Skip to main content
Top
Published in: Production Engineering 5/2018

11-06-2018 | Production Management

Coordination policy for production and delivery scheduling in the closed loop supply chain

Authors: Alireza Goli, Sayyed Mohammad Reza Davoodi

Published in: Production Engineering | Issue 5/2018

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Coordinating a supply chain necessitates a synchronization strategy for reordering products and a cost-effective production and replenishment cycle time. The aim of this paper is to present an optimization framework for producing and distribution in the supply chains with a cooperating strategy. The main contribution of this paper is to integrate closed loop supply chain with open-shop manufacturing and economic lot and delivery scheduling problem (ELDSP). This integration is applied with the aim of better coordination between the members of the supply chain. This study examines the ELDSP for a multi-stage closed loop supply chain, where each product is returned to a manufacturing center at a constant rate of demand. The supply chain is also characterized by a sub-open-shop system for remanufacturing returned items. Common cycle time and multiplier policies is adopted to accomplish the desired synchronization. For this purpose, we developed a mathematical model in which a manufacturer with an open-shop system purchases raw materials from suppliers, converts them into final products, and sends them to package companies. Given that the ELDSPR is an NP-hard problem, a simulated annealing (SA) algorithm and a biography-based optimization (BBO) algorithm is developed. Two operational scenarios are formulated for the simulated annealing algorithm, after which both the algorithms are used to solve problems of different scales. The numerical results show that the biography-based optimization algorithm excellently performs in finding the best solution to the ELDSPR.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Osman H, Demirli K (2012) Economic lot and delivery scheduling problem for multi-stage supply chains. Int J Prod Econ 136(2):275–286CrossRef Osman H, Demirli K (2012) Economic lot and delivery scheduling problem for multi-stage supply chains. Int J Prod Econ 136(2):275–286CrossRef
2.
go back to reference Jensen MT, Khouja M (2004) An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem. Eur J Oper Res 156(2):305–311MathSciNetCrossRef Jensen MT, Khouja M (2004) An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem. Eur J Oper Res 156(2):305–311MathSciNetCrossRef
3.
go back to reference Torabi SA, Ghomi SF, Karimi B (2006) A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Eur J Oper Res 173(1):173–189MathSciNetCrossRef Torabi SA, Ghomi SF, Karimi B (2006) A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Eur J Oper Res 173(1):173–189MathSciNetCrossRef
4.
go back to reference Kim T, Hong Y, Chang SY (2006) Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system. Int J Prod Econ 103(1):199–208CrossRef Kim T, Hong Y, Chang SY (2006) Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system. Int J Prod Econ 103(1):199–208CrossRef
5.
go back to reference Sarker R, Newton C (2002) A genetic algorithm for solving economic lot size scheduling problem. Comput Ind Eng 42(2):189–198CrossRef Sarker R, Newton C (2002) A genetic algorithm for solving economic lot size scheduling problem. Comput Ind Eng 42(2):189–198CrossRef
6.
go back to reference Bae H, Moon I, Yun W (2016) A time-varying lot sizes approach for the economic lot scheduling problem with returns. Int J Prod Res 54(11):3380–3396CrossRef Bae H, Moon I, Yun W (2016) A time-varying lot sizes approach for the economic lot scheduling problem with returns. Int J Prod Res 54(11):3380–3396CrossRef
7.
go back to reference Hahm J, Yano CA (1995) The economic lot and delivery scheduling problem: Models for nested schedules. IIE Trans 27(2):126–139CrossRef Hahm J, Yano CA (1995) The economic lot and delivery scheduling problem: Models for nested schedules. IIE Trans 27(2):126–139CrossRef
8.
go back to reference Khouja M (2000) The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate. Iie Trans 32(8):715–725 Khouja M (2000) The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate. Iie Trans 32(8):715–725
9.
go back to reference Khouja M (2003) Synchronization in supply chains: implications for design and management. J Oper Res Soc 54(9):984–994CrossRef Khouja M (2003) Synchronization in supply chains: implications for design and management. J Oper Res Soc 54(9):984–994CrossRef
10.
go back to reference Lee W (2005) A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering. Omega 33(2):163–174CrossRef Lee W (2005) A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering. Omega 33(2):163–174CrossRef
11.
go back to reference Clausen J, Ju S (2006) A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case. Eur J Oper Res 175(2):1141–1150CrossRef Clausen J, Ju S (2006) A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case. Eur J Oper Res 175(2):1141–1150CrossRef
12.
go back to reference Torabi S, Jenabi M (2009) Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain. Int J Adv Manuf Technol 43(7):785–798CrossRef Torabi S, Jenabi M (2009) Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain. Int J Adv Manuf Technol 43(7):785–798CrossRef
13.
go back to reference Osman H, Demirli K (2010) A bilinear goal programming model and a modified Benders decomposition algorithm for supply chain reconfiguration and supplier selection. Int J Prod Econ 124(1):97–105CrossRef Osman H, Demirli K (2010) A bilinear goal programming model and a modified Benders decomposition algorithm for supply chain reconfiguration and supplier selection. Int J Prod Econ 124(1):97–105CrossRef
14.
go back to reference Kai Chan H, Ho Chung S, Lim MK (2013) Recent research trend of economic-lot scheduling problems. J Manuf Technol Manag 24(3):465–482CrossRef Kai Chan H, Ho Chung S, Lim MK (2013) Recent research trend of economic-lot scheduling problems. J Manuf Technol Manag 24(3):465–482CrossRef
15.
go back to reference Dousthaghi S, Tavakkoli-Moghaddam R, Makui A (2013) Solving the economic lot and delivery scheduling problem in a flexible job shop with unrelated parallel machines and a shelf life by a proposed hybrid PSO. Int J Adv Manuf Technol 68(5–8):1401–1416CrossRef Dousthaghi S, Tavakkoli-Moghaddam R, Makui A (2013) Solving the economic lot and delivery scheduling problem in a flexible job shop with unrelated parallel machines and a shelf life by a proposed hybrid PSO. Int J Adv Manuf Technol 68(5–8):1401–1416CrossRef
16.
go back to reference Kuhn H, Liske T (2014) An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy. Comput Oper Res 51:30–40MathSciNetCrossRef Kuhn H, Liske T (2014) An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy. Comput Oper Res 51:30–40MathSciNetCrossRef
18.
go back to reference Konur D, Campbell JF, Monfared SA (2017) Economic and environmental considerations in a stochastic inventory control model with order splitting under different delivery schedules among suppliers. Omega 71:46–65CrossRef Konur D, Campbell JF, Monfared SA (2017) Economic and environmental considerations in a stochastic inventory control model with order splitting under different delivery schedules among suppliers. Omega 71:46–65CrossRef
19.
go back to reference Kia H, Ghodsypour SH, Davoudpour H (2017) A hybrid imperialist competitive algorithm for solving economic lot and delivery scheduling problem in a four-stage supply chain. Adv Mech Eng 9(2):1687814016686893CrossRef Kia H, Ghodsypour SH, Davoudpour H (2017) A hybrid imperialist competitive algorithm for solving economic lot and delivery scheduling problem in a four-stage supply chain. Adv Mech Eng 9(2):1687814016686893CrossRef
20.
go back to reference Schmidt M, Schäfers P (2017) The Hanoverian Supply Chain Model: modelling the impact of production planning and control on a supply chain’s logistic objectives. Prod Eng Res Devel 11(4–5):487–493CrossRef Schmidt M, Schäfers P (2017) The Hanoverian Supply Chain Model: modelling the impact of production planning and control on a supply chain’s logistic objectives. Prod Eng Res Devel 11(4–5):487–493CrossRef
21.
go back to reference Rezaei S, Kheirkhah A (2017) Applying forward and reverse cross-docking in a multi-product integrated supply chain network. Prod Eng Res Devel 11(4–5):495–509CrossRef Rezaei S, Kheirkhah A (2017) Applying forward and reverse cross-docking in a multi-product integrated supply chain network. Prod Eng Res Devel 11(4–5):495–509CrossRef
22.
23.
go back to reference Simon D (2008) Biogeography-based optimization. IEEE Trans Evol Comput 12(6):702–713CrossRef Simon D (2008) Biogeography-based optimization. IEEE Trans Evol Comput 12(6):702–713CrossRef
24.
go back to reference Li L-L, Yang Y-F, Wang C-H, Lin K-P (2018) Biogeography-based optimization based on population competition strategy for solving the substation location problem. Expert Syst Appl 97:290–302CrossRef Li L-L, Yang Y-F, Wang C-H, Lin K-P (2018) Biogeography-based optimization based on population competition strategy for solving the substation location problem. Expert Syst Appl 97:290–302CrossRef
25.
go back to reference Goli A, Aazami A, Jabbarzadeh A (2018) Accelerated cuckoo optimization algorithm for capacitated vehicle routing problem in competitive conditions. Int J Artif Intell 16(1):88–112 Goli A, Aazami A, Jabbarzadeh A (2018) Accelerated cuckoo optimization algorithm for capacitated vehicle routing problem in competitive conditions. Int J Artif Intell 16(1):88–112
Metadata
Title
Coordination policy for production and delivery scheduling in the closed loop supply chain
Authors
Alireza Goli
Sayyed Mohammad Reza Davoodi
Publication date
11-06-2018
Publisher
Springer Berlin Heidelberg
Published in
Production Engineering / Issue 5/2018
Print ISSN: 0944-6524
Electronic ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-018-0841-0

Other articles of this Issue 5/2018

Production Engineering 5/2018 Go to the issue

Premium Partners