Published in: Innovative Infrastructure Solutions 11/2023

Open Access 01-11-2023 | Technical Paper

Multi-criteria decision support system for bridge construction system selection utilizing value engineering and TOPSIS

Authors: Alaa ElMarkaby, Abdelmonem Sanad, Ahmed Elyamany, Ebtisam Yehia

Published in: Innovative Infrastructure Solutions | Issue 11/2023

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

When selecting the appropriate bridge deck construction system, it is essential to consider many criteria such as the span length, geographical location, construction speed, cost, site conditions, resource availability, technology, ease of construction, and service life. The objective of this study is to optimize the decision-making process for selecting a bridge deck construction system in the preliminary design and planning stage. The proposed model allows designers or decision-makers to make an informed choice of an appropriate construction system according to project criteria through a decision support system. The model employs value engineering methodology and a multi-criteria decision-making method and utilizes the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS), a multi-criteria decision-making method. To gather modeling data from a focus group consisting of professional bridge engineers, a semi-structured interview and two questionnaires are conducted. When applying the proposed model to two active bridge construction projects in Egypt, it reveals that "Span by Span using launching girder" and "precast post tension girder" are better suited to cases one and two, respectively. The study makes a contribution by presenting a decision support system that combines value engineering methodology and a multi-criteria decision-making method (TOPSIS). This system empowers designers and decision-makers to make project decisions considering specific criteria and constraints.

Introduction

Bridges are a type of infrastructure project characterized by their long-term service life objectives, implementation complexity, and substantial financial investment requirements [1, 2]. Determining the constructability of a bridge is becoming increasingly essential due to new environmental and political requirements as well as construction industry constraints. The construction of a bridge is one of the most challenging projects in the world, necessitating an extensive amount of expertise, machinery, and financial resources [3, 4]. Rapid population growth has created new transportation requirements and increased demand for efficient bridge construction [5].
Several variables, including bridge length, resources availability, project location, and project duration, influence the selection of the bridge construction method and its design [4, 6, 7]. The most appropriate construction method should be chosen after a thorough examination of all available methods using project-specific evaluation criteria. The selection of the appropriate bridge superstructure method is crucial to the success of bridge projects [8]. In bridge design, it is vital to take into account factors such as structural safety, serviceability, economy, constructability, maintainability, and environmental impact in order to determine the appropriate bridge location and structural type [8]. The proposed structural system should then be simplified as much as possible to address various challenges such as application difficulties, lack of knowledge, lack of time, and limited resources [9].
The traditional method, Design-Bid-Build, promotes separating design and construction, affecting project quality, especially when no constructability review is mandatory before construction begins. In bridge projects, Field practices have revealed several instances where the contractor changed the primary construction methods to accommodate construction needs that the designer had not anticipated or addressed [10]. The literature indicates that "Design errors made by designers" and "Wrong or improper design" are ranked among the top 10 causes of project time delays and higher costs in both design and construction [10, 11].
Inadequate investigations of alternatives or when the contract terms require the use of a specific construction system are considered factors for inapt selection of the construction system [10, 12]. When there is no a set of specific requirements that clearly make one solution superior to others, evaluating the most appropriate alternative becomes a challenging task [8]. As a result of that, the selection is mostly based on the expertise, skill, knowledge, and judgment of engineers, allowing for subsequent decision-making errors [10].
One of the various tools and techniques that can assist in determining the most practical bridge structure system is value engineering (VE). Even though VE has been known since the middle of the twentieth century, construction practitioners in many developing countries have often been unable to employ it through the design and construction phases due to their limited knowledge and trust in this technique [3]. Incorporating VE methodology into the design process of bridges can help decision-makers choose a better functional method [3]. VE has been successfully adopted in many projects worldwide to eliminate unnecessary costs while maintaining desired quality, safety, and reliability [5].
In a general sense, VE is a relationship between function and cost. VE is described as an organized process that discovers possibilities to cut unnecessary expenses while ensuring that the objective, reliability, performance, and other essential criteria meet or exceed the customer's expectations [13]. Professional duty for the designer is to evaluate all feasible design alternatives that achieve the required and necessary function, for example but is not limited to quality, safety, durability, etc., and make a financial comparison to reach the most valuable alternative. Application of VE during early development stages assists in getting the project off to a good start and saves greater money [12, 14, 15]. Adopting VE methodology could save 10 to 30% reduction in total project construction costs [16].
In the VE methodology, choosing the appropriate construction system necessitates the presence of a decision support tool, as it plays a crucial role in handling the huge amount of knowledge involved in making the decision [17]. A wide range of multi-criteria decision-making methods (MCDM) is utilized to choose a suitable design through different design alternatives [17]. As shown in Table 1, MCDM methods can be classified into different groups according to similar characteristics [1820]. Choosing a specific method depends on evaluation criteria such as: internal consistency, logical soundness, transparency, ease of use, ability to provide an audit trail, and software availability [21]. The Technique for Order of Preference by Similarity to Ideal Solution, TOPSIS, is based on the concept that the most suitable alternative is the one that simultaneously has the shortest geometric distance from the positive ideal solution and the longest geometric distance from the negative ideal solution [2224].
Table 1
MCDM methods description
MCDM Group
MCDM method
Ref.
Scoring methods
Simple additive weighting (SAW)
[25]
Complex proportional assessment (COPRAS)
[25]
Distance-based methods
Goal programming (GP)
[26]
Compromise programming (CP)
[27]
Technique for order of preference by similarity to ideal solution (TOPSIS)
[28]
Multi-criteria optimization and compromise solution (VIKOR)
[28]
Data envelopment analysis (DEA)
[29]
Pairwise comparison methods
Analytic hierarchy process (AHP)
[30]
Analytic network process (ANP)
[30]
Measuring Attractiveness by a Categorical Based Evaluation Technique (MACBETH)
[31]
Outranking methods
Preference ranking organization method for enrichment of evaluations (PROMETHEE)
[32]
Elimination and choice expressing reality (ELECTRE)
[33]
Utility/Valuate
methods
Multi-attribute utility theory (MAUT)
[34]
Multi-attribute value theory (MAVT)
[34]
Other
Quality function development (QFD)
[35]
The purpose of this study is to optimize the decision-making process for selecting a bridge deck construction system during the preliminary design and planning stage. The primary focus is developing an integrated decision support system to include new construction systems and selection criteria, as they emerge over time to help decision-makers select the appropriate alternative [2, 4, 10]. This system could be established through using value engineering methodology and a multi-criteria decision-making method. Including more selection criteria could lead to a more suitable bridge construction system.

Study scope and objectives

The objective of this study is to optimize the decision-making process for selecting a bridge deck construction system during the preliminary design and planning stage. The model allows the designer or decision-maker to select the appropriate construction system by utilizing a decision support system that considers project criteria. This model can be developed by integrating value engineering methodology and a multi-criteria decision-making method. The proposed model utilizes the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS), a multi-criteria decision-making method. TOPSIS enables decision-makers to make more informed bridge construction system selection decisions based on project criteria and constraints. Two ongoing bridge construction projects in Egypt were selected to validate the proposed model. The significance of the VE methodology in bridge projects lies in allowing decision-makers to pursue the highest quality and performance without wasting money on unnecessary costs [4, 15].

Research methodology

The proposed study comprises three major phases. Phase one involves conducting a literature review to identify various types of bridge construction systems in Egypt and the evaluation criteria used to select the appropriate construction system for a certain project. The data collected is assessed in semi-structured interviews with bridge construction experts to refine and set a final list of construction systems and criteria for use in the subsequent phases.
Phase two involves conducting two questionnaires to a focus group of professional engineers employed in bridge construction companies. The goal of the first questionnaire is to determine the most important criteria that affect choosing the appropriate construction system. The goal of the second questionnaire aims to apply the structural criteria to each construction system. It also aims to prioritize the subjective criteria for inclusion in the selection process for all bridge construction systems.
Phase three involves the development, implementation, and validation of the value engineering decision support (VEDS) model. Figure 1 illustrates the Research methodology.

Phase one

Several bridge construction systems (BCS) and selection criteria are gathered from the existing literature. Experts from the bridge construction industry in semi-structured interviews to identify any missing system/criteria or eliminate redundant ones then evaluate these collected construction systems and criteria. Phase one results in the creation of two lists: BCSs list and selection criteria of BCS list.
  • Identification of BCS
Investigating the construction systems to be used in the study, as identified through semi-structured interview and the literature review [10, 12, 36], a set of 11 construction systems is chosen based on the following measures; (I) construction systems associated with box section, which permanently evolve due to its various construction methods, (II) construction systems newly used in Egypt as a result of the technological advancement in the bridge industry, and III) construction systems commonly used in Egypt. The 11 construction systems included in this study are listed in Table 2.
  • Selection criteria of BCS
Table 2
Bridge deck construction systems
Code
Name
BCS1
Precast span by span using launching Girder
BCS2
Full span launching method
BCS3
Free Cantilever precast using lifting frame
BCS4
Balanced Cantilever cast in situ using two travelers
BCS5
Balanced Cantilever precast using lifting frames
BCS6
Precast Incremental launching
BCS7
Cast in Situ segment using formwork supported on ground
BCS8
Reinforced concrete cast in situ girder
BCS9
precast post tension girder
BCS10
cast in situ post tension girder
BCS11
Hollow core slab cast in situ
As shown in Table 3, the literature search has provided 27 criteria that affect the selection of the appropriate construction system by the designer or the decision-maker during the conceptual design phase. Note that 4 out of the 7 references collected in Table 3 have been studied in Egypt to simulate and encompass most of the conditions there. Additionally, during the semi-structured interviews with bridge construction experts in Egypt,7 more criteria are introduced: Construction risk (C28), Use of latest technology (C29), Expandability (C30), Logistics difficulties (C31), Ease Communication among Stakeholders (C32), Payment scheme (C33), and PTO (Provisional Taking Over) difficulty (C34). Consequently, a total of 34 criteria are considered during the subsequent phases of the research study to select the appropriate BCS.
Table 3
Criteria collected from published work
Code
Criteria
[36]
[12]
[4]
[2]
[8]
[10]
[14]
C1
Nature of crossing
C2
Surrounding area nature
 
C3
Accessibility to site
    
C4
Budget cost
  
C5
Cost of defected quality
   
  
C6
Life cycle cost
  
    
C7
Service life (durability)
 
  
 
C8
Contractor experience and capabilities
      
C9
Diversion cost of Existing utilities
  
  
C10
Availability of Equipment
 
 
  
C11
Availability of skilled manpower
 
  
C12
Availability of material
 
 
  
C13
Aesthetics of bridge
    
 
C14
Typical span number
  
  
C15
Breadth of deck
  
  
C16
Bridge height above ground
 
 
C17
Soil condition
  
 
C18
Horizontal Alignment
 
C19
Volume of traffic during construction
 
     
C20
Effect of construction on design
    
C21
Cranes capacity and maneuvering
  
  
C22
Climate during construction
    
  
C23
Construction safety requirement
 
 
 
C24
Ease of maintenance
 
  
 
C25
Bridge span length
 
 
C26
Speed of construction
 
C27
Land topography
      

Phase two

In phase two, two questionnaire are conducted to professional engineers working in bridge construction firms. The goal of the first questionnaire is to identify the most important criteria affecting the selection of the appropriate BCS. The goal of the second questionnaire is to prioritize the subjective criteria considered affecting the BCS selection process. The results of both surveys serve as inputs for VEDS model.

Sample size

Simple random sampling method is used in the study because the process is easy to follow and viewed as fair as each person can be selected. Additionally, it is a versatile method that can be used for both large and small populations [37]. This study is targeted construction companies specializing in bridge works and large facility works. In Egypt, as of 2021, the Egyptian Engineers Syndicate's records indicate that there are approximately 800,000 registered building and construction engineers. Identifying the proper sample size is important to ensure the survey's reliability and credibility. If the sample size is too small, valuable research insights may be missed, while an excessively large sample can result in unnecessary expenditures of time and resources.
Equation (1) is used to calculate the sample size that best represents the targeted population [38].
$$n=\frac{{n}^{,}}{1+\frac{{n}^{,}-1}{N}}$$
(1)
where: n is the sample size from finite population; N is the total population (800,000 construction engineer) and n' can be calculated using Eq. (2).
$${n}^{,}=\frac{{z}^{2}+{s}^{2}}{{v}^{2}}$$
(2)
where: v is standard error of sample population assumed 0.05. S2 is the standard error variance of population elements which is defined as S2 = P (1P) and it is maximum at P = 0.5 and Z is the confidence coefficient equals 1.645 at 90% confidence.
Based on Eqs. (1) and (2), a sample size of 271 is required. However, the survey questionnaire received 250 responses through structured interviews, phone calls, or electronic forms out of a total of 300.

Kaiser–Meyer–Olkin (KMO) measure of sampling adequacy

The KMO test is a measure designed to assess the acceptability of data for factor analysis. In other words, it assesses the sample size's adequacy [39]. The KMO statistic has a scale of 0 to 1. scores between 0.8 and 1.0 indicate that the sample is appropriate. For KMO scores in the range of 0.7 to 0.79, it is considered an average result, while values falling between 0.6 and 0.69 are indicative of a suboptimal outcome. KMO values below 0.6 indicate insufficient sampling, necessitating corrective measures. If the value falls below 0.5, it is highly likely that the results of the factor analysis will not be suitable for further data analysis. When the sample size is less than 300, the average communality of the retained items must be tested. For sample size below100, an average value exceeding 0.6 is considered acceptable. For sample sizes between 100 and 200, an average value within the range of 0.5 to 0.6 is acceptable [3942].
Since the Kaiser–Meyer–Olkin (KMO) measure of sampling adequacy equals 0.922, which is greater than 0.5, the current sample size of 250 is suitable for factor analysis.
Figure 2 illustrates the demographic information of the questionnaire respondents. It indicates that 58% of the respondents have more than 10 years of experience, 54% work for consultants, and 52% work as designers.

Questionnaire I

Questionnaire I aims to identify the important criteria that utilizes to choose the appropriate BCS. Respondents rate 34 criteria using 1–5 Likert scale in which 1, 2, 3, 4, and 5 indicate: Extremely not significant, Not significant, Moderate, Significant, and Extremely Significant, respectively [43 , 44]. The relative importance index (RII) in Eq. (3) is used to analyze responses and determine the relative importance for each criterion [43, 45].
$$RII=\frac{\sum_{1}^{5}{w}_{i}\times {x}_{i}}{A\times N}$$
(3)
where "wi" is the five-point Likert scale (1 to 5), "xi" is the frequency of the Likert scale, "A" is the greatest priority value (5), and "N" is the total number of responses. The RII values are reported at five key levels: High "H" (0.8 ≤ RII ≤ 1), High–Medium "H–M" (0.6 ≤ RII < 0.8), Medium "M" (0.4 ≤ RII < 0.6), Medium–Low "M–L" (0.2 ≤ RII < 0.4), and Low "L" (0 ≤ RII < 0.2). BCS criteria within the least significance levels "M-L" and "L" are dropped off from further study analysis [46]. This guarantees that the chosen criteria hold sufficient significance according to the perspective of professional bridge experts. As the number of criteria exceeds 16, the effectiveness of the TOPSIS method diminishes, making it more advantageous to have fewer criteria [43]. As a result, 8 criteria that are rated as "L" or "M-L" are removed, namely: C5, C23, C14, C34, C33, C15, C7, and C22. Table 4 presents the list of the 26 BCS criteria that are deemed important.
Table 4
Ranking the criteria using the RII
No
Criteria
RII
Importance
1
C1
Nature of crossing
1
H
2
C25
Bridge span length
1
H
3
C26
Speed of construction
0.98
H
4
C20
Effect of construction on design
0.94
H
5
C21
Cranes capacity and maneuvering
0.94
H
6
C4
Budget cost
0.94
H
7
C12
Availability of material
0.9
H
8
C2
Surrounding area nature
0.88
H
9
C10
Availability of equipment
0.88
H
10
C3
Accessibility to site
0.88
H
11
C29
Use of latest technology
0.86
H
12
C27
Land topography
0.86
H
13
C28
Construction risk
0.86
H
14
C16
Bridge height above ground
0.86
H
15
C11
Availability of skilled manpower
0.84
H
16
C6
Life cycle cost
0.84
H
17
C24
Ease of Maintenance
0.82
H
18
C8
Contractor experience and capabilities
0.82
H
19
C19
Volume of traffic during construction
0.78
M-H
20
C9
Diversion cost of existing utilities
0.78
M-H
21
C30
Expandability
0.74
M-H
22
C17
Soil condition
0.72
M-H
23
C13
Aesthetics of bridge
0.68
M-H
24
C31
logistics difficulties
0.64
M-H
25
C18
Horizontal Alignment
0.62
M-H
26
C32
Ease communication among Stakeholders
0.52
M-H
27
C5
Cost of defected quality
0.38
M-L
28
C23
Construction safety requirement
0.36
M-L
29
C14
Typical span number
0.35
M-L
30
C34
PTO difficulty
0.33
M-L
31
C33
Payment scheme method
0.32
M-L
32
C15
Breadth of deck
0.28
M-L
33
C7
Service life (durability)
0.26
M-L
34
C22
Climate during construction
0.24
M-L

Questionnaire II

Questionnaire II aims to rank the 26 BCS criteria identified by the RII analysis.
Structural Criteria
The selection of the preliminary construction system is mostly influenced by structural criteria, and also influences the preliminary designer choice. Among the 26 criteria, 10 are considered important for the selection of the optimal BCS [2, 4, 8, 36]. In questionnaire II, respondents are asked to rate each structural criterion with respect to each construction system as 0 or 1. A rating of (0) indicates that the criterion does not apply to the construction system, whereas a rating of (1) indicates that the criterion is applicable to the construction system. This allowed the authors to determine the criteria that apply to each construction system. Table 5 introduces the results for all respondents, where (1) meaning that more than half of the respondents select (1), and (0) meaning that more than half of the respondents select (0).
Table 5
Structural criteria results with respect to each construction system
Structural criteria
Bridge deck construction systems
BCS1
BCS2
BCS3
BCS4
BCS5
BCS6
BCS7
BCS8
BCS9
BCS10
BCS11
C1
Highway
1
1
1
1
1
1
1
1
1
1
1
Railway
1
1
0
0
1
1
0
0
0
0
0
Waterway
1
1
0
1
1
1
0
0
1
0
0
C2
Downtown
1
1
1
1
1
1
1
1
1
1
1
Desert
1
1
1
1
1
1
1
1
1
1
1
Agrarian
1
1
1
1
1
1
1
1
1
1
1
C3
Ease access
1
1
1
1
1
1
1
1
1
1
1
non-ease access
1
1
0
1
1
1
1
1
0
1
1
C17
Strong
1
1
1
1
1
1
1
1
1
1
1
Medium
1
1
1
1
1
1
1
1
1
1
1
Weak
1
0
0
1
1
1
1
0
1
1
0
C19
Moderate
1
1
1
1
1
1
1
1
1
1
1
Height
1
1
0
1
1
1
0
0
1
0
0
C27
0–100 cm
1
1
1
1
1
1
1
1
1
1
1
100–200 cm
1
1
1
1
1
1
0
0
1
0
0
 > 200 cm
1
1
0
1
1
1
0
0
0
0
0
C16
0–7 m
1
1
1
1
1
1
1
1
1
1
1
7–20 m
1
1
1
1
1
1
1
1
1
1
1
 > 20 m
1
1
0
1
1
1
0
0
1
0
0
C18
Small to medium
1
1
1
1
1
1
1
1
1
1
1
medium to high
0
0
1
1
1
0
1
1
0
0
1
C25
0–20 m
0
0
0
0
0
0
0
1
1
1
1
20–50 m
1
1
0
0
0
1
1
1
1
1
1
50–200 m
0
0
1
1
1
0
1
0
0
0
0
 > 200 m
0
0
0
1
1
0
0
0
0
0
0
C21
Area for maneuvering
1
1
1
1
1
1
1
1
1
1
1
No area for maneuvering
1
1
0
1
1
1
0
0
0
0
0
Subjective criteria
Subjective criteria are used to arrange the only applicable BCS and finally get the appropriate one. Where, the applicable BCS are derived from the allocation of the structural criteria to a project, as demonstrated in the VEDS model presented below. In questionnaire II, the respondents are required to rate the remaining important criteria which is 16, in relation to each bridge deck construction system. Respondents are asked to use a Likert scale ranging from of 1 to 9, where 1 and 9 represents the least degree of correspondence and the highest degree of correspondence, respectively [36, 43, 44].
Table 6 illustrates the collective average score for subjective criteria. For the criteria "Speed of Construction," the "Full span launching method" is rated the highest rating of (8.50). This rating indicates that, in terms of "Speed of Construction," the "Full span launching method" is considered the most preferred BCS among the methods examined in this study. Similarly, for the criteria "Availability of Equipment," the "Full span launching method" is rated the lowest rating of (3.50). This rating indicates that, in terms of "Availability of Equipment," the "Full span launching method" is comparatively more challenging compared to the other methods examined in this study.
Table 6
Collective subjective criteria scores
Subjective criteria
Bridge deck construction systems
BCS1
BCS2
BCS3
BCS4
BCS5
BCS6
BCS7
BCS8
BCS9
BCS10
BCS11
C11
5
5
4
4
4
3
7.5
8
6.5
6.5
6.5
C12
5.25
5.25
5.25
5.25
5.25
5.25
8.25
8.25
7.25
7.25
7.25
C13
6.5
6.5
6.5
6.5
6.5
6.5
6.5
4.5
4.5
4.5
5
C10
5
3.5
6
6
6
4
8.5
8.5
8.5
8.5
7.5
C26
7.5
8.5
6
5.5
5.5
5.5
4.5
4
6.5
5.5
4.5
C8
7.5
8
7.25
7.25
7.25
8.25
5.25
3
5.5
4.25
5.5
C24
6
6
6
6
6
6
8
8
8
8
6
C30
4
4
4
4
4
4
7
6
6
6
6
C29
7
8
5
5
5
8
4
3
3
3
3
C20
5
7
8
8
8
6
4
4
4
4
3.5
C6
7.5
8.5
6.5
6.5
7
7.5
4
4
4.5
4.5
4.5
C9
5
5
4
4
4
4
5
6
6
6
6
C4
7.5
8.5
6.5
6.5
7
7.5
4
4
4.5
4.5
4.5
C32
8
8
7
6.5
7
8
4.5
4.5
5.5
5.5
5.5
C28
6
6.5
6
6
6
3.5
2.5
2.5
3
3
3
C31
7
7
5
4.5
5
6.5
4
4
5
4
4

Phase three

Value engineering decision support (VEDS) model

The VEDS model aims to implement the VE methodology, which is integrated with multi-criteria decision-making for BCS. The value engineering methodology progresses through the following phases: Information, Creativity, Analytical, Development, and presentation. The VEDS model is transformed into a VEDS software, developed as a Java program, using TOPSIS as a Multi-Criteria decision-making engine, MySQL as a database engine, and Spring Boot as a framework. The flow chart of the VEDS software is shown in Fig. 3.
The Goals of the VEDS model are:
1.
The software guides the user through all phases of the Value Engineering task plan in a logical order.
 
2.
In terms of the amount of paperwork needed, the model creation would save a lot of space while also ensuring quick retrieval of the many pieces of information.
 
3.
The model handles the entire work, ensuring precise and exact unbiased outcomes.
 
4.
The model serves as a decision support system by assisting the user in selecting the appropriate bridge construction system.
 
5.
The model assists in applying the Value Engineering methodology in an organized manner to save time and effort.
 

Multi-criteria decision-making (MCDM)

Multi-Criteria Decision-Making (MCDM) encompasses various methods designed to provide an overall ranking of alternatives, arranged from most to least desired. There may be differences in the extent to which the alternatives satisfy certain criteria, and no one alternative is certainly the greatest at fulfilling all requirements. The alternatives in the current study are 11 BCS and 26 criteria.
Among the different methods of MCDM, the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is chosen in the analytical phase to prioritize the different alternatives based on a set of criteria and select the appropriate BCS. The TOPSIS method aids in the ranking of alternatives based on their proximity to the optimal ideal solution and obtaining the highest possible level from available alternatives [47]. The TOPSIS method is chosen out of the other methods of MCDM for its simplicity, rationality, comprehensibility, good computational efficiency, and ease of computation [21, 48]. The TOPSIS method is suitable to use in the field of bridge construction [49]. The TOPSIS method is simpler for use and robust in assessing more criteria. Also, this method results in an indisputable order of preference [24, 50].
The steps for the analysis using TOPSIS are as follows: [21, 51].
Step 1: Construct the decision matrix.
$$\mathrm{DM}=\begin{array}{c}{A}_{1}\\ {A}_{2}\\ {\begin{array}{c}\vdots \\ A\end{array}}_{p}\end{array}\left[\begin{array}{ccc}{R}_{1}& {R}_{2}& \begin{array}{cc}\dots & {R}_{q}\end{array}\\ {C}_{11}& {C}_{12}& \begin{array}{cc}\cdots & {C}_{1q}\end{array}\\ \begin{array}{c}{C}_{21}\\ \vdots \\ {C}_{p1}\end{array}& \begin{array}{c}{C}_{22}\\ \vdots \\ {C}_{p2}\end{array}& \begin{array}{cc}\begin{array}{c}\dots \\ \ddots \\ \dots \end{array}& \begin{array}{c}{C}_{2q}\\ \vdots \\ {C}_{pq}\end{array}\end{array}\end{array}\right]$$
(4)
where DM is the decision matrix, (A1, A2, …., Ap) defining the alternatives, (R1, R2…, Rq) defining the criteria, and Cpq is rating of alternative Ap with respect to Criteria Cq.
Step 2: Calculate the Normalized Decision Matrix
$$\overline{{X }_{ij}}=\frac{{X}_{ij}}{\sqrt{\sum_{i=1}^{n}{X}_{ij}^{2}}}$$
(5)
where i determines the alternative index (i = 1, 2, …, n), j determines the criteria index (j = 1, 2, …, m).
Step 3: Calculate weighted Normalized Decision Matrix
$${V}_{ij}={\overline{X} }_{ij}\times {W}_{j}$$
(6)
where Wj is the weight of the criteria for all j.
Step 4: Calculate the ideal best and ideal worst value (Max V + & Min V−).
Step 5: Calculate the Euclidean distance from the ideal best
$${S}_{i}^{+}={\left[\sum_{j=1}^{m}{\left({V}_{ij}-{V}_{j}^{+}\right)}^{2}\right]}^{0.5}$$
(7)
where i = 1, 2, …, q
Step 6: Calculate the Euclidean distance from the ideal Worst
$${S}_{i}^{-}={\left[\sum_{j=1}^{m}{\left({V}_{ij}-{V}_{j}^{-}\right)}^{2}\right]}^{0.5}$$
(8)
where i = 1, 2, …, q
Step 7: Calculate Performance Score
$${P}_{i}=\frac{{S}_{i}^{-}}{{S}_{i}^{+}+{S}_{i}^{-}}$$
(9)
where 0 ≤ Pi ≤ 1.
Step 8: Rank the performance score.
Step 9: Select the alternative with the highest performance score in order to be the suitable construction system.

VEDS software

Information phase
The VEDS software starts by asking the user to provide general project information such as the project's name, country, starting date, location, project description, and project regions. As showed in Fig. 4, the user then specifies the characteristics of the structural criteria for each project region before moving to the creativity phase.
Creativity phase
The VEDS software includes all 11 BCS discussed in phase one of the study methodology. The VEDS software provides the user with a brief description of each of these selected BCS. Subsequently, the software presents the user with the 26 subjective criteria required for determining the appropriate BCS. These 26 criteria were identified in phase two of the study methodology. Finally, the software allows users to add "construction systems" and incorporate "new criteria" as needed. The creativity phase, as its name implies, is established for brainstorming, thinking, and adding new creative alternatives and solutions to avoid any limitations. Figures 5 and 6 illustrate the creativity phase.
Analytical phase
Analytical phase begins with acquiring all possible BCS as illustrated in Fig. 7. Next, the user proceeds to assign weighs to the subjective criteria. It is worth noting that the default weights used within the VEDS software are the ones determined during the second phase of the study methodology, the weights can be modified as per the user’s needs as shown in Fig. 8.
The next step in this process involves evaluating the subjective criteria for each construction system on a scale of 1 to 9. The performance score for each BCS is then calculated using TOPSIS, based on the user's ranking criteria in the previous step. Figure 9 illustrates the Analytical Phase–performance score table.
Development and presentation phase
Based on the input data, the VEDS model recommends a suggestion for the appropriate BCS. The user has the option to receive a presentation regarding the recommended system, which comprises an overview of the recommended system and its relevant construction procedure.

Model implementation and validation

The VEDS model has been implemented on two case study projects in Egypt: The Cairo metro and the New 26th July axis.

Case one: Cairo metro

Cairo metro Line 3-Phase 3B spans approximately 6.3 km and includes a total of 5 stations. This phase encompasses four elevated stations and one at-grade station. The owner is the National Authority for Tunnels, and the consultant is a joint venture consisting of Systra (France), EHAF (Egypt), ACCE (Egypt), and AGIS (Egypt). The contractor is a joint venture consisting of Vinci (France), Bouygues group (France), Orascom (Egypt), and Arab Contractors (Egypt). The selected case study is a 124-span bridge with a total length of 4000 m.
The structural criteria for case study one in Table 7 are entered into the VEDS Software. The results obtained from applying the VEDS model revealed that "Span by Span using a launching girder" method is the preferred choice. Screens illustrating the VEDS model steps are displayed in Figs. 10, 11, 12, 13, 14.
Table 7
Case study one structural criteria
Main structural criteria
Cairo metro–Phase 3B
Nature of crossing
Highways, railway and roads
Surrounding area nature
Down town and Agrarian
Accessibility to site
Non-ease access
Soil condition
Medium
Volume of traffic during construction
Moderate
Land topography
0-50 cm
Bridge high above ground
15 m
Horizontal Alignment
Small to medium curvature.
Bridge span length
Standard span: 33 m & longest span: 47 m
Cranes Capacity and maneuvering
No area for maneuvering
Construction system used
Precast Span by Span Using Launching Girder

Case two: new 26th July axis

The new 26th of July axis project aims to alleviate traffic congestion on the existing 26th of July axis while improving access to the cities of 6th of October and Sheikh Zayed. The owner is the Armed Forces Engineering Authority, and the consultant is a joint venture consisting of El-Raeid Engineering Consultants, and SICE office. The contractor is Hassan Allam Roads & Bridges. The selected case study is a 30-span bridge with a total length of 1200 m.
The structural criteria for case study two in Table 8 are entered into the VEDS Software. The results obtained from applying the VEDS model revealed that the "precast post tension girder" method is the preferred choice. Screens illustrating the VEDS model steps are displayed in Figs. 15, 16, 17, 18, 19.
Table 8
Case study two structural criteria
Main structural criteria
New 26th July axis
Nature of crossing
Roads
Surrounding area nature
Down town
Accessibility to site
Ease access to the site
Soil condition
Medium
Volume of traffic during construction
High
Land topography
0–50 cm
Bridge high above ground
17 m
Horizontal Alignment
Small to medium curvature
Bridge span length
Span length: 40 m
Cranes Capacity and maneuvering
Have area for maneuvering
Construction system used
Precast post tension girder

Discussion of results

Based on the results presented in case study 1, as illustrated in Figs. 13 and 14, it is evident that the performance score for the "span by span using launching girder" is 0.9113, which is less than the ideal score of 1. This result means that the executed construction system, within a set of project criteria, could be the preferred choice. The result is affected by the subjective criteria rates provided for each recommended construction system during the analytical phase on a Likert scale from 1 to 9, highly meets the first alternative conditions.
The same is true for case study 2, as illustrated in Figs. 18 and 19, it is evident that the performance score for the "Precast Post Tension Girder" is 0.7969. This result means that the executed construction system, within a set of project criteria, could be the preferred choice. This result is affected by the subjective criteria rates provided for each recommended construction system during the analytical phase on a Likert scale from 1 to 9, highly meets the first alternative conditions. These rates are entered based on the project participant’s requirements, project conditions, and the market's current status. For improved results, the project participant’s requirements and project conditions must be modified. For example, but not limited to, budget cost, speed of construction, contractor experience, and capabilities. Similarly, the market status should be enhanced. For example, but not limited to, the availability of material, equipment, and skilled manpower.

Validation results

A semi-structured interview is carried out with a total of 6 bridge engineers, with 3 engineers from each project, to check the validation and accuracy of the VEDS software in selecting the two construction systems mentioned above.
For case study one, all three experts report that "precast span by span using a launching girder" is the most preferred construction system to be used. This feedback complies with the results produced by the VEDS software. For case study two, all three experts report that the "precast post tension girder" is the most preferred construction system to be used. This feedback complies with the results produced by the VEDS software. Additionally, the interviewees report that the current selection criteria adequately suit the project's circumstances in Egypt and recommend the inclusion of additional construction systems in the model.

Study limitations

While the proposed model has proven successful in both case studies, it is important to acknowledge that this research still has some limitations that should be addressed in future studies. First, the proposed VEDS model is constrained by a specific number of construction systems. Such construction systems limitations may prevent the generalization for applying this model for a broader range during the preliminary design. Secondly, certain structural criteria have limited to specific characteristics, such as land topography, bridge high from ground, etc. These limitations prevent the model from being applied on all the construction bridge projects. Lastly, the VEDS model is applied on bridge projects in Egypt based on the methodology for choosing construction systems and criteria. However, in order to use the model internationally, it could be need to review the selection of criteria and the construction systems used into the model.

Summary and conclusions

Clients and consultants aim to choose the appropriate bridge construction system during the conceptual design phase. The primary goal of this research is to provide a decision support tool that recommends the appropriate construction system, considering project-specific criteria. The research went through three major phases to attain the previously mentioned goal.
The first phase included conducting literature review to identify and collect various types of bridge construction systems and criteria for evaluating and selecting the appropriate construction system for a certain project. The collected data are reviewed in semi-structured interviews with experts from the bridge construction industry. This process aims to add or remove any construction system or criteria, resulting in a final list of construction systems and criteria to be used in the subsequent phases.
The second phase is conducted using two questionnaires that are directed at a specific focus group consisting of professional engineers employed in bridge construction companies. The goal of the first questionnaire is to determine the most important criteria influencing the selection of the appropriate construction system. The goal of the second questionnaire is to apply the structural criteria for each bridge construction system. Additionally, it prioritizes the subjective criteria to be considered throughout the selection process for all bridge construction systems.
Lastly, the third phase of this study involves the creation and implementation of the VEDS software, designed to compare various bridge deck construction systems. The model, which is intended to assist in the selection of the appropriate bridge deck construction system, is introduced during this phase.
To validate the computer model and assist the decision-maker in choosing the appropriate construction system, two case studies are used. The VEDS model performed well in the results, with the experts surveyed recommending the same construction system as suggested by the VEDS model.
The contribution of this research lies in presenting a value engineering decision support system that utilizes a multi-criteria decision making method, using the TOPSIS method. This system helps designers or decision-makers in choosing the appropriate bridge system based on a range of structural and subjective criteria.
In addition to the efforts outlined in this paper, it has become evident that additional efforts are required to bridge the gap in the following areas: (1) Improve the proposed model to include new construction systems. (2) Add more characteristics of structural criteria, such as span lengths ranging from 500 to 1000, to enhance the precision of the selection of the appropriate construction system. (3) Introduce additional subjective criteria to further enhance the model’s accuracy. (4) Upgrade the model by incorporating substructure elements, such as foundations, piers, and bearings, which will contribute to the determination of the appropriate construction system.

Declarations

Conflict of interest

The authors have no relevant financial or non-financial interests to disclose.

Ethical approval

This article does not contain any studies with human participants or animals performed by any of the authors.
For this type of study, formal consent is not required.
Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://​creativecommons.​org/​licenses/​by/​4.​0/​.
Literature
2.
go back to reference Afify A, Heiza K, Mahdi IM (2017) State of the art report on value engineering applications on new construction systems at R.C bridges in Egypt, Menoufia University, Menoufia Afify A, Heiza K, Mahdi IM (2017) State of the art report on value engineering applications on new construction systems at R.C bridges in Egypt, Menoufia University, Menoufia
4.
go back to reference Haiazah K, Abu al-Aynayn N, Mahdi I (2021) Integrated framework for proper constructability in bridges using value engineering and analytical network process “ANP”: analytical study. J Eng Sci Inf Technol 5(4):81–107 Haiazah K, Abu al-Aynayn N, Mahdi I (2021) Integrated framework for proper constructability in bridges using value engineering and analytical network process “ANP”: analytical study. J Eng Sci Inf Technol 5(4):81–107
6.
go back to reference Tang M-C (2016) Conceptual design of bridges, Taylo & Francis Group, p. 10 Tang M-C (2016) Conceptual design of bridges, Taylo & Francis Group, p. 10
8.
go back to reference Upadhya P, Das M, Das B (2021) Multi-criteria decision-making approach for selecting a bridge superstructure construction method. In: Das BB, Nanukuttan SV, Patnaik AK, Panandikar NS (eds) Recent Trends in Civil Engineering. Lecture Notes in Civil Engineering, vol 105. Springer, Singapore. https://doi.org/10.1007/978-981-15-8293-6_41 Upadhya P, Das M, Das B (2021) Multi-criteria decision-making approach for selecting a bridge superstructure construction method. In: Das BB, Nanukuttan SV, Patnaik AK, Panandikar NS (eds) Recent Trends in Civil Engineering. Lecture Notes in Civil Engineering, vol 105. Springer, Singapore. https://​doi.​org/​10.​1007/​978-981-15-8293-6_​41
11.
go back to reference Remon F. Aziz, Asmaa A. Abdel-Hakam, (2016) Exploring delay causes of road construction in Egypt. Alexandria Eng J p. 25 Remon F. Aziz, Asmaa A. Abdel-Hakam, (2016) Exploring delay causes of road construction in Egypt. Alexandria Eng J p. 25
13.
go back to reference Dell'Isola A (1997) Value engineering: practical applications for design, construction, maintenance and operations. Wiley Dell'Isola A (1997) Value engineering: practical applications for design, construction, maintenance and operations. Wiley
14.
go back to reference Mansour D, Rashid I, Arafat H (2013) Value engineering analysis in the construction of box-girder bridges. Int J Latest Trends Eng Technol 2:65–72 Mansour D, Rashid I, Arafat H (2013) Value engineering analysis in the construction of box-girder bridges. Int J Latest Trends Eng Technol 2:65–72
17.
go back to reference Daniel Jato-Espino, Elena Castillo-Lopez, Jorge Rodriguez-Hernandez and Juan Carlos Canteras-Jordana (2014) A review of application of multi-criteria decision making methods, Automation in Construction, p. 12 Daniel Jato-Espino, Elena Castillo-Lopez, Jorge Rodriguez-Hernandez and Juan Carlos Canteras-Jordana (2014) A review of application of multi-criteria decision making methods, Automation in Construction, p. 12
18.
go back to reference Hajkowicz, Stefan and Kerry Collins (2007) A review of multiple criteria analysis for water resource planning and management, Water resources management Hajkowicz, Stefan and Kerry Collins (2007) A review of multiple criteria analysis for water resource planning and management, Water resources management
19.
go back to reference de Brito M, Evers M (2016) Multi-criteria decision-making for flood risk management: a survey of the current state of the art, Nat Hazards Earth Syst Sci de Brito M, Evers M (2016) Multi-criteria decision-making for flood risk management: a survey of the current state of the art, Nat Hazards Earth Syst Sci
20.
go back to reference Vicent Penadés-Plà, Tatiana García-Segura, José V. Martí and Víctor Yepes (2016) A review of multi-criteria decision-making methods applied to the sustainable bridge design," Institute of Concrete Science and Technology (ICITECH), Universitat Politècnica de València, p. 21 Vicent Penadés-Plà, Tatiana García-Segura, José V. Martí and Víctor Yepes (2016) A review of multi-criteria decision-making methods applied to the sustainable bridge design," Institute of Concrete Science and Technology (ICITECH), Universitat Politècnica de València, p. 21
21.
go back to reference Roszkowska E (2011) Multi-criteria decision making models by applying the topsis method to crisp and interval data. Multiple Criteria Decis Mak 6:200–230 Roszkowska E (2011) Multi-criteria decision making models by applying the topsis method to crisp and interval data. Multiple Criteria Decis Mak 6:200–230
22.
go back to reference Ching-Lai Hwang, Kwangsun Yoon (1981) Multiple attributes decision making: methods and applications Ching-Lai Hwang, Kwangsun Yoon (1981) Multiple attributes decision making: methods and applications
23.
go back to reference Kazimieras EK, Mardani A, Turskis Z, Jusoh A, Nor KM (2016) Development of TOPSIS method to solve complicated decision-making problems—An overview on developments from 2000 to 2015. In: International Journal of Information Technology & Decision Making Kazimieras EK, Mardani A, Turskis Z, Jusoh A, Nor KM (2016) Development of TOPSIS method to solve complicated decision-making problems—An overview on developments from 2000 to 2015. In: International Journal of Information Technology & Decision Making
24.
go back to reference Jia J, Ibrahim M, Hadi M, Orabi W, Xiao Y (2018) Multi-criteria evaluation framework in selection of accelerated bridge construction (ABC) method, Sustainability Jia J, Ibrahim M, Hadi M, Orabi W, Xiao Y (2018) Multi-criteria evaluation framework in selection of accelerated bridge construction (ABC) method, Sustainability
25.
go back to reference Podvezko V (2011) The Comparative Analysis of MCDA Methods SAW and COPRAS, Inzinerine Ekonomika-Engineering Economics Podvezko V (2011) The Comparative Analysis of MCDA Methods SAW and COPRAS, Inzinerine Ekonomika-Engineering Economics
26.
go back to reference Tamiz M, Jones D, Romero C (1998) Goal programming for decision making: an overview of the current state-of-the-art. Eur J Operat Res 111:569CrossRef Tamiz M, Jones D, Romero C (1998) Goal programming for decision making: an overview of the current state-of-the-art. Eur J Operat Res 111:569CrossRef
27.
go back to reference Ballestero E (2007) Compromise programming: a utility-based linear-quadratic composite metric from the trade-off between achievement and balanced (non-corner) solutions. Eur J Operat Res 182:1369CrossRef Ballestero E (2007) Compromise programming: a utility-based linear-quadratic composite metric from the trade-off between achievement and balanced (non-corner) solutions. Eur J Operat Res 182:1369CrossRef
28.
go back to reference Opricovic S, Tzeng G-H (2004) Compromise solution by MCDM methods: a comparative analysis of VIKOR and TOPSIS. Eur J Operat Res 156:445CrossRef Opricovic S, Tzeng G-H (2004) Compromise solution by MCDM methods: a comparative analysis of VIKOR and TOPSIS. Eur J Operat Res 156:445CrossRef
29.
go back to reference Podinovski VV (2016) Optimal weights in DEA models with weight restrictions. Eur J Operat Res 254:916CrossRef Podinovski VV (2016) Optimal weights in DEA models with weight restrictions. Eur J Operat Res 254:916CrossRef
30.
go back to reference Görener A (2012) Comparing AHP and ANP: an application of strategic decisions making in a manufacturing company. Int J Bus Soc Sci 3:194 Görener A (2012) Comparing AHP and ANP: an application of strategic decisions making in a manufacturing company. Int J Bus Soc Sci 3:194
31.
go back to reference e Costa CA, Chagas MP (2004) A career choice problem: an example of how to use MACBETH to build a quantitative value judgments. Eur J Operat Res e Costa CA, Chagas MP (2004) A career choice problem: an example of how to use MACBETH to build a quantitative value judgments. Eur J Operat Res
32.
go back to reference Behzadian M, Kazemzadeh R, Albadvi A, Aghdasi M (2010) PROMETHEE: a comprehensive literature review on methodologies and applications. Eur J Operat Res 200:198CrossRef Behzadian M, Kazemzadeh R, Albadvi A, Aghdasi M (2010) PROMETHEE: a comprehensive literature review on methodologies and applications. Eur J Operat Res 200:198CrossRef
33.
go back to reference Govindan K, Jepsen MB (2016) ELECTRE: a comprehensive literature review on methodologies and applications. Eur J Operat Res 250:1CrossRef Govindan K, Jepsen MB (2016) ELECTRE: a comprehensive literature review on methodologies and applications. Eur J Operat Res 250:1CrossRef
34.
go back to reference Sarabando P, Dias LC (2010) Simple procedures of choice in multicriteria problems without precise information about the alternatives’ values. Comput Oper Res 37:2239CrossRef Sarabando P, Dias LC (2010) Simple procedures of choice in multicriteria problems without precise information about the alternatives’ values. Comput Oper Res 37:2239CrossRef
35.
go back to reference Shahin A (2005) Quality function deployment: a comprehensive review, Department of management, University of Isfahan, Isfahan, Iran Shahin A (2005) Quality function deployment: a comprehensive review, Department of management, University of Isfahan, Isfahan, Iran
38.
go back to reference Andrea E. Berndt (2020) Sampling methods. J Human Lactat Andrea E. Berndt (2020) Sampling methods. J Human Lactat
39.
go back to reference Shrestha N (2021) Factor analysis as a tool for survey analysis. Am J Appl Math Stat 9:4CrossRef Shrestha N (2021) Factor analysis as a tool for survey analysis. Am J Appl Math Stat 9:4CrossRef
40.
go back to reference Tabachnick BG, Fidell LS (2019) Using multivariate statistics (7th ed.) Tabachnick BG, Fidell LS (2019) Using multivariate statistics (7th ed.)
41.
go back to reference Guttman L (1954) Some necessary conditions for common-factor analysis. Psychometrika 19(149):1954 Guttman L (1954) Some necessary conditions for common-factor analysis. Psychometrika 19(149):1954
42.
44.
go back to reference Gündüz M, Nielsen Y, Özdemir M (2013) Quantification of delay factors using the relative importance index method for construction projects in Turkey. J Manag Eng 29:133CrossRef Gündüz M, Nielsen Y, Özdemir M (2013) Quantification of delay factors using the relative importance index method for construction projects in Turkey. J Manag Eng 29:133CrossRef
45.
go back to reference Tholibon DA, Nujid MM, Mokhtar H, Abd Rahim J, Abdul Aziz NF, Tarmizi AAA (2021) Relative importance index (RII) in ranking the factors of employer satisfaction towards industrial training students. Int J Asian Educ 2:493CrossRef Tholibon DA, Nujid MM, Mokhtar H, Abd Rahim J, Abdul Aziz NF, Tarmizi AAA (2021) Relative importance index (RII) in ranking the factors of employer satisfaction towards industrial training students. Int J Asian Educ 2:493CrossRef
48.
go back to reference Hung C-C, Chen L-H (2009) A fuzzy TOPSIS decision making model with entropy weight under intuitionistic fuzzy environment, In: Proceedings of the International Multi-Conference of Engineers and Computer Scientists IMECS, Hong Kong Hung C-C, Chen L-H (2009) A fuzzy TOPSIS decision making model with entropy weight under intuitionistic fuzzy environment, In: Proceedings of the International Multi-Conference of Engineers and Computer Scientists IMECS, Hong Kong
49.
go back to reference Mehdi keshavarz-ghorabaee, Maghsoud Amiri (2018) Ranking of bridge design alternatives: a topsis-fadr method. Baltic J Road Bridge Engi Mehdi keshavarz-ghorabaee, Maghsoud Amiri (2018) Ranking of bridge design alternatives: a topsis-fadr method. Baltic J Road Bridge Engi
50.
go back to reference Szpotowicz R, Tóth C (2020) Revision of sustainable road rating systems: selection of the best suited system for hungarian road construction using TOPSIS method. Sustainability 12:8864 Szpotowicz R, Tóth C (2020) Revision of sustainable road rating systems: selection of the best suited system for hungarian road construction using TOPSIS method. Sustainability 12:8864
51.
go back to reference Zulqarnain R, Saeed M, Ahmad N, Dayan F, Ahmad B (2020) Application of TOPSIS method for decision making. Int J Sci Res Math Statist Sci 7(2):76–81 Zulqarnain R, Saeed M, Ahmad N, Dayan F, Ahmad B (2020) Application of TOPSIS method for decision making. Int J Sci Res Math Statist Sci 7(2):76–81
Metadata
Title
Multi-criteria decision support system for bridge construction system selection utilizing value engineering and TOPSIS
Authors
Alaa ElMarkaby
Abdelmonem Sanad
Ahmed Elyamany
Ebtisam Yehia
Publication date
01-11-2023
Publisher
Springer International Publishing
Published in
Innovative Infrastructure Solutions / Issue 11/2023
Print ISSN: 2364-4176
Electronic ISSN: 2364-4184
DOI
https://doi.org/10.1007/s41062-023-01267-7

Other articles of this Issue 11/2023

Innovative Infrastructure Solutions 11/2023 Go to the issue