Abstract

The demand for gob-side entry retaining (GSER) technology is extensive in Chinese coal mines because of its outstanding advantages. However, due to the occurrence of long-term roof movement disturbances, maintaining the conventional GSER over long distances is difficult. The urgent demand for this technology and its difficult maintenance are prominent contradictions faced in its application. In this paper, two characteristics of strata movement after mining that have great influence on GSER are determined in a physical simulation experiment. One is that the roof layers, which are dominated by the key strata (KS), collapse in multiple groups to form two-directional periodic pressures and superposed disturbances. The other is that the movement of the main roof will experience three stages of deformation, as follows: bending subsidence before collapse, sinking deformation at collapse and compressive deformation after collapse. In particular, the gradual compression of the bulging gangue in the gob extends the disturbance cycle. Therefore, it is difficult to maintain the GSER over long distances because of the long-term and multiple breaking disturbances of the roof layers. Mechanical models of KS breaking and GSER are established, and a method to determine the timing and strength of KS disturbances are proposed. Making use of the characteristics of staged collapse and fluctuating weighting of the overlying strata, an innovative technology named short-staged GSER is proposed. This technology maintains the maximum length of GSER within the optimal length, which ensures that the entry avoids superposed disturbances, and reduces the maintenance difficulty. The method for determining the key technical parameters is discussed, and an engineering case in panel 24202 of the Shaqu Mine in China is presented. From a back-calculation of measurements, the engineering practice demonstrates that the surrounding rock mass is stable, and the deformed entry size is safe when the length of the short-staged GSER does not exceed 100 m.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Bai JB, Shen WL, Guo GL, Wang XY, Yu Y (2015) Roof deformation, failure characteristics, and preventive techniques of gob-side entry driving heading adjacent to the advancing working face. Rock Mech Rock Eng 48:2447–2458CrossRef Bai JB, Shen WL, Guo GL, Wang XY, Yu Y (2015) Roof deformation, failure characteristics, and preventive techniques of gob-side entry driving heading adjacent to the advancing working face. Rock Mech Rock Eng 48:2447–2458CrossRef
go back to reference Cao ZZ, Zhou YJ (2015) Research on coal pillar width in roadway driving along goaf based on the stability of key block. Comput Mater Contin 48:77–90 Cao ZZ, Zhou YJ (2015) Research on coal pillar width in roadway driving along goaf based on the stability of key block. Comput Mater Contin 48:77–90
go back to reference Gong P, Ma ZG, Zhang RRC, Ni XY, Liu F, Huang ZM (2017) Surrounding rock deformation mechanism and control technology for gob-side entry retaining with fully mechanized gangue backfilling mining: a case study. Shock Vib 2017:6085941 Gong P, Ma ZG, Zhang RRC, Ni XY, Liu F, Huang ZM (2017) Surrounding rock deformation mechanism and control technology for gob-side entry retaining with fully mechanized gangue backfilling mining: a case study. Shock Vib 2017:6085941
go back to reference Han CL, Zhang N, Li BY, Si GY, Zheng XG (2015) Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining. J Cent South Univ 22:4445–4455CrossRef Han CL, Zhang N, Li BY, Si GY, Zheng XG (2015) Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining. J Cent South Univ 22:4445–4455CrossRef
go back to reference He MC, Gao YB, Yang J, Gong WL (2017) An innovative approach for gob-side entry retaining in thick coal seam longwall mining. Energies 10:1785CrossRef He MC, Gao YB, Yang J, Gong WL (2017) An innovative approach for gob-side entry retaining in thick coal seam longwall mining. Energies 10:1785CrossRef
go back to reference Huang BX, Chen SL, Zhao XL (2017) Hydraulic fracturing stress transfer methods to control the strong strata behaviours in gob-side gateroads of longwall mines. Arab J Geosci 10:236CrossRef Huang BX, Chen SL, Zhao XL (2017) Hydraulic fracturing stress transfer methods to control the strong strata behaviours in gob-side gateroads of longwall mines. Arab J Geosci 10:236CrossRef
go back to reference Huang BX, Liu JW, Zhang Q (2018) The reasonable breaking location of overhanging hard roof for directional hydraulic fracturing to control strong strata behaviors of gob-side entry. Int J Rock Mech Min 103:1–11CrossRef Huang BX, Liu JW, Zhang Q (2018) The reasonable breaking location of overhanging hard roof for directional hydraulic fracturing to control strong strata behaviors of gob-side entry. Int J Rock Mech Min 103:1–11CrossRef
go back to reference Islavath SR, Deb D, Kumar H (2016) Numerical analysis of a longwall mining cycle and development of a composite longwall index. Int J Rock Mech Min 89:43–54CrossRef Islavath SR, Deb D, Kumar H (2016) Numerical analysis of a longwall mining cycle and development of a composite longwall index. Int J Rock Mech Min 89:43–54CrossRef
go back to reference Jiang LS, Zhang PP, Chen LJ, Hao Z, Sainoki A, Mitri HS, Wang QB (2017) Numerical approach for goaf-side entry layout and yield pillar design in fractured ground conditions. Rock Mech Rock Eng 50:3049–3071CrossRef Jiang LS, Zhang PP, Chen LJ, Hao Z, Sainoki A, Mitri HS, Wang QB (2017) Numerical approach for goaf-side entry layout and yield pillar design in fractured ground conditions. Rock Mech Rock Eng 50:3049–3071CrossRef
go back to reference Kan JG, Zhang N, Wu JK, Wu H (2013) Effect of main roofs fracture position on the secondary gob-side entry retaining stability. Disaster Adv 6:189–199 Kan JG, Zhang N, Wu JK, Wu H (2013) Effect of main roofs fracture position on the secondary gob-side entry retaining stability. Disaster Adv 6:189–199
go back to reference Kang H, Niu D, Zhang Z, Lin J, Li Z, Fan M (2010) Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine. Chin J Rock Mech Eng 29:1977–1987 (in Chinese) Kang H, Niu D, Zhang Z, Lin J, Li Z, Fan M (2010) Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine. Chin J Rock Mech Eng 29:1977–1987 (in Chinese)
go back to reference Li XH, Ju MH, Yao QL, Zhou J, Chong ZH (2016a) Numerical investigation of the effect of the location of critical rock block fracture on crack evolution in a gob-side filling wall. Rock Mech Rock Eng 49:1041–1058CrossRef Li XH, Ju MH, Yao QL, Zhou J, Chong ZH (2016a) Numerical investigation of the effect of the location of critical rock block fracture on crack evolution in a gob-side filling wall. Rock Mech Rock Eng 49:1041–1058CrossRef
go back to reference Li ZL, Dou LM, Cai W, Wang GF, Ding YL, Kong Y (2016b) Roadway stagger layout for effective control of gob-side rock bursts in the longwall mining of a thick coal seam. Rock Mech Rock Eng 49:621–629CrossRef Li ZL, Dou LM, Cai W, Wang GF, Ding YL, Kong Y (2016b) Roadway stagger layout for effective control of gob-side rock bursts in the longwall mining of a thick coal seam. Rock Mech Rock Eng 49:621–629CrossRef
go back to reference Luan HJ, Jiang YJ, Lin HL, Li GF (2018) Development of a new gob-side entry-retaining approach and its application. Sustainability 10:470CrossRef Luan HJ, Jiang YJ, Lin HL, Li GF (2018) Development of a new gob-side entry-retaining approach and its application. Sustainability 10:470CrossRef
go back to reference Ma SQ, Chen Y (2017) Application of hydraulic fracturing and energy-absorption rockbolts to improve the stability of a gob-side roadway in a 10-m-thick coal seam: case study. Int J Geomech 17:05017002CrossRef Ma SQ, Chen Y (2017) Application of hydraulic fracturing and energy-absorption rockbolts to improve the stability of a gob-side roadway in a 10-m-thick coal seam: case study. Int J Geomech 17:05017002CrossRef
go back to reference Ning JG, Wang J, Bu TT, Hu SC, Liu XS (2017) An innovative support structure for gob-side entry retention in steep coal seam mining. Minerals 7:75CrossRef Ning JG, Wang J, Bu TT, Hu SC, Liu XS (2017) An innovative support structure for gob-side entry retention in steep coal seam mining. Minerals 7:75CrossRef
go back to reference Salmi EF, Nazem M, Karakus M (2017) Numerical analysis of a large landslide induced by coal mining subsidence. Eng Geol 217:141–152CrossRef Salmi EF, Nazem M, Karakus M (2017) Numerical analysis of a large landslide induced by coal mining subsidence. Eng Geol 217:141–152CrossRef
go back to reference Tan YL, Yu FH, Ning JG, Zhao TB (2015) Design and construction of entry retaining wall along a gob side under hard roof stratum. Int J Rock Mech Min 77:115–121CrossRef Tan YL, Yu FH, Ning JG, Zhao TB (2015) Design and construction of entry retaining wall along a gob side under hard roof stratum. Int J Rock Mech Min 77:115–121CrossRef
go back to reference Wang M, Bai JB, Li WF, Wang XY, Cao SG (2015) Failure mechanism and control of deep gob-side entry. Arab J Geosci 8:9117–9131CrossRef Wang M, Bai JB, Li WF, Wang XY, Cao SG (2015) Failure mechanism and control of deep gob-side entry. Arab J Geosci 8:9117–9131CrossRef
go back to reference Wang HS, Zhang DS, Liu L, Guo WB, Fan GW, Song KI, Wang XF (2016) Stabilization of gob-side entry with an artificial side for sustaining mining work. Sustainability 8:627CrossRef Wang HS, Zhang DS, Liu L, Guo WB, Fan GW, Song KI, Wang XF (2016) Stabilization of gob-side entry with an artificial side for sustaining mining work. Sustainability 8:627CrossRef
go back to reference Yang HY, Cao SG, Li Y, Sun CM, Guo P (2015) Soft roof failure mechanism and supporting method for gob-side entry retaining. Minerals-Basel 5:707–722CrossRef Yang HY, Cao SG, Li Y, Sun CM, Guo P (2015) Soft roof failure mechanism and supporting method for gob-side entry retaining. Minerals-Basel 5:707–722CrossRef
go back to reference Zhang N, Yuan L, Han CL, Xue JH, Kan JG (2012) Stability and deformation of surrounding rock in pillarless gob-side entry retaining. Saf Sci 50:593–599CrossRef Zhang N, Yuan L, Han CL, Xue JH, Kan JG (2012) Stability and deformation of surrounding rock in pillarless gob-side entry retaining. Saf Sci 50:593–599CrossRef
go back to reference Zhang N, Zhang Z, Wu H, Cao P (2014) Technology and application of reparation in deep gob-side entry retaining. Chin J Rock Mech Eng 33:468–474 (in Chinese) Zhang N, Zhang Z, Wu H, Cao P (2014) Technology and application of reparation in deep gob-side entry retaining. Chin J Rock Mech Eng 33:468–474 (in Chinese)
go back to reference Zhang ZZ, Bai JB, Chen Y, Yan S (2015) An innovative approach for gob-side entry retaining in highly gassy fully-mechanized longwall top-coal caving. Int J Rock Mech Min 80:1–11CrossRef Zhang ZZ, Bai JB, Chen Y, Yan S (2015) An innovative approach for gob-side entry retaining in highly gassy fully-mechanized longwall top-coal caving. Int J Rock Mech Min 80:1–11CrossRef
go back to reference Zhang ZY, Shimada H, Qian DY, Sasaoka T (2016) Application of the retained gob-side gateroad in a deep underground coalmine. Int J Min Reclam Environ 30:371–389CrossRef Zhang ZY, Shimada H, Qian DY, Sasaoka T (2016) Application of the retained gob-side gateroad in a deep underground coalmine. Int J Min Reclam Environ 30:371–389CrossRef
go back to reference Zhang ZY, Zhang N, Shimada H, Sasaoka T, Wahyudi S (2017) Optimization of hard roof structure over retained goaf-side gateroad by pre-split blasting technology. Int J Rock Mech Min 100:330–337CrossRef Zhang ZY, Zhang N, Shimada H, Sasaoka T, Wahyudi S (2017) Optimization of hard roof structure over retained goaf-side gateroad by pre-split blasting technology. Int J Rock Mech Min 100:330–337CrossRef
Metadata
Title
Multiple and Long-Term Disturbance of Gob-Side Entry Retaining by Grouped Roof Collapse and an Innovative Adaptive Technology
Authors
Changliang Han
Nong Zhang
Junhua Xue
Jiaguang Kan
Yiming Zhao
Publication date
03-10-2018
Publisher
Springer Vienna
Published in
Rock Mechanics and Rock Engineering / Issue 8/2019
Print ISSN: 0723-2632
Electronic ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-018-1612-0

Other articles of this Issue 8/2019

Rock Mechanics and Rock Engineering 8/2019 Go to the issue