2022 | OriginalPaper | Chapter

System Dynamics-Based Identification of Mechanical Factors for Metro Construction Schedule Management

Authors : Can Yin, Yi Tan

Published in: Proceedings of the 26th International Symposium on Advancement of Construction Management and Real Estate

Publisher: Springer Nature Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The scale of rail transit has been increasing recently, which lead to demanding requirements the management level for metro projects. To effectively control the construction schedule of the metro shield project, system dynamics is an effective method of dynamic control, so it was introduced to this article. This paper proposes to study the influence level of various factors on the construction schedule. Firstly, constructing various subsystems includes the shield launching, the shield tunneling and segment assembly subsystems. Secondly, a total system dynamics model can be established based on the relationship between the various subsystems. Finally, the shield machinery influence factors functions are obtained by questionnaire survey and the analytic hierarchy process method (AHP), and the functions are input into the system dynamics model to simulate the construction schedule. The results show that the metro construction model has a high fit with the actual construction operation, which can effectively reflect the actual schedule of metro construction. Through the forecast of the construction schedule, the project manager can obtain decision-making reference and comprehensively understand the project progress.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Analysis of the current situation of investment, construction and operation of China’s railway industry in 2020 (2021) Analysis of the current situation of investment, construction and operation of China’s railway industry in 2020 (2021)
2.
go back to reference Analysis of China’s railway operating mileage and capacity in 2020: mileage will exceed 140,000 kilometers (2021) Analysis of China’s railway operating mileage and capacity in 2020: mileage will exceed 140,000 kilometers (2021)
3.
go back to reference Qiyao, S.: Research on progress management of China’s rail transit projects (2019) Qiyao, S.: Research on progress management of China’s rail transit projects (2019)
4.
go back to reference Zhou Shaodong, R.Y., Zhou, Y., et al.: Integrated management of subway construction process based on BIM (2016) Zhou Shaodong, R.Y., Zhou, Y., et al.: Integrated management of subway construction process based on BIM (2016)
5.
go back to reference Quan, L.: Analysis of the key chain technology in the construction schedule control of the subway station (2019) Quan, L.: Analysis of the key chain technology in the construction schedule control of the subway station (2019)
6.
go back to reference Zhang Zhao, C.G., Jiang, M.: Application of critical chain technology in construction schedule control of metro station (2017) Zhang Zhao, C.G., Jiang, M.: Application of critical chain technology in construction schedule control of metro station (2017)
7.
8.
go back to reference Shouzhi, G.: Application of improved BP neural network in risk analysis of construction schedule of metro project (2018) Shouzhi, G.: Application of improved BP neural network in risk analysis of construction schedule of metro project (2018)
9.
go back to reference Man Qingpeng, W.Y., Li, X.: Construction schedule modeling and optimization method based on Petri net (2009) Man Qingpeng, W.Y., Li, X.: Construction schedule modeling and optimization method based on Petri net (2009)
10.
go back to reference Hailing, L.: Research on engineering project group management based on Petri net workflow technology (2012) Hailing, L.: Research on engineering project group management based on Petri net workflow technology (2012)
11.
go back to reference Cheng, F.F., Wang, Y.W., Ling, X.Z., et al.: A Petri net simulation model for virtual construction of earthmoving operations. Autom. Constr. 20(2), 181–188 (2011)CrossRef Cheng, F.F., Wang, Y.W., Ling, X.Z., et al.: A Petri net simulation model for virtual construction of earthmoving operations. Autom. Constr. 20(2), 181–188 (2011)CrossRef
12.
go back to reference Long Hongde, F.W., Wu, Y.: Schedule management of BT project of Shenzhen metro line 5 (2012) Long Hongde, F.W., Wu, Y.: Schedule management of BT project of Shenzhen metro line 5 (2012)
13.
go back to reference Chaochao, L.: Analysis on the progress management of subway civil engineering (2017) Chaochao, L.: Analysis on the progress management of subway civil engineering (2017)
14.
go back to reference Song Yirong, C.G., Xia, S.: Underground excavation method metro construction survey and feedback technology (2010) Song Yirong, C.G., Xia, S.: Underground excavation method metro construction survey and feedback technology (2010)
15.
go back to reference Jianjian, R.: Geotechnical anchoring construction information feedback and engineering changes (2018) Jianjian, R.: Geotechnical anchoring construction information feedback and engineering changes (2018)
16.
go back to reference Pingan, L.: Information feedback and construction control of foundation pit construction of a metro station (2004) Pingan, L.: Information feedback and construction control of foundation pit construction of a metro station (2004)
17.
go back to reference Xiao, J., Song, J., Liang, D., et al.: Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils. Int. J. Transp. Sci. Technol. 9(4), 344–354 (2020)CrossRef Xiao, J., Song, J., Liang, D., et al.: Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils. Int. J. Transp. Sci. Technol. 9(4), 344–354 (2020)CrossRef
18.
go back to reference Ouyang Yewei, S.K., Zhang, Y.: Research on BIM-based metro engineering construction schedule management method (2017) Ouyang Yewei, S.K., Zhang, Y.: Research on BIM-based metro engineering construction schedule management method (2017)
19.
go back to reference He Qinghua, H.X.: Framework construction and process design of BIM-based schedule management system (2011) He Qinghua, H.X.: Framework construction and process design of BIM-based schedule management system (2011)
20.
go back to reference Chen, C., Tang, L.: BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance. Autom. Constr. 107, 102944 (2019)CrossRef Chen, C., Tang, L.: BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance. Autom. Constr. 107, 102944 (2019)CrossRef
21.
go back to reference Hu, Z., Zhang, J.: BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Autom. Constr. 20(2), 167–180 (2011) Hu, Z., Zhang, J.: BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Autom. Constr. 20(2), 167–180 (2011)
22.
go back to reference Chen Xuefeng, C.H., Liu, X.: Research on the monitoring system of the information construction of the foundation pit of the metro station (2011) Chen Xuefeng, C.H., Liu, X.: Research on the monitoring system of the information construction of the foundation pit of the metro station (2011)
23.
go back to reference Huang Kan, X.J., Zhao, D.: Early warning mechanism and information processing feedback for highway tunnel monitoring and measurement (2017) Huang Kan, X.J., Zhao, D.: Early warning mechanism and information processing feedback for highway tunnel monitoring and measurement (2017)
24.
go back to reference Tang Shulin, J.A.: Research on the application of visualized intelligent feedback analysis system in tunnel construction (2011) Tang Shulin, J.A.: Research on the application of visualized intelligent feedback analysis system in tunnel construction (2011)
25.
go back to reference Tang Xiangao, L.N., Zhao, B.: Application of video information feedback system in the construction of rail transit engineering (2011) Tang Xiangao, L.N., Zhao, B.: Application of video information feedback system in the construction of rail transit engineering (2011)
26.
go back to reference Sahlol, D.G., Elbeltagi, E., Elzoughiby, M., et al.: Sustainable building materials assessment and selection using system dynamics. J. Build. Eng. 35, 101978 (2021)CrossRef Sahlol, D.G., Elbeltagi, E., Elzoughiby, M., et al.: Sustainable building materials assessment and selection using system dynamics. J. Build. Eng. 35, 101978 (2021)CrossRef
27.
go back to reference Mak, T.M.W., Chen, P.-C., Wang, L., et al.: A system dynamics approach to determine construction waste disposal charge in Hong Kong. J. Clean. Prod. 241, 118309 (2019)CrossRef Mak, T.M.W., Chen, P.-C., Wang, L., et al.: A system dynamics approach to determine construction waste disposal charge in Hong Kong. J. Clean. Prod. 241, 118309 (2019)CrossRef
28.
go back to reference Mohammadi, A., Tavakolan, M.: Modeling the effects of production pressure on safety performance in construction projects using system dynamics. J. Saf. Res. 71, 273–284 (2019)CrossRef Mohammadi, A., Tavakolan, M.: Modeling the effects of production pressure on safety performance in construction projects using system dynamics. J. Saf. Res. 71, 273–284 (2019)CrossRef
29.
go back to reference Ozcan-Deniz, G., Zhu, Y.: A system dynamics model for construction method selection with sustainability considerations. J. Clean. Prod. 121, 33–44 (2016)CrossRef Ozcan-Deniz, G., Zhu, Y.: A system dynamics model for construction method selection with sustainability considerations. J. Clean. Prod. 121, 33–44 (2016)CrossRef
Metadata
Title
System Dynamics-Based Identification of Mechanical Factors for Metro Construction Schedule Management
Authors
Can Yin
Yi Tan
Copyright Year
2022
Publisher
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-19-5256-2_62