1997 | OriginalPaper | Chapter
Multiple Resources
Author : Dr. Alf Kimms
Published in: Multi-Level Lot Sizing and Scheduling
Publisher: Physica-Verlag HD
Included in: Professional Book Archive
Activate our intelligent search to find suitable subject content or patents.
Select sections of text to find matching patents with Artificial Intelligence. powered by
Select sections of text to find additional relevant content using AI-assisted search. powered by
In this chapter we deal with the PLSP—MR. Although some lot sizing models are with multiple resources (e.g. [Der95, He194, Sta88, Sta94]), for solution procedures other than LP—based techniques the single—or multi—machine case is assumed. In Section 8.1 we give an introduction into the resource constrained project scheduling problem (RCPSP) where multiple resources are standard. Then, in Section 8.2, we show how the demand shuffle heuristic can be modified in order to be able to solve the PLSP—MR. Preliminary computational tests are provided in Section 8.3.