Skip to main content
Top
Published in: Bulletin of Engineering Geology and the Environment 4/2021

18-02-2021 | Original Paper

Evaluating the influence of engineering geological parameters on TBM performance during grinding process in limestone strata

Authors: Seyed Mahdi Pourhashemi, Kaveh Ahangari, Jafar Hassanpour, Seyed Mosleh Eftekhari

Published in: Bulletin of Engineering Geology and the Environment | Issue 4/2021

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The chipping and grinding processes are the basis for understanding rock cutting during TBM excavation in hard rock conditions. The chips are produced when tensile fractures created by adjacent cutters propagate parallel to the tunnel face and coalesce whereas grinding occurs when fractures do not fully propagate through the rock and only fines are generated. Chipping is the normal and efficient boring process using machines equipped with disc cutters. Consequently, almost all of the models proposed for predicting the TBM penetration have been developed by the assumption that chipping is the dominant mode. It is obvious that these models are unable to predict correctly TBM performance when grinding is dominated in the rock cutting process. In this study, the relationships between engineering geological properties of the rock units (Cretaceous limestones) and operating and performance parameters of a refurbished EPB-TBM, employed for completion of SEL6 (the Southern Extension of Line 6, Tehran Metro) tunnel, were evaluated and analyzed. In this project due to limitations in the load capacity of the employed cutters and insufficient initial penetration in rock, the excavation was mostly carried out on grinding-dominated mode. So, the suitable data for establishing a special database and consequent analyses were provided. The established database composed of actual operating and performance parameters of the machine (i.e., cutterhead penetration and RPM and cutter load) and also engineering geological properties (i.e., UCS, alpha angle, GSI, and RQD) of limestone strata. Finally, by statistical analyses performed on collected and screened data (41 data sets), some simple, site-specific, empirical equations were developed to predict the TBM performance on grinding mode. In addition, according to the multivariate regression method, a significant relationship between the cutterhead penetration (PRev), the cutter load (Fn), intact rock strength (UCS), and geological strength index (GSI) was established, statistically. The obtained results demonstrate that this engineering geological-based model could provide a new applicable equation for accurately predicting TBM performance for similar geological conditions where grinding is dominant.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Armetti G, Migliazza MR, Ferrari F et al (2018) Geological and mechanical rock mass conditions for TBM performance prediction. The case of “La Maddalena” exploratory tunnel, Chiomonte (Italy). Tunn Undergr Sp Technol 77:115–126CrossRef Armetti G, Migliazza MR, Ferrari F et al (2018) Geological and mechanical rock mass conditions for TBM performance prediction. The case of “La Maddalena” exploratory tunnel, Chiomonte (Italy). Tunn Undergr Sp Technol 77:115–126CrossRef
go back to reference Balci C, Bilgin N (2007) Correlative study of linear small and full-scale rock cutting tests to select mechanized excavation machines. Int J Rock Mech Min Sci 44:468–476CrossRef Balci C, Bilgin N (2007) Correlative study of linear small and full-scale rock cutting tests to select mechanized excavation machines. Int J Rock Mech Min Sci 44:468–476CrossRef
go back to reference Berdal T, Jakobsen PD, Jacobsen S (2018) Utilising excavated rock material from tunnel boring machines (TBMs) for concrete. SynerCrete’ 8 International Conference on Interdisciplinary Approaches for Cement-based Materials and Structural Concrete, Funchal, Madeira Island, Portugal. Berdal T, Jakobsen PD, Jacobsen S (2018) Utilising excavated rock material from tunnel boring machines (TBMs) for concrete. SynerCrete’ 8 International Conference on Interdisciplinary Approaches for Cement-based Materials and Structural Concrete, Funchal, Madeira Island, Portugal.
go back to reference Brino G, Peila D, Steidl A, Fasching F (2015) Prediction of performance and cutter wear in rock TBM: application to Koralm tunnel project. GEAM-GEOINGEGNERIA Ambient E MINERARIA-GEAM-GEOENGINEERING. Environ Min:37–50 Brino G, Peila D, Steidl A, Fasching F (2015) Prediction of performance and cutter wear in rock TBM: application to Koralm tunnel project. GEAM-GEOINGEGNERIA Ambient E MINERARIA-GEAM-GEOENGINEERING. Environ Min:37–50
go back to reference Bruland A (1998) Hard rock tunnel boring, vol 1–10 Bruland A (1998) Hard rock tunnel boring, vol 1–10
go back to reference Delisio A, Zhao J, Einstein HH (2013) Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel. Tunn Undergr Sp Technol 33:131–142CrossRef Delisio A, Zhao J, Einstein HH (2013) Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel. Tunn Undergr Sp Technol 33:131–142CrossRef
go back to reference Farmer IW, Glossop NH (1980) Mechanics of disc cutter penetration. Tunnels Tunn 12:22–25 Farmer IW, Glossop NH (1980) Mechanics of disc cutter penetration. Tunnels Tunn 12:22–25
go back to reference Farrokh E, Rostami J, Laughton C (2012) Study of various models for estimation of penetration rate of hard rock TBMs. Tunn Undergr Sp Technol 30:110–123CrossRef Farrokh E, Rostami J, Laughton C (2012) Study of various models for estimation of penetration rate of hard rock TBMs. Tunn Undergr Sp Technol 30:110–123CrossRef
go back to reference Firouzei Y, Hassanpour J, Pourhashemi SM (2019) Tunneling with a soft rock EPB machine in hard rock conditions, the experience of Tehran metro line 6 southern expansion sector. In: 4th International Conference on Tunnel Boring Machines in Difficult Grounds. Denver, USA Firouzei Y, Hassanpour J, Pourhashemi SM (2019) Tunneling with a soft rock EPB machine in hard rock conditions, the experience of Tehran metro line 6 southern expansion sector. In: 4th International Conference on Tunnel Boring Machines in Difficult Grounds. Denver, USA
go back to reference Frenzel C, Galler R, Käsling H, Villeneuve M (2012) Penetration tests for TBMs and their practical application/Penetrationstests für Tunnelbohrmaschinen und deren Anwendung in der Praxis. Geomech Tunn 5:557–566CrossRef Frenzel C, Galler R, Käsling H, Villeneuve M (2012) Penetration tests for TBMs and their practical application/Penetrationstests für Tunnelbohrmaschinen und deren Anwendung in der Praxis. Geomech Tunn 5:557–566CrossRef
go back to reference Frenzel C, Käsling H, Thuro K (2008) Factors influencing disc cutter wear. Geomech Tunnelbau Geomech Tunnelbau 1:55–60CrossRef Frenzel C, Käsling H, Thuro K (2008) Factors influencing disc cutter wear. Geomech Tunnelbau Geomech Tunnelbau 1:55–60CrossRef
go back to reference Gong Q, Zhao J (2009) Development of a rock mass characteristics model for TBM penetration rate prediction. Int J Rock Mech Min Sci 46:8–18CrossRef Gong Q, Zhao J (2009) Development of a rock mass characteristics model for TBM penetration rate prediction. Int J Rock Mech Min Sci 46:8–18CrossRef
go back to reference Graham PC, PC G (1976) Rock exploration for machine manufacturers. Graham PC, PC G (1976) Rock exploration for machine manufacturers.
go back to reference Gunsallus KL, Kulhawy FH (1984) A comparative evaluation of rock strength measures. In: International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts. Elsevier, Amsterdam, pp 233–248 Gunsallus KL, Kulhawy FH (1984) A comparative evaluation of rock strength measures. In: International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts. Elsevier, Amsterdam, pp 233–248
go back to reference Hassanpour J, Rostami J, Zhao J (2011) A new hard rock TBM performance prediction model for project planning. Tunn Undergr Sp Technol 26:595–603CrossRef Hassanpour J, Rostami J, Zhao J (2011) A new hard rock TBM performance prediction model for project planning. Tunn Undergr Sp Technol 26:595–603CrossRef
go back to reference Hassanpour J, Rostami J, Zhao J, Tarigh Azali S (2015) TBM performance and disc cutter wear prediction based on ten years’ experience of TBM tunneling in Iran. Geomech Tunnelbau 8(3):239–247CrossRef Hassanpour J, Rostami J, Zhao J, Tarigh Azali S (2015) TBM performance and disc cutter wear prediction based on ten years’ experience of TBM tunneling in Iran. Geomech Tunnelbau 8(3):239–247CrossRef
go back to reference Hassanpour J, Firouzei Y, Hajipour G (2020) Actual performance analysis of a double shield TBM through sedimentary and low to medium grade metamorphic rocks of Ghomrood Water Conveyance Tunnel Project (Lots 3 & 4). Bull Eng Geol Environ, under production. https://doi.org/10.1007/s10064-020-01947-z Hassanpour J, Firouzei Y, Hajipour G (2020) Actual performance analysis of a double shield TBM through sedimentary and low to medium grade metamorphic rocks of Ghomrood Water Conveyance Tunnel Project (Lots 3 & 4). Bull Eng Geol Environ, under production. https://​doi.​org/​10.​1007/​s10064-020-01947-z
go back to reference Hoek E, Marinos P, Benissi M (1998) Applicability of the Geological Strength Index (GSI) classification for very weak and sheared rock masses. The case of the Athens Schist Formation. Bull Eng Geol Environ 57:151–160CrossRef Hoek E, Marinos P, Benissi M (1998) Applicability of the Geological Strength Index (GSI) classification for very weak and sheared rock masses. The case of the Athens Schist Formation. Bull Eng Geol Environ 57:151–160CrossRef
go back to reference ISRM (1978) Suggested methods for the quantitative description of discontinuities in rock masses. Int J Rock Mech Min Sci Geomech Abstr 15:319–368CrossRef ISRM (1978) Suggested methods for the quantitative description of discontinuities in rock masses. Int J Rock Mech Min Sci Geomech Abstr 15:319–368CrossRef
go back to reference ISRM (1985) Suggested method for determining point load strength. Int J Rock Mech Min Sci Geomech Abstr 22:51–60CrossRef ISRM (1985) Suggested method for determining point load strength. Int J Rock Mech Min Sci Geomech Abstr 22:51–60CrossRef
go back to reference Koopialipoor M, Tootoonchi H, Armaghani DJ et al (2019) Application of deep neural networks in predicting the penetration rate of tunnel boring machines. Bull Eng Geol Environ 78:6347–6360CrossRef Koopialipoor M, Tootoonchi H, Armaghani DJ et al (2019) Application of deep neural networks in predicting the penetration rate of tunnel boring machines. Bull Eng Geol Environ 78:6347–6360CrossRef
go back to reference Labra C, Rojek J, Onate E (2017) Discrete/finite element modelling of rock cutting with a TBM disc cutter. Rock Mech Rock Eng 50:621–638CrossRef Labra C, Rojek J, Onate E (2017) Discrete/finite element modelling of rock cutting with a TBM disc cutter. Rock Mech Rock Eng 50:621–638CrossRef
go back to reference Lazemi HA, Dehkordi MS (2019) Estimation of the TBM penetration rate using the post-failure behavior of a rock mass and the equivalent thrust per cutter. A case study: the Amirkabir Water Transferring Tunnel of Iran. Bull Eng Geol Environ 78:1735–1746CrossRef Lazemi HA, Dehkordi MS (2019) Estimation of the TBM penetration rate using the post-failure behavior of a rock mass and the equivalent thrust per cutter. A case study: the Amirkabir Water Transferring Tunnel of Iran. Bull Eng Geol Environ 78:1735–1746CrossRef
go back to reference Marinos P, Hoek E (2001) Estimating the geotechnical properties of heterogeneous rock masses such as flysch. Bull Eng Geol Environ 60:85–92CrossRef Marinos P, Hoek E (2001) Estimating the geotechnical properties of heterogeneous rock masses such as flysch. Bull Eng Geol Environ 60:85–92CrossRef
go back to reference Marinos V (2019) A revised, geotechnical classification GSI system for tectonically disturbed heterogeneous rock masses, such as flysch. Bull Eng Geol Environ 78:899–912CrossRef Marinos V (2019) A revised, geotechnical classification GSI system for tectonically disturbed heterogeneous rock masses, such as flysch. Bull Eng Geol Environ 78:899–912CrossRef
go back to reference Marinos V, Marinos P, Hoek E (2005) The geological strength index: applications and limitations. Bull Eng Geol Environ 64:55–65CrossRef Marinos V, Marinos P, Hoek E (2005) The geological strength index: applications and limitations. Bull Eng Geol Environ 64:55–65CrossRef
go back to reference Rahsaz-Tarh Consulting Engineers (2016) Engineering geological investigation report of Southern Extension of Tehran Metro Line, p 6 Rahsaz-Tarh Consulting Engineers (2016) Engineering geological investigation report of Southern Extension of Tehran Metro Line, p 6
go back to reference Salimi A, Rostami J, Moormann C, Hassanpour J (2018) Examining feasibility of developing a rock mass classification for hard rock TBM application using non-linear regression, regression tree and generic programming. Geotech Geol Eng 36(2):1145–1159 Salimi A, Rostami J, Moormann C, Hassanpour J (2018) Examining feasibility of developing a rock mass classification for hard rock TBM application using non-linear regression, regression tree and generic programming. Geotech Geol Eng 36(2):1145–1159
go back to reference Tarigh Azali S, Ghafoori M, Lashkaripour GR, Hassanpour J (2013) Engineering geological investigations of mechanized tunneling in soft ground: a case study, East–West lot of line 7, Tehran Metro, Iran. Eng Geol 166:170–185CrossRef Tarigh Azali S, Ghafoori M, Lashkaripour GR, Hassanpour J (2013) Engineering geological investigations of mechanized tunneling in soft ground: a case study, East–West lot of line 7, Tehran Metro, Iran. Eng Geol 166:170–185CrossRef
go back to reference Tarigh Azali S, Pourhashemi SM, Khorasani E (2018) NATM Tunneling in urban area, a review of planning, executing, and monitoring in Tehran Metro Line 6. In: ITA - AITES WORLD TUNNEL CONGRESS (WTC 2018). Dubai Tarigh Azali S, Pourhashemi SM, Khorasani E (2018) NATM Tunneling in urban area, a review of planning, executing, and monitoring in Tehran Metro Line 6. In: ITA - AITES WORLD TUNNEL CONGRESS (WTC 2018). Dubai
go back to reference Villeneuve M (2008) Examination of geological influence on machine excavation of highly stressed tunnels in massive hard rock Villeneuve M (2008) Examination of geological influence on machine excavation of highly stressed tunnels in massive hard rock
go back to reference Villeneuve MC (2017) Hard rock tunnel boring machine penetration test as an indicator of chipping process efficiency. J Rock Mech Geotech Eng 9:611–622CrossRef Villeneuve MC (2017) Hard rock tunnel boring machine penetration test as an indicator of chipping process efficiency. J Rock Mech Geotech Eng 9:611–622CrossRef
go back to reference Villeneuve MC, Diederichs MS, Kaiser PK (2012) Effects of grain scale heterogeneity on rock strength and the chipping process. Int J Geomech 12:632–647CrossRef Villeneuve MC, Diederichs MS, Kaiser PK (2012) Effects of grain scale heterogeneity on rock strength and the chipping process. Int J Geomech 12:632–647CrossRef
go back to reference Yagiz S (2008) Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn Undergr Sp Technol 23:326–339CrossRef Yagiz S (2008) Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn Undergr Sp Technol 23:326–339CrossRef
go back to reference Zhou J, Yazdani Bejarbaneh BJA, Danial TMM (2020) Forecasting of TBM advance rate in hard rock condition based on artificial neural network and genetic programming techniques. Bull Eng Geol Environ 79:2069–2084CrossRef Zhou J, Yazdani Bejarbaneh BJA, Danial TMM (2020) Forecasting of TBM advance rate in hard rock condition based on artificial neural network and genetic programming techniques. Bull Eng Geol Environ 79:2069–2084CrossRef
Metadata
Title
Evaluating the influence of engineering geological parameters on TBM performance during grinding process in limestone strata
Authors
Seyed Mahdi Pourhashemi
Kaveh Ahangari
Jafar Hassanpour
Seyed Mosleh Eftekhari
Publication date
18-02-2021
Publisher
Springer Berlin Heidelberg
Published in
Bulletin of Engineering Geology and the Environment / Issue 4/2021
Print ISSN: 1435-9529
Electronic ISSN: 1435-9537
DOI
https://doi.org/10.1007/s10064-021-02134-4

Other articles of this Issue 4/2021

Bulletin of Engineering Geology and the Environment 4/2021 Go to the issue