Skip to main content
Top
Published in: Production Engineering 2-3/2013

01-04-2013 | Production Process

Validation of data fusion as a method for forecasting the regeneration workload for complex capital goods

Authors: Steffen C. Eickemeyer, Tim Borcherding, Sebastian Schäfer, Peter Nyhuis

Published in: Production Engineering | Issue 2-3/2013

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The regeneration of complex capital goods is afflicted with a high degree of uncertainty. Neither the extent of the damage to the goods nor the resulting maintenance workload is known in advance, and that poses challenges for capacity planning. Data fusion in the form of Bayesian networks is used to prepare forecasts in order to estimate the workload in maintenance processes. The objective is to optimize the planability of the capacities required.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Footnotes
1
Customer type (e.g. low-cost carrier, leasing company) distinguishes between business models that characterize various regeneration strategies.
 
Literature
1.
go back to reference Schuh G, Lorenz B (2009) TPM—eine Basis für die wertorientierte Instandhaltung. In: Reichel J, Müller G, Mandelartz J (eds) Betriebliche Instandhaltung, 1st edn. Springer, Berlin, p 76 Schuh G, Lorenz B (2009) TPM—eine Basis für die wertorientierte Instandhaltung. In: Reichel J, Müller G, Mandelartz J (eds) Betriebliche Instandhaltung, 1st edn. Springer, Berlin, p 76
2.
go back to reference Cigolini R, Fedele L, Garetti M, Macchi M (2008) Recent advances in maintenance and facility management. Prod Plan Control 19(4):279–286CrossRef Cigolini R, Fedele L, Garetti M, Macchi M (2008) Recent advances in maintenance and facility management. Prod Plan Control 19(4):279–286CrossRef
3.
go back to reference Horn W (2009) Dienstleistung Instandhaltung. In: Reichel J, Müller G, Mandelartz J (eds) Betriebliche Instandhaltung, 1st edn. Springer, Berlin, p 253CrossRef Horn W (2009) Dienstleistung Instandhaltung. In: Reichel J, Müller G, Mandelartz J (eds) Betriebliche Instandhaltung, 1st edn. Springer, Berlin, p 253CrossRef
4.
go back to reference Eickemeyer SC, Nyhuis P (2010) Capacity planning and coordination with fuzzy load information. Bus Rev Camb 16(1):259–264 Eickemeyer SC, Nyhuis P (2010) Capacity planning and coordination with fuzzy load information. Bus Rev Camb 16(1):259–264
5.
go back to reference Eickemeyer SC, Borcherding T, Nyhuis P (2012) Information fusion as a means of forecasting expenditures for regenerating complex investment goods. Int J Mech Ind Eng 6:179–182 Eickemeyer SC, Borcherding T, Nyhuis P (2012) Information fusion as a means of forecasting expenditures for regenerating complex investment goods. Int J Mech Ind Eng 6:179–182
6.
go back to reference Freund C (2010) Die Instandhaltung im Wandel. In: Schenk M (ed) Instandhaltung technischer systeme: methoden und Werkzeuge zur Gewährleistung eines sicheren und wirtschaftlichen Anlagenbetriebes, 1st edn. Springer, Berlin, p 17 Freund C (2010) Die Instandhaltung im Wandel. In: Schenk M (ed) Instandhaltung technischer systeme: methoden und Werkzeuge zur Gewährleistung eines sicheren und wirtschaftlichen Anlagenbetriebes, 1st edn. Springer, Berlin, p 17
7.
go back to reference Reményi C, Staudacher S (2012) Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance. Int J Prod Econ (accepted for publication). doi:10.1016/j.ijpe.2012.10.022 Reményi C, Staudacher S (2012) Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance. Int J Prod Econ (accepted for publication). doi:10.​1016/​j.​ijpe.​2012.​10.​022
8.
go back to reference Reményi C, Staudacher S, Becker H, Dinc S, Manejev R, Fichtelmann R (2011) Decentralized job-shop control for the maintenance of aircraft engines. In: Spath D (ed) Proceedings of the 21st ICPR international conference on production research, July 31—August 4, 2011, Stuttgart Reményi C, Staudacher S, Becker H, Dinc S, Manejev R, Fichtelmann R (2011) Decentralized job-shop control for the maintenance of aircraft engines. In: Spath D (ed) Proceedings of the 21st ICPR international conference on production research, July 31—August 4, 2011, Stuttgart
9.
go back to reference Guide VDR Jr, Spencer MS (1997) Rough-cut capacity planning for remanufacturing firms. Prod Plan Control 8(3):237–244CrossRef Guide VDR Jr, Spencer MS (1997) Rough-cut capacity planning for remanufacturing firms. Prod Plan Control 8(3):237–244CrossRef
10.
go back to reference Reményi C, Staudacher S, Holzheimer N, Schulz S (2011) Simulation of the maintenance process in an aircraft engine maintenance company. In: Duffie NA, DeVries MF (eds) Proceedings of the 44rd CIRP conference on manufacturing systems, June 1–3, 2011, Madison, Wisconsin/USA Reményi C, Staudacher S, Holzheimer N, Schulz S (2011) Simulation of the maintenance process in an aircraft engine maintenance company. In: Duffie NA, DeVries MF (eds) Proceedings of the 44rd CIRP conference on manufacturing systems, June 1–3, 2011, Madison, Wisconsin/USA
11.
go back to reference Wagner M (2009) Modellbasierte Arbeitskräfteplanung für stochastische Instandhaltungsereignisse in der zivilen Luftfahrt. Dissertation, Technical University of Berlin Wagner M (2009) Modellbasierte Arbeitskräfteplanung für stochastische Instandhaltungsereignisse in der zivilen Luftfahrt. Dissertation, Technical University of Berlin
12.
go back to reference Eickemeyer SC, Goßmann D, Wesebaum S, Nyhuis P (2012) Entwicklung einer Schadensbibliothek für die Regeneration komplexer Investitionsgüter. Ind Manag 2:59–62 Eickemeyer SC, Goßmann D, Wesebaum S, Nyhuis P (2012) Entwicklung einer Schadensbibliothek für die Regeneration komplexer Investitionsgüter. Ind Manag 2:59–62
13.
go back to reference Winston PH (1992) Artificial intelligence, 3rd edn. Addison-Wesley, Boston, p 5 Winston PH (1992) Artificial intelligence, 3rd edn. Addison-Wesley, Boston, p 5
14.
go back to reference Azadegan A, Ghazinoory S, Samouei P (2011) Fuzzy logic in manufacturing: a review of literature and a specialized application. Int J Prod Econom 2:258–270CrossRef Azadegan A, Ghazinoory S, Samouei P (2011) Fuzzy logic in manufacturing: a review of literature and a specialized application. Int J Prod Econom 2:258–270CrossRef
15.
go back to reference Novák V, Perfilieva I, Močkoř J (1999) Mathematical principles of fuzzy logic, 1st edn. Kluwer, Norvell, pp 1–12MATH Novák V, Perfilieva I, Močkoř J (1999) Mathematical principles of fuzzy logic, 1st edn. Kluwer, Norvell, pp 1–12MATH
16.
go back to reference Hopfield JJ (1988) Artificial neural networks. IEEE Trans Circuits Devices Mag 4:3–10CrossRef Hopfield JJ (1988) Artificial neural networks. IEEE Trans Circuits Devices Mag 4:3–10CrossRef
17.
go back to reference Graupe D (2007) Principles of artificial and neural networks, 2nd edn. World Scientific Publishing Co. Pte. Ltd., Singapore, p 1 Graupe D (2007) Principles of artificial and neural networks, 2nd edn. World Scientific Publishing Co. Pte. Ltd., Singapore, p 1
18.
go back to reference Büttner R (2009) Automatisierte Verhandlungen in Multi-Agenten-Systemen—Entwurf eines argumentationsbasierten Mechanismus für nur imperfekt beschreibbare Verhandlungsgegenstände. Dissertation, University of Hohenheim Büttner R (2009) Automatisierte Verhandlungen in Multi-Agenten-Systemen—Entwurf eines argumentationsbasierten Mechanismus für nur imperfekt beschreibbare Verhandlungsgegenstände. Dissertation, University of Hohenheim
19.
go back to reference Richter MM (2000) Fallbasiertes Schließen. In: Görz G, Rollinger C-R, Schneeberger J (eds) Handbuch der Künstlichen Intelligenz, 3rd edn. Oldenbourg Wissenschaftsverlag, Munich, p 408 Richter MM (2000) Fallbasiertes Schließen. In: Görz G, Rollinger C-R, Schneeberger J (eds) Handbuch der Künstlichen Intelligenz, 3rd edn. Oldenbourg Wissenschaftsverlag, Munich, p 408
20.
go back to reference Beierle C, Kern-Isberner G (2008) Methoden wissensbasierter Systeme—Grundlagen, Algorithmen, Anwendungen, 4th edn. Viehweg + Teubner, Wiesbaden, p 158 Beierle C, Kern-Isberner G (2008) Methoden wissensbasierter Systeme—Grundlagen, Algorithmen, Anwendungen, 4th edn. Viehweg + Teubner, Wiesbaden, p 158
21.
go back to reference Xu LD (1994/1995) Case based reasoning: a major paradigm of artificial intelligence. IEEE Potentials 5:10–13 Xu LD (1994/1995) Case based reasoning: a major paradigm of artificial intelligence. IEEE Potentials 5:10–13
22.
go back to reference Akerkar R (2005) Introduction to artificial intelligence, 1st edn. Prenctice-Hall of India Private Limited, New Delhi, pp 234–237 Akerkar R (2005) Introduction to artificial intelligence, 1st edn. Prenctice-Hall of India Private Limited, New Delhi, pp 234–237
23.
go back to reference Alpaydin E (2008) Maschinelles Lernen, 1st edn. Oldenbourg Wissenschaftsverlag, München, p 53MATH Alpaydin E (2008) Maschinelles Lernen, 1st edn. Oldenbourg Wissenschaftsverlag, München, p 53MATH
24.
go back to reference Schiaffino S, Amandi A (2005) Intelligent user profiling. In: Brahmer M (ed) Artificial intelligence—an international perspective, 1st edn. Springer, Berlin, p 205 Schiaffino S, Amandi A (2005) Intelligent user profiling. In: Brahmer M (ed) Artificial intelligence—an international perspective, 1st edn. Springer, Berlin, p 205
25.
go back to reference Darwiche A (2010) Bayesian networks—what are Bayesian networks and why are their applications growing across all fields? Commun ACM 12:80–90CrossRef Darwiche A (2010) Bayesian networks—what are Bayesian networks and why are their applications growing across all fields? Commun ACM 12:80–90CrossRef
26.
go back to reference Koski T, Noble JM (2009) Bayesian networks—an introduction, 1st edn. Wiley, Chichester, p 21MATHCrossRef Koski T, Noble JM (2009) Bayesian networks—an introduction, 1st edn. Wiley, Chichester, p 21MATHCrossRef
27.
go back to reference Heckerman D, Geiger D, Chickering DM (1995) Learning Bayesian networks: the combination of knowledge and statistical data. Mach Learn 20:197–243MATH Heckerman D, Geiger D, Chickering DM (1995) Learning Bayesian networks: the combination of knowledge and statistical data. Mach Learn 20:197–243MATH
29.
go back to reference Everitt B, Howell DC (2005) Encyclopedia of statistics in behavioral science, volume 1 (A-D), 1st edn. Wiley, New York, p 132fCrossRef Everitt B, Howell DC (2005) Encyclopedia of statistics in behavioral science, volume 1 (A-D), 1st edn. Wiley, New York, p 132fCrossRef
30.
go back to reference Heckerman D (1997) Bayesian networks for data mining. Data Min Knowl Discov 1:79–119CrossRef Heckerman D (1997) Bayesian networks for data mining. Data Min Knowl Discov 1:79–119CrossRef
31.
go back to reference Jain CL, Malehorn J (2005) Practical guide to business forecasting, 2nd edn. Institute of business forecast, New York, pp 210–213 Jain CL, Malehorn J (2005) Practical guide to business forecasting, 2nd edn. Institute of business forecast, New York, pp 210–213
32.
go back to reference Kahn KB (1998) Revisiting top-down versus bottom-up forecasting. J Bus Forecast Methods Syst 2:14–19 Kahn KB (1998) Revisiting top-down versus bottom-up forecasting. J Bus Forecast Methods Syst 2:14–19
33.
go back to reference Schwarzkopf AB, Tersine RJ, Morris JS (1988) Top-down versus bottom-up forecasting strategies. Int J Prod Res 11:1833–1843CrossRef Schwarzkopf AB, Tersine RJ, Morris JS (1988) Top-down versus bottom-up forecasting strategies. Int J Prod Res 11:1833–1843CrossRef
34.
go back to reference McNaught K, Chan A (2011) Bayesian networks in manufacturing. J Manuf Techn Manag 6:734–747CrossRef McNaught K, Chan A (2011) Bayesian networks in manufacturing. J Manuf Techn Manag 6:734–747CrossRef
Metadata
Title
Validation of data fusion as a method for forecasting the regeneration workload for complex capital goods
Authors
Steffen C. Eickemeyer
Tim Borcherding
Sebastian Schäfer
Peter Nyhuis
Publication date
01-04-2013
Publisher
Springer-Verlag
Published in
Production Engineering / Issue 2-3/2013
Print ISSN: 0944-6524
Electronic ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-013-0444-8

Other articles of this Issue 2-3/2013

Production Engineering 2-3/2013 Go to the issue

Premium Partners