Skip to main content
Top
Published in: Journal of Intelligent Manufacturing 1/2019

02-06-2016

Makespan minimization for batching work and rework process on a single facility with an aging effect: a hybrid meta-heuristic algorithm for sustainable production management

Authors: A. Beynaghi, F. Moztarzadeh, A. Shahmardan, R. Alizadeh, J. Salimi, M. Mozafari

Published in: Journal of Intelligent Manufacturing | Issue 1/2019

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper takes into account a single facility that produces good quality as well as defective units in batches. In addition, units produced on the facility are inspected for quality in batches. Herein, after the inspection is completed, the defective units of the inspected batch are reworked. Each reworked unit has the required good quality. When the facility is related to reworking defective units, there is an aging effect in which the processing time of a defective unit depends on its position in a sequence. Subsequently, when reworking of all defective units in each batch is completed, a maintenance activity is required, after which the facility will be restored to its initial condition. In addition, it is assumed that the percentage of the defective units is the same in each batch. The objective is to find the number of batches and their (integer) size such that the makespan is minimized. The major contributions of this paper can be summarized in two aspects. Firstly, we propose a new reasonable model for an imperfect production of a single product, and secondly, to solve the proposed model, a hybrid meta-heuristic algorithm comprising genetic algorithm, variable neighborhood search and simulated annealing algorithms is developed. The experimental results confirms that the hybrid algorithm can be proposed to sustainably solve this problem.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Alidaee, B., & Womer, N. K. (1999). Scheduling with time dependent processing times: Review and extensions. Journal of the Operational Research Society, 50(7), 711–720.CrossRef Alidaee, B., & Womer, N. K. (1999). Scheduling with time dependent processing times: Review and extensions. Journal of the Operational Research Society, 50(7), 711–720.CrossRef
go back to reference Arab, A., Ismail, N., & Lee, L. S. (2013). Maintenance scheduling incorporating dynamics of production system and real-time information from workstations. Journal of Intelligent Manufacturing, 24(4), 695–705.CrossRef Arab, A., Ismail, N., & Lee, L. S. (2013). Maintenance scheduling incorporating dynamics of production system and real-time information from workstations. Journal of Intelligent Manufacturing, 24(4), 695–705.CrossRef
go back to reference Baptiste, P. (2000). Batching identical jobs. Mathematical Methods of Operations Research, 52(3), 355–367.CrossRef Baptiste, P. (2000). Batching identical jobs. Mathematical Methods of Operations Research, 52(3), 355–367.CrossRef
go back to reference Belmecheri, F., Prins, C., Yalaoui, F., & Amodeo, L. (2013). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of Intelligent Manufacturing, 24(4), 775–789.CrossRef Belmecheri, F., Prins, C., Yalaoui, F., & Amodeo, L. (2013). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of Intelligent Manufacturing, 24(4), 775–789.CrossRef
go back to reference Biskup, D. (2008). A state-of-the-art review on scheduling with learning effects. European Journal of Operational Research, 188(2), 315–329.CrossRef Biskup, D. (2008). A state-of-the-art review on scheduling with learning effects. European Journal of Operational Research, 188(2), 315–329.CrossRef
go back to reference Cheng, T. C. E., Ding, Q., & Lin, B. M. T. (2004). A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152(1), 1–13.CrossRef Cheng, T. C. E., Ding, Q., & Lin, B. M. T. (2004). A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152(1), 1–13.CrossRef
go back to reference Damodaran, P., Vélez-Gallego, M. C., & Maya, J. (2011). A GRASP approach for makespan minimization on parallel batch processing machines. Journal of Intelligent Manufacturing, 22(5), 767–777.CrossRef Damodaran, P., Vélez-Gallego, M. C., & Maya, J. (2011). A GRASP approach for makespan minimization on parallel batch processing machines. Journal of Intelligent Manufacturing, 22(5), 767–777.CrossRef
go back to reference Fan, J., & Xu, D. (2010). Some single-machine scheduling problems with aging effect. In IEEE international conference on service operations and logistics and informatics (SOLI), (pp. 430–431). IEEE. Fan, J., & Xu, D. (2010). Some single-machine scheduling problems with aging effect. In IEEE international conference on service operations and logistics and informatics (SOLI), (pp. 430–431). IEEE.
go back to reference Goldberg, D. E. (1989). Genetic algorithms in search, optimization, and machine learning. Boston: Addison-Wesley. Goldberg, D. E. (1989). Genetic algorithms in search, optimization, and machine learning. Boston: Addison-Wesley.
go back to reference Graves, G. H., & Lee, C. Y. (1999). Scheduling maintenance and semiresumable jobs on a single machine. Naval Research Logistics, 46(7), 845–863.CrossRef Graves, G. H., & Lee, C. Y. (1999). Scheduling maintenance and semiresumable jobs on a single machine. Naval Research Logistics, 46(7), 845–863.CrossRef
go back to reference Gribkovskaia, I. V., Kovalev, S., & Werner, F. (2010). Batching for work and rework processes on dedicated facilities to minimize the makespan. Omega, 38(6), 522–527.CrossRef Gribkovskaia, I. V., Kovalev, S., & Werner, F. (2010). Batching for work and rework processes on dedicated facilities to minimize the makespan. Omega, 38(6), 522–527.CrossRef
go back to reference Hsu, C. J., Low, C., & Su, C. T. (2010). A single-machine scheduling problem with maintenance activities to minimize makespan. Applied Mathematics and Computation, 215(11), 3929–3935.CrossRef Hsu, C. J., Low, C., & Su, C. T. (2010). A single-machine scheduling problem with maintenance activities to minimize makespan. Applied Mathematics and Computation, 215(11), 3929–3935.CrossRef
go back to reference Inderfurth, K., Janiak, A., Kovalyov, M. Y., & Werner, F. (2006). Batching work and rework processes with limited deterioration of reworkables. Computers and Operations Research, 33(6), 1595–1605.CrossRef Inderfurth, K., Janiak, A., Kovalyov, M. Y., & Werner, F. (2006). Batching work and rework processes with limited deterioration of reworkables. Computers and Operations Research, 33(6), 1595–1605.CrossRef
go back to reference Jabbarizadeh, F., Zandieh, M., & Talebi, D. (2009). Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints. Computers and Industrial Engineering, 57(3), 949–957.CrossRef Jabbarizadeh, F., Zandieh, M., & Talebi, D. (2009). Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints. Computers and Industrial Engineering, 57(3), 949–957.CrossRef
go back to reference Jolai, F., Amalnick, M. S., Alinaghian, M., Shakhsi-Niaei, M., & Omrani, H. (2011). A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines. Journal of Intelligent Manufacturing, 22(2), 247–261.CrossRef Jolai, F., Amalnick, M. S., Alinaghian, M., Shakhsi-Niaei, M., & Omrani, H. (2011). A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines. Journal of Intelligent Manufacturing, 22(2), 247–261.CrossRef
go back to reference Khatami, M., & Zegordi, S. H. (2014). Coordinative production and maintenance scheduling problem with flexible maintenance time intervals. Journal of Intelligent Manufacturing. doi:10.1007/s10845-014-1001-9. Khatami, M., & Zegordi, S. H. (2014). Coordinative production and maintenance scheduling problem with flexible maintenance time intervals. Journal of Intelligent Manufacturing. doi:10.​1007/​s10845-014-1001-9.
go back to reference Kirkpatrick, S., Gelatt, C. D, Jr., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science, 220, 671–680.CrossRef Kirkpatrick, S., Gelatt, C. D, Jr., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science, 220, 671–680.CrossRef
go back to reference Kuo, W. H., & Yang, D. L. (2008). Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect. Journal of the Operational Research Society, 59(3), 416–420.CrossRef Kuo, W. H., & Yang, D. L. (2008). Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect. Journal of the Operational Research Society, 59(3), 416–420.CrossRef
go back to reference Lai, P.-J., & Wu, H.-C. (2013). Using heuristic algorithms to solve the scheduling problems with job-dependent and machine-dependent learning effects. Journal of Intelligent Manufacturing, 26, 1–11. Lai, P.-J., & Wu, H.-C. (2013). Using heuristic algorithms to solve the scheduling problems with job-dependent and machine-dependent learning effects. Journal of Intelligent Manufacturing, 26, 1–11.
go back to reference Li, X., Ishii, H., & Masuda, T. (2012). Single machine batch scheduling problem with fuzzy batch size. Computers & Industrial Engineering, 62(3), 688–692.CrossRef Li, X., Ishii, H., & Masuda, T. (2012). Single machine batch scheduling problem with fuzzy batch size. Computers & Industrial Engineering, 62(3), 688–692.CrossRef
go back to reference Lindner, G., Flapper, S. D. P., & Buscher, U. (2001). An optimal lot and batch size policy for a single item produced and remanufactured on one machine. Magdeburg: FEMM, Otto-von-Guericke-Univ. Lindner, G., Flapper, S. D. P., & Buscher, U. (2001). An optimal lot and batch size policy for a single item produced and remanufactured on one machine. Magdeburg: FEMM, Otto-von-Guericke-Univ.
go back to reference Mladenovi’c, N., & Hansen, P. (1997). Variable neighborhood search. Computers and Operations Research, 24(11), 1097–1100.CrossRef Mladenovi’c, N., & Hansen, P. (1997). Variable neighborhood search. Computers and Operations Research, 24(11), 1097–1100.CrossRef
go back to reference Mokhtari, H., & Noroozi, A. (2015). An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem. Journal of Intelligent Manufacturing. doi:10.1007/s10845-015-1158-x. Mokhtari, H., & Noroozi, A. (2015). An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem. Journal of Intelligent Manufacturing. doi:10.​1007/​s10845-015-1158-x.
go back to reference Mosheiov, G. (1994). Scheduling jobs under simple linear deterioration. Computers & Operations Research, 21(6), 653–659. Mosheiov, G. (1994). Scheduling jobs under simple linear deterioration. Computers & Operations Research, 21(6), 653–659.
go back to reference Mosheiov, G. (2001). Scheduling problems with a learning effect. European Journal of Operational Research, 132(3), 687–693.CrossRef Mosheiov, G. (2001). Scheduling problems with a learning effect. European Journal of Operational Research, 132(3), 687–693.CrossRef
go back to reference Ojha, D., Sarker, B. R., & Biswas, P. (2007). An optimal batch size for an imperfect production system with quality assurance and rework. International Journal of Production Research, 45(14), 3191–3214.CrossRef Ojha, D., Sarker, B. R., & Biswas, P. (2007). An optimal batch size for an imperfect production system with quality assurance and rework. International Journal of Production Research, 45(14), 3191–3214.CrossRef
go back to reference Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: A review. European Journal of Operational Research, 120(2), 228–249.CrossRef Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: A review. European Journal of Operational Research, 120(2), 228–249.CrossRef
go back to reference Ramezani, P., Rabiee, M., & Jolai, F. (2013). No-wait flexible flowshop with uniform parallel machines and sequence-dependent setup time: A hybrid meta-heuristic approach. Journal of Intelligent Manufacturing, 26, 1–14. Ramezani, P., Rabiee, M., & Jolai, F. (2013). No-wait flexible flowshop with uniform parallel machines and sequence-dependent setup time: A hybrid meta-heuristic approach. Journal of Intelligent Manufacturing, 26, 1–14.
go back to reference Schmidt, G. (2000). Scheduling with limited machine availability. European Journal of Operational Research, 121(1), 1–15.CrossRef Schmidt, G. (2000). Scheduling with limited machine availability. European Journal of Operational Research, 121(1), 1–15.CrossRef
go back to reference Solimanpur, M., & Kamran, M. A. (2010). Solving facilities location problem in the presence of alternative processing routes using a genetic algorithm. Computers & Industrial Engineering, 59(4), 830–839.CrossRef Solimanpur, M., & Kamran, M. A. (2010). Solving facilities location problem in the presence of alternative processing routes using a genetic algorithm. Computers & Industrial Engineering, 59(4), 830–839.CrossRef
go back to reference Tayebi Araghi, M., Jolai, F., & Rabiee, M. (2014). Incorporating learning effect and deterioration for solving a SDST flexible job-shop scheduling problem with a hybrid meta-heuristic approach. International Journal of Computer Integrated Manufacturing, 27(8), 733–746.CrossRef Tayebi Araghi, M., Jolai, F., & Rabiee, M. (2014). Incorporating learning effect and deterioration for solving a SDST flexible job-shop scheduling problem with a hybrid meta-heuristic approach. International Journal of Computer Integrated Manufacturing, 27(8), 733–746.CrossRef
go back to reference Tavakkoli-Moghaddam, R., Ranjbar-Bourani, M., Amin, G. R., & Siadat, A. (2012). A cell formation problem considering machine utilization and alternative process routes by scatter search. Journal of Intelligent Manufacturing, 23(4), 1127–1139.CrossRef Tavakkoli-Moghaddam, R., Ranjbar-Bourani, M., Amin, G. R., & Siadat, A. (2012). A cell formation problem considering machine utilization and alternative process routes by scatter search. Journal of Intelligent Manufacturing, 23(4), 1127–1139.CrossRef
go back to reference Teunter, R. H., & Flapper, S. D. P. (2003). Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum, 25(1), 85–96.CrossRef Teunter, R. H., & Flapper, S. D. P. (2003). Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum, 25(1), 85–96.CrossRef
go back to reference Tian, Z., Lin, D., & Wu, B. (2012). Condition based maintenance optimization considering multiple objectives. Journal of Intelligent Manufacturing, 23(2), 333–340.CrossRef Tian, Z., Lin, D., & Wu, B. (2012). Condition based maintenance optimization considering multiple objectives. Journal of Intelligent Manufacturing, 23(2), 333–340.CrossRef
go back to reference Toksarı, M. D., & Güner, E. (2010). Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs. Journal of Intelligent Manufacturing, 21(6), 843–851.CrossRef Toksarı, M. D., & Güner, E. (2010). Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs. Journal of Intelligent Manufacturing, 21(6), 843–851.CrossRef
go back to reference Vahdani, B., Tavakkoli-Moghaddam, R., Zandieh, M., & Razmi, J. (2012). Vehicle routing scheduling using an enhanced hybrid optimization approach. Journal of Intelligent Manufacturing, 23(3), 759–774.CrossRef Vahdani, B., Tavakkoli-Moghaddam, R., Zandieh, M., & Razmi, J. (2012). Vehicle routing scheduling using an enhanced hybrid optimization approach. Journal of Intelligent Manufacturing, 23(3), 759–774.CrossRef
go back to reference Wu, C. C., Shiau, Y. R., Lee, L. H., & Lee, W. C. (2009). Scheduling deteriorating jobs to minimize the makespan on a single machine. International Journal of Advanced Manufacturing Technology, 44(11–12), 1230–1236.CrossRef Wu, C. C., Shiau, Y. R., Lee, L. H., & Lee, W. C. (2009). Scheduling deteriorating jobs to minimize the makespan on a single machine. International Journal of Advanced Manufacturing Technology, 44(11–12), 1230–1236.CrossRef
go back to reference Xu, R., Chen, H., & Li, X. (2012). Makespan minimization on single batch-processing machine via ant colony optimization. Computers and Operations Research, 39(3), 582–593.CrossRef Xu, R., Chen, H., & Li, X. (2012). Makespan minimization on single batch-processing machine via ant colony optimization. Computers and Operations Research, 39(3), 582–593.CrossRef
go back to reference Yang, S.-J., Yang, D.-L., & Cheng, T. C. E. (2010). Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance. Computers & Operations Research, 37(8), 1510–1514.CrossRef Yang, S.-J., Yang, D.-L., & Cheng, T. C. E. (2010). Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance. Computers & Operations Research, 37(8), 1510–1514.CrossRef
go back to reference Zhao, C. L., & Tang, H. Y. (2007). Single-machine scheduling problems with an aging effect. Journal of Applied Mathematics and Computing, 25(1–2), 305–314.CrossRef Zhao, C. L., & Tang, H. Y. (2007). Single-machine scheduling problems with an aging effect. Journal of Applied Mathematics and Computing, 25(1–2), 305–314.CrossRef
go back to reference Zhao, C. L., & Tang, H. Y. (2010). Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan. Applied Mathematical Modelling, 34(3), 837–841.CrossRef Zhao, C. L., & Tang, H. Y. (2010). Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan. Applied Mathematical Modelling, 34(3), 837–841.CrossRef
Metadata
Title
Makespan minimization for batching work and rework process on a single facility with an aging effect: a hybrid meta-heuristic algorithm for sustainable production management
Authors
A. Beynaghi
F. Moztarzadeh
A. Shahmardan
R. Alizadeh
J. Salimi
M. Mozafari
Publication date
02-06-2016
Publisher
Springer US
Published in
Journal of Intelligent Manufacturing / Issue 1/2019
Print ISSN: 0956-5515
Electronic ISSN: 1572-8145
DOI
https://doi.org/10.1007/s10845-016-1223-0

Other articles of this Issue 1/2019

Journal of Intelligent Manufacturing 1/2019 Go to the issue

Premium Partners