Skip to main content

2016 | OriginalPaper | Buchkapitel

11. Causal Models of JIT Elements Associated with Production Process and the Obtained Benefits

verfasst von : Jorge Luis García-Alcaraz, Aidé Aracely Maldonado-Macías

Erschienen in: Just-in-Time Elements and Benefits

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This chapter addresses three models to associate JIT elements from production process with JIT benefits obtained. Readers may once more refer to methodology addressed in Chap. 5 for a full comprehension of the procedures here described concerning the planning, development, and execution of models. Moreover, since the category of JIT elements associated with the production process comprises 18 items required for the successful JIT production process, it was necessary to perform a factor analysis to identify how many latent variables were comprised in this category.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Absi N, Dauzère-Pérès S, Kedad-Sidhoum S (2012) Just-in-time planning and lot-sizing. In: Ríos-Mercado RZ, Ríos-Solís YA (eds) Just-in-time systems. Springer New York, pp 191–207 Absi N, Dauzère-Pérès S, Kedad-Sidhoum S (2012) Just-in-time planning and lot-sizing. In: Ríos-Mercado RZ, Ríos-Solís YA (eds) Just-in-time systems. Springer New York, pp 191–207
Zurück zum Zitat Almomani MA, Aladeemy M, Abdelhadi A, Mumani A (2013) A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques. Comput Ind Eng 66(2):461–469. doi:10.1016/j.cie.2013.07.011 CrossRef Almomani MA, Aladeemy M, Abdelhadi A, Mumani A (2013) A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques. Comput Ind Eng 66(2):461–469. doi:10.​1016/​j.​cie.​2013.​07.​011 CrossRef
Zurück zum Zitat Avelar-Sosa L, García-Alcaraz J, Vergara-Villegas OO, Maldonado-Macías AA, Alor-Hernández G (2015) Impact of traditional and international logistic policies in supply chain performance. Int J Adv Manuf Technol 76(5–8):913–925. doi:10.1007/s00170-014-6308-3 CrossRef Avelar-Sosa L, García-Alcaraz J, Vergara-Villegas OO, Maldonado-Macías AA, Alor-Hernández G (2015) Impact of traditional and international logistic policies in supply chain performance. Int J Adv Manuf Technol 76(5–8):913–925. doi:10.​1007/​s00170-014-6308-3 CrossRef
Zurück zum Zitat Chiarini A (2013) The main methods of lean organization: Kanban, cellular manufacturing, SMED and TPM. In: Lean organization: from the tools of the toyota production system to lean office. Springer, Milan, pp 81–116 Chiarini A (2013) The main methods of lean organization: Kanban, cellular manufacturing, SMED and TPM. In: Lean organization: from the tools of the toyota production system to lean office. Springer, Milan, pp 81–116
Zurück zum Zitat Crumpton MA (2015) 3—Human resources as a strategic partner. In: Crumpton MA (ed) Strategic human resources planning for academic libraries. Chandos Publishing, Oxford, pp 23–29CrossRef Crumpton MA (2015) 3—Human resources as a strategic partner. In: Crumpton MA (ed) Strategic human resources planning for academic libraries. Chandos Publishing, Oxford, pp 23–29CrossRef
Zurück zum Zitat Fiscus, JE (1987) Kanban and just-in-time at Toyota: Edited by the Japanese management association. Eng Manage Int 4(2):157. (trans: David JL. Productivity Press, Cambridge, MA, U.S.A., 1986. 192 pages, 40 figures, hardcover. ISBN 0-915299-08-0. List price: $29.95). doi:http://dx.doi.org/10.1016/0167-5419(87)90022-6 Fiscus, JE (1987) Kanban and just-in-time at Toyota: Edited by the Japanese management association. Eng Manage Int 4(2):157. (trans: David JL. Productivity Press, Cambridge, MA, U.S.A., 1986. 192 pages, 40 figures, hardcover. ISBN 0-915299-08-0. List price: $29.95). doi:http://​dx.​doi.​org/​10.​1016/​0167-5419(87)90022-6
Zurück zum Zitat Hajakbari MS, Minaei-Bidgoli B (2014) A new scoring system for assessing the risk of occupational accidents: a case study using data mining techniques with Iran’s Ministry of Labor data. J Loss Prev Process Ind 32:443–453. doi:10.1016/j.jlp.2014.10.013 CrossRef Hajakbari MS, Minaei-Bidgoli B (2014) A new scoring system for assessing the risk of occupational accidents: a case study using data mining techniques with Iran’s Ministry of Labor data. J Loss Prev Process Ind 32:443–453. doi:10.​1016/​j.​jlp.​2014.​10.​013 CrossRef
Zurück zum Zitat Kia R, Khaksar-Haghani F, Javadian N, Tavakkoli-Moghaddam R (2014) Solving a multi-floor layout design model of a dynamic cellular manufacturing system by an efficient genetic algorithm. J Manuf Syst 33(1):218–232. doi:10.1016/j.jmsy.2013.12.005 CrossRef Kia R, Khaksar-Haghani F, Javadian N, Tavakkoli-Moghaddam R (2014) Solving a multi-floor layout design model of a dynamic cellular manufacturing system by an efficient genetic algorithm. J Manuf Syst 33(1):218–232. doi:10.​1016/​j.​jmsy.​2013.​12.​005 CrossRef
Zurück zum Zitat Kumiega A, Van Vliet B (2008) 30—Kaizen: continuous improvement. In: Kumiega A, Van Vliet B (eds) Quality money management. Academic Press, Burlington, pp 271–277CrossRef Kumiega A, Van Vliet B (2008) 30—Kaizen: continuous improvement. In: Kumiega A, Van Vliet B (eds) Quality money management. Academic Press, Burlington, pp 271–277CrossRef
Zurück zum Zitat Lemak DJ, Reed R (1997) Commitment to total quality management: Is there a relationship with firm performance? J Qual Manage 2(1):67CrossRef Lemak DJ, Reed R (1997) Commitment to total quality management: Is there a relationship with firm performance? J Qual Manage 2(1):67CrossRef
Zurück zum Zitat Liberopoulos G, Koukoumialos S (2005) Tradeoffs between base stock levels, numbers of Kanbans, and planned supply lead times in production/inventory systems with advance demand information. Int J Prod Econ 96(2):213–232. doi:10.1016/j.ijpe.2004.04.006 CrossRef Liberopoulos G, Koukoumialos S (2005) Tradeoffs between base stock levels, numbers of Kanbans, and planned supply lead times in production/inventory systems with advance demand information. Int J Prod Econ 96(2):213–232. doi:10.​1016/​j.​ijpe.​2004.​04.​006 CrossRef
Zurück zum Zitat Macbeth DK, Baxter LF, Farguson N, Neil GC (1988) Buyer-Vendor Relationship with Just-in-Time: lessons from US multinationals. Ind Eng 20(9):38–41 Macbeth DK, Baxter LF, Farguson N, Neil GC (1988) Buyer-Vendor Relationship with Just-in-Time: lessons from US multinationals. Ind Eng 20(9):38–41
Zurück zum Zitat Marodin GA, Saurin TA, Tortorella GL, Denicol J (2015) How context factors influence lean production practices in manufacturing cells. Int J Adv Manuf Technol 79(5–8):1389–1399. doi:10.1007/s00170-015-6944-2 CrossRef Marodin GA, Saurin TA, Tortorella GL, Denicol J (2015) How context factors influence lean production practices in manufacturing cells. Int J Adv Manuf Technol 79(5–8):1389–1399. doi:10.​1007/​s00170-015-6944-2 CrossRef
Zurück zum Zitat Martínez-Jurado PJ, Moyano-Fuentes J, Jerez-Gómez P (2014) Human resource management in lean production adoption and implementation processes: success factors in the aeronautics industry. BRQ Bus Res Q 17(1):47–68. doi:10.1016/j.cede.2013.06.004 CrossRef Martínez-Jurado PJ, Moyano-Fuentes J, Jerez-Gómez P (2014) Human resource management in lean production adoption and implementation processes: success factors in the aeronautics industry. BRQ Bus Res Q 17(1):47–68. doi:10.​1016/​j.​cede.​2013.​06.​004 CrossRef
Zurück zum Zitat Oropesa-Vento M, García-Alcaraz JL, Rivera L, Manotas DF (2015) Effects of management commitment and organization of work teams on the benefits of Kaizen: Planning stage. DYNA 82(191):76–84 Oropesa-Vento M, García-Alcaraz JL, Rivera L, Manotas DF (2015) Effects of management commitment and organization of work teams on the benefits of Kaizen: Planning stage. DYNA 82(191):76–84
Zurück zum Zitat Pourbabai B (1988) A just-in-time/group technology based scheduling model. In: Radharamanan R (ed) Robotics and factories of the future ’87. Springer, Berlin Heidelberg, pp 105–110CrossRef Pourbabai B (1988) A just-in-time/group technology based scheduling model. In: Radharamanan R (ed) Robotics and factories of the future ’87. Springer, Berlin Heidelberg, pp 105–110CrossRef
Zurück zum Zitat Schaefer B, Konur D (2015) Economic and environmental considerations in a continuous review inventory control system with integrated transportation decisions. Transp Res Part E Logistics Transp Rev 80:142–165. doi:10.1016/j.tre.2015.05.006 CrossRef Schaefer B, Konur D (2015) Economic and environmental considerations in a continuous review inventory control system with integrated transportation decisions. Transp Res Part E Logistics Transp Rev 80:142–165. doi:10.​1016/​j.​tre.​2015.​05.​006 CrossRef
Zurück zum Zitat Spencer MS (1998) Group technology at John Deere: production planning and control issues. In: Suresh NC, Kay JM (eds) Group technology and cellular manufacturing. Springer, US, pp 501–516CrossRef Spencer MS (1998) Group technology at John Deere: production planning and control issues. In: Suresh NC, Kay JM (eds) Group technology and cellular manufacturing. Springer, US, pp 501–516CrossRef
Zurück zum Zitat Sylvain L, Duguay R (1997) Integrating MRP, KANBAN and bar coding system to achieve JIT procurement. Prod Inventory Manage J First Q:18–26 Sylvain L, Duguay R (1997) Integrating MRP, KANBAN and bar coding system to achieve JIT procurement. Prod Inventory Manage J First Q:18–26
Zurück zum Zitat Thomas AJ, Jones GR, Vidales P (2006) An integrated approach to TPM and six sigma development in the castings industry. In: Pham DT, Eldukhri EE, Soroka AJ (eds) Intelligent production machines and systems. Elsevier Science Ltd., Oxford, pp 620–625CrossRef Thomas AJ, Jones GR, Vidales P (2006) An integrated approach to TPM and six sigma development in the castings industry. In: Pham DT, Eldukhri EE, Soroka AJ (eds) Intelligent production machines and systems. Elsevier Science Ltd., Oxford, pp 620–625CrossRef
Zurück zum Zitat Williams DJ (1991) 1—An introduction to the manufacturing cell and its integration and control. In: WilliamsPaul Rogers DJ (eds) Manufacturing cells. Newnes, pp 1–9 Williams DJ (1991) 1—An introduction to the manufacturing cell and its integration and control. In: WilliamsPaul Rogers DJ (eds) Manufacturing cells. Newnes, pp 1–9
Metadaten
Titel
Causal Models of JIT Elements Associated with Production Process and the Obtained Benefits
verfasst von
Jorge Luis García-Alcaraz
Aidé Aracely Maldonado-Macías
Copyright-Jahr
2016
DOI
https://doi.org/10.1007/978-3-319-25919-2_11