(10), 98–108 (1990)
185.
go back to reference Missbauer, H.: Aggregate order release planning for time-varying demand. Int. J. Prod. Res. 40(3), 699–718 (2002) Missbauer, H.: Aggregate order release planning for time-varying demand. Int. J. Prod. Res. 40(3), 699–718 (2002)
186.
go back to reference Mittler, M., Schmig, A.: Comparison of dispatching rules for reducing the mean and variability of cycle times in semiconductor manufacturing. In: Proceedings of the International Symposium on Operations Research, pp. 479–485 (1999) Mittler, M., Schmig, A.: Comparison of dispatching rules for reducing the mean and variability of cycle times in semiconductor manufacturing. In: Proceedings of the International Symposium on Operations Research, pp. 479–485 (1999)
187.
go back to reference Mittler, M., Schmig, A.: Comparison of dispatching rules for semiconductor manufacturing using large facility models. In: Proceedings of the 1999 Winter Simulation Conference, pp. 709–713 (1999) Mittler, M., Schmig, A.: Comparison of dispatching rules for semiconductor manufacturing using large facility models. In: Proceedings of the 1999 Winter Simulation Conference, pp. 709–713 (1999)
188.
go back to reference Mladenović, N., Hansen, P.: Variable neighborhood search. Comput. Oper. Res. 24(11), 1097–1100 (1997) Mladenović, N., Hansen, P.: Variable neighborhood search. Comput. Oper. Res. 24(11), 1097–1100 (1997)
189.
go back to reference Mnch, L.: A genetic algorithm heuristic applied to stepper scheduling. In: Proceedings of the International Conference on Modelling and Analysis of Semiconductor Manufacturing (MASM 2002), pp. 276–281 (2002) Mnch, L.: A genetic algorithm heuristic applied to stepper scheduling. In: Proceedings of the International Conference on Modelling and Analysis of Semiconductor Manufacturing (MASM 2002), pp. 276–281 (2002)
190.
go back to reference Mnch, L.: Scheduling-Framework fr Jobs auf parallelen Maschinen in komplexen Produktionssystemen. WIRTSCHAFTSINFORMATIK 46(6), 470–480 (2004) Mnch, L.: Scheduling-Framework fr Jobs auf parallelen Maschinen in komplexen Produktionssystemen. WIRTSCHAFTSINFORMATIK 46(6), 470–480 (2004)
191.
go back to reference Mnch, L.: Simulation-based assessment of order release strategies for a distributed shifting bottleneck heuristic. In: Proceedings of the 2005 Winter Simulation Conference, pp. 2186–2193 (2005) Mnch, L.: Simulation-based assessment of order release strategies for a distributed shifting bottleneck heuristic. In: Proceedings of the 2005 Winter Simulation Conference, pp. 2186–2193 (2005)
192.
go back to reference Mnch, L.: Simulation-based benchmarking of production control schemes for complex manufacturing systems. Contr. Eng. Pract. 15(11), 1381–1393 (2007) Mnch, L.: Simulation-based benchmarking of production control schemes for complex manufacturing systems. Contr. Eng. Pract. 15(11), 1381–1393 (2007)
193.
go back to reference Mnch, L., Driessel, R.: A distributed shifting bottleneck heuristic for complex job shops. Comput. Ind. Eng. 49(3), 363–380 (2005) Mnch, L., Driessel, R.: A distributed shifting bottleneck heuristic for complex job shops. Comput. Ind. Eng. 49(3), 363–380 (2005)
194.
go back to reference Mnch, L., Habenicht, I.: Simulation-based assessment of batching heuristics in semiconductor manufacturing. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1338–1345 (2003) Mnch, L., Habenicht, I.: Simulation-based assessment of batching heuristics in semiconductor manufacturing. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1338–1345 (2003)
195.
go back to reference Mnch, L., Stehli, M.: An ontology for production control of semiconductor manufacturing processes. In: Proceedings First German Conference on Multiagent System Technologies (MATES 2003), LNAI 2831, pp. 156–167 (2003) Mnch, L., Stehli, M.: An ontology for production control of semiconductor manufacturing processes. In: Proceedings First German Conference on Multiagent System Technologies (MATES 2003), LNAI 2831, pp. 156–167 (2003)
196.
go back to reference Mnch, L., Stehli, M.: A content language for a hierarchically organized multi-agent-system for production control. In: Proceedings Multi-Konferenz Wirtschaftsinformatik, Teilkonferenz “Coordination and Agent Technology in Value Networks”, pp. 197–212 (2004) Mnch, L., Stehli, M.: A content language for a hierarchically organized multi-agent-system for production control. In: Proceedings Multi-Konferenz Wirtschaftsinformatik, Teilkonferenz “Coordination and Agent Technology in Value Networks”, pp. 197–212 (2004)
197.
go back to reference Mnch, L., Zimmermann, J.: Improving the performance of dispatching rules in semiconductor manufacturing by iterative simulation. In: Proceedings of the 2004 Winter Simulation Conference, pp. 1881–1887 (2004) Mnch, L., Zimmermann, J.: Improving the performance of dispatching rules in semiconductor manufacturing by iterative simulation. In: Proceedings of the 2004 Winter Simulation Conference, pp. 1881–1887 (2004)
198.
go back to reference Mnch, L., Zimmermann, J.: Simulation-based assessment of machine criticality measures for a shifting bottleneck heuristic in complex manufacturing systems. Comput. Ind. 58(7), 644–655 (2007) Mnch, L., Zimmermann, J.: Simulation-based assessment of machine criticality measures for a shifting bottleneck heuristic in complex manufacturing systems. Comput. Ind. 58(7), 644–655 (2007)
199.
go back to reference Mnch, L., Zimmermann, J.: Providing production planning and control functionality by web services: state of the art and experiences with prototypes. In: Proceedings of the 5th Annual IEEE Conference on Automation Science and Engineering, pp. 495–500 (2009) Mnch, L., Zimmermann, J.: Providing production planning and control functionality by web services: state of the art and experiences with prototypes. In: Proceedings of the 5th Annual IEEE Conference on Automation Science and Engineering, pp. 495–500 (2009)
200.
go back to reference Mnch, L., Zimmermann, J.: A computational study of a shifting bottleneck heuristic for multi-product complex job shops. Prod. Plann. Contr. 22(1), 25–40 (2011) Mnch, L., Zimmermann, J.: A computational study of a shifting bottleneck heuristic for multi-product complex job shops. Prod. Plann. Contr. 22(1), 25–40 (2011)
201.
go back to reference Mnch, L., Prause, M., Schmalfuß, V.: Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1170–1177 (2001) Mnch, L., Prause, M., Schmalfuß, V.: Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1170–1177 (2001)
202.
go back to reference Mnch, L., Rose, O., Sturm, R.: A simulation framework for the performance assessment of shop-floor control systems. SIMULATION—Transactions of the Society of Modeling and Simulation International 79(3), 163–170 (2003) Mnch, L., Rose, O., Sturm, R.: A simulation framework for the performance assessment of shop-floor control systems. SIMULATION—Transactions of the Society of Modeling and Simulation International 79(3), 163–170 (2003)
203.
go back to reference Mnch, L., Balasubramanian, H., Fowler, J.W., Pfund, M.E.: Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Comput. Oper. Res. 32(11), 2731–2750 (2005) Mnch, L., Balasubramanian, H., Fowler, J.W., Pfund, M.E.: Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Comput. Oper. Res. 32(11), 2731–2750 (2005)
204.
go back to reference Mnch, L., Stehli, M., Zimmermann, J., Habenicht, I.: The FABMAS multi-agent-system prototype for production control of wafer fabs: design, implementation and performance assessment. Prod. Plann. Contr. 17(7), 701–716 (2006) Mnch, L., Stehli, M., Zimmermann, J., Habenicht, I.: The FABMAS multi-agent-system prototype for production control of wafer fabs: design, implementation and performance assessment. Prod. Plann. Contr. 17(7), 701–716 (2006)
205.
go back to reference Mnch, L., Zimmermann, J., Otto, P.: Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. J. Eng. Appl. Artif. Intell. 19(3), 235–245 (2006) Mnch, L., Zimmermann, J., Otto, P.: Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. J. Eng. Appl. Artif. Intell. 19(3), 235–245 (2006)
206.
go back to reference Mnch, L., Schabacker, R., Pabst, D., Fowler, J.W.: Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. Eur. J. Oper. Res. 177(3), 2100–2118 (2007) Mnch, L., Schabacker, R., Pabst, D., Fowler, J.W.: Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. Eur. J. Oper. Res. 177(3), 2100–2118 (2007)
207.
go back to reference Mnch, L., Fowler, J.W., Mason, S.J., Dauzère-Pérès, S., Rose, O.: A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Scheduling 14(6), 583–599 (2011) Mnch, L., Fowler, J.W., Mason, S.J., Dauzère-Pérès, S., Rose, O.: A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Scheduling 14(6), 583–599 (2011)
208.
go back to reference Montgomery, D.C.: Design and Analysis of Experiments, 5th edn. Wiley, New York (2001) Montgomery, D.C.: Design and Analysis of Experiments, 5th edn. Wiley, New York (2001)
209.
go back to reference Montoya-Torres, J.R.: A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs. Prod. Plann. Contr. 17(7), 648–663 (2006) Montoya-Torres, J.R.: A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs. Prod. Plann. Contr. 17(7), 648–663 (2006)
210.
go back to reference Mosley, S.A., Teyner, T., Uzsoy, R.: Maintenance scheduling and staffing policies in a wafer fabrication facility operating under theory of constraints. IEEE Trans. Semicond. Manuf. 11(2), 316–323 (1998) Mosley, S.A., Teyner, T., Uzsoy, R.: Maintenance scheduling and staffing policies in a wafer fabrication facility operating under theory of constraints. IEEE Trans. Semicond. Manuf. 11(2), 316–323 (1998)
211.
go back to reference Moyne, J., del Castillo, E.D., Hurwitz, A.: Run-to-Run Control in Semiconductor Manufacturing. CRC Press, Chichester (2001) Moyne, J., del Castillo, E.D., Hurwitz, A.: Run-to-Run Control in Semiconductor Manufacturing. CRC Press, Chichester (2001)
212.
go back to reference Myers, R.H., Montgomery, D.C., Anderson-Cook, C.M.: Response Surface Methodology: Process and Product Optimization Using Designed Experiments, 3rd edn. Wiley, New Jersey (2009) Myers, R.H., Montgomery, D.C., Anderson-Cook, C.M.: Response Surface Methodology: Process and Product Optimization Using Designed Experiments, 3rd edn. Wiley, New Jersey (2009)
213.
go back to reference Najmi, A., Lozinski, C.: Managing factory productivity using object-oriented simulation for setting shift production targets in VLSI manufacturing. In: Proceedings AUTOFACT ’89, pp. (3–1)–(3–14) (1989) Najmi, A., Lozinski, C.: Managing factory productivity using object-oriented simulation for setting shift production targets in VLSI manufacturing. In: Proceedings AUTOFACT ’89, pp. (3–1)–(3–14) (1989)
214.
go back to reference Nemhauser, G., Wolsey, L.A.: Integer and Combinatorial Optimization, 3rd edn. Wiley, New York (1999) Nemhauser, G., Wolsey, L.A.: Integer and Combinatorial Optimization, 3rd edn. Wiley, New York (1999)
215.
go back to reference Nowicki, E., Smutnicki, C.: An advanced tabu search algorithm for the job shop problem. J. Scheduling 8(2), 145–159 (2005) Nowicki, E., Smutnicki, C.: An advanced tabu search algorithm for the job shop problem. J. Scheduling 8(2), 145–159 (2005)
216.
go back to reference Occhino, T.J.: Capacity planning model: the important inputs, formulas, and benefits. In: Proceedings of the 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 455–458 (2000) Occhino, T.J.: Capacity planning model: the important inputs, formulas, and benefits. In: Proceedings of the 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 455–458 (2000)
217.
go back to reference Odell, J.J., Parunak, H.V.D., Fleischer, M.: Modeling agent organizations using roles. Software Syst. Model. 2(2), 76–81 (2003) Odell, J.J., Parunak, H.V.D., Fleischer, M.: Modeling agent organizations using roles. Software Syst. Model. 2(2), 76–81 (2003)
218.
go back to reference Oechsner, S., Rose, O.: A filtered beam search approach to scheduling cluster tools in semiconductor manufacturing. In: Proceedings of the Industrial Engineering Research Conference (2005) Oechsner, S., Rose, O.: A filtered beam search approach to scheduling cluster tools in semiconductor manufacturing. In: Proceedings of the Industrial Engineering Research Conference (2005)
219.
go back to reference Oechsner, S., Rose, O.: Scheduling cluster tools using filtered beam search and recipe comparison. In: Proceedings of the 2005 Winter Simulation Conference, pp. 2203–2210 (2005) Oechsner, S., Rose, O.: Scheduling cluster tools using filtered beam search and recipe comparison. In: Proceedings of the 2005 Winter Simulation Conference, pp. 2203–2210 (2005)
221.
go back to reference Osisek, V., Aytug, H.: Discovering subproblem prioritization rules for shifting bottleneck algorithms. J. Intell. Manuf. 15(1), 55–67 (2003) Osisek, V., Aytug, H.: Discovering subproblem prioritization rules for shifting bottleneck algorithms. J. Intell. Manuf. 15(1), 55–67 (2003)
222.
go back to reference Ovacik, I.M., Uzsoy, R.: Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent setup times. Int. J. Prod. Res. 33(11), 3173–3192 (1995) Ovacik, I.M., Uzsoy, R.: Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent setup times. Int. J. Prod. Res. 33(11), 3173–3192 (1995)
223.
go back to reference Ovacik, I.M., Uzsoy, R.: Decomposition Methods for Complex Factory Scheduling Problems. Kluwer, Norwell (1997) Ovacik, I.M., Uzsoy, R.: Decomposition Methods for Complex Factory Scheduling Problems. Kluwer, Norwell (1997)
224.
go back to reference Ozturk, O., Coburn, M.B., Kitterman, S.: Conceptualization, design and implementation of a static capacity model. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1373–1376 (2003) Ozturk, O., Coburn, M.B., Kitterman, S.: Conceptualization, design and implementation of a static capacity model. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1373–1376 (2003)
225.
go back to reference Pabst, D.: Handling precedence constraints for the shifting bottleneck heuristic applied in a dynamic semiconductor manufacturing environment. Master’s thesis, Institut fr Informatik, Universitt Wrzburg, Wrzburg (2003) Pabst, D.: Handling precedence constraints for the shifting bottleneck heuristic applied in a dynamic semiconductor manufacturing environment. Master’s thesis, Institut fr Informatik, Universitt Wrzburg, Wrzburg (2003)
226.
go back to reference Pahl, J., Voß, S., Woodruff, D.L.: Production planning with load dependent lead times: an update of research. Ann. Oper. Res. 153(1), 297–345 (2007) Pahl, J., Voß, S., Woodruff, D.L.: Production planning with load dependent lead times: an update of research. Ann. Oper. Res. 153(1), 297–345 (2007)
227.
go back to reference Pain, A.R., Reeves, C.R.: Genetic algorithm optimization software class libraries. In: Voß, S., Woodruff, D.L. (eds.) Optimization Software Class Libraries, pp. 295–329. Springer, New York (2002) Pain, A.R., Reeves, C.R.: Genetic algorithm optimization software class libraries. In: Voß, S., Woodruff, D.L. (eds.) Optimization Software Class Libraries, pp. 295–329. Springer, New York (2002)
228.
go back to reference Park, S., Fowler, J.W., Carlyle, M.W., Hickie, M.: Assessment of potential gains in productivity due to proactive reticle management using discrete event simulation. In: Proceedings of the 1999 Winter Simulation Conference, pp. 856–864 (1999) Park, S., Fowler, J.W., Carlyle, M.W., Hickie, M.: Assessment of potential gains in productivity due to proactive reticle management using discrete event simulation. In: Proceedings of the 1999 Winter Simulation Conference, pp. 856–864 (1999)
229.
go back to reference Park, Y., Kim, S., Lee, Y.-H.: Scheduling jobs on parallel machines applying neural networks and heuristic rules. Comput. Ind. Eng. 38(1), 189–202 (2000) Park, Y., Kim, S., Lee, Y.-H.: Scheduling jobs on parallel machines applying neural networks and heuristic rules. Comput. Ind. Eng. 38(1), 189–202 (2000)
230.
go back to reference Park, S., Fowler, J.W., Mackulak, G.T., Keats, J.B., Carlyle, W.M.: D-optimal sequential experiments for generating a simulation-based cycle time-throughput curve. Oper. Res. 50(6), 981–990 (2002) Park, S., Fowler, J.W., Mackulak, G.T., Keats, J.B., Carlyle, W.M.: D-optimal sequential experiments for generating a simulation-based cycle time-throughput curve. Oper. Res. 50(6), 981–990 (2002)
231.
go back to reference Peikert, A., Thoma, J., Brown, S.: A rapid modeling technique for measurable improvements in factory performance. In: Proceedings of the 1998 Winter Simulation Conference, pp. 1011–1016 (1998) Peikert, A., Thoma, J., Brown, S.: A rapid modeling technique for measurable improvements in factory performance. In: Proceedings of the 1998 Winter Simulation Conference, pp. 1011–1016 (1998)
232.
go back to reference Perez, I.C., Fowler, J.W., Carlyle, W.M.: Minimizing total weighted tardiness on a single batch processing machine with incompatible job families. Comput. Oper. Res. 32(2), 327–341 (2005) Perez, I.C., Fowler, J.W., Carlyle, W.M.: Minimizing total weighted tardiness on a single batch processing machine with incompatible job families. Comput. Oper. Res. 32(2), 327–341 (2005)
233.
go back to reference Pfeiffer, A., Kadar, B., Monostori, L.: Stability-oriented evaluation of rescheduling strategies by using simulation. Comput. Ind. 58(7), 630–643 (2007) Pfeiffer, A., Kadar, B., Monostori, L.: Stability-oriented evaluation of rescheduling strategies by using simulation. Comput. Ind. 58(7), 630–643 (2007)
234.
go back to reference Pfund, M.E., Mason, S.J., Fowler, J.W.: Semiconductor manufacturing scheduling and dispatching. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 213–241. Springer, New York (2006) Pfund, M.E., Mason, S.J., Fowler, J.W.: Semiconductor manufacturing scheduling and dispatching. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 213–241. Springer, New York (2006)
235.
go back to reference Pfund, M.E., Balasubramanian, H., Fowler, J.W., Mason, S.J., Rose, O.: A multi-criteria approach for scheduling semiconductor wafer fabrication facilities. J. Scheduling 11(1), 29–47 (2008) Pfund, M.E., Balasubramanian, H., Fowler, J.W., Mason, S.J., Rose, O.: A multi-criteria approach for scheduling semiconductor wafer fabrication facilities. J. Scheduling 11(1), 29–47 (2008)
236.
go back to reference Pfund, M.E., Fowler, J.W., Gadkari, A., Chen, Y.: Scheduling jobs on parallel machines with setup times and ready times. Comput. Ind. Eng. 54(4), 764–782 (2008) Pfund, M.E., Fowler, J.W., Gadkari, A., Chen, Y.: Scheduling jobs on parallel machines with setup times and ready times. Comput. Ind. Eng. 54(4), 764–782 (2008)
237.
go back to reference Pickardt, C., Branke, J., Hildebrandt, T., Heger, J., Scholz-Reiter, B.: Generating dispatching rules in semiconductor manufacturing to minimize weighted tardiness. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2504–2515 (2010) Pickardt, C., Branke, J., Hildebrandt, T., Heger, J., Scholz-Reiter, B.: Generating dispatching rules in semiconductor manufacturing to minimize weighted tardiness. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2504–2515 (2010)
238.
go back to reference Pickerill, J.: Better cycle time and on-time delivery via real-time dispatching. Solid State Tech. 43(6), 151–154 (2000) Pickerill, J.: Better cycle time and on-time delivery via real-time dispatching. Solid State Tech. 43(6), 151–154 (2000)
239.
go back to reference Pillai, D.D., Bass, E.L., Dempsey, J.C., Yellig, E.J.: 300-mm full-factory simulations for 90- and 65-nm IC manufacturing. IEEE Trans. Semicond. Manuf. 17(3), 292–298 (2004) Pillai, D.D., Bass, E.L., Dempsey, J.C., Yellig, E.J.: 300-mm full-factory simulations for 90- and 65-nm IC manufacturing. IEEE Trans. Semicond. Manuf. 17(3), 292–298 (2004)
240.
go back to reference Pinedo, M.: Scheduling: Theory, Algorithms, and Systems, 3rd edn. Springer, New York (2008) Pinedo, M.: Scheduling: Theory, Algorithms, and Systems, 3rd edn. Springer, New York (2008)
241.
go back to reference Pinedo, M., Chao, X.: Operations Scheduling with Applications in Manufacturing and Services. Irwin McGraw-Hill, New York (1999) Pinedo, M., Chao, X.: Operations Scheduling with Applications in Manufacturing and Services. Irwin McGraw-Hill, New York (1999)
242.
go back to reference Pinedo, M., Singer, M.: A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Nav. Res. Logist. 46(1), 1–17 (1999) Pinedo, M., Singer, M.: A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Nav. Res. Logist. 46(1), 1–17 (1999)
243.
go back to reference Pochet, Y., Wolsey, L.A.: Production Planning by Mixed Integer Programming. Springer, New York (2006) Pochet, Y., Wolsey, L.A.: Production Planning by Mixed Integer Programming. Springer, New York (2006)
244.
go back to reference Ponsignon, T., Mnch, L.: Architecture for simulation-based performance assessment of planning approaches in semiconductor manufacturing. In: Proceedings of the 2010 Winter Simulation Conference, pp. 3341–3349 (2010) Ponsignon, T., Mnch, L.: Architecture for simulation-based performance assessment of planning approaches in semiconductor manufacturing. In: Proceedings of the 2010 Winter Simulation Conference, pp. 3341–3349 (2010)
245.
go back to reference Ponsignon, T., Mnch, L.: Heuristic approaches for master planning in semiconductor manufacturing. Comput. Oper. Res. 39(3), 479–491 (2012) Ponsignon, T., Mnch, L.: Heuristic approaches for master planning in semiconductor manufacturing. Comput. Oper. Res. 39(3), 479–491 (2012)
246.
go back to reference Potoradi, J., Boon, O.S., Mason, S.J., Fowler, J.W., Pfund, M.E.: Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1857–1861 (2002) Potoradi, J., Boon, O.S., Mason, S.J., Fowler, J.W., Pfund, M.E.: Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1857–1861 (2002)
247.
go back to reference Potts, C.N., Kovalyov, M.Y.: Scheduling with batching: a review. Eur. J. Oper. Res. 120(2), 228–249 (2000) Potts, C.N., Kovalyov, M.Y.: Scheduling with batching: a review. Eur. J. Oper. Res. 120(2), 228–249 (2000)
248.
go back to reference Preiss, B.R.: Data Structures and Algorithms with Object-Oriented Design Patterns in C++. Wiley, Chichester (1999) Preiss, B.R.: Data Structures and Algorithms with Object-Oriented Design Patterns in C++. Wiley, Chichester (1999)
249.
go back to reference Pukelsheim, F.: Optimal Design of Experiments. SIAM, Philadelphia (2006) Pukelsheim, F.: Optimal Design of Experiments. SIAM, Philadelphia (2006)
250.
go back to reference Qi, C., Sivakumar, A.I., Gershwin, S.B.: Impact of production control and system factors in semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 21(3), 376–389 (2008) Qi, C., Sivakumar, A.I., Gershwin, S.B.: Impact of production control and system factors in semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 21(3), 376–389 (2008)
251.
go back to reference Qi, C., Sivakumar, A.I., Gershwin, S.B.: An efficient new job release control methodology. Int. J. Prod. Res. 47(3), 703–731 (2009) Qi, C., Sivakumar, A.I., Gershwin, S.B.: An efficient new job release control methodology. Int. J. Prod. Res. 47(3), 703–731 (2009)
252.
go back to reference Qiu, R.G.: E-manufacturing: the keystone of a plant-wide real time information system. J. Chin. Inst. Ind. Eng. 20(3), 266–274 (2003) Qiu, R.G.: E-manufacturing: the keystone of a plant-wide real time information system. J. Chin. Inst. Ind. Eng. 20(3), 266–274 (2003)
253.
go back to reference Qiu, R.G.: A service-oriented integration framework for semiconductor manufacturing systems. Int. J. Manuf. Tech. Manag. 10(2/3), 177–191 (2007) Qiu, R.G.: A service-oriented integration framework for semiconductor manufacturing systems. Int. J. Manuf. Tech. Manag. 10(2/3), 177–191 (2007)
254.
go back to reference Qu, P., Mason, S.J.: Metaheuristic scheduling of 300mm lots containing multiple orders. IEEE Trans. Semicond. Manuf. 18(4), 633–643 (2005) Qu, P., Mason, S.J.: Metaheuristic scheduling of 300mm lots containing multiple orders. IEEE Trans. Semicond. Manuf. 18(4), 633–643 (2005)
255.
go back to reference Qiu, R.G., Zhou, M.: Mighty MESs: state-of-the-art and future manufacturing execution systems. IEEE Robot. Autom. Mag. 80(1), 19–25 (2004) Qiu, R.G., Zhou, M.: Mighty MESs: state-of-the-art and future manufacturing execution systems. IEEE Robot. Autom. Mag. 80(1), 19–25 (2004)
256.
go back to reference Ragatz, G.L., Mabert, V.A.: An evaluation of order release mechanisms in a job-shop environment. Decis. Sci. 19(1), 167–189 (1988) Ragatz, G.L., Mabert, V.A.: An evaluation of order release mechanisms in a job-shop environment. Decis. Sci. 19(1), 167–189 (1988)
257.
go back to reference Rardin, R.L., Uzsoy, R.: Experimental evaluation of heuristic optimization algorithms: a tutorial. J. Heuristics 7(3), 261–304 (2001) Rardin, R.L., Uzsoy, R.: Experimental evaluation of heuristic optimization algorithms: a tutorial. J. Heuristics 7(3), 261–304 (2001)
258.
go back to reference Rastogi, A.P., Fowler, J.W., Carlyle, W.M., Araz, O.M., Maltz, A., Bke, B.: Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations. Int. J. Prod. Econ. 134(2), 322–332 (2011) Rastogi, A.P., Fowler, J.W., Carlyle, W.M., Araz, O.M., Maltz, A., Bke, B.: Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations. Int. J. Prod. Econ. 134(2), 322–332 (2011)
259.
go back to reference Reichelt, D., Mnch, L.: Multiobjective scheduling of jobs with incompatible families on parallel batch machines. In: Proceedings EvoCop 2006, LNCS 3906, pp. 209–221 (2006) Reichelt, D., Mnch, L.: Multiobjective scheduling of jobs with incompatible families on parallel batch machines. In: Proceedings EvoCop 2006, LNCS 3906, pp. 209–221 (2006)
260.
go back to reference Robinson, J., Fowler, J.W., Bard, J.F.: The use of upstream and downstream information in scheduling semiconductor batch operations. Int. J. Prod. Res. 33(7), 1849–1869 (1995) Robinson, J., Fowler, J.W., Bard, J.F.: The use of upstream and downstream information in scheduling semiconductor batch operations. Int. J. Prod. Res. 33(7), 1849–1869 (1995)
261.
go back to reference Robinson, J., Fowler, J.W., Bard, J.F.: A review of real-time control strategies for furnace batch sizing in semiconductor manufacturing. Technical report, FabTime Inc. (2000) Robinson, J., Fowler, J.W., Bard, J.F.: A review of real-time control strategies for furnace batch sizing in semiconductor manufacturing. Technical report, FabTime Inc. (2000)
262.
go back to reference Roderick, L.M., Phillips, D.T., Hogg, G.L.: A comparison of order release strategies in production control systems. Int. J. Prod. Res. 30(3), 611–626 (1992) Roderick, L.M., Phillips, D.T., Hogg, G.L.: A comparison of order release strategies in production control systems. Int. J. Prod. Res. 30(3), 611–626 (1992)
263.
go back to reference Rose, O.: WIP evolution of a semiconductor factory after a bottleneck workcenter breakdown. In: Proceedings of the 1998 Winter Simulation Conference, pp. 997–1003 (1998) Rose, O.: WIP evolution of a semiconductor factory after a bottleneck workcenter breakdown. In: Proceedings of the 1998 Winter Simulation Conference, pp. 997–1003 (1998)
264.
go back to reference Rose, O.: CONLOAD—a new lot release rule for semiconductor wafer fabs. In: Proceedings of the 1999 Winter Simulation Conference, pp. 850–855 (1999) Rose, O.: CONLOAD—a new lot release rule for semiconductor wafer fabs. In: Proceedings of the 1999 Winter Simulation Conference, pp. 850–855 (1999)
265.
go back to reference Rose, O.: Why do simple wafer fab models fail in certain scenarios? In: Proceedings of the 2000 Winter Simulation Conference, pp. 1481–1490 (2000) Rose, O.: Why do simple wafer fab models fail in certain scenarios? In: Proceedings of the 2000 Winter Simulation Conference, pp. 1481–1490 (2000)
266.
go back to reference Rose, O.: CONWIP-like lot release for a wafer fabrication facility with dynamic load changes. In: Proceedings of the SMOMS ’01 (ASTC ’01), pp. 41–46 (2001) Rose, O.: CONWIP-like lot release for a wafer fabrication facility with dynamic load changes. In: Proceedings of the SMOMS ’01 (ASTC ’01), pp. 41–46 (2001)
267.
go back to reference Rose, O.: The shortest processing time first (SPTF) dispatch rule and some variants in semiconductor manufacturing. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1220–1224 (2001) Rose, O.: The shortest processing time first (SPTF) dispatch rule and some variants in semiconductor manufacturing. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1220–1224 (2001)
268.
go back to reference Rose, O.: Some issues of the critical ratio dispatch rule in semiconductor manufacturing. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1401–1405 (2002) Rose, O.: Some issues of the critical ratio dispatch rule in semiconductor manufacturing. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1401–1405 (2002)
269.
go back to reference Rose, O.: Improved simple simulation models for semiconductor wafer factories. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1708–1712 (2007) Rose, O.: Improved simple simulation models for semiconductor wafer factories. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1708–1712 (2007)
270.
go back to reference Rothlauf, F.: Representations for Genetic and Evolutionary Algorithms, 2nd edn. Springer, Berlin (2006) Rothlauf, F.: Representations for Genetic and Evolutionary Algorithms, 2nd edn. Springer, Berlin (2006)
271.
go back to reference Roundy, R.: Report on practices related to demand forecasting for semiconductor products. Technical report, School of Operations Research and Industrial Engineering, Cornell University (2001) Roundy, R.: Report on practices related to demand forecasting for semiconductor products. Technical report, School of Operations Research and Industrial Engineering, Cornell University (2001)
272.
go back to reference Rudolph, G.: Convergence analysis of canonical genetic algorithms. IEEE Trans. Neural Network 5(1), 96–101 (1994) Rudolph, G.: Convergence analysis of canonical genetic algorithms. IEEE Trans. Neural Network 5(1), 96–101 (1994)
273.
go back to reference Russell, S.J., Norvig, P.: Artificial Intelligence—A Modern Approach, 2nd edn. Prentice Hall, New Jersey (2003) Russell, S.J., Norvig, P.: Artificial Intelligence—A Modern Approach, 2nd edn. Prentice Hall, New Jersey (2003)
274.
go back to reference Sarin, S.C., Varadarajan, A., Wang, L.: A survey of dispatching rules for operational control in wafer fabrication. Prod. Plann. Contr. 22(1), 4–24 (2011) Sarin, S.C., Varadarajan, A., Wang, L.: A survey of dispatching rules for operational control in wafer fabrication. Prod. Plann. Contr. 22(1), 4–24 (2011)
275.
go back to reference Scholl, W., Domaschke, J.: Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations. IEEE Trans. Semicond. Manuf. 13(3), 273–277 (2000) Scholl, W., Domaschke, J.: Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations. IEEE Trans. Semicond. Manuf. 13(3), 273–277 (2000)
276.
go back to reference Schömig, A., Fowler, J.W.: Modeling semiconductor manufacturing operations. In: Proceedings of the 9th ASIM Dedicated Conference Simulation in Production and Logistics, pp. 55–64 (2000) Schömig, A., Fowler, J.W.: Modeling semiconductor manufacturing operations. In: Proceedings of the 9th ASIM Dedicated Conference Simulation in Production and Logistics, pp. 55–64 (2000)
277.
go back to reference Schömig, A., Rose, O.: On the suitability of the Weibull distribution for the approximation of machine failures. In: Proceedings of the 2003 Industrial Engineering Research Conference (2003) Schömig, A., Rose, O.: On the suitability of the Weibull distribution for the approximation of machine failures. In: Proceedings of the 2003 Industrial Engineering Research Conference (2003)
278.
go back to reference Schulz, M., Stanley, T.D., Renelt, B., Sturm, R., Schwertschlager, O.: Simulation based decision support for future 300mm automated material handling. In: Proceedings of the 2000 Winter Simulation Conference, pp. 1518–1522 (2000) Schulz, M., Stanley, T.D., Renelt, B., Sturm, R., Schwertschlager, O.: Simulation based decision support for future 300mm automated material handling. In: Proceedings of the 2000 Winter Simulation Conference, pp. 1518–1522 (2000)
280.
go back to reference SEMI-E10-0304E. Specification for definition and measurement of equipment reliability, availability, and maintainability (RAM) (2004) SEMI-E10-0304E. Specification for definition and measurement of equipment reliability, availability, and maintainability (RAM) (2004)
281.
go back to reference Shanthikumar, J.G., Ding, S., Zhang, M.T.: Queueing theory for semiconductor manufacturing systems: a survey and open problems. IEEE Trans. Autom. Sci. Eng. 4(4), 513–522 (2007) Shanthikumar, J.G., Ding, S., Zhang, M.T.: Queueing theory for semiconductor manufacturing systems: a survey and open problems. IEEE Trans. Autom. Sci. Eng. 4(4), 513–522 (2007)
282.
go back to reference Shikalgar, S.T., Fronckowiak, D., MacNair, E.A.: 300mm wafer fabrication line simulation model. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1365–1368 (2002) Shikalgar, S.T., Fronckowiak, D., MacNair, E.A.: 300mm wafer fabrication line simulation model. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1365–1368 (2002)
283.
go back to reference Simchi-Levi, D., Kaminsky, P., Simchi-Levi, E.: Designing and Managing the Supply Chain. McGraw-Hill, Boston (2000) Simchi-Levi, D., Kaminsky, P., Simchi-Levi, E.: Designing and Managing the Supply Chain. McGraw-Hill, Boston (2000)
284.
go back to reference Sivakumar, A.I.: Multiobjective dynamic scheduling using discrete event simulation. Int. J. Comput. Integrated Manuf. 14(2), 154–167 (2001) Sivakumar, A.I.: Multiobjective dynamic scheduling using discrete event simulation. Int. J. Comput. Integrated Manuf. 14(2), 154–167 (2001)
285.
go back to reference Sivakumar, A.I., Gupta, A.K.: Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling. IEEE Trans. Electron. Packag. Manuf. 29(2), 99–109 (2006) Sivakumar, A.I., Gupta, A.K.: Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling. IEEE Trans. Electron. Packag. Manuf. 29(2), 99–109 (2006)
286.
go back to reference Sobeyko, O., Mnch, L.: Genetic algorithms to solve a single machine multiple orders per job scheduling problem. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2493–2503 (2010) Sobeyko, O., Mnch, L.: Genetic algorithms to solve a single machine multiple orders per job scheduling problem. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2493–2503 (2010)
287.
go back to reference Solomon, L., Fowler, J.W., Pfund, M.E., Jensen, P.H.: The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions. J. Electron. Manuf. 11(2), 149–159 (2002) Solomon, L., Fowler, J.W., Pfund, M.E., Jensen, P.H.: The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions. J. Electron. Manuf. 11(2), 149–159 (2002)
288.
go back to reference Sourirajan, K., Uzsoy, R.: Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. J. Scheduling 10(1), 41–65 (2007) Sourirajan, K., Uzsoy, R.: Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. J. Scheduling 10(1), 41–65 (2007)
289.
go back to reference Spearman, M.L., Hopp, W.J., Woodruff, D.L.: A hierarchical control architecture for constant work-in-process (CONWIP) production systems. J. Manuf. Oper. Manag. 2(3), 147–171 (1989) Spearman, M.L., Hopp, W.J., Woodruff, D.L.: A hierarchical control architecture for constant work-in-process (CONWIP) production systems. J. Manuf. Oper. Manag. 2(3), 147–171 (1989)
290.
go back to reference Spearman, M.L., Woodruff, D.L., Hopp, W.J.: CONWIP: a pull alternative to Kanban. Int. J. Prod. Res. 28(5), 879–894 (1990) Spearman, M.L., Woodruff, D.L., Hopp, W.J.: CONWIP: a pull alternative to Kanban. Int. J. Prod. Res. 28(5), 879–894 (1990)
291.
go back to reference Spier, J., Kempf, K.: Simulation of emergent behavior in manufacturing systems. In: Proceedings of the 1995 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 90–94 (1995) Spier, J., Kempf, K.: Simulation of emergent behavior in manufacturing systems. In: Proceedings of the 1995 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 90–94 (1995)
292.
go back to reference Srinivasan, A., Carey, M., Morton, T.E.: Resource pricing and aggregate scheduling in manufacturing systems. GSIA Working Papers 88-89-58, Carnegie Mellon University, Tepper School of Business, Pittsburgh (1988) Srinivasan, A., Carey, M., Morton, T.E.: Resource pricing and aggregate scheduling in manufacturing systems. GSIA Working Papers 88-89-58, Carnegie Mellon University, Tepper School of Business, Pittsburgh (1988)
293.
go back to reference Stray, J., Fowler, J.W., Carlyle, W.M., Rastogi, A.P.: Enterprise-wide strategic and logistics planning for semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 19(2), 259–268 (2006) Stray, J., Fowler, J.W., Carlyle, W.M., Rastogi, A.P.: Enterprise-wide strategic and logistics planning for semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 19(2), 259–268 (2006)
294.
go back to reference Sze, S.M.: Semiconductor Devices: Physics and Technology, 2nd edn. Wiley, New York (2001) Sze, S.M.: Semiconductor Devices: Physics and Technology, 2nd edn. Wiley, New York (2001)
295.
go back to reference Tay, J.C., Ho, N.B.: Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Comput. Ind. Eng. 54(3), 453–473 (2008) Tay, J.C., Ho, N.B.: Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Comput. Ind. Eng. 54(3), 453–473 (2008)
296.
go back to reference Thiel, M.: Simulationsbasierte Reihenfolgeplanung in der Halbleiterindustrie. PhD thesis, Technical University of Ilmenau (2001) Thiel, M.: Simulationsbasierte Reihenfolgeplanung in der Halbleiterindustrie. PhD thesis, Technical University of Ilmenau (2001)
297.
go back to reference Thiel, M., Schulz, R., Gmilkowsky, P.: Simulation-based production control in the semiconductor industry. In: Proceedings of the 1998 Winter Simulation Conference, pp. 1029–1033 (1998) Thiel, M., Schulz, R., Gmilkowsky, P.: Simulation-based production control in the semiconductor industry. In: Proceedings of the 1998 Winter Simulation Conference, pp. 1029–1033 (1998)
298.
go back to reference T’kindt, V., Billaut, J.-C.: Multicriteria Scheduling: Theory, Models and Algorithms, 2nd edn. Springer, Berlin (2006) T’kindt, V., Billaut, J.-C.: Multicriteria Scheduling: Theory, Models and Algorithms, 2nd edn. Springer, Berlin (2006)
299.
go back to reference Turban, E., Aronson, J.E., Liang, T.-P.: Decision Support Systems and Intelligent Systems, 7th edn. Prentice Hall, USA (2005) Turban, E., Aronson, J.E., Liang, T.-P.: Decision Support Systems and Intelligent Systems, 7th edn. Prentice Hall, USA (2005)
300.
go back to reference Tyan, J.C., Du, T.C., Chen, J.C., Chang, I.-H.: Multiple response optimization in an fully automated FAB: an integrated tool and vehicle dispatching strategy. Comput. Ind. Eng. 46(1), 121–139 (2004) Tyan, J.C., Du, T.C., Chen, J.C., Chang, I.-H.: Multiple response optimization in an fully automated FAB: an integrated tool and vehicle dispatching strategy. Comput. Ind. Eng. 46(1), 121–139 (2004)
301.
go back to reference Upasani, A.A., Uzsoy, R.: Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study. Int. J. Prod. Res. 46(21), 5883–5905 (2008) Upasani, A.A., Uzsoy, R.: Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study. Int. J. Prod. Res. 46(21), 5883–5905 (2008)
302.
go back to reference Upasani, A.A., Uzsoy, R., Sourirajan, K.: A problem reduction approach for scheduling semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(2), 216–225 (2006) Upasani, A.A., Uzsoy, R., Sourirajan, K.: A problem reduction approach for scheduling semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(2), 216–225 (2006)
303.
go back to reference Uzsoy, R.: Scheduling batch processing machines with incompatible job families. Int. J. Prod. Res. 33(10), 2685–2708 (1995) Uzsoy, R.: Scheduling batch processing machines with incompatible job families. Int. J. Prod. Res. 33(10), 2685–2708 (1995)
304.
go back to reference Uzsoy, R., Wang, C.-S.: Performance of decomposition procedures for job shop scheduling problems with bottleneck machines. Int. J. Prod. Res. 38(6), 1271–1286 (2000) Uzsoy, R., Wang, C.-S.: Performance of decomposition procedures for job shop scheduling problems with bottleneck machines. Int. J. Prod. Res. 38(6), 1271–1286 (2000)
305.
go back to reference Uzsoy, R., Martin-Vega, L.A., Lee, C.Y., Leonard, P.: Production scheduling algorithms for a semiconductor test facility. IEEE Trans. Semicond. Manuf. 4(4), 270–280 (1991) Uzsoy, R., Martin-Vega, L.A., Lee, C.Y., Leonard, P.: Production scheduling algorithms for a semiconductor test facility. IEEE Trans. Semicond. Manuf. 4(4), 270–280 (1991)
306.
go back to reference Uzsoy, R., Lee, C.-Y., Martin-Vega, L.: A review of production planning and scheduling models in the semiconductor industry—Part I: system characteristics, performance evaluation and production planning. IIE Trans. Scheduling Logistics 24(4), 47–61 (1992) Uzsoy, R., Lee, C.-Y., Martin-Vega, L.: A review of production planning and scheduling models in the semiconductor industry—Part I: system characteristics, performance evaluation and production planning. IIE Trans. Scheduling Logistics 24(4), 47–61 (1992)
307.
go back to reference Uzsoy, R., Lee, C.-Y., Martin-Vega, L.: A review of production planning and scheduling models in the semiconductor industry—Part II: shop floor control. IIE Trans. Scheduling Logistics 26(5), 44–55 (1994) Uzsoy, R., Lee, C.-Y., Martin-Vega, L.: A review of production planning and scheduling models in the semiconductor industry—Part II: shop floor control. IIE Trans. Scheduling Logistics 26(5), 44–55 (1994)
308.
go back to reference van Beers, W.C.M., Kleijnen, J.P.C.: Kriging for interpolation in random simulation. J. Oper. Res. Soc. 54, 255–262 (2003) van Beers, W.C.M., Kleijnen, J.P.C.: Kriging for interpolation in random simulation. J. Oper. Res. Soc. 54, 255–262 (2003)
309.
go back to reference van Beers, W.C.M., Kleijnen, J.P.C.: Kriging in simulation: a survey. In: Proceedings of the 2004 Winter Simulation Conference, pp. 113–121 (2004) van Beers, W.C.M., Kleijnen, J.P.C.: Kriging in simulation: a survey. In: Proceedings of the 2004 Winter Simulation Conference, pp. 113–121 (2004)
310.
go back to reference Van Brussel, H., Wyns, J., Valckenaers, P., Bongaerts, L., Peeters, P.: Reference architecture for holonic manufacturing systems: PROSA. Comput. Ind. 37(3), 255–274 (1998) Van Brussel, H., Wyns, J., Valckenaers, P., Bongaerts, L., Peeters, P.: Reference architecture for holonic manufacturing systems: PROSA. Comput. Ind. 37(3), 255–274 (1998)
311.
go back to reference Vepsalainen, A.P.J., Morton, T.E.: Priority rules for job shops with weighted tardiness costs. Manag. Sci. 33(8), 1035–1047 (1987) Vepsalainen, A.P.J., Morton, T.E.: Priority rules for job shops with weighted tardiness costs. Manag. Sci. 33(8), 1035–1047 (1987)
312.
go back to reference Vepsalainen, A.P.J., Morton, T.E.: Improving local priority rules with global lead-time estimates: a simulation study. J. Manuf. Oper. Manag. 1, 102–118 (1988) Vepsalainen, A.P.J., Morton, T.E.: Improving local priority rules with global lead-time estimates: a simulation study. J. Manuf. Oper. Manag. 1, 102–118 (1988)
313.
go back to reference Vieira, G.E.: A practical view of the complexity in developing master production schedules: fundamentals, examples, and implementation. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 149–176. Springer, New York (2006) Vieira, G.E.: A practical view of the complexity in developing master production schedules: fundamentals, examples, and implementation. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 149–176. Springer, New York (2006)
314.
go back to reference Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Scheduling 6(1), 39–62 (2003) Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Scheduling 6(1), 39–62 (2003)
316.
go back to reference Wang, F.K., Lin, J.T.: Performance evaluation of an automated material handling system for a wafer fab. Robot. Comput. Integrated Manuf. 20(2), 91–100 (2004) Wang, F.K., Lin, J.T.: Performance evaluation of an automated material handling system for a wafer fab. Robot. Comput. Integrated Manuf. 20(2), 91–100 (2004)
317.
go back to reference Weigert, G., Klemmt, A., Horn, S.: Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor backend facility. Int. J. Prod. Res. 47(8), 2165–2183 (2009) Weigert, G., Klemmt, A., Horn, S.: Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor backend facility. Int. J. Prod. Res. 47(8), 2165–2183 (2009)
318.
go back to reference Wein, L.M.: Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 1(3), 115–130 (1988) Wein, L.M.: Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 1(3), 115–130 (1988)
319.
go back to reference Weiss, G.: Multiagent Systems: A Modern Approach to Distributed Artificial Intelligence. MIT Press, Cambridge, Massachusetts (1999) Weiss, G.: Multiagent Systems: A Modern Approach to Distributed Artificial Intelligence. MIT Press, Cambridge, Massachusetts (1999)
320.
go back to reference Weng, W.W., Leachman, R.C.: An improved methodology for real-time production decisions at batch-process work stations. IEEE Trans. Semicond. Manuf. 6(3), 219–225 (1993) Weng, W.W., Leachman, R.C.: An improved methodology for real-time production decisions at batch-process work stations. IEEE Trans. Semicond. Manuf. 6(3), 219–225 (1993)
321.
go back to reference Werner, S., Horn, S., Weigert, G., Jähnig, T.: Simulation based scheduling system in a semiconductor backend facility. In: Proceedings of the 2006 Winter Simulation Conference, pp. 1741–1748 (2006) Werner, S., Horn, S., Weigert, G., Jähnig, T.: Simulation based scheduling system in a semiconductor backend facility. In: Proceedings of the 2006 Winter Simulation Conference, pp. 1741–1748 (2006)
322.
go back to reference Wight, O.W.: Input/output control: a real handle on lead time. J. Prod. Inventory Manag. 11(3), 9–31 (1970) Wight, O.W.: Input/output control: a real handle on lead time. J. Prod. Inventory Manag. 11(3), 9–31 (1970)
323.
go back to reference Witte, J.D.: Using static capacity modeling techniques in semiconductor manufacturing. In: Proceedings of the 1996 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 31–35 (1996) Witte, J.D.: Using static capacity modeling techniques in semiconductor manufacturing. In: Proceedings of the 1996 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 31–35 (1996)
324.
go back to reference Wooldridge, M.: An Introduction to Multiagent Systems, 2nd edn. Wiley, Chichester (2009) Wooldridge, M.: An Introduction to Multiagent Systems, 2nd edn. Wiley, Chichester (2009)
325.
go back to reference Yang, F., Ankenman, B.E., Nelson, B.L.: Efficient generation of cycle time-throughput curves through simulation and metamodeling. Nav. Res. Logist. 54(1), 78–93 (2007) Yang, F., Ankenman, B.E., Nelson, B.L.: Efficient generation of cycle time-throughput curves through simulation and metamodeling. Nav. Res. Logist. 54(1), 78–93 (2007)
326.
go back to reference Yang, F., Liu, J., Nelson, B.L., Ankenman, B.E., Tongarlak, M.: Metamodelling for cycle time-throughput-product mix surfaces using progressive model fitting. Prod. Plann. Contr. 22(1), 50–68 (2011) Yang, F., Liu, J., Nelson, B.L., Ankenman, B.E., Tongarlak, M.: Metamodelling for cycle time-throughput-product mix surfaces using progressive model fitting. Prod. Plann. Contr. 22(1), 50–68 (2011)
327.
go back to reference Yeung, T.G., Mason, S.J.: Using real options analysis to value reoptimization options in the shifting bottleneck heuristic. Nav. Res. Logist. 53(4), 285–297 (2006) Yeung, T.G., Mason, S.J.: Using real options analysis to value reoptimization options in the shifting bottleneck heuristic. Nav. Res. Logist. 53(4), 285–297 (2006)
328.
go back to reference Yoon, H.J., Shen, W.: A multi-agent based decision making system for semiconductor wafer fabrication with hard temporal constraints. IEEE Trans. Semicond. Manuf. 21(1), 83–91 (2008) Yoon, H.J., Shen, W.: A multi-agent based decision making system for semiconductor wafer fabrication with hard temporal constraints. IEEE Trans. Semicond. Manuf. 21(1), 83–91 (2008)
329.
go back to reference Yugma, C., Dauzère-Pérès, S., Derreumaux, A., Sibille, O.: A batch optimization software for diffusion area scheduling in semiconductor manufacturing. In: Proceedings of the 2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 327–332 (2008) Yugma, C., Dauzère-Pérès, S., Derreumaux, A., Sibille, O.: A batch optimization software for diffusion area scheduling in semiconductor manufacturing. In: Proceedings of the 2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 327–332 (2008)
330.
go back to reference Yurtsever, T., Kutanoglu, E., Johns, J.: Heuristic based scheduling system for diffusion in semiconductor manufacturing. In: Proceedings of the 2009 Winter Simulation Conference, pp. 1677–1685 (2009) Yurtsever, T., Kutanoglu, E., Johns, J.: Heuristic based scheduling system for diffusion in semiconductor manufacturing. In: Proceedings of the 2009 Winter Simulation Conference, pp. 1677–1685 (2009)
331.
go back to reference Zambonelli, F., Jennings, N.R., Wooldridge, M.: Developing multiagent systems: the Gaia methodology. ACM Trans. Software Eng. Methodol. 12(3), 317–370 (2003) Zambonelli, F., Jennings, N.R., Wooldridge, M.: Developing multiagent systems: the Gaia methodology. ACM Trans. Software Eng. Methodol. 12(3), 317–370 (2003)
332.
go back to reference Zimmermann, J., Mnch, L., Otto, P.: On the parameterization of dispatching rules in manufacturing. In: Proceedings of the 49th International Scientific Colloquium, Technical University of Ilmenau, pp. 74–79 (2004) Zimmermann, J., Mnch, L., Otto, P.: On the parameterization of dispatching rules in manufacturing. In: Proceedings of the 49th International Scientific Colloquium, Technical University of Ilmenau, pp. 74–79 (2004)
Metadata
Title
Introduction
Authors
Lars Mönch
John W. Fowler
Scott J. Mason
Copyright Year
2013
Publisher
Springer New York
DOI
https://doi.org/10.1007/978-1-4614-4472-5_1