Skip to main content
Top
Published in: EURO Journal on Transportation and Logistics 5/2019

20-02-2018 | Research Paper

Risk-based optimal scheduling of maintenance activities in a railway network

Authors: Alice Consilvio, Angela Di Febbraro, Rossella Meo, Nicola Sacco

Published in: EURO Journal on Transportation and Logistics | Issue 5/2019

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In a railway system, maintenance activities need to be continuously performed to ensure safety and continued rail operations. In this framework, while on one hand unplanned corrective maintenance activities performed when a fault is occurred are expensive and would cause low service quality, on the other hand preventive maintenance that does not consider the actual asset condition is often unnecessary and turns out to generate avoidable costs. To deal with this issue, in this paper, a risk-based decision support system to schedule the predictive maintenance activities is proposed. In such a framework, the interventions are planned by taking into account the forecast degradation state of railway assets and performed when a given threshold is reached, thus minimizing the probability of both sudden and unnecessary operations. With the end of finding the optimal scheduling of predictive maintenance, in this paper also the space-distributed aspect of railway infrastructure is considered, defining the best path and the activities assignment for each maintenance team. The scheduling model is formulated as a Mixed Integer Linear Programming (MILP) problem aiming at based on the risk minimization, according to the ISO 55000 guidelines. A matheuristic solution approach is proposed and applied to a real rail network. The relevant results show how the proposed scheduling model can use the outputs of predictive tools and degradation models, based on data from field, to mitigate the sudden failure risk by means of a cost-effective maintenance plan at a network level.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Andrews J, Prescott D, De Rozières F (2014) A stochastic model for railway track asset management. Reliab Eng Syst Safe 130:76–84CrossRef Andrews J, Prescott D, De Rozières F (2014) A stochastic model for railway track asset management. Reliab Eng Syst Safe 130:76–84CrossRef
go back to reference Baldi M, Heinicke F, Simroth A, Tadei R (2016) New heuristics for the stochastic tactical railway maintenance problem. Omega 63:94–102CrossRef Baldi M, Heinicke F, Simroth A, Tadei R (2016) New heuristics for the stochastic tactical railway maintenance problem. Omega 63:94–102CrossRef
go back to reference Bharadwaj U (2007) A risk based approach to maintenance optimisation of business critical railway structures/equipment. Seminar on the application of new technologies to railways, 2007 Institution of Engineering and Technology, p 53–60 Bharadwaj U (2007) A risk based approach to maintenance optimisation of business critical railway structures/equipment. Seminar on the application of new technologies to railways, 2007 Institution of Engineering and Technology, p 53–60
go back to reference Borraz-Śanchez C, Yang D, Klabjan D, (2011) Strategic Gang Scheduling for Railroad Maintenance. Operations research and management science, railway application section Borraz-Śanchez C, Yang D, Klabjan D, (2011) Strategic Gang Scheduling for Railroad Maintenance. Operations research and management science, railway application section
go back to reference Budai G, Huisman D, Dekker R (2004) Scheduling preventive railway maintenance activities systems. Proc IEEE Int Conf on Syst ManCyber 5:4171–4176 Budai G, Huisman D, Dekker R (2004) Scheduling preventive railway maintenance activities systems. Proc IEEE Int Conf on Syst ManCyber 5:4171–4176
go back to reference Burrow MPN, Naito S, Evdorides HT (2009) Network-level railway track maintenance management model. Transp Res Rec 2117:66–76CrossRef Burrow MPN, Naito S, Evdorides HT (2009) Network-level railway track maintenance management model. Transp Res Rec 2117:66–76CrossRef
go back to reference Camci F (2015) Maintenance scheduling of geographically distributed assets with prognostics information. Eur J Oper Res 245:506–516CrossRef Camci F (2015) Maintenance scheduling of geographically distributed assets with prognostics information. Eur J Oper Res 245:506–516CrossRef
go back to reference Carretero J, Pérez JM, García-Carballeira JM, Calderón A, Fernández J, García J, Cardona L, Lozano A, Cotaina N, Prete P (2003) Applying RCM in large scale systems: a case study with railway networks. Reliab Eng Syst Safe 82(3):257–273CrossRef Carretero J, Pérez JM, García-Carballeira JM, Calderón A, Fernández J, García J, Cardona L, Lozano A, Cotaina N, Prete P (2003) Applying RCM in large scale systems: a case study with railway networks. Reliab Eng Syst Safe 82(3):257–273CrossRef
go back to reference Consilvio A, Di Febbraro A, Sacco N (2015) A modular model to schedule predictive railway maintenance operations. In: Proc. of 2015 International Conference on Models and Technologies for Intelligent Transportation Systems (MT-ITS), p 426–433 Consilvio A, Di Febbraro A, Sacco N (2015) A modular model to schedule predictive railway maintenance operations. In: Proc. of 2015 International Conference on Models and Technologies for Intelligent Transportation Systems (MT-ITS), p 426–433
go back to reference Consilvio A, Di Febbraro A, Sacco N (2016) Stochastic scheduling approach for predictive risk-based railway maintenance. In: 2016 IEEE International Conference on Intelligent Rail Transportation ICIRT Birmingham UK, p 197–203 Consilvio A, Di Febbraro A, Sacco N (2016) Stochastic scheduling approach for predictive risk-based railway maintenance. In: 2016 IEEE International Conference on Intelligent Rail Transportation ICIRT Birmingham UK, p 197–203
go back to reference Della Croce F, Grosso F, Salassa F (2014) A matheuristic approach for the two-machine total completion time flow shop problem. Ann Oper Res 213:67–78CrossRef Della Croce F, Grosso F, Salassa F (2014) A matheuristic approach for the two-machine total completion time flow shop problem. Ann Oper Res 213:67–78CrossRef
go back to reference DelľOrco M, Ottomanelli M, Caggiani L, Sassanelli D (2008) New decision support system for optimization of rail track maintenance planning based on adaptive neurofuzzy inference system. Transp Res Rec 2043:49–54CrossRef DelľOrco M, Ottomanelli M, Caggiani L, Sassanelli D (2008) New decision support system for optimization of rail track maintenance planning based on adaptive neurofuzzy inference system. Transp Res Rec 2043:49–54CrossRef
go back to reference Ghodrati B, Famurewa S, Hoseinie SH (2016) Railway switches and crossings reliability analysis. In: Proceedings of IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), pp 1412–1416 Ghodrati B, Famurewa S, Hoseinie SH (2016) Railway switches and crossings reliability analysis. In: Proceedings of IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), pp 1412–1416
go back to reference Higgins A (1998) Scheduling of railway track maintenance activities and crews. J Oper Res Soc 49:1026–1033CrossRef Higgins A (1998) Scheduling of railway track maintenance activities and crews. J Oper Res Soc 49:1026–1033CrossRef
go back to reference ISO International Standardization Organisation (2014) ISO 55000:2014 Preview asset management—overview, principles and terminology ISO International Standardization Organisation (2014) ISO 55000:2014 Preview asset management—overview, principles and terminology
go back to reference Jimenez N, Barragan A, Cembrero P, Benitez FG, Caceres N, Schubert F, Simroth A, Santanera C (2010) ACEM-RAIL W.P.1 Task1.1 D1.1 Report on the state of practice of railway infrastructure maintenance. Seventh Framework Programme theme sst.2010.5.2.1 Jimenez N, Barragan A, Cembrero P, Benitez FG, Caceres N, Schubert F, Simroth A, Santanera C (2010) ACEM-RAIL W.P.1 Task1.1 D1.1 Report on the state of practice of railway infrastructure maintenance. Seventh Framework Programme theme sst.2010.5.2.1
go back to reference Jiménez-Redondo N, Escriba S, Benítez FG, Cores F and Cáceres N (2014) Towards automated and cost-efficient track maintenance. Final developments of the ACEM-Rail project. Transport Research Arena 2014 Jiménez-Redondo N, Escriba S, Benítez FG, Cores F and Cáceres N (2014) Towards automated and cost-efficient track maintenance. Final developments of the ACEM-Rail project. Transport Research Arena 2014
go back to reference Jothi R, Raghavachari R (2007) Approximating the k-traveling repairman problem with repair times. J Discret Algorithms 5(2):293–303CrossRef Jothi R, Raghavachari R (2007) Approximating the k-traveling repairman problem with repair times. J Discret Algorithms 5(2):293–303CrossRef
go back to reference Juntti U, Nissen A, Kumar U (2016) Augmented utilization of possession time: analysis for track geometry maintenance. Proc Inst Mech Eng 230(4):1118–1130CrossRef Juntti U, Nissen A, Kumar U (2016) Augmented utilization of possession time: analysis for track geometry maintenance. Proc Inst Mech Eng 230(4):1118–1130CrossRef
go back to reference Letot C, Soleimanmeigouni I, Ahmadi A, Dehombreux P (2016) An adaptive opportunistic maintenance model based on railway track condition prediction. IFAC-PapersOnLine 49–28:120–125CrossRef Letot C, Soleimanmeigouni I, Ahmadi A, Dehombreux P (2016) An adaptive opportunistic maintenance model based on railway track condition prediction. IFAC-PapersOnLine 49–28:120–125CrossRef
go back to reference Lidén T (2015) Railway infrastructure maintenance—a survey of planning problems and conducted research, 18th Euro Working Group on Transportation, EWGT 2015, 14–16 July 2015, Delft, The Netherlands, Transportation Research Procedia Vol 10, p 574–583CrossRef Lidén T (2015) Railway infrastructure maintenance—a survey of planning problems and conducted research, 18th Euro Working Group on Transportation, EWGT 2015, 14–16 July 2015, Delft, The Netherlands, Transportation Research Procedia Vol 10, p 574–583CrossRef
go back to reference Macedo R, Benmansour R, Artiba A, Mladenovic N, Urosevic D (2017) Scheduling preventive railway maintenance activities with resource constraints. Electron Notes Discret Math 58:215–222CrossRef Macedo R, Benmansour R, Artiba A, Mladenovic N, Urosevic D (2017) Scheduling preventive railway maintenance activities with resource constraints. Electron Notes Discret Math 58:215–222CrossRef
go back to reference Morant A, Larsson-Kråik PO, Kumar U (2016) Data-driven model for maintenance decision support—a case study of railway signalling systems. Proc Inst Mech Engineers 230:220–234CrossRef Morant A, Larsson-Kråik PO, Kumar U (2016) Data-driven model for maintenance decision support—a case study of railway signalling systems. Proc Inst Mech Engineers 230:220–234CrossRef
go back to reference Patra AP, Kumar U (2010) Availability analysis of railway track circuit. Proc Inst Mech Eng 224:169–177CrossRef Patra AP, Kumar U (2010) Availability analysis of railway track circuit. Proc Inst Mech Eng 224:169–177CrossRef
go back to reference Peng F, Kang S, Li X, Ouyang Y (2011) A heuristic approach to the railroad track maintenance scheduling problem. Comput Aided Civ Infrastruct Eng 26(12):129–145CrossRef Peng F, Kang S, Li X, Ouyang Y (2011) A heuristic approach to the railroad track maintenance scheduling problem. Comput Aided Civ Infrastruct Eng 26(12):129–145CrossRef
go back to reference Perrier N, Langevin A, Campbell JF (2007) A survey of models and algorithms for winter road maintenance Part III: vehicle routing and depot location for spreading. Comput Oper Res 34(1):211–257CrossRef Perrier N, Langevin A, Campbell JF (2007) A survey of models and algorithms for winter road maintenance Part III: vehicle routing and depot location for spreading. Comput Oper Res 34(1):211–257CrossRef
go back to reference Quiroga LM, Antoni M, Schnieder E (2011) Heuristic based track maintenance scheduling optimization. In: WCRR 2011—9th World Congress of Railway and Research, Lille, France, May 2011 Quiroga LM, Antoni M, Schnieder E (2011) Heuristic based track maintenance scheduling optimization. In: WCRR 2011—9th World Congress of Railway and Research, Lille, France, May 2011
go back to reference Shingler R, Fadin G, Umiliacchi P (2008) From RCM to predictive maintenance: The InteGRail approach. In: 4th IET International Conference on Railway Condition Monitoring, p 1–5 Shingler R, Fadin G, Umiliacchi P (2008) From RCM to predictive maintenance: The InteGRail approach. In: 4th IET International Conference on Railway Condition Monitoring, p 1–5
go back to reference Simson SA, Ferreira L, Murray MH (2000) Rail track maintenance planning: an assessment model. Transport Res Rec 1713:29–35CrossRef Simson SA, Ferreira L, Murray MH (2000) Rail track maintenance planning: an assessment model. Transport Res Rec 1713:29–35CrossRef
go back to reference Soh SS, Radzi NHM, Haron H (2012) Review on scheduling techniques of preventive maintenance activities of railway. In: Proc. 4th International Conference on computational intelligence, modelling and simulation (CIMSiM), p 310–315 Soh SS, Radzi NHM, Haron H (2012) Review on scheduling techniques of preventive maintenance activities of railway. In: Proc. 4th International Conference on computational intelligence, modelling and simulation (CIMSiM), p 310–315
go back to reference Su Z, Jamshidi A, Núñez A, Baldi S, De Schutter B (2017) Multi-level condition-based maintenance planning for railway infrastructures—a scenario-based chance-constrained approach. Transp Res Part C 84:92–123CrossRef Su Z, Jamshidi A, Núñez A, Baldi S, De Schutter B (2017) Multi-level condition-based maintenance planning for railway infrastructures—a scenario-based chance-constrained approach. Transp Res Part C 84:92–123CrossRef
go back to reference Sun J, Zhang R, Qin S (2017) Turnout maintenance scheduling problem considering reliabilities: modeling and optimization. In: Proceedings of the 36th Chinese Control Conference July 26–28, Dalian, China Sun J, Zhang R, Qin S (2017) Turnout maintenance scheduling problem considering reliabilities: modeling and optimization. In: Proceedings of the 36th Chinese Control Conference July 26–28, Dalian, China
go back to reference Tezuka M, Munakata S, Sawada M, (2015) Maintenance schedule optimization based on failure probability distribution. In: Proceedings of the 2015 International Conference on industrial engineering and operations management Dubai, United Arab Emirates (UAE), March 3–5 Tezuka M, Munakata S, Sawada M, (2015) Maintenance schedule optimization based on failure probability distribution. In: Proceedings of the 2015 International Conference on industrial engineering and operations management Dubai, United Arab Emirates (UAE), March 3–5
go back to reference Umiliacchi P, Lane D, Romano F (2011) Predictive maintenance of railway subsystems using an ontology based modelling approach. In: 9th World Conference on Railway Research Umiliacchi P, Lane D, Romano F (2011) Predictive maintenance of railway subsystems using an ontology based modelling approach. In: 9th World Conference on Railway Research
go back to reference Wen M, Li R, Salling KB (2016) Optimization of preventive condition-based tamping for railway tracks. Eur J Oper Res 252:455–465CrossRef Wen M, Li R, Salling KB (2016) Optimization of preventive condition-based tamping for railway tracks. Eur J Oper Res 252:455–465CrossRef
go back to reference Yokoyama A (2015) Innovative changes for maintenance of railway by using ICT—to achieve Smart maintenance. In: The Fourth International Conference on through-life engineering services, Procedia CIRP, Vol. 38 pp. 24–29CrossRef Yokoyama A (2015) Innovative changes for maintenance of railway by using ICT—to achieve Smart maintenance. In: The Fourth International Conference on through-life engineering services, Procedia CIRP, Vol. 38 pp. 24–29CrossRef
go back to reference Zhang T, Andrews J, Wang R (2013) Optimal scheduling of track maintenance on a railway network. QualReliab Eng Int 29:285–297 Zhang T, Andrews J, Wang R (2013) Optimal scheduling of track maintenance on a railway network. QualReliab Eng Int 29:285–297
go back to reference Zoeteman A, Esveld C (2004) State of the art in railway maintenance management: planning systems and their application in Europe. IEEE Int Conf Syst Man Cyber 5:4165–4170 Zoeteman A, Esveld C (2004) State of the art in railway maintenance management: planning systems and their application in Europe. IEEE Int Conf Syst Man Cyber 5:4165–4170
Metadata
Title
Risk-based optimal scheduling of maintenance activities in a railway network
Authors
Alice Consilvio
Angela Di Febbraro
Rossella Meo
Nicola Sacco
Publication date
20-02-2018
Publisher
Springer Berlin Heidelberg
Published in
EURO Journal on Transportation and Logistics / Issue 5/2019
Print ISSN: 2192-4376
Electronic ISSN: 2192-4384
DOI
https://doi.org/10.1007/s13676-018-0117-z

Other articles of this Issue 5/2019

EURO Journal on Transportation and Logistics 5/2019 Go to the issue