Skip to main content

2012 | OriginalPaper | Buchkapitel

Chance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times

verfasst von : Tarik Aouam, Reha Uzsoy

Erschienen in: Decision Policies for Production Networks

Verlag: Springer London

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

While the problem of planning production in the face of uncertain demand has been studied in various forms for decades, there is still no completely satisfactory solution approach. In this chapter we propose several heuristics based on chance-constrained models for a simple single stage single product system with workload-dependent lead times, which we compare to two-stage and multi-stage stochastic programing formulations. Exploratory computational experiments show promising performance for the heuristics, and raise a number of interesting issues that arise in comparing solutions obtained by the different approaches.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Agnew C (1976) Dynamic modeling and control of some congestion prone systems. Oper Res 24(3):400–419CrossRef Agnew C (1976) Dynamic modeling and control of some congestion prone systems. Oper Res 24(3):400–419CrossRef
2.
Zurück zum Zitat Anli OM, Caramanis M, Paschalidis IC (2007) Tractable supply chain production planning modeling non-linear lead time and quality of service constraints. J Manuf Syst 26(2):116–134CrossRef Anli OM, Caramanis M, Paschalidis IC (2007) Tractable supply chain production planning modeling non-linear lead time and quality of service constraints. J Manuf Syst 26(2):116–134CrossRef
3.
Zurück zum Zitat Anupindi R, Morton TE, Pentico D (1996) The nonstationary stochastic lead-time inventory problem: near-myopic bounds, heuristics, and testing. Manag Sci 42(1):124–129CrossRef Anupindi R, Morton TE, Pentico D (1996) The nonstationary stochastic lead-time inventory problem: near-myopic bounds, heuristics, and testing. Manag Sci 42(1):124–129CrossRef
4.
Zurück zum Zitat Asmundsson JM, Rardin RL, Turkseven CH, Uzsoy R (2009) Production planning models with resources subject to congestion. Naval Res Logist 56:142–157CrossRef Asmundsson JM, Rardin RL, Turkseven CH, Uzsoy R (2009) Production planning models with resources subject to congestion. Naval Res Logist 56:142–157CrossRef
5.
Zurück zum Zitat Asmundsson JM, Rardin RL, Uzsoy R (2006) Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans Semicond Manuf 19:95–111CrossRef Asmundsson JM, Rardin RL, Uzsoy R (2006) Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans Semicond Manuf 19:95–111CrossRef
6.
Zurück zum Zitat Bang JY, Kim YD (2010) Hierarchical production planning for semiconductor wafer fabrication based on linear programming and discrete-event simulation. IEEE Trans Autom Sci Eng 7(2):326–336CrossRef Bang JY, Kim YD (2010) Hierarchical production planning for semiconductor wafer fabrication based on linear programming and discrete-event simulation. IEEE Trans Autom Sci Eng 7(2):326–336CrossRef
7.
Zurück zum Zitat Ben-Tal A, Nemirovski A (2000) Robust solutions of linear programming problems contaminated with uncertain data. Math Program 88(3):411–424CrossRef Ben-Tal A, Nemirovski A (2000) Robust solutions of linear programming problems contaminated with uncertain data. Math Program 88(3):411–424CrossRef
8.
Zurück zum Zitat Bergstrom GL, Smith BE (1970) Multi-Item production planning—an extension of the Hmms rules. Manag Sci 16(10):B614–B629CrossRef Bergstrom GL, Smith BE (1970) Multi-Item production planning—an extension of the Hmms rules. Manag Sci 16(10):B614–B629CrossRef
9.
Zurück zum Zitat Bertsimas D, Mourtzinou G (1997) Transient laws of non-stationary queueing systems and their applications. Queueing Syst 25:115–155CrossRef Bertsimas D, Mourtzinou G (1997) Transient laws of non-stationary queueing systems and their applications. Queueing Syst 25:115–155CrossRef
10.
Zurück zum Zitat Bertsimas D, Thiele A (2006) A robust optimization approach to inventory theory. Oper Res 54(1):150–168CrossRef Bertsimas D, Thiele A (2006) A robust optimization approach to inventory theory. Oper Res 54(1):150–168CrossRef
11.
Zurück zum Zitat Birge JR (1985) Decomposition and partitioning methods for multistage stochastic linear programs. Oper Res 33(5):989–1007CrossRef Birge JR (1985) Decomposition and partitioning methods for multistage stochastic linear programs. Oper Res 33(5):989–1007CrossRef
12.
Zurück zum Zitat Birge JR, Louveaux F (1997) Introduction to stochastic programming. Springer, New York Birge JR, Louveaux F (1997) Introduction to stochastic programming. Springer, New York
13.
Zurück zum Zitat Blackburn JD, Kropp DH, Millen RA (1986) A comparison of strategies to dampen nervousness in Mrp systems. Manag Sci 32(4):412–439CrossRef Blackburn JD, Kropp DH, Millen RA (1986) A comparison of strategies to dampen nervousness in Mrp systems. Manag Sci 32(4):412–439CrossRef
14.
Zurück zum Zitat Blau RA (1974) Stochastic programming and decision analysis: an apparent dilemma. Manag Sci 21(3):271–276CrossRef Blau RA (1974) Stochastic programming and decision analysis: an apparent dilemma. Manag Sci 21(3):271–276CrossRef
15.
Zurück zum Zitat Bookbinder JH, Tan JY (1988) Strategies for the probabilistic lot sizing problem with service level constraints. Manag Sci 34(9):1096–1108CrossRef Bookbinder JH, Tan JY (1988) Strategies for the probabilistic lot sizing problem with service level constraints. Manag Sci 34(9):1096–1108CrossRef
16.
Zurück zum Zitat Buffa ES, Taubert WH (1972) Production-inventory systems; planning and control. R.D. Irwin, Homewood Ill Buffa ES, Taubert WH (1972) Production-inventory systems; planning and control. R.D. Irwin, Homewood Ill
17.
Zurück zum Zitat Buzacott JA, Shanthikumar JG (1993) Stochastic models of manufacturing systems. Prentice-Hall, Englewood Cliffs Buzacott JA, Shanthikumar JG (1993) Stochastic models of manufacturing systems. Prentice-Hall, Englewood Cliffs
18.
Zurück zum Zitat Byrne MD, Bakir MA (1999) Production planning using a hybrid simulation-analytical approach. Int J Prod Econ 59:305–311CrossRef Byrne MD, Bakir MA (1999) Production planning using a hybrid simulation-analytical approach. Int J Prod Econ 59:305–311CrossRef
19.
Zurück zum Zitat Byrne MD, Hossain MM (2005) Production planning: an improved hybrid approach. Int J Prod Econ 93–94:225–229CrossRef Byrne MD, Hossain MM (2005) Production planning: an improved hybrid approach. Int J Prod Econ 93–94:225–229CrossRef
20.
Zurück zum Zitat Charnes A, Cooper WW (1959) Chance-constrained programming. Manag Sci 6(1):73–79CrossRef Charnes A, Cooper WW (1959) Chance-constrained programming. Manag Sci 6(1):73–79CrossRef
21.
Zurück zum Zitat Charnes A, Cooper WW (1963) Deterministic equivalents for optimizing and satisficing under chance constraints. Oper Res 11:18–39CrossRef Charnes A, Cooper WW (1963) Deterministic equivalents for optimizing and satisficing under chance constraints. Oper Res 11:18–39CrossRef
22.
Zurück zum Zitat Charnes A, Cooper WW, Symonds GH (1958) Cost horizons and certainty equivalents: an approach to stochastic programming of heating oil. Manag Sci 4(3):235–263CrossRef Charnes A, Cooper WW, Symonds GH (1958) Cost horizons and certainty equivalents: an approach to stochastic programming of heating oil. Manag Sci 4(3):235–263CrossRef
23.
Zurück zum Zitat Ciarallo FW, Akella R, Morton TE (1994) A periodic review, production planning-model with uncertain capacity and uncertain demand—optimality of extended myopic policies. Manag Sci 40(3):320–332CrossRef Ciarallo FW, Akella R, Morton TE (1994) A periodic review, production planning-model with uncertain capacity and uncertain demand—optimality of extended myopic policies. Manag Sci 40(3):320–332CrossRef
24.
Zurück zum Zitat Clark AJ, Scarf H (1960) Optimal policies for a multi-echelon inventory problem. Manag Sci 6(4):475–490CrossRef Clark AJ, Scarf H (1960) Optimal policies for a multi-echelon inventory problem. Manag Sci 6(4):475–490CrossRef
25.
Zurück zum Zitat Dantzig GB, Wolfe P (1960) Decomposition principle for linear programs. Oper Res 8(1): 101–111CrossRef Dantzig GB, Wolfe P (1960) Decomposition principle for linear programs. Oper Res 8(1): 101–111CrossRef
26.
Zurück zum Zitat Dauzere-Peres S, Lasserre JB (1994) An integrated approach in production planning and scheduling. Springer, Berlin Dauzere-Peres S, Lasserre JB (1994) An integrated approach in production planning and scheduling. Springer, Berlin
27.
Zurück zum Zitat de Kok AG, Fransoo JC (2003) Planning supply chain operations: definition and comparison of planning concepts. In: Kok AG, Graves SC (eds) Or handbook on supply chain management, Elsevier, Amsterdam, pp 597–675 de Kok AG, Fransoo JC (2003) Planning supply chain operations: definition and comparison of planning concepts. In: Kok AG, Graves SC (eds) Or handbook on supply chain management, Elsevier, Amsterdam, pp 597–675
28.
Zurück zum Zitat Deckro RF, Hebert JE (1984) Goal programming approaches to solving linear decision rule based aggregate production planning-models. IIE Trans 16(4):308–315CrossRef Deckro RF, Hebert JE (1984) Goal programming approaches to solving linear decision rule based aggregate production planning-models. IIE Trans 16(4):308–315CrossRef
29.
Zurück zum Zitat Eppen G, Martin RK (1988) Determining safety stock in the presence of stochastic lead times. Manag Sci 34:1380–1390CrossRef Eppen G, Martin RK (1988) Determining safety stock in the presence of stochastic lead times. Manag Sci 34:1380–1390CrossRef
30.
Zurück zum Zitat Escudero LF, Kamesan PV, King AJ, Wets JB (1993) Production planning via scenario modelling. Ann Oper Res 43:311–335 Escudero LF, Kamesan PV, King AJ, Wets JB (1993) Production planning via scenario modelling. Ann Oper Res 43:311–335
31.
Zurück zum Zitat Ettl M, Feigin G, Lin GY, Yao DD (2000) A supply chain network model with base-stock control and service requirements. Oper Res 48:216–232CrossRef Ettl M, Feigin G, Lin GY, Yao DD (2000) A supply chain network model with base-stock control and service requirements. Oper Res 48:216–232CrossRef
32.
Zurück zum Zitat Federgruen A, Zipkin P (1986) An inventory model with limited production capacity and uncertain demands I: the average cost criterion. Math Oper Res 11(2):193–207CrossRef Federgruen A, Zipkin P (1986) An inventory model with limited production capacity and uncertain demands I: the average cost criterion. Math Oper Res 11(2):193–207CrossRef
33.
Zurück zum Zitat Federgruen A, Zipkin P (1986) An inventory model with limited production capacity and uncertain demands II: the discounted cost criterion. Math Oper Res 11(2):208–215CrossRef Federgruen A, Zipkin P (1986) An inventory model with limited production capacity and uncertain demands II: the discounted cost criterion. Math Oper Res 11(2):208–215CrossRef
34.
Zurück zum Zitat Garstka SJ, Wets RJB (1974) On decision rules in stochastic programming. Math Program 7(2):117–143CrossRef Garstka SJ, Wets RJB (1974) On decision rules in stochastic programming. Math Program 7(2):117–143CrossRef
35.
Zurück zum Zitat Gassmann HI (1990) Mslips: a computer code for the multistage stochastic linear programming problem. Math Program 47:407–423CrossRef Gassmann HI (1990) Mslips: a computer code for the multistage stochastic linear programming problem. Math Program 47:407–423CrossRef
36.
Zurück zum Zitat Goodman DA (1974) Goal programming approach to aggregate planning of production and work force. Manag Sci Ser B Appl 20(12):1569–1575 Goodman DA (1974) Goal programming approach to aggregate planning of production and work force. Manag Sci Ser B Appl 20(12):1569–1575
37.
Zurück zum Zitat Graves SC (1986) A tactical planning model for a job shop. Oper Res 34:552–533CrossRef Graves SC (1986) A tactical planning model for a job shop. Oper Res 34:552–533CrossRef
38.
Zurück zum Zitat Graves SC (1988) Safety stocks in manufacturing systems. J Manuf Oper Manag 1:67–101 Graves SC (1988) Safety stocks in manufacturing systems. J Manuf Oper Manag 1:67–101
39.
Zurück zum Zitat Grubbstrom RW (1998) A net present value approach to safety stocks in planned production. Int J Prod Econ 56(57):213–229CrossRef Grubbstrom RW (1998) A net present value approach to safety stocks in planned production. Int J Prod Econ 56(57):213–229CrossRef
40.
Zurück zum Zitat Gupta A, Maranas CD (2003) Managing demand ncertainty in supply chain planning. Comput Chem Eng 27(8–9):1219–1227CrossRef Gupta A, Maranas CD (2003) Managing demand ncertainty in supply chain planning. Comput Chem Eng 27(8–9):1219–1227CrossRef
41.
Zurück zum Zitat Hackman S (2008) Production economics. Springer, Berlin Hackman S (2008) Production economics. Springer, Berlin
42.
Zurück zum Zitat Hackman ST, Leachman RC (1989) A general framework for modeling production. Manag Sci 35:478–495CrossRef Hackman ST, Leachman RC (1989) A general framework for modeling production. Manag Sci 35:478–495CrossRef
43.
Zurück zum Zitat Hadley G, Whitin TM (1963) Analysis of inventory systems. Prentice-Hall, Englewood Cliffs Hadley G, Whitin TM (1963) Analysis of inventory systems. Prentice-Hall, Englewood Cliffs
44.
Zurück zum Zitat Hanssmann F, Hess SW (1960) A linear programming approach to production and employment scheduling. Manag Technol 1(1):46–51 Hanssmann F, Hess SW (1960) A linear programming approach to production and employment scheduling. Manag Technol 1(1):46–51
45.
Zurück zum Zitat Hax AC, Candea D (1984) Production and inventory management. Prentice-Hall, Englewood Cliffs Hax AC, Candea D (1984) Production and inventory management. Prentice-Hall, Englewood Cliffs
46.
Zurück zum Zitat Heyman DP, Sobel MJ (1982) Stochastic models in operations research. McGraw-Hill, New York Heyman DP, Sobel MJ (1982) Stochastic models in operations research. McGraw-Hill, New York
47.
Zurück zum Zitat Heyman DP, Sobel MJ (1990) Stochastic models. Elsevier Science Publishing Co., New York Heyman DP, Sobel MJ (1990) Stochastic models. Elsevier Science Publishing Co., New York
48.
Zurück zum Zitat Higle JL, Kempf KG (2010) Production planning under supply and demand uncertainty: a stochastic programming approach: stochastic programming: the state of the art. G. infanger. Springer, Berlin Higle JL, Kempf KG (2010) Production planning under supply and demand uncertainty: a stochastic programming approach: stochastic programming: the state of the art. G. infanger. Springer, Berlin
49.
Zurück zum Zitat Holt CC, Modigliani F, Muth JF (1956) Derivation of a linear rule for production and employment. Manag Sci 2(2):159–177CrossRef Holt CC, Modigliani F, Muth JF (1956) Derivation of a linear rule for production and employment. Manag Sci 2(2):159–177CrossRef
50.
Zurück zum Zitat Holt CC, Modigliani F, Muth JF, Simon HA (1960) Planning production, inventories and work force. Prentice Hall, Englewood Cliffs Holt CC, Modigliani F, Muth JF, Simon HA (1960) Planning production, inventories and work force. Prentice Hall, Englewood Cliffs
51.
Zurück zum Zitat Holt CC, Modigliani F, Simon HA (1955) A linear decision rule for production and employment scheduling. Manag Sci 2(1):1–30CrossRef Holt CC, Modigliani F, Simon HA (1955) A linear decision rule for production and employment scheduling. Manag Sci 2(1):1–30CrossRef
52.
Zurück zum Zitat Hopp WJ, Spearman ML (2001) Factory physics: foundations of manufacturing management. Irwin/McGraw-Hill, Boston Hopp WJ, Spearman ML (2001) Factory physics: foundations of manufacturing management. Irwin/McGraw-Hill, Boston
53.
Zurück zum Zitat Hung YF, Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257–269CrossRef Hung YF, Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257–269CrossRef
54.
Zurück zum Zitat Iglehart DL, Karlin S (1962) Optimal policy for dynamic inventory process with nonstationary stochastic demands. Stanford University Press, Stanford Calif, pp 127–147 Iglehart DL, Karlin S (1962) Optimal policy for dynamic inventory process with nonstationary stochastic demands. Stanford University Press, Stanford Calif, pp 127–147
55.
Zurück zum Zitat Irdem DF, Kacar NB, Uzsoy R (2010) An exploratory analysis of two iterative linear programming-simulation approaches for production planning. IEEE Trans Semicond Manuf 23:442–455CrossRef Irdem DF, Kacar NB, Uzsoy R (2010) An exploratory analysis of two iterative linear programming-simulation approaches for production planning. IEEE Trans Semicond Manuf 23:442–455CrossRef
56.
Zurück zum Zitat Johnson LA, Montgomery DC (1974) Operations research in production planning, scheduling and inventory control. Wiley, New York Johnson LA, Montgomery DC (1974) Operations research in production planning, scheduling and inventory control. Wiley, New York
57.
Zurück zum Zitat Kacar NB, Irdem DF, Uzsoy R (2010) An experimental comparison of production planning using clearing functions and iterative linear programming-simulation algorithms. Research Report, Edward P. Fitts Department of Industrial and Systems Engineering, North Carolina State University Kacar NB, Irdem DF, Uzsoy R (2010) An experimental comparison of production planning using clearing functions and iterative linear programming-simulation algorithms. Research Report, Edward P. Fitts Department of Industrial and Systems Engineering, North Carolina State University
58.
Zurück zum Zitat Kall P, Wallace SW (1994) Stochastic programming. Wiley, Chichester Kall P, Wallace SW (1994) Stochastic programming. Wiley, Chichester
59.
Zurück zum Zitat Karlin S (1960) Dynamic inventory policy with varying stochastic demands. Manag Sci 6(3):231–258CrossRef Karlin S (1960) Dynamic inventory policy with varying stochastic demands. Manag Sci 6(3):231–258CrossRef
60.
Zurück zum Zitat Karmarkar US (1987) Lot sizes, lead times and in-process inventories. Manag Sci 33(3): 409–418CrossRef Karmarkar US (1987) Lot sizes, lead times and in-process inventories. Manag Sci 33(3): 409–418CrossRef
61.
Zurück zum Zitat Karmarkar US (1989) Capacity loading and release planning with Work-in-Progress (WIP) and lead-times. J Manuf Oper Manag 2:105–123 Karmarkar US (1989) Capacity loading and release planning with Work-in-Progress (WIP) and lead-times. J Manuf Oper Manag 2:105–123
62.
Zurück zum Zitat Kefeli A, Uzsoy R, Fathi Y, Kay M (2011) Using a mathematical programming model to examine the marginal price of capacitated resources. Int J Prod Econ 131(1):383–391CrossRef Kefeli A, Uzsoy R, Fathi Y, Kay M (2011) Using a mathematical programming model to examine the marginal price of capacitated resources. Int J Prod Econ 131(1):383–391CrossRef
63.
Zurück zum Zitat Kekre S (1984) Some issues in job shop design. University of Rochester, Rochester NY Kekre S (1984) Some issues in job shop design. University of Rochester, Rochester NY
64.
Zurück zum Zitat Kempf KG (2004) Control-oriented approaches to supply chain management in semiconductor manufacturing. In: Proceedings of the American control conference, Boston, MA, United States Kempf KG (2004) Control-oriented approaches to supply chain management in semiconductor manufacturing. In: Proceedings of the American control conference, Boston, MA, United States
65.
Zurück zum Zitat Kempf KG, Keskinocak P, Uzsoy R (2010) Preface. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook, Springer, Amsterdam, pp 1–20 Kempf KG, Keskinocak P, Uzsoy R (2010) Preface. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook, Springer, Amsterdam, pp 1–20
66.
Zurück zum Zitat Kim B, Kim S (2001) Extended model for a hybrid production planning approach. Int J Prod Econ 73:165–173CrossRef Kim B, Kim S (2001) Extended model for a hybrid production planning approach. Int J Prod Econ 73:165–173CrossRef
67.
Zurück zum Zitat Kleindorfer PR, Kriebel CH, Thompson GL, Kleindorfer GB (1975) Discrete optimal control of production plans. Manag Sci 22(3):261–273CrossRef Kleindorfer PR, Kriebel CH, Thompson GL, Kleindorfer GB (1975) Discrete optimal control of production plans. Manag Sci 22(3):261–273CrossRef
68.
Zurück zum Zitat Lasdon LS (1970) Optimization theory for large systems. Macmillan, New York Lasdon LS (1970) Optimization theory for large systems. Macmillan, New York
69.
Zurück zum Zitat Lautenschläger M, Stadtler H (1998) Modelling lead times depending on capacity utilization. Research Report, Technische Universitat Darmstadt Lautenschläger M, Stadtler H (1998) Modelling lead times depending on capacity utilization. Research Report, Technische Universitat Darmstadt
70.
Zurück zum Zitat Leung SCH, Wu Y (2004) A robust optimization model for stochastic aggregate production planning. Prod Planning Control 15(5):502–514CrossRef Leung SCH, Wu Y (2004) A robust optimization model for stochastic aggregate production planning. Prod Planning Control 15(5):502–514CrossRef
71.
Zurück zum Zitat Liu L, Liu X, Yao DD (2004) Analysis and optimization of multi-stage inventory queues. Manag Sci 50:365–380CrossRef Liu L, Liu X, Yao DD (2004) Analysis and optimization of multi-stage inventory queues. Manag Sci 50:365–380CrossRef
72.
Zurück zum Zitat Louveaux F (1980) A solution method for multistage stochastc programs with recourse with application to an energy investment problem. Oper Res 28(4):889–902CrossRef Louveaux F (1980) A solution method for multistage stochastc programs with recourse with application to an energy investment problem. Oper Res 28(4):889–902CrossRef
73.
Zurück zum Zitat Meal H (1979) Safety stocks in Mrp systems. Operations Research Center, Massachusetts Institute of Technology, Cambridge MA Meal H (1979) Safety stocks in Mrp systems. Operations Research Center, Massachusetts Institute of Technology, Cambridge MA
74.
Zurück zum Zitat Medhi J (1991) Stochastic models in queuing theory. Academic Press, Boston Medhi J (1991) Stochastic models in queuing theory. Academic Press, Boston
75.
Zurück zum Zitat Miller JG (1979) Hedging the master schedule. Dissagregation problems in manufacturing and service organizations. LP Ritzman, Martinus Nijhoff, Boston MA Miller JG (1979) Hedging the master schedule. Dissagregation problems in manufacturing and service organizations. LP Ritzman, Martinus Nijhoff, Boston MA
76.
Zurück zum Zitat Missbauer H (2002) Aggregate order release planning for time-varying demand. Int J Prod Res 40:688–718CrossRef Missbauer H (2002) Aggregate order release planning for time-varying demand. Int J Prod Res 40:688–718CrossRef
77.
Zurück zum Zitat Missbauer H (2011) Order release planning with clearing functions: a queueing-theoretical analysis of the clearing function concept. Int J Prod Econ 131(1):399–406CrossRef Missbauer H (2011) Order release planning with clearing functions: a queueing-theoretical analysis of the clearing function concept. Int J Prod Econ 131(1):399–406CrossRef
78.
Zurück zum Zitat Missbauer H, Uzsoy R (2010) Optimization models for production planning. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook, Springer, New York, pp 437–508 Missbauer H, Uzsoy R (2010) Optimization models for production planning. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook, Springer, New York, pp 437–508
79.
Zurück zum Zitat Orcun S, Kempf KG, Uzsoy R (2009) An integrated production planning model with load-dependent lead times and safety stocks. Comput Chem Eng 32:2159–2136CrossRef Orcun S, Kempf KG, Uzsoy R (2009) An integrated production planning model with load-dependent lead times and safety stocks. Comput Chem Eng 32:2159–2136CrossRef
80.
Zurück zum Zitat Orcun S, Uzsoy R (2011) The effects of production planning on the dynamic behavior of a simple supply chain: an experimental study. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning in the extended enterprise: a state of the art handbook, Springer, Berlin, pp 43–80 Orcun S, Uzsoy R (2011) The effects of production planning on the dynamic behavior of a simple supply chain: an experimental study. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning in the extended enterprise: a state of the art handbook, Springer, Berlin, pp 43–80
81.
Zurück zum Zitat Orcun S, Uzsoy R, Kempf KG (2006) Using system dynamics simulations to compare capacity models for production planning. Winter Simulation Conference, Monterey Orcun S, Uzsoy R, Kempf KG (2006) Using system dynamics simulations to compare capacity models for production planning. Winter Simulation Conference, Monterey
82.
Zurück zum Zitat Orlicky J (1975) Material requirements planning: the new way of life in production and inventory management. McGraw-Hill, New York Orlicky J (1975) Material requirements planning: the new way of life in production and inventory management. McGraw-Hill, New York
83.
Zurück zum Zitat Pahl J, Voss S, Woodruff DL (2005) Production planning with load dependent lead times. 4OR Q J Oper Res 3:257–302CrossRef Pahl J, Voss S, Woodruff DL (2005) Production planning with load dependent lead times. 4OR Q J Oper Res 3:257–302CrossRef
84.
Zurück zum Zitat Parlar M (1985) A stochastic production planning model with a dynamic chance constraint. Eur J Oper Res 20(2):255–260 Parlar M (1985) A stochastic production planning model with a dynamic chance constraint. Eur J Oper Res 20(2):255–260
85.
Zurück zum Zitat Peters RJ, Boskma K, Kupper HAE (1977) Stochastic programming in production planning: a case with non-simple recourse. Statistica Neerlandica 31:113–126CrossRef Peters RJ, Boskma K, Kupper HAE (1977) Stochastic programming in production planning: a case with non-simple recourse. Statistica Neerlandica 31:113–126CrossRef
86.
Zurück zum Zitat Powell WB, Jaillet P, Odoni A (1995) Stochastic and dynamic networks and routing. In: Ball M, Magnanti T, Monma C (eds) Handbooks in operations research and the management sciences. Amsterdam, Elsevier, pp 141–295 Powell WB, Jaillet P, Odoni A (1995) Stochastic and dynamic networks and routing. In: Ball M, Magnanti T, Monma C (eds) Handbooks in operations research and the management sciences. Amsterdam, Elsevier, pp 141–295
87.
Zurück zum Zitat Prékopa A (1995) Stochastic programming. Kluwer Academic Publishers, Boston Prékopa A (1995) Stochastic programming. Kluwer Academic Publishers, Boston
88.
Zurück zum Zitat Pritsker AAB, Snyder K (1997) Production scheduling using factor. In: Artiba A, Elmaghraby SE (eds) The planning and scheduling of production systems. Chapman and Hall Pritsker AAB, Snyder K (1997) Production scheduling using factor. In: Artiba A, Elmaghraby SE (eds) The planning and scheduling of production systems. Chapman and Hall
89.
Zurück zum Zitat Puterman ML (2005) Markov decision processes: discrete stochastic dynamic programming. Wiley, New York Puterman ML (2005) Markov decision processes: discrete stochastic dynamic programming. Wiley, New York
90.
Zurück zum Zitat Raa B, Aghezzaf EH (2005) A robust dynamic planning strategy for lot-sizing problems with stochastic demands. J Intell Manuf 16(2):207–213CrossRef Raa B, Aghezzaf EH (2005) A robust dynamic planning strategy for lot-sizing problems with stochastic demands. J Intell Manuf 16(2):207–213CrossRef
91.
Zurück zum Zitat Rao SS, Gunasekaran A, Goyal SK, Martikainen T (1998) Waiting line model applications in manufacturing. Int J Prod Econ 54(1):1–28CrossRef Rao SS, Gunasekaran A, Goyal SK, Martikainen T (1998) Waiting line model applications in manufacturing. Int J Prod Econ 54(1):1–28CrossRef
92.
Zurück zum Zitat Rardin RL, Uzsoy R (2001) Experimental evaluation of heuristic optimization algorithms: a tutorial. J Heuristics 7:261–304CrossRef Rardin RL, Uzsoy R (2001) Experimental evaluation of heuristic optimization algorithms: a tutorial. J Heuristics 7:261–304CrossRef
93.
Zurück zum Zitat Ravindran A, Kempf KG, Uzsoy R (2008) Dynamic base stock models for production-inventory systems with nonstationary demand. Research Report, Edward P. Fitts Department of Industrial and Systems Engineering, North carolina State University Ravindran A, Kempf KG, Uzsoy R (2008) Dynamic base stock models for production-inventory systems with nonstationary demand. Research Report, Edward P. Fitts Department of Industrial and Systems Engineering, North carolina State University
94.
Zurück zum Zitat Ravindran A, Kempf KG, Uzsoy R (2011) Production planning with load-dependent lead times and safety stocks. Int J Plan Sched 1(1–2):58–89 Ravindran A, Kempf KG, Uzsoy R (2011) Production planning with load-dependent lead times and safety stocks. Int J Plan Sched 1(1–2):58–89
95.
Zurück zum Zitat Riaño G (2003) Transient behavior of stochastic networks: application to production planning with load-dependent lead times. School of industrial and systems engineering. Georgia Institute of Technology, Atlanta GA Riaño G (2003) Transient behavior of stochastic networks: application to production planning with load-dependent lead times. School of industrial and systems engineering. Georgia Institute of Technology, Atlanta GA
96.
Zurück zum Zitat Selçuk B, Fransoo JC, de Kok AG (2007) Work in process clearing in supply chain operations planning. IIE Trans 40:206–220CrossRef Selçuk B, Fransoo JC, de Kok AG (2007) Work in process clearing in supply chain operations planning. IIE Trans 40:206–220CrossRef
97.
Zurück zum Zitat Spearman ML (1991) An Analytic congestion model for closed production systems with Ifr processing times. Manag Sci 37(8):1015–1029CrossRef Spearman ML (1991) An Analytic congestion model for closed production systems with Ifr processing times. Manag Sci 37(8):1015–1029CrossRef
98.
Zurück zum Zitat Srinivasan A, Carey M, Morton TE (1988) Resource pricing and aggregate scheduling in manufacturing systems. Graduate School of Industrial Administration, Carnegie-Mellon University, Pittsburgh Srinivasan A, Carey M, Morton TE (1988) Resource pricing and aggregate scheduling in manufacturing systems. Graduate School of Industrial Administration, Carnegie-Mellon University, Pittsburgh
99.
Zurück zum Zitat Tayur SR (1993) Computing the optimal policy for capacitated inventory models. Commun Stat Stoch Models 9(4):585–598CrossRef Tayur SR (1993) Computing the optimal policy for capacitated inventory models. Commun Stat Stoch Models 9(4):585–598CrossRef
100.
Zurück zum Zitat Van Slyke RM, Wets JB (1969) L-shaped linear programs with applications to optimal control and stochastic programming. SiAM J Appl Math 17(4):638–663CrossRef Van Slyke RM, Wets JB (1969) L-shaped linear programs with applications to optimal control and stochastic programming. SiAM J Appl Math 17(4):638–663CrossRef
101.
Zurück zum Zitat Veinott AF (1965) Optimal policy for a multi-product, dynamic, nonstationary inventory problem. Manag Sci 12(3):206–222CrossRef Veinott AF (1965) Optimal policy for a multi-product, dynamic, nonstationary inventory problem. Manag Sci 12(3):206–222CrossRef
102.
Zurück zum Zitat Veinott AF (1965) Optimal policy in a dynamic single product nonstationary inventory model with several demand classes. Oper Res 13(5):761–778CrossRef Veinott AF (1965) Optimal policy in a dynamic single product nonstationary inventory model with several demand classes. Oper Res 13(5):761–778CrossRef
103.
Zurück zum Zitat Voss S, Woodruff DL (2003) Introduction to computational optimization models for production planning in a supply chain. Springer, Berlin Voss S, Woodruff DL (2003) Introduction to computational optimization models for production planning in a supply chain. Springer, Berlin
104.
Zurück zum Zitat Whitt W (1991) A Review of \(L=\Uplambda {\rm w}\) and Extensions. Queueing Syst 9:235–268 Whitt W (1991) A Review of \(L=\Uplambda {\rm w}\) and Extensions. Queueing Syst 9:235–268
105.
Zurück zum Zitat Wittrock RJ (1983) Advances in a nested decomposition algorithm for solving staircase linear programs. Technical Report SOL-83-2, Systems Optimization Laboratory Wittrock RJ (1983) Advances in a nested decomposition algorithm for solving staircase linear programs. Technical Report SOL-83-2, Systems Optimization Laboratory
106.
Zurück zum Zitat Zipkin PH (1986) Models for design and control of stochastic, multi-item batch production systems. Oper Res 34(1):91–104CrossRef Zipkin PH (1986) Models for design and control of stochastic, multi-item batch production systems. Oper Res 34(1):91–104CrossRef
107.
Zurück zum Zitat Zipkin PH (2000) Foundations of inventory management. Irwin, Burr Ridge IL Zipkin PH (2000) Foundations of inventory management. Irwin, Burr Ridge IL
Metadaten
Titel
Chance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times
verfasst von
Tarik Aouam
Reha Uzsoy
Copyright-Jahr
2012
Verlag
Springer London
DOI
https://doi.org/10.1007/978-0-85729-644-3_8