Skip to main content
Top

2015 | OriginalPaper | Chapter

3. Two-Stage Optimal Scheduling Model of Hydrothermal Electricity Based on Generation Performance

Authors : Jiayu Li, Ruochen Li, Chao Qin, Minfang Huang, Guan Wang, Zhongfu Tan

Published in: Proceedings of the Second International Conference on Mechatronics and Automatic Control

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Electric power industry is energy-intensive industry. The energy efficiency improvement, change of energy utilization mode, and reduction of carbon-based energy use of electric power industry play important roles in alleviating the contradiction between supply and demand of energy and improving the ecological environment. Theory and practice indicated that the priority use of clean and renewable energy and making cleaning power and thermal power combined operation are effective ways to make the power system economic operation, improve energy utilization efficiency, and save nonrenewable energy. At present, hydroelectric energy is in dominant among clean and renewable energies in China. Hydrothermal power system combined operation is an effective way to enhance the energy utilization efficiency of power systems and promote the adjustment of energy utilization mode. The rational coordination of hydrothermal power system operation mode which can make the best use of the complementary advantages of power systems can promote power system energy-saving operation. Tightly focusing on combined optimization dispatch problems for hydrothermal power system, this chapter has made deep research on power supply and demand as well as power output and replacements of hydrothermal units for the purpose of water resources reasonable utilization and coal and non-renewable energy conservation.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Arroyo JM, Conejo AJ. Optimal response of a thermal unit to an electricity spot market. IEEE Trans Power Syst. 2000;15(3):1098–104.CrossRef Arroyo JM, Conejo AJ. Optimal response of a thermal unit to an electricity spot market. IEEE Trans Power Syst. 2000;15(3):1098–104.CrossRef
2.
go back to reference Rodrigues RN, Finardi EC, DaSilva EL. Optimal dispatch of hydro generation plants via augmented Lagrangian. IEEE Trans Power Sys. 2005;3(7):1–6. Rodrigues RN, Finardi EC, DaSilva EL. Optimal dispatch of hydro generation plants via augmented Lagrangian. IEEE Trans Power Sys. 2005;3(7):1–6.
3.
go back to reference Farhat IA, El-Hawary ME. Optimization methods applied for solving the short-term hydrothermal coordination problem. Electr Power Sys Res. 2009;79(9):1308–20.CrossRef Farhat IA, El-Hawary ME. Optimization methods applied for solving the short-term hydrothermal coordination problem. Electr Power Sys Res. 2009;79(9):1308–20.CrossRef
4.
go back to reference Rashid AHA, Nor KM. An efficient method for optimal scheduling of fixed head hydro and thermal plants. IEEE Trans Power Sys. 1991;6(2):632–6.CrossRef Rashid AHA, Nor KM. An efficient method for optimal scheduling of fixed head hydro and thermal plants. IEEE Trans Power Sys. 1991;6(2):632–6.CrossRef
5.
go back to reference Sasikala J, Ramaswamy M Optimal gamma based fixed head hydrothermal scheduling using genetic algorithm. Exp Sys Appl. 2010;37(4):3352–57.CrossRef Sasikala J, Ramaswamy M Optimal gamma based fixed head hydrothermal scheduling using genetic algorithm. Exp Sys Appl. 2010;37(4):3352–57.CrossRef
6.
go back to reference El-Hawary ME, Ravindranath KM. Hydro-thermal power flow scheduling accounting for head variations. IEEE Trans Power Sys. 1992;7(3):1232–38.CrossRef El-Hawary ME, Ravindranath KM. Hydro-thermal power flow scheduling accounting for head variations. IEEE Trans Power Sys. 1992;7(3):1232–38.CrossRef
7.
go back to reference Lyra C, Ferreira LRM. A multi-objective approach to the short-term scheduling of a hydroelectric power system. IEEE Trans Power Sys. 1995;10(4):1750–55.CrossRef Lyra C, Ferreira LRM. A multi-objective approach to the short-term scheduling of a hydroelectric power system. IEEE Trans Power Sys. 1995;10(4):1750–55.CrossRef
Metadata
Title
Two-Stage Optimal Scheduling Model of Hydrothermal Electricity Based on Generation Performance
Authors
Jiayu Li
Ruochen Li
Chao Qin
Minfang Huang
Guan Wang
Zhongfu Tan
Copyright Year
2015
DOI
https://doi.org/10.1007/978-3-319-13707-0_3