Issue 4-5/2007
Content (10 Articles)
Maximizing the weighted number of just-in-time jobs in flow shop scheduling
Byung-Cheon Choi, Suk-Hun Yoon
Single machine batch scheduling to minimize total completion time and resource consumption costs
Dvir Shabtay, George Steiner
Semi on-line scheduling on three processors with known sum of the tasks
Enrico Angelelli, Maria Grazia Speranza, Zsolt Tuza
Preemption in single machine earliness/tardiness scheduling
Kerem Bülbül, Philip Kaminsky, Candace Yano
Single-machine scheduling to stochastically minimize maximum lateness
Xiaoqiang Cai, Liming Wang, Xian Zhou
Single-machine scheduling with trade-off between number of tardy jobs and compression cost
Yong He, Qi Wei, T. C. E. Cheng
The discrete time/cost trade-off problem: extensions and heuristic procedures
Mario Vanhoucke, Dieter Debels
A tabu search heuristic for the quay crane scheduling problem
Marcello Sammarra, Jean-François Cordeau, Gilbert Laporte, M. Flavia Monaco
Conference Diary