Skip to main content
Top
Published in: Soft Computing 4/2013

01-04-2013 | Focus

Rescheduling trains with scenario-based fuzzy recovery time representation on two-way double-track railways

Authors: Lixing Yang, Xuesong Zhou, Ziyou Gao

Published in: Soft Computing | Issue 4/2013

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Severe weather conditions and inherent uncertainties in various components of railway traffic systems can lead to equipment breakdown and reduced capacity on tracks and stations. This paper formulates a two-stage fuzzy optimization model to obtain a robust rescheduling plan under irregular traffic conditions, and a scenario-based representation is adapted to characterize fuzzy recovery time durations on a double-track railway line. The model aims to minimize the expected total delay time in the rescheduled train schedule with respect to the original timetable. Two decomposed sub-models are further developed corresponding to the trains in different directions, and then GAMS optimization software is used to obtain the robust rescheduling plan. The numerical experiments demonstrate the effectiveness of the proposed approaches.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Cacchiani V, Caprara A, Fischetti M (2012) A Lagrangian heuristic for robustness with an application to train timetabling. Transp Sci 144((1):65–73 Cacchiani V, Caprara A, Fischetti M (2012) A Lagrangian heuristic for robustness with an application to train timetabling. Transp Sci 144((1):65–73
go back to reference Caprara A, Galli L, Kroon L, Maroti G, Toth P (2010) Robust Train routing and online re-scheduling. In: Proceedings of 10th workshop on algorithmic approaches for transportation modelling, optimization, and systems (ATMOS’10), pp 24–33 Caprara A, Galli L, Kroon L, Maroti G, Toth P (2010) Robust Train routing and online re-scheduling. In: Proceedings of 10th workshop on algorithmic approaches for transportation modelling, optimization, and systems (ATMOS’10), pp 24–33
go back to reference Dorfman MJ, Medanic J (2004) Scheduling trains on a railway network using a discrete event model of railway traffic. Transp Res B: Methodological 38((1):81–98CrossRef Dorfman MJ, Medanic J (2004) Scheduling trains on a railway network using a discrete event model of railway traffic. Transp Res B: Methodological 38((1):81–98CrossRef
go back to reference Fischetti M, Salvagnin D, Zanette A (2007) Fast approaches to robust railway timetabling. In: Proceedings of 7th workshop on algorithmic approaches for transportation modeling, optimization, and systems, pp 142–157 Fischetti M, Salvagnin D, Zanette A (2007) Fast approaches to robust railway timetabling. In: Proceedings of 7th workshop on algorithmic approaches for transportation modeling, optimization, and systems, pp 142–157
go back to reference Gao J, Liu ZQ, Shen P (2009) On characterization of credibilistic equilibria of fuzzy-payoff two-player zero-sum game. Soft Comput 13(2):127–132MATHCrossRef Gao J, Liu ZQ, Shen P (2009) On characterization of credibilistic equilibria of fuzzy-payoff two-player zero-sum game. Soft Comput 13(2):127–132MATHCrossRef
go back to reference Gao J, Zhang Q, Shen P (2011) Coalitional game with fuzzy payoffs and credibilistic Shapley value. Iran J Fuzzy Syst 8(4):107–117MathSciNet Gao J, Zhang Q, Shen P (2011) Coalitional game with fuzzy payoffs and credibilistic Shapley value. Iran J Fuzzy Syst 8(4):107–117MathSciNet
go back to reference Ghoseiri K, Szidarovszky F, Asgharpour MJ (2004) A multi-objective train scheduling model and solution. Transp Res B: Methodological 38((10):927–952CrossRef Ghoseiri K, Szidarovszky F, Asgharpour MJ (2004) A multi-objective train scheduling model and solution. Transp Res B: Methodological 38((10):927–952CrossRef
go back to reference Higgins A, Kozan E, Ferreira L (1996) Optimal scheduling of trains on a single line track. Transp Res B: Methodological 30(2):147–161CrossRef Higgins A, Kozan E, Ferreira L (1996) Optimal scheduling of trains on a single line track. Transp Res B: Methodological 30(2):147–161CrossRef
go back to reference Higgins A, Kozan E, Ferreira L (1997) Modelling the number and location of siding on a single line railway. Comput Oper Res 24(3):209–220MATHCrossRef Higgins A, Kozan E, Ferreira L (1997) Modelling the number and location of siding on a single line railway. Comput Oper Res 24(3):209–220MATHCrossRef
go back to reference Iida Y (1988) Timetable preparation by A.I. approach. In: Proceedings of European simulation multiconference, Nice, France, pp 163–168 Iida Y (1988) Timetable preparation by A.I. approach. In: Proceedings of European simulation multiconference, Nice, France, pp 163–168
go back to reference Jovanovic D, Harker PT (1991) Tactical scheduling of rail operations: the SCAN I system. Transp Sci 25:46–64CrossRef Jovanovic D, Harker PT (1991) Tactical scheduling of rail operations: the SCAN I system. Transp Sci 25:46–64CrossRef
go back to reference Li F, Gao Z, Li K, Yang L (2008) Efficient scheduling of railway traffic based on global information of train. Transp Res B: Methodological 42:1008–1030 Li F, Gao Z, Li K, Yang L (2008) Efficient scheduling of railway traffic based on global information of train. Transp Res B: Methodological 42:1008–1030
go back to reference Li X, Ralescu D, Tang T (2011) Fuzzy train energy consumption minimization model and algorithm. Iranian J Fuzzy Syst 8(4):77–91MathSciNet Li X, Ralescu D, Tang T (2011) Fuzzy train energy consumption minimization model and algorithm. Iranian J Fuzzy Syst 8(4):77–91MathSciNet
go back to reference Li X, Chien C, Li L, Gao ZY, Yang L (2012a) Energy-constraint operation strategy for high-speed railway. Int J Innov Comput Inf Control 8(10):6569–6583 Li X, Chien C, Li L, Gao ZY, Yang L (2012a) Energy-constraint operation strategy for high-speed railway. Int J Innov Comput Inf Control 8(10):6569–6583
go back to reference Liu B (2004) Uncertainty theory: an introduction to its axiomatic foundations. Springer, Berlin Liu B (2004) Uncertainty theory: an introduction to its axiomatic foundations. Springer, Berlin
go back to reference Liu B, Liu YK (2002) Expected value of fuzzy variable and fuzzy expected value model. IEEE Trans Fuzzy Syst 10(4):445–450CrossRef Liu B, Liu YK (2002) Expected value of fuzzy variable and fuzzy expected value model. IEEE Trans Fuzzy Syst 10(4):445–450CrossRef
go back to reference Meng L, Zhou X (2011) Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach. Transp Res B: Methodological 45:1080–1102CrossRef Meng L, Zhou X (2011) Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach. Transp Res B: Methodological 45:1080–1102CrossRef
go back to reference Sahin I (1999) Railway traffic control and train scheduling based on inter-train conflict management. Transp Res B: Methodological 33(7):511–534CrossRef Sahin I (1999) Railway traffic control and train scheduling based on inter-train conflict management. Transp Res B: Methodological 33(7):511–534CrossRef
go back to reference Yang L, Li K, Gao Z (2009) Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Trans Fuzzy Syst 17(3):617–629CrossRef Yang L, Li K, Gao Z (2009) Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Trans Fuzzy Syst 17(3):617–629CrossRef
go back to reference Yang L, Gao Z, Li K (2010) Passenger train scheduling on single or partially double lines railway with stochastic information. Eng Optim 42:1003–1022MathSciNetCrossRef Yang L, Gao Z, Li K (2010) Passenger train scheduling on single or partially double lines railway with stochastic information. Eng Optim 42:1003–1022MathSciNetCrossRef
go back to reference Yang L, Li X, Gao Z, Li K (2011a) A fuzzy minimum risk model for the railway transportation planning problem. Iranian J Fuzzy Syst 8:39–60MathSciNet Yang L, Li X, Gao Z, Li K (2011a) A fuzzy minimum risk model for the railway transportation planning problem. Iranian J Fuzzy Syst 8:39–60MathSciNet
go back to reference Yang L, Gao Z, Li K (2011b) Railway freight transportation planning with mixed uncertainty of randomness and fuzziness. Appl Soft Comput 11:778–792CrossRef Yang L, Gao Z, Li K (2011b) Railway freight transportation planning with mixed uncertainty of randomness and fuzziness. Appl Soft Comput 11:778–792CrossRef
go back to reference Yang L, Li K, Gao Z, Li X (2012) Optimizing trains movement on a railway network. Omega: Int J Manag Sci 40:619–633CrossRef Yang L, Li K, Gao Z, Li X (2012) Optimizing trains movement on a railway network. Omega: Int J Manag Sci 40:619–633CrossRef
go back to reference Zhou X, Zhong M (2007) Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds. Transp Res B: Methodological 41(3):320–341CrossRef Zhou X, Zhong M (2007) Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds. Transp Res B: Methodological 41(3):320–341CrossRef
Metadata
Title
Rescheduling trains with scenario-based fuzzy recovery time representation on two-way double-track railways
Authors
Lixing Yang
Xuesong Zhou
Ziyou Gao
Publication date
01-04-2013
Publisher
Springer-Verlag
Published in
Soft Computing / Issue 4/2013
Print ISSN: 1432-7643
Electronic ISSN: 1433-7479
DOI
https://doi.org/10.1007/s00500-012-0934-1

Other articles of this Issue 4/2013

Soft Computing 4/2013 Go to the issue

Premium Partner