Skip to main content
Top

2018 | OriginalPaper | Chapter

Lower Bounds for the Two-Machine Flow Shop Problem with Time Delays

Authors : Mohamed Amine Mkadem, Aziz Moukrim, Mehdi Serairi

Published in: Operations Research Proceedings 2016

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

We consider the flow shop problem with two machines and time delays with respect to the makespan, i.e., the maximum completion time. We recall the lower bounds of the literature and we propose new relaxation schemes. Moreover, we investigate a linear programming-based lower bound that includes the implementation of a new dominance rule and a valid inequality. A computational study that was carried out on a set of 480 instances including new hard ones shows that our new relaxation schemes outperform the state of the art lower bounds.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Dell’Amico, M.: Shop problems with two machines and time lags. Oper. Res. 44(5), 777–787 (1996)CrossRef Dell’Amico, M.: Shop problems with two machines and time lags. Oper. Res. 44(5), 777–787 (1996)CrossRef
2.
go back to reference Mitten, L.G.: Sequencing n jobs on two machines with arbitrary time lags. Manag. Sci. 5(3), 293–298 (1959)CrossRef Mitten, L.G.: Sequencing n jobs on two machines with arbitrary time lags. Manag. Sci. 5(3), 293–298 (1959)CrossRef
3.
go back to reference Yu, W.: The two-machine flow shop problem and the one-machine total tardiness problem. Ph.D. thesis, Eindhoven University of Technology, The Netherlands (1996) Yu, W.: The two-machine flow shop problem and the one-machine total tardiness problem. Ph.D. thesis, Eindhoven University of Technology, The Netherlands (1996)
Metadata
Title
Lower Bounds for the Two-Machine Flow Shop Problem with Time Delays
Authors
Mohamed Amine Mkadem
Aziz Moukrim
Mehdi Serairi
Copyright Year
2018
DOI
https://doi.org/10.1007/978-3-319-55702-1_70

Premium Partner