Skip to main content

1993 | OriginalPaper | Buchkapitel

Control Surveys During the Construction of the Channel Tunnel

verfasst von : N. Korittke

Erschienen in: Applications of Geodesy to Engineering

Verlag: Springer Berlin Heidelberg

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

The Institute for Deposits and Surveying of the Deutsche Montan Technologie (DMT), Bochum, delivered 3 high precision gyrotheodolites GYROMAT to the English-French-syndicate for the construction of the tunnel under the English Channel. The GYROMATS are in use for direction-finding during the construction of the EUROTUNNEL from both sides.Furthermore, DMT surveying teams carried out control surveys both on the French and on the British side to guarantee a successful breakthrough under the English Channel in December 1990.Within 7 surveying campaigns more than 100 km of bored tunnels in the EUROTUNNEL-project were checked.The GYROMAT and the EUROTUNNEL-project will be outlined in this paper.Finally the results of the control surveys and the influence of horizontal refraction on traverse measurements in tunnels are discussed.

Metadaten
Titel
Control Surveys During the Construction of the Channel Tunnel
verfasst von
N. Korittke
Copyright-Jahr
1993
Verlag
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-77958-9_24

Premium Partner