Skip to main content
Top

1997 | OriginalPaper | Chapter

Multiple Resources

Author : Dr. Alf Kimms

Published in: Multi-Level Lot Sizing and Scheduling

Publisher: Physica-Verlag HD

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

In this chapter we deal with the PLSP—MR. Although some lot sizing models are with multiple resources (e.g. [Der95, He194, Sta88, Sta94]), for solution procedures other than LP—based techniques the single—or multi—machine case is assumed. In Section 8.1 we give an introduction into the resource constrained project scheduling problem (RCPSP) where multiple resources are standard. Then, in Section 8.2, we show how the demand shuffle heuristic can be modified in order to be able to solve the PLSP—MR. Preliminary computational tests are provided in Section 8.3.

Metadata
Title
Multiple Resources
Author
Dr. Alf Kimms
Copyright Year
1997
Publisher
Physica-Verlag HD
DOI
https://doi.org/10.1007/978-3-642-50162-3_8