Skip to main content
Erschienen in: Rock Mechanics and Rock Engineering 2/2016

09.04.2015 | Technical Note

Roadway Stagger Layout for Effective Control of Gob-Side Rock Bursts in the Longwall Mining of a Thick Coal Seam

verfasst von: Zhen-lei Li, Lin-ming Dou, Wu Cai, Gui-feng Wang, Yan-lu Ding, Yong Kong

Erschienen in: Rock Mechanics and Rock Engineering | Ausgabe 2/2016

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Excerpt

Currently, rock bursts pose a serious threat to the safety of miners and equipment in underground coal mining operations, especially in China. The number of coal mines with rock burst hazards is increasing year by year with no signs of letting up. By 31 December 2013, there were 142 coal mines in China which had experienced rock bursts. Each year, rock bursts cause considerable economic loss and enormous casualties. For instance, a rock burst induced by a large thrust fault caused 10 deaths and trapped 75 people on 3 November 2011 during the headgate excavation of LW21221 in Qianqiu coal mine, Yima City, China (Cai et al. 2014a, b; Li et al. 2014). Rock bursts are serious not only because the hazard itself can cause damage, but because it can cause a series of secondary disasters, such as coal and gas outbursts, and gas explosions. The most serious gas explosion recorded to date killed 214 people, injured 30 people, and caused a direct economic loss of \(\yen\)49.689 million. It happened on 14 February 2005 in Sunjiawan coal mine, Fuxin City, China. Investigation revealed that the gas explosion was induced by a rock burst (State Administration of Work Safety, State Administration of Coal Mine Safety 2005). …

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Anhänge
Nur mit Berechtigung zugänglich
Literatur
Zurück zum Zitat Adoko AC, Gokceoglu C, Wu L, Zuo QJ (2013) Knowledge-based and data-driven fuzzy modeling for rockburst prediction. Int J Rock Mech Min Sci 61:86–95 Adoko AC, Gokceoglu C, Wu L, Zuo QJ (2013) Knowledge-based and data-driven fuzzy modeling for rockburst prediction. Int J Rock Mech Min Sci 61:86–95
Zurück zum Zitat Cai W, Dou LM, Cao AY, Gong SY, Li ZL (2014a) Application of seismic velocity tomography in underground coal mines: a case study of Yima mining area, Henan, China. J Appl Geophys 109:140–149CrossRef Cai W, Dou LM, Cao AY, Gong SY, Li ZL (2014a) Application of seismic velocity tomography in underground coal mines: a case study of Yima mining area, Henan, China. J Appl Geophys 109:140–149CrossRef
Zurück zum Zitat Cai W, Dou LM, Li ZL, Liu J, Gong SY, He J (2014b) Microseismic multidimensional information identification and spatio-temporal forecasting of rock burst: a case study of Yima Yuejin coal mine, Henan, China. Chin J Geophys 57(8):2687–2700 (in Chinese) Cai W, Dou LM, Li ZL, Liu J, Gong SY, He J (2014b) Microseismic multidimensional information identification and spatio-temporal forecasting of rock burst: a case study of Yima Yuejin coal mine, Henan, China. Chin J Geophys 57(8):2687–2700 (in Chinese)
Zurück zum Zitat Dou LM, He XQ (2001) Theory and technology of rock burst prevention. China University of Mining and Technology Press, Xuzhou (in Chinese) Dou LM, He XQ (2001) Theory and technology of rock burst prevention. China University of Mining and Technology Press, Xuzhou (in Chinese)
Zurück zum Zitat Dou LM, Chen TJ, Gong SY, He H, Zhang SB (2012) Rockburst hazard determination by using computed tomography technology in deep workface. Saf Sci 50(4):736–740CrossRef Dou LM, Chen TJ, Gong SY, He H, Zhang SB (2012) Rockburst hazard determination by using computed tomography technology in deep workface. Saf Sci 50(4):736–740CrossRef
Zurück zum Zitat Dou LM, Mu ZL, Li ZL, Cao AY, Gong SY (2014) Research progress of monitoring, forecasting, and prevention of rockburst in underground coal mining in China. Int J Coal Sci Technol 1(3):278–288CrossRef Dou LM, Mu ZL, Li ZL, Cao AY, Gong SY (2014) Research progress of monitoring, forecasting, and prevention of rockburst in underground coal mining in China. Int J Coal Sci Technol 1(3):278–288CrossRef
Zurück zum Zitat Gao MS, Dou LM, Zhang N, Mu ZL, Wang K, Yang BS (2007) Experimental study on earthquake tremor for transmitting law of rockburst in geomaterials. Chin J Rock Mech Eng 26(7):1365–1371 (in Chinese) Gao MS, Dou LM, Zhang N, Mu ZL, Wang K, Yang BS (2007) Experimental study on earthquake tremor for transmitting law of rockburst in geomaterials. Chin J Rock Mech Eng 26(7):1365–1371 (in Chinese)
Zurück zum Zitat He J (2013) Research of mining dynamic loading effect and its induced rock burst in coal mine. PhD thesis, China University of Mining and Technology, Xuzhou, p 154 (in Chinese) He J (2013) Research of mining dynamic loading effect and its induced rock burst in coal mine. PhD thesis, China University of Mining and Technology, Xuzhou, p 154 (in Chinese)
Zurück zum Zitat He H, Dou LM, Fan J, Du TT, Sun XL (2012a) Deep-hole directional fracturing of thick hard roof for rockburst prevention. Tunn Undergr Sp Technol 32:34–43CrossRef He H, Dou LM, Fan J, Du TT, Sun XL (2012a) Deep-hole directional fracturing of thick hard roof for rockburst prevention. Tunn Undergr Sp Technol 32:34–43CrossRef
Zurück zum Zitat He J, Dou LM, Cao AY, Gong SY, Lü JW (2012b) Rock burst induced by roof breakage and its prevention. J Cent South Univ Technol 19(4):1086–1091CrossRef He J, Dou LM, Cao AY, Gong SY, Lü JW (2012b) Rock burst induced by roof breakage and its prevention. J Cent South Univ Technol 19(4):1086–1091CrossRef
Zurück zum Zitat He J, Dou LM, Cai W, Li ZL, Ding YL (2014) Mechanism of dynamic and static combined load inducing rock burst in thin coal seam. J China Coal Soc 39(11):2177–2182 (in Chinese) He J, Dou LM, Cai W, Li ZL, Ding YL (2014) Mechanism of dynamic and static combined load inducing rock burst in thin coal seam. J China Coal Soc 39(11):2177–2182 (in Chinese)
Zurück zum Zitat Konicek P, Soucek K, Stas L, Singh R (2013) Long-hole destress blasting for rockburst control during deep underground coal mining. Int J Rock Mech Min Sci 61:141–153 Konicek P, Soucek K, Stas L, Singh R (2013) Long-hole destress blasting for rockburst control during deep underground coal mining. Int J Rock Mech Min Sci 61:141–153
Zurück zum Zitat Kornowski J, Kurzeja J (2012) Prediction of rockburst probability given seismic energy and factors defined by the expert method of hazard evaluation (MRG). Acta Geophys 60(2):472–486CrossRef Kornowski J, Kurzeja J (2012) Prediction of rockburst probability given seismic energy and factors defined by the expert method of hazard evaluation (MRG). Acta Geophys 60(2):472–486CrossRef
Zurück zum Zitat Li ZL, Dou LM, Cai W, He J, Wang GF, Liu J, Han RJ (2013) Fault-pillar induced rock burst mechanism of thick coal seam in deep mining. Chin J Rock Mech Eng 32(2):333–342 (in Chinese) Li ZL, Dou LM, Cai W, He J, Wang GF, Liu J, Han RJ (2013) Fault-pillar induced rock burst mechanism of thick coal seam in deep mining. Chin J Rock Mech Eng 32(2):333–342 (in Chinese)
Zurück zum Zitat Li ZL, Dou LM, Cai W, Wang GF, He J, Gong SY, Ding YL (2014) Investigation and analysis of the rock burst mechanism induced within fault-pillars. Int J Rock Mech Min Sci 70:192–200 Li ZL, Dou LM, Cai W, Wang GF, He J, Gong SY, Ding YL (2014) Investigation and analysis of the rock burst mechanism induced within fault-pillars. Int J Rock Mech Min Sci 70:192–200
Zurück zum Zitat Li ZL, Dou LM, Wang GF, Cai W, He J, Ding YL (2015) Risk evaluation of rock burst through theory of static and dynamic stresses superposition. J Cent South Univ 22(2):676–683CrossRef Li ZL, Dou LM, Wang GF, Cai W, He J, Ding YL (2015) Risk evaluation of rock burst through theory of static and dynamic stresses superposition. J Cent South Univ 22(2):676–683CrossRef
Zurück zum Zitat Mu ZL, Dou LM, He H, Fan J (2013) F-structure model of overlying strata for dynamic disaster prevention in coal mine. Int J Min Sci Technol 23(4):513–519CrossRef Mu ZL, Dou LM, He H, Fan J (2013) F-structure model of overlying strata for dynamic disaster prevention in coal mine. Int J Min Sci Technol 23(4):513–519CrossRef
Zurück zum Zitat Pan JF, Mao DB, Lan H, Wang SW, Qi QX (2013) Study status and prospects of mine pressure bumping control technology in China. Coal Sci Technol 41(6):21–25, 41 (in Chinese) Pan JF, Mao DB, Lan H, Wang SW, Qi QX (2013) Study status and prospects of mine pressure bumping control technology in China. Coal Sci Technol 41(6):21–25, 41 (in Chinese)
Zurück zum Zitat Qian MG, Shi PW (2003) Mine pressure and ground control. China University of Mining and Technology Press, Xuzhou (in Chinese) Qian MG, Shi PW (2003) Mine pressure and ground control. China University of Mining and Technology Press, Xuzhou (in Chinese)
Zurück zum Zitat Zhao JL (2004) Research on full-seam mining adopted roadway layout of stagger arrangement in thick coal seam. J China Coal Soc 29(2):142–145 (in Chinese) Zhao JL (2004) Research on full-seam mining adopted roadway layout of stagger arrangement in thick coal seam. J China Coal Soc 29(2):142–145 (in Chinese)
Zurück zum Zitat Zhao JL, Wu J (2002) Full-seam mining adopted roadway layout of stagger arrangement in thick coal seam. Authorization Proclamation No.: CN 1078301C, (Chinese patent) Zhao JL, Wu J (2002) Full-seam mining adopted roadway layout of stagger arrangement in thick coal seam. Authorization Proclamation No.: CN 1078301C, (Chinese patent)
Metadaten
Titel
Roadway Stagger Layout for Effective Control of Gob-Side Rock Bursts in the Longwall Mining of a Thick Coal Seam
verfasst von
Zhen-lei Li
Lin-ming Dou
Wu Cai
Gui-feng Wang
Yan-lu Ding
Yong Kong
Publikationsdatum
09.04.2015
Verlag
Springer Vienna
Erschienen in
Rock Mechanics and Rock Engineering / Ausgabe 2/2016
Print ISSN: 0723-2632
Elektronische ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-015-0746-6

Weitere Artikel der Ausgabe 2/2016

Rock Mechanics and Rock Engineering 2/2016 Zur Ausgabe