Issue 4/2023
Content (6 Articles)
Lot streaming for a two-stage assembly system in the presence of handling costs
Niloy J. Mukherjee, Subhash C. Sarin, Daniel A. Neira
Exact and metaheuristic methods for a real-world examination timetabling problem
Mats Carlsson, Sara Ceschia, Luca Di Gaspero, Rasmus Ørnstrup Mikkelsen, Andrea Schaerf, Thomas Jacob Riis Stidsen
Open Access
A multivariate complexity analysis of the material consumption scheduling problem
Matthias Bentert, Robert Bredereck, Péter Györgyi, Andrzej Kaczmarczyk, Rolf Niedermeier
Approximation algorithms for scheduling monotonic moldable tasks on multiple platforms
Fangfang Wu, Zhongyi Jiang, Run Zhang, Xiandong Zhang
A note: maximizing the weighted number of Just-in-Time jobs for a given job sequence
Enrique Gerstl, Gur Mosheiov