Skip to main content
Top

1993 | OriginalPaper | Chapter

Control Surveys During the Construction of the Channel Tunnel

Author : N. Korittke

Published in: Applications of Geodesy to Engineering

Publisher: Springer Berlin Heidelberg

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

The Institute for Deposits and Surveying of the Deutsche Montan Technologie (DMT), Bochum, delivered 3 high precision gyrotheodolites GYROMAT to the English-French-syndicate for the construction of the tunnel under the English Channel. The GYROMATS are in use for direction-finding during the construction of the EUROTUNNEL from both sides.Furthermore, DMT surveying teams carried out control surveys both on the French and on the British side to guarantee a successful breakthrough under the English Channel in December 1990.Within 7 surveying campaigns more than 100 km of bored tunnels in the EUROTUNNEL-project were checked.The GYROMAT and the EUROTUNNEL-project will be outlined in this paper.Finally the results of the control surveys and the influence of horizontal refraction on traverse measurements in tunnels are discussed.

Metadata
Title
Control Surveys During the Construction of the Channel Tunnel
Author
N. Korittke
Copyright Year
1993
Publisher
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-77958-9_24

Premium Partner