12-01-2024 | Research

A Fuzzy Overlapping Project Resource Optimization Model in the Project Construction Industry with a Fractal Approach

Author: Shakib Zohrehvandi

Published in: Mobile Networks and Applications

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

When the number of projects in a company increases, it becomes very important to choose the right strategy to supply resources and raw materials in profit and loss and finish the work according to the schedule. This study presents a new mathematical model using the fractal method to optimize the resource planning system in project-oriented construction and industrial companies, and the results are analyzed. In the model proposed in this research, a fuzzy method and an overlapping method are used. Using the method of Pentagonal fuzzy numbers in determining the appropriate number of resources for project activities, as well as using a method of overlapping activities to determine the appropriate time of overlapping activities will lead to optimal use of project resources. This article aims to introduce a fuzzy overlapping project resource optimization (FOPRO) model in project-oriented construction and industrial companies by providing a fractal framework to minimize resource costs and the smooth flow of materials between projects to meet the existing demand. Assuming three levels of headquarters, regions, and projects, each of them in the collection is a self-similar structure defined as a fractal. The study was carried out in one of the contracting companies in the industrial and construction fields, which operates as a project-oriented project in different regions of the country. To evaluate the proposed model, the obtained results were compared with the results of previous models. The results showed that the model presented in this research was able to create optimization in terms of sending machines, material and manpower between different centers.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Show more products
Literature
1.
go back to reference Cheraghi E, Zohrehvandi S, Knapčíková L, Shadrokh S, Soltani R, Khalilzadeh M (2022) Optimizing the resource’s mobility, transportation, and networking in the project construction industry, using a fractal method. In: EAI international conference on smart cities within SmartCity360° Summit. Springer Nature Switzerland, Cham, pp 101–118. https://doi.org/10.1007/978-3-031-28225-6_7 Cheraghi E, Zohrehvandi S, Knapčíková L, Shadrokh S, Soltani R, Khalilzadeh M (2022) Optimizing the resource’s mobility, transportation, and networking in the project construction industry, using a fractal method. In: EAI international conference on smart cities within SmartCity360° Summit. Springer Nature Switzerland, Cham, pp 101–118. https://​doi.​org/​10.​1007/​978-3-031-28225-6_​7
4.
go back to reference Karaa FA, Nasr AY (1986) Resource management in construction. J Constr Eng Manag 112(3):346–357CrossRef Karaa FA, Nasr AY (1986) Resource management in construction. J Constr Eng Manag 112(3):346–357CrossRef
14.
go back to reference Canavesio MM, Quaglia C, Martinez E (2016) Agent-based simulation of a project fractal company. In: XXII Congreso Argentino de Ciencias de la Computación (CACIC 2016) Canavesio MM, Quaglia C, Martinez E (2016) Agent-based simulation of a project fractal company. In: XXII Congreso Argentino de Ciencias de la Computación (CACIC 2016)
15.
go back to reference Roghanian E, Alipour M, Rezaei M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. Int J Constr Manag 18(1):1–13 Roghanian E, Alipour M, Rezaei M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. Int J Constr Manag 18(1):1–13
16.
go back to reference Sengupta D, Datta A, Das A, Bera UK (2018) The expected value defuzzification method for pentagonal fuzzy number to solve a carbon cost integrated solid transportation problem. In: 2018 3rd International Conference for Convergence in Technology (I2CT). IEEE, pp 1–6 Sengupta D, Datta A, Das A, Bera UK (2018) The expected value defuzzification method for pentagonal fuzzy number to solve a carbon cost integrated solid transportation problem. In: 2018 3rd International Conference for Convergence in Technology (I2CT). IEEE, pp 1–6
17.
go back to reference Rosline JJ, Dison EM (2018) Symmetric pentagonal fuzzy numbers. Int J Pure Appl Math 119(9):245–253 Rosline JJ, Dison EM (2018) Symmetric pentagonal fuzzy numbers. Int J Pure Appl Math 119(9):245–253
18.
go back to reference Salah A, Moselhi O (2015) Contingency modelling for construction projects using fuzzy-set theory. Eng Constr Archit Manag 22(2):214–241CrossRef Salah A, Moselhi O (2015) Contingency modelling for construction projects using fuzzy-set theory. Eng Constr Archit Manag 22(2):214–241CrossRef
19.
go back to reference Dehghan R, Ruwnapura JY (2013) Model of trade-off between overlapping and rework of design activities. J Constr Eng Manag 140(2):04013043CrossRef Dehghan R, Ruwnapura JY (2013) Model of trade-off between overlapping and rework of design activities. J Constr Eng Manag 140(2):04013043CrossRef
20.
go back to reference Dehghan R, Hazini K, Ruwanpura J (2015) Optimization of overlapping activities in the design phase of construction projects. Autom Constr 59:81–95CrossRef Dehghan R, Hazini K, Ruwanpura J (2015) Optimization of overlapping activities in the design phase of construction projects. Autom Constr 59:81–95CrossRef
21.
go back to reference Zohrehvandi S, Knapčíková L (2022) A heuristic project buffer management algorithm in the scheduling phase of a renewable energies project. In: EAI International Conference on Management of Manufacturing Systems. Springer International Publishing, Cham, pp 183–195. https://doi.org/10.1007/978-3-031-22719-6_14 Zohrehvandi S, Knapčíková L (2022) A heuristic project buffer management algorithm in the scheduling phase of a renewable energies project. In: EAI International Conference on Management of Manufacturing Systems. Springer International Publishing, Cham, pp 183–195. https://​doi.​org/​10.​1007/​978-3-031-22719-6_​14
26.
go back to reference Warnecke HJ (1993) The fractal company: a revolution in corporate culture. Springer-Verlag, BerlinCrossRef Warnecke HJ (1993) The fractal company: a revolution in corporate culture. Springer-Verlag, BerlinCrossRef
Metadata
Title
A Fuzzy Overlapping Project Resource Optimization Model in the Project Construction Industry with a Fractal Approach
Author
Shakib Zohrehvandi
Publication date
12-01-2024
Publisher
Springer US
Published in
Mobile Networks and Applications
Print ISSN: 1383-469X
Electronic ISSN: 1572-8153
DOI
https://doi.org/10.1007/s11036-023-02254-z