Skip to main content
Top

2022 | OriginalPaper | Chapter

Latent Dirichlet Allocation-Based Approach for Automatically Mapping Components to Tasks in Modular Construction

Authors : Xiao Li, Chengke Wu, Weisheng Lu, Fan Xue

Published in: Proceedings of the 26th International Symposium on Advancement of Construction Management and Real Estate

Publisher: Springer Nature Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

A large portion of cross-knowledge domain tasks have interdependent relationships with varied components in modular construction (MC). The MC components serve as the critical resources to support the task planning and execution for generating excellent MC products and services. Meanwhile, dynamic changes of tasks may adversely affect the design, procurement, and assembly of components. Furthermore, manually mapping components to tasks will be time-consuming and prevent forming effective work packages to achieve collaborative working. Thus, this study aims to develop an approach for automatically connecting components with tasks, which helps workers efficiently know the relationships between tasks and components. To this end, the latent Dirichlet allocation (LDA) approach is customized to this task-component mapping scenario. Moreover, compared with other leading unsupervised clustering techniques, e.g., K-means, the customized LDA demonstrated better performance on accuracy and efficiency for task-component mapping, and it can pave the way for effective work package formation in MC.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Gann, D.M.: Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Constr. Manag. Econ. 14(5), 437–450 (1996)CrossRef Gann, D.M.: Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Constr. Manag. Econ. 14(5), 437–450 (1996)CrossRef
2.
go back to reference Teng, Y., Mao, C., Liu, G., Wang, X.: Analysis of stakeholder relationships in the industry chain of industrialized buildings in China. J. Clean. Prod. 152, 387–398 (2017)CrossRef Teng, Y., Mao, C., Liu, G., Wang, X.: Analysis of stakeholder relationships in the industry chain of industrialized buildings in China. J. Clean. Prod. 152, 387–398 (2017)CrossRef
3.
go back to reference Li, X., et al.: SWP-enabled constraints modeling for the on-site assembly process of prefabrication housing production. J. Clean. Prod. 239, 117991 (2019)CrossRef Li, X., et al.: SWP-enabled constraints modeling for the on-site assembly process of prefabrication housing production. J. Clean. Prod. 239, 117991 (2019)CrossRef
4.
go back to reference Eriksson, P.E., Olander, S., Szentes, H., Widén, K.: Managing short-term efficiency and long-term development through industrialized construction. Constr. Manag. Econ. 32(1–2), 97–108 (2014)CrossRef Eriksson, P.E., Olander, S., Szentes, H., Widén, K.: Managing short-term efficiency and long-term development through industrialized construction. Constr. Manag. Econ. 32(1–2), 97–108 (2014)CrossRef
5.
go back to reference Goh, M., Goh, Y.M.: Lean production theory-based simulation of modular construction processes. Autom. Constr. 101, 227–244 (2019)CrossRef Goh, M., Goh, Y.M.: Lean production theory-based simulation of modular construction processes. Autom. Constr. 101, 227–244 (2019)CrossRef
6.
go back to reference Gong, P., Teng, Y., Li, X., Luo, L.: Modeling constraints for the on-site assembly process of prefabrication housing production: a social network analysis. Sustainability 11(5), 1387 (2019)CrossRef Gong, P., Teng, Y., Li, X., Luo, L.: Modeling constraints for the on-site assembly process of prefabrication housing production: a social network analysis. Sustainability 11(5), 1387 (2019)CrossRef
7.
go back to reference Hammad, A.W., Akbarnezhad, A., Wu, P., Wang, X., Haddad, A.: Building information modeling-based framework to contrast conventional and modular construction methods through selected sustainability factors. J. Clean. Prod. 228, 1264–1281 (2019)CrossRef Hammad, A.W., Akbarnezhad, A., Wu, P., Wang, X., Haddad, A.: Building information modeling-based framework to contrast conventional and modular construction methods through selected sustainability factors. J. Clean. Prod. 228, 1264–1281 (2019)CrossRef
8.
go back to reference Arashpour, M., Kamat, V., Bai, Y., Wakefield, R., Abbasi, B.: Optimization modeling of multi-skilled resources in prefabrication: theorizing cost analysis of process integration in off-site construction. Autom. Constr. 95, 1–9 (2018)CrossRef Arashpour, M., Kamat, V., Bai, Y., Wakefield, R., Abbasi, B.: Optimization modeling of multi-skilled resources in prefabrication: theorizing cost analysis of process integration in off-site construction. Autom. Constr. 95, 1–9 (2018)CrossRef
9.
go back to reference Lawson, M., Ogden, R., Goodier, C.: Design in Modular Construction. CRC Press, Boca Raton (2014)CrossRef Lawson, M., Ogden, R., Goodier, C.: Design in Modular Construction. CRC Press, Boca Raton (2014)CrossRef
10.
go back to reference Salama, T., Salah, A., Moselhi, O., Al-Hussein, M.: Near optimum selection of module configuration for efficient modular construction. Autom. Constr. 83, 316–329 (2017)CrossRef Salama, T., Salah, A., Moselhi, O., Al-Hussein, M.: Near optimum selection of module configuration for efficient modular construction. Autom. Constr. 83, 316–329 (2017)CrossRef
11.
go back to reference DOD and NASA: DOD and NASA Guide: PERT COST Systems Design (1962) DOD and NASA: DOD and NASA Guide: PERT COST Systems Design (1962)
12.
go back to reference Siami-Irdemoosa, E., Dindarloo, S.R., Sharifzadeh, M.: Work breakdown structure (WBS) development for underground construction. Autom. Constr. 58, 85–94 (2015)CrossRef Siami-Irdemoosa, E., Dindarloo, S.R., Sharifzadeh, M.: Work breakdown structure (WBS) development for underground construction. Autom. Constr. 58, 85–94 (2015)CrossRef
13.
go back to reference Li, D., Lu, M.: Automated generation of work breakdown structure and project network model for earthworks project planning: a flow network-based optimization approach. J. Constr. Eng. Manag. 143(1), 04016086 (2017)CrossRef Li, D., Lu, M.: Automated generation of work breakdown structure and project network model for earthworks project planning: a flow network-based optimization approach. J. Constr. Eng. Manag. 143(1), 04016086 (2017)CrossRef
14.
go back to reference Jung, Y., Woo, S.: Flexible work breakdown structure for integrated cost and schedule control. J. Constr. Eng. Manag. 130(5), 616–625 (2004)CrossRef Jung, Y., Woo, S.: Flexible work breakdown structure for integrated cost and schedule control. J. Constr. Eng. Manag. 130(5), 616–625 (2004)CrossRef
15.
go back to reference Sutrisna, M., Ramanayaka, C.D., Goulding, J.S.: Developing work breakdown structure matrix for managing offsite construction projects. Archit. Eng. Des. Manage. 14(5), 381–397 (2018) Sutrisna, M., Ramanayaka, C.D., Goulding, J.S.: Developing work breakdown structure matrix for managing offsite construction projects. Archit. Eng. Des. Manage. 14(5), 381–397 (2018)
16.
go back to reference Project Management Institute: Guide to the Project Management Body of Knowledge (PMBOK Guide). Project Management Institute, Newtown Square, PA, 5th edn. (2013) Project Management Institute: Guide to the Project Management Body of Knowledge (PMBOK Guide). Project Management Institute, Newtown Square, PA, 5th edn. (2013)
17.
go back to reference Isaac, S., Curreli, M., Stoliar, Y.: Work packaging with BIM. Autom. Constr. 83, 121–133 (2017)CrossRef Isaac, S., Curreli, M., Stoliar, Y.: Work packaging with BIM. Autom. Constr. 83, 121–133 (2017)CrossRef
18.
go back to reference Li, X., Shen, G.Q., Wu, P., Xue, F., Chi, H.L., Li, C.Z.: Developing a conceptual framework of smart work packaging for constraints management in prefabrication housing production. Adv. Eng. Inform. 42, 100938 (2019)CrossRef Li, X., Shen, G.Q., Wu, P., Xue, F., Chi, H.L., Li, C.Z.: Developing a conceptual framework of smart work packaging for constraints management in prefabrication housing production. Adv. Eng. Inform. 42, 100938 (2019)CrossRef
19.
go back to reference Liu, H., Al-Hussein, M., Lu, M.: BIM-based integrated approach for detailed construction scheduling under resource constraints. Autom. Constr. 53, 29–43 (2015)CrossRef Liu, H., Al-Hussein, M., Lu, M.: BIM-based integrated approach for detailed construction scheduling under resource constraints. Autom. Constr. 53, 29–43 (2015)CrossRef
20.
go back to reference Liu, H., Lu, M., Al-Hussein, M.: Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry. Adv. Eng. Inform. 30(2), 190–207 (2016)CrossRef Liu, H., Lu, M., Al-Hussein, M.: Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry. Adv. Eng. Inform. 30(2), 190–207 (2016)CrossRef
21.
go back to reference Wu, C., Wu, P., Wang, J., Jiang, R., Chen, M., Wang, X.: Developing a hybrid approach to extract constraints-related information for constraint management. Autom. Constr. 124, 103563 (2021)CrossRef Wu, C., Wu, P., Wang, J., Jiang, R., Chen, M., Wang, X.: Developing a hybrid approach to extract constraints-related information for constraint management. Autom. Constr. 124, 103563 (2021)CrossRef
22.
go back to reference Ramasesh, R.V., Browning, T.R.: A conceptual framework for tackling knowable unknown unknowns in project management. J. Oper. Manag. 32(4), 190–204 (2014)CrossRef Ramasesh, R.V., Browning, T.R.: A conceptual framework for tackling knowable unknown unknowns in project management. J. Oper. Manag. 32(4), 190–204 (2014)CrossRef
23.
go back to reference Ibrahim, Y.M., Lukins, T.C., Zhang, X., Trucco, E., Kaka, A.P.: Towards automated progress assessment of work package components in construction projects using computer vision. Adv. Eng. Inform. 23(1), 93–103 (2009)CrossRef Ibrahim, Y.M., Lukins, T.C., Zhang, X., Trucco, E., Kaka, A.P.: Towards automated progress assessment of work package components in construction projects using computer vision. Adv. Eng. Inform. 23(1), 93–103 (2009)CrossRef
24.
go back to reference Golpayegani, S.A.H., Emamizadeh, B.: Designing work breakdown structures using modular neural networks. Decis. Support Syst. 44(1), 202–222 (2007)CrossRef Golpayegani, S.A.H., Emamizadeh, B.: Designing work breakdown structures using modular neural networks. Decis. Support Syst. 44(1), 202–222 (2007)CrossRef
25.
go back to reference Torkanfar, N., Azar, E.R.: Quantitative similarity assessment of construction projects using WBS-based metrics. Adv. Eng. Inform. 46, 101179 (2020)CrossRef Torkanfar, N., Azar, E.R.: Quantitative similarity assessment of construction projects using WBS-based metrics. Adv. Eng. Inform. 46, 101179 (2020)CrossRef
26.
go back to reference Lee, J., Deng, W.Y., Lee, W.T., Lee, S.J., Hsu, K.H., Ma, S.P.: Integrating process and work breakdown structure with design structure matrix. Simulation 7, 8 (2010) Lee, J., Deng, W.Y., Lee, W.T., Lee, S.J., Hsu, K.H., Ma, S.P.: Integrating process and work breakdown structure with design structure matrix. Simulation 7, 8 (2010)
27.
go back to reference Park, J., Cai, H.: WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation. Autom. Constr. 77, 15–23 (2017)CrossRef Park, J., Cai, H.: WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation. Autom. Constr. 77, 15–23 (2017)CrossRef
28.
go back to reference Aversano, L., Grasso, C., Tortorella, M.: Managing the alignment between business processes and software systems. Inf. Softw. Technol. 72, 171–188 (2016)CrossRef Aversano, L., Grasso, C., Tortorella, M.: Managing the alignment between business processes and software systems. Inf. Softw. Technol. 72, 171–188 (2016)CrossRef
29.
go back to reference Marcus, A., Maletic, J.I.: Recovering documentation-to-source-code traceability links using latent semantic indexing. In: 25th International Conference on Software Engineering. Proceedings, pp. 125–135. IEEE, May 2003 Marcus, A., Maletic, J.I.: Recovering documentation-to-source-code traceability links using latent semantic indexing. In: 25th International Conference on Software Engineering. Proceedings, pp. 125–135. IEEE, May 2003
30.
go back to reference Pessiot, J.F., Kim, Y.M., Amini, M.R., Gallinari, P.: Improving document clustering in a learned concept space. Inf. Process. Manage. 46(2), 180–192 (2010)CrossRef Pessiot, J.F., Kim, Y.M., Amini, M.R., Gallinari, P.: Improving document clustering in a learned concept space. Inf. Process. Manage. 46(2), 180–192 (2010)CrossRef
31.
go back to reference Al-Anazi, S., AlMahmoud, H., Al-Turaiki, I.: Finding similar documents using different clustering techniques. Procedia Comput. Sci. 82, 28–34 (2016) Al-Anazi, S., AlMahmoud, H., Al-Turaiki, I.: Finding similar documents using different clustering techniques. Procedia Comput. Sci. 82, 28–34 (2016)
32.
go back to reference Baskara, A.R., Sarno, R., Solichah, A.: Discovering traceability between business process and software component using Latent Dirichlet Allocation. In: 2016 International Conference on Informatics and Computing (ICIC), pp. 251–256. IEEE, October 2016 Baskara, A.R., Sarno, R., Solichah, A.: Discovering traceability between business process and software component using Latent Dirichlet Allocation. In: 2016 International Conference on Informatics and Computing (ICIC), pp. 251–256. IEEE, October 2016
33.
go back to reference Blei, D.M., Ng, A.Y., Jordan, M.I.: Latent Dirichlet allocation. J. Mach. Learn. Res. 3, 993–1022 (2003) Blei, D.M., Ng, A.Y., Jordan, M.I.: Latent Dirichlet allocation. J. Mach. Learn. Res. 3, 993–1022 (2003)
34.
go back to reference Lin, J.R., Hu, Z.Z., Li, J.L., Chen, L.M.: Understanding on-site inspection of construction projects based on keyword extraction and topic modeling. IEEE Access 8, 198503–198517 (2020)CrossRef Lin, J.R., Hu, Z.Z., Li, J.L., Chen, L.M.: Understanding on-site inspection of construction projects based on keyword extraction and topic modeling. IEEE Access 8, 198503–198517 (2020)CrossRef
35.
go back to reference Wu, L., Ye, K., Gong, P., Xing, J.: Perceptions of governments towards mitigating the environmental impacts of expressway construction projects: a case of China. J. Clean. Prod. 236, 117704 (2019)CrossRef Wu, L., Ye, K., Gong, P., Xing, J.: Perceptions of governments towards mitigating the environmental impacts of expressway construction projects: a case of China. J. Clean. Prod. 236, 117704 (2019)CrossRef
36.
go back to reference Jallan, Y., Brogan, E., Ashuri, B., Clevenger, C.M.: Application of natural language processing and text mining to identify patterns in construction-defect litigation cases. J. Leg. Aff. Disput. Resolut. Eng. Constr. 11(4), 04519024 (2019)CrossRef Jallan, Y., Brogan, E., Ashuri, B., Clevenger, C.M.: Application of natural language processing and text mining to identify patterns in construction-defect litigation cases. J. Leg. Aff. Disput. Resolut. Eng. Constr. 11(4), 04519024 (2019)CrossRef
37.
go back to reference Zhong, B., Pan, X., Love, P.E., Sun, J., Tao, C.: Hazard analysis: a deep learning and text mining framework for accident prevention. Adv. Eng. Inform. 46, 101152 (2020)CrossRef Zhong, B., Pan, X., Love, P.E., Sun, J., Tao, C.: Hazard analysis: a deep learning and text mining framework for accident prevention. Adv. Eng. Inform. 46, 101152 (2020)CrossRef
38.
go back to reference Hoffman, M., Bach, F., Blei, D.: Online learning for latent Dirichlet allocation. Adv. Neural Inf. Process. Syst. 23, 856–864 (2010) Hoffman, M., Bach, F., Blei, D.: Online learning for latent Dirichlet allocation. Adv. Neural Inf. Process. Syst. 23, 856–864 (2010)
39.
go back to reference Gelfand, A.E.: Gibbs sampling. J. Am. Stat. Assoc. 95(452), 1300–1304 (2000)CrossRef Gelfand, A.E.: Gibbs sampling. J. Am. Stat. Assoc. 95(452), 1300–1304 (2000)CrossRef
40.
41.
go back to reference Baker, H., Hallowell, M.R., Tixier, A.J.P.: Automatically learning construction injury precursors from the text. Autom. Constr. 118, 103145 (2020)CrossRef Baker, H., Hallowell, M.R., Tixier, A.J.P.: Automatically learning construction injury precursors from the text. Autom. Constr. 118, 103145 (2020)CrossRef
42.
go back to reference Pennington, J., Socher, R., Manning, C.D.: Glove: global vectors for word representation. In: Proceedings of the 2014 Conference on Empirical Methods in Natural Language Processing (EMNLP), pp. 1532–1543, October 2014 Pennington, J., Socher, R., Manning, C.D.: Glove: global vectors for word representation. In: Proceedings of the 2014 Conference on Empirical Methods in Natural Language Processing (EMNLP), pp. 1532–1543, October 2014
Metadata
Title
Latent Dirichlet Allocation-Based Approach for Automatically Mapping Components to Tasks in Modular Construction
Authors
Xiao Li
Chengke Wu
Weisheng Lu
Fan Xue
Copyright Year
2022
Publisher
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-19-5256-2_89