Skip to main content
Top

2014 | OriginalPaper | Chapter

Incorporating the Work Pace Concept into the MMSP-W

Authors : Joaquín Bautista, Rocío Alfaro, Cristina Batalla, Alberto Cano

Published in: Managing Complexity

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This work proposes an extension for the MMSP-W (Mixed-Model Sequencing Problem with Work overload Minimization) with variable processing times by the incorporation of the work pace or work speed concept. A computational experience, linked to a case study of Nissan Powertrain plant in Barcelona, is carried out to compare the performance of the reference model with the new proposed model.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Bautista J, Cano A (2011) Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules. Eur J Oper Res 210(3):495–513CrossRefMATH Bautista J, Cano A (2011) Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules. Eur J Oper Res 210(3):495–513CrossRefMATH
2.
go back to reference Bautista J, Cano A, Alfaro R (2012) Models for MMSP-W considering workstation dependencies: a case study of Nissan’s Barcelona plant. Eur J Oper Res 223(3):669–679CrossRef Bautista J, Cano A, Alfaro R (2012) Models for MMSP-W considering workstation dependencies: a case study of Nissan’s Barcelona plant. Eur J Oper Res 223(3):669–679CrossRef
3.
go back to reference Boysen N, Fliedner M, Scholl A (2009) Sequencing mixed-model assembly lines: survey, classification and model critique. Eur J Oper Res 192(2):349–373CrossRefMATHMathSciNet Boysen N, Fliedner M, Scholl A (2009) Sequencing mixed-model assembly lines: survey, classification and model critique. Eur J Oper Res 192(2):349–373CrossRefMATHMathSciNet
4.
go back to reference Lawrence S Aft (2001) Measurement of work. In: Maynard’s industrial engineering handbook, fifth edition. McGraw-Hill, New York, pp 5.3–5.22 Lawrence S Aft (2001) Measurement of work. In: Maynard’s industrial engineering handbook, fifth edition. McGraw-Hill, New York, pp 5.3–5.22
5.
go back to reference Muse LA, Harris SG, Feild HS (2003) Has the inverted-U theory of stress and job performance had a fair test? Hum Perform 16(4):349–364.CrossRef Muse LA, Harris SG, Feild HS (2003) Has the inverted-U theory of stress and job performance had a fair test? Hum Perform 16(4):349–364.CrossRef
6.
go back to reference Scholl A, Klein R, Domschke W (1998) Pattern based vocabulary building for effectively sequencing mixed-model assembly lines. J Heuristics 4(4):359–381CrossRefMATH Scholl A, Klein R, Domschke W (1998) Pattern based vocabulary building for effectively sequencing mixed-model assembly lines. J Heuristics 4(4):359–381CrossRefMATH
7.
go back to reference Yano CA, Rachamadugu R (1991) Sequencing to minimize work overload in assembly lines with product options. Manage Sci 37(5):572–586CrossRef Yano CA, Rachamadugu R (1991) Sequencing to minimize work overload in assembly lines with product options. Manage Sci 37(5):572–586CrossRef
Metadata
Title
Incorporating the Work Pace Concept into the MMSP-W
Authors
Joaquín Bautista
Rocío Alfaro
Cristina Batalla
Alberto Cano
Copyright Year
2014
DOI
https://doi.org/10.1007/978-3-319-04705-8_30